Attachment A2-2 Phase A Drawing Overview Set.pdf
PDF 29 MB Posted
- Attached to
- RFP-48-27 CM/GC KSU Health Sciences Center
- Solicitation number
- RFP 785 2700000052 1
- Issued by
- Elliott County, Kentucky
About this file
This document consists of Phase A architectural and mechanical engineering drawings for the Kentucky State University (KSU) Health Sciences Center project, prepared by Kohrs Lonnemann Heil Engineers, Inc. under contract with the Commonwealth of Kentucky's Finance and Administration Cabinet, Department for Facilities and Support Services, Division of Engineering & Contract Administration. The drawings provide comprehensive design documentation for plumbing systems, mechanical HVAC systems, and control sequences across four building levels and a roof level. The project includes detailed plumbing plans for restrooms and janitor storage areas with specifications for domestic cold water (copper Type L), sanitary drainage (PVC Schedule 40 and cast iron hubless), and vent piping systems. Mechanical systems encompass dedicated outdoor air systems (DOAS) with energy recovery, water-source heat pumps utilizing geothermal well fields, ductless split systems for electrical and IDF rooms, and comprehensive ductwork distribution across all occupied spaces including classrooms, labs, exam rooms, and administrative offices.
The mechanical design incorporates advanced energy-efficient systems including a geothermal well field (approximately 40,000 square feet), variable flow hydronic pumps with automatic sequencing, and enthalpy wheel-based energy recovery ventilation. Control sequences specify Building Automation System (BAS) integration with BACNet communication protocols, occupancy-based operation schedules, and detailed monitoring of temperature, humidity, pressure differentials, and equipment status across all systems. The drawings include standard details for louver installations, pipe hangers, condensate drain traps, equipment support, and refrigerant piping configurations. All instruments of service and intellectual property rights remain with the consulting engineer, with electronic drawing copies available through the firm's online request portal. The project documents are formatted in both color and black-and-white versions with layer-controlled visibility for printing purposes.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Space
M
W
6" S1.19
2" S1.19
2" S1.19
6" S1.19
Space
M
W
4" C1.6
2" C1.6
4" S1.2
4" V1.2
4" V1.2 - UP
4" V1.2
4" V1.2 - UP/DN
4" S1.2
2" C1.6
4" S1.2 - UP/DN
2" C1.6 - UP
M
W
4" V1.2 - UP/DN
4" V1.2
2" C1.6
1 1/2" C1.6
Space
Space
JANITOR STORAGE
4" S1.19
4" C1.6
JANITOR STORAGE
4" C1.6
4" C1.6
4" C1.6
EWH1 EWH2
HPT1
DBP1
ET1
CP1
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KFE
DMR
P-741
PLUMBING ENLARGED PLANS05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
3/8" = 1'-0"
PLUMBING - ENLARGED UNDERGROUND PLAN - LEVEL 1 - RESTROOMS
3/8" = 1'-0"
PLUMBING - ENLARGED ABOVE GROUND PLAN - LEVEL 01 - RESTROOMS
3/8" = 1'-0"
PLUMBING - ENLARGED ABOVE GROUND PLAN - LEVEL 02 - RESTROOMS
3/8" = 1'-0"
PLUMBING - ENLARGED ABOVE GROUND PLAN - LEVEL 03 - RESTROOMS
Pipe Type Legend
Mark Color System Name Pipe Material
C1.6
S1.19
S1.2
V1.2
C1 - Domestic Cold Water
S1 - Sanitary
S1 - Sanitary
V1 - Vent
6 - Copper - Type L - ASTM B88
19 - PVC - Schedule 40 - ASTM D1785/D2665
2 - Cast Iron - Hubless - ASTM A888
2 - Cast Iron - Hubless - ASTM A888
3/8" = 1'-0"
PLUMBING - ENLARGED UNDERGROUND PLAN - LEVEL 1 - JANITOR STORAGE
3/8" = 1'-0"
PLUMBING - ENLARGED ABOVE GROUND PLAN - LEVEL 1 - JANITOR STORAGE
Space
M
W
6" S1.19
2" S1.19
2" S1.19
6" S1.19
Space
M
W
4" C1.6
2" C1.6
4" S1.2
4" V1.2
4" V1.2 - UP
4" V1.2
4" V1.2 - UP/DN
4" S1.2
2" C1.6
4" S1.2 - UP/DN
2" C1.6 - UP
M
W
4" V1.2 - UP/DN
4" V1.2
2" C1.6
1 1/2" C1.6
Space
Space
JANITOR STORAGE
4" S1.19
4" C1.6
JANITOR STORAGE
4" C1.6
4" C1.6
4" C1.6
EWH1 EWH2
HPT1
DBP1
ET1
CP1
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KFE
DMR
P-741
PLUMBING ENLARGED PLANS05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
3/8" = 1'-0"
PLUMBING - ENLARGED UNDERGROUND PLAN - LEVEL 1 - RESTROOMS
3/8" = 1'-0"
PLUMBING - ENLARGED ABOVE GROUND PLAN - LEVEL 01 - RESTROOMS
3/8" = 1'-0"
PLUMBING - ENLARGED ABOVE GROUND PLAN - LEVEL 02 - RESTROOMS
3/8" = 1'-0"
PLUMBING - ENLARGED ABOVE GROUND PLAN - LEVEL 03 - RESTROOMS
Pipe Type Legend
Mark Color System Name Pipe Material
C1.6
S1.19
S1.2
V1.2
C1 - Domestic Cold Water
S1 - Sanitary
S1 - Sanitary
V1 - Vent
6 - Copper - Type L - ASTM B88
19 - PVC - Schedule 40 - ASTM D1785/D2665
2 - Cast Iron - Hubless - ASTM A888
2 - Cast Iron - Hubless - ASTM A888
3/8" = 1'-0"
PLUMBING - ENLARGED UNDERGROUND PLAN - LEVEL 1 - JANITOR STORAGE
3/8" = 1'-0"
PLUMBING - ENLARGED ABOVE GROUND PLAN - LEVEL 1 - JANITOR STORAGE
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KFE
DMR
P-901
PLUMBING ISOMETRICS05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
PLUMBING - SANITARY AND VENT ISOMETRIC
Pipe Type Legend
Mark Color System Name Pipe Material
S1.19
S1.2
S9.3
V1.2
S1 - Sanitary
S1 - Sanitary
S9 - Indirect Waste
V1 - Vent
19 - PVC - Schedule 40 - ASTM D1785/D2665
2 - Cast Iron - Hubless - ASTM A888
3 - Copper - DWV - ASTM B306
2 - Cast Iron - Hubless - ASTM A888
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KFE
DMR
P-901
PLUMBING ISOMETRICS05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
PLUMBING - SANITARY AND VENT ISOMETRIC
Pipe Type Legend
Mark Color System Name Pipe Material
S1.19
S1.2
S9.3
V1.2
S1 - Sanitary
S1 - Sanitary
S9 - Indirect Waste
V1 - Vent
19 - PVC - Schedule 40 - ASTM D1785/D2665
2 - Cast Iron - Hubless - ASTM A888
3 - Copper - DWV - ASTM B306
2 - Cast Iron - Hubless - ASTM A888
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KFE
DMR
P-902
PLUMBING ISOMETRICS05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
PLUMBING - WATER ISOMETRIC
Pipe Type Legend
Mark Color System Name Pipe Material
C1.6
H1.6
HR1.6
C1 - Domestic Cold Water
H1 - Domestic Hot Water
HR1 - Hot Water Return
6 - Copper - Type L - ASTM B88
6 - Copper - Type L - ASTM B88
6 - Copper - Type L - ASTM B88
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KFE
DMR
P-902
PLUMBING ISOMETRICS05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
PLUMBING - WATER ISOMETRIC
Pipe Type Legend
Mark Color System Name Pipe Material
C1.6
H1.6
HR1.6
C1 - Domestic Cold Water
H1 - Domestic Hot Water
HR1 - Hot Water Return
6 - Copper - Type L - ASTM B88
6 - Copper - Type L - ASTM B88
6 - Copper - Type L - ASTM B88
STANDARD HVAC ABBREVIATIONS
AAV AUTOMATIC AIR VENT
ACCESS ACCESSORIES
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
BAS BUILDING AUTOMATION SYSTEM
BD BACKDRAFT DAMPER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CD CEILING DIFFUSER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CLG COOLING
CO CARBON MONOXIDE
CO2 CARBON DIOXODE
COP COEFFICIENT OF PERFORMANCE
CV CONSTANT VOLUME
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DB DECIBELS
DB DRY-BULB TEMPERATURE
DC DISCONNECT
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE DELTA(CHANGE IN TEMPERATURE)
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EG EXHAUST GRILLE
EMERG EMERGENCY POWER
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FD FIRE DAMPER
FLA FULL LOAD AMPERES
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
FURN FURNISHED
GA GAUGE
GAL GALLONS
GPM GALLONS PER MINUTE
HD HEAD
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HSTAT HUMIDISTAT
HTG HEATING
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IPLV INTERGRATED PART LOAD VALUE
INST INSTALLED
KW KILOWATT
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LPR LOW PRESSURE RETURN
(STEAM CONDENSATE)
LPS LOW PRESSURE STEAM
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MERV MINIMUM EFFICIENCY REPORTING VALUE
MIN MINIMUM
MOD MOTOR OPERATED DAMPER
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OCP OVER CURRENT PROTECTION
PD PRESSURE DROP
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCD SMOKE CONTROL DAMPER
SD SMOKE DETECTOR
SENS SENSIBLE HEAT
SP STATIC PRESSURE
TAB TESTING, ADJUSTING, BALANCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
UL UNDERWRITERS LABORATORY
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
WB WET-BULB (TEMPERATURE)
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
WIRE WIRED
SYMBOL
PLAN-VIEW LINE TYPES
WORK SHOWN BOLD-CONTINUOUS INDICATES NEW WORK
PIPING LINE TYPES
HWS
HOT WATER SUPPLY
HWR
HOT WATER RETURN
CWS
CONDENSER WATER SUPPLY
CWR
CONDENSER WATER RETURN
RL
REFRIGERANT LIQUID
RS
REFRIGERANT SUCTION
CD
CONDENSATE DRAIN
SUPPLY MAIN OR BRANCH
RETURN MAIN OR BRANCH
MECHANICAL PIPING ACCESSORIES
MANUAL ISOLATION VALVE
CHECK VALVE (DIRECTION OF FLOW INDICATED)
PRESSURE RELIEF VALVE
PRESSURE REGULATING VALVE
AUTOMATIC BALANCING VALVE
MAN
MANUAL BALANCING VALVE
HEAT TRACING
UNION
TEMPERATURE & PRESSURE TEST PORT
FLOW DIRECTION
FLEX PIPING CONNECTOR
THERMOMETER
PRESSURE GAUGE
SOLENOID VALVE
M
WATER METER
Y-STRAINER
STRAINER WITH BLOW OFF
3 WAY CONTROL VALVE (2 POSITION)
DRAIN VALVE (3/4" UNLESS OTHERWISE NOTED)
MANUAL AIR VENT
STEAM TRAP (INVERTED BUCKET)
ST
3 WAY CONTROL VALVE (MODULATION)
MOD
2 WAY CONTROL VALVE (MODULATING)
2 WAY CONTROL VALVE (2 POSITION)
MECHANICAL AIR DEVICES
SUPPLY REGISTERSR
RR RETURN REGISTER
EXHAUST REGISTERER
RETURN GRILLERG
ROUND CEILING DIFFUSER
LINEAR SLOT DIFFUSER
MECHANICAL DUCTWORK
SUPPLY DUCT WITH ELBOW TURNED UPUP
SUPPLY DUCT WITH ELBOW TURNED DOWNDN
RETURN DUCT WITH ELBOW TURNED UPUP
RETURN DUCT WITH ELBOW TURNED DOWNDN
EXHAUST DUCT WITH ELBOW TURNED UPUP
EXHAUST DUCT WITH ELBOW TURNED DOWNDN
SUPPLY DUCT
RETURN DUCT
EXHAUST DUCT
OUTSIDE AIR DUCT
1" LINED DUCTWORK
FLEXIBLE DUCTWORK CONNECTION
BRANCH TAKEOFF
REDUCER, CONCENTRIC
MECHANICAL DUCTWORK ACCESSORIES
ROUND ELBOW WITH TURNING VANES
DUCT WITH MANUAL VOLUME DAMPER
ELBOW WITH TURNING VANES
MOTOR OPERATED DAMPER - LINE VOLTAGEM
BAROMETRIC DAMPERBD
FIRE DAMPER - 1.5 HRFD
MECHANICAL STATS & SENSORS
FLOW SENSORFS
CURRENT SENSORCS
END SWITCHES
TEMPERATURE SENSORTS
LOW VOLTAGE THERMOSTATT
R REVERSE ACTING THERMOSTAT
H HUMIDISTAT
PRESSURE STATP
PRESSURE SENSORPS
L LINE VOLTAGE THERMOSTAT
HUMIDITY SENSORHS
FLUID SENSORFL
CARBON MONOXIDE SENSORCO
CARBON DIOXIDE SENSORCO2
VOC SENSORVOC
SYMBOL
MECHANICAL MISCELLANOUS
DI
DIGITAL INPUT
DO
DIGITAL OUTPUT
AI
ANALOG INPUT
AO
ANALOG OUTPUT
I
HARD WIRE INTERLOCK
CONNECT TO EXISTING (FIELD VERIFY EXISTING UTILITY SERVICE TYPE, PRIOR TO
MAKING CONNECTION)
MOD
MOTOR OPERATED DAMPER - LOW VOLTAGEM
24X12 SA
24X12 RA
24X12 EA
24X12 OA
FIRE DAMPER - 3 HR
FD
1.5 HR
3.0 HR
REDUCER, NONCONCENTRIC
SMOKE CONTROL DAMPERSCD
IB
STEAM TRAP (THERMOSTATIC)
ST
THS
STEAM TRAP (THERMODYNAMIC)
ST
THD
RCD
HT
ENVIRONMENTAL CONTROL PANEL
ECP
REFRIGERANT MONITORRD
LOW VOLTAGE THERMOSTAT WITH LOCKABLE GUARDT
ANS
ANSUL PULL STATION
1" DOOR UNDERCUTUC 0'-1"
DUCT MOUNTED SMOKE DETECTOR (HARD WIRE INTERLOCK TO FAN MOTOR BY E.C.)
FURNISHED BY E.C., INSTALLED BY M.C.
SMOKE DAMPER
COMBINATION FIRE/SMOKE DAMPER - 1.5 HR
COMBINATION FIRE/SMOKE DAMPER - 3 HR
S
S F
F 1.5
S
S
F 1.5
F
DESCRIPTION DESCRIPTION
DRAWING SET APPEARANCE
TO BETTER COMMUNICATE SCOPE TO PERMIT AGENCIES AND CONTRACTORS, EACH DRAWING IN THIS DRAWING SET HAS BEEN CREATED IN BOTH "COLOR" AND "BLACK AND WHITE". THERE EXISTS A COLOR LAYER WITHIN EACH DRAWING WHERE VISIBILITY IS CONTROLLED THROUGH THE PDF LAYER MANAGER. THIS LAYER VISIBILITY CAN BE TOGGLED DISPLAYING EITHER "COLOR" OR "BLACK AND WHITE". TO MAINTAIN SCOPE BASED SHADING WHEN PRINTING TO PAPER, BLACK AND WHITE NEEDS TO BE VISIBLE.
FOR FURTHER INSTRUCTIONS, REFER TO CONTRACTOR RESOURCES ON OUR WEBSITE AND DOWNLOAD "DRAWING COLOR
INSTRUCTIONS".
WWW.KLHENGRS.COM - CONTRACTOR RESOURCES (RIGHT HAND SIDE OF PAGE).
MECHANICAL LEGEND MECHANICAL LEGEND
POINT OF DEMOLITION TO EXISTING (FIELD VERIFY EXISTING UTILITY
SERVICE TYPE, PRIOR TO TERMINATING CONNECTION)
ELECTRONIC DRAWING REQUEST
ELECTRONIC COPIES OF THESE DRAWINGS MAY BE REQUESTED AT:
APPS.KLHENGRS.COM/DRAWINGREQUESTS.
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KSL
AJK
M-001
MECHANICAL COVER SHEET05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
MECHANICAL DRAWING INDEX
SHEET
NUMBER SHEET NAME
M-001 MECHANICAL COVER SHEET
M-101 MECHANICAL DUCTWORK LEVEL 01 PLAN OVERALL
M-102 MECHANICAL DUCTWORK LEVEL 02 PLAN OVERALL
M-103 MECHANICAL DUCTWORK LEVEL 03 PLAN OVERALL
M-104 MECHANICAL DUCTWORK ROOF PLAN OVERALL
M-501 MECHANICAL - DETAILS
M-601 MECHANICAL - SEQUENCES
MP101 MECHANICAL PIPING LEVEL 01 PLAN OVERALL
MP102 MECHANICAL PIPING LEVEL 02 PLAN OVERALL
MP103 MECHANICAL PIPING LEVEL 03 PLAN OVERALL
MP104 MECHANICAL PIPING LEVEL 04 PLAN OVERALL
STANDARD HVAC ABBREVIATIONS
AAV AUTOMATIC AIR VENT
ACCESS ACCESSORIES
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
BAS BUILDING AUTOMATION SYSTEM
BD BACKDRAFT DAMPER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CD CEILING DIFFUSER
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CLG COOLING
CO CARBON MONOXIDE
CO2 CARBON DIOXODE
COP COEFFICIENT OF PERFORMANCE
CV CONSTANT VOLUME
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DB DECIBELS
DB DRY-BULB TEMPERATURE
DC DISCONNECT
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE DELTA(CHANGE IN TEMPERATURE)
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EG EXHAUST GRILLE
EMERG EMERGENCY POWER
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FD FIRE DAMPER
FLA FULL LOAD AMPERES
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
FURN FURNISHED
GA GAUGE
GAL GALLONS
GPM GALLONS PER MINUTE
HD HEAD
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HSTAT HUMIDISTAT
HTG HEATING
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HZ HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IPLV INTERGRATED PART LOAD VALUE
INST INSTALLED
KW KILOWATT
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LPR LOW PRESSURE RETURN
(STEAM CONDENSATE)
LPS LOW PRESSURE STEAM
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MERV MINIMUM EFFICIENCY REPORTING VALUE
MIN MINIMUM
MOD MOTOR OPERATED DAMPER
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MRI MAGNETIC RESONANCE IMAGING
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OCP OVER CURRENT PROTECTION
PD PRESSURE DROP
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
SA SUPPLY AIR
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCD SMOKE CONTROL DAMPER
SD SMOKE DETECTOR
SENS SENSIBLE HEAT
SP STATIC PRESSURE
TAB TESTING, ADJUSTING, BALANCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
UL UNDERWRITERS LABORATORY
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
WB WET-BULB (TEMPERATURE)
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
WIRE WIRED
SYMBOL
PLAN-VIEW LINE TYPES
WORK SHOWN BOLD-CONTINUOUS INDICATES NEW WORK
PIPING LINE TYPES
HWS
HOT WATER SUPPLY
HWR
HOT WATER RETURN
CWS
CONDENSER WATER SUPPLY
CWR
CONDENSER WATER RETURN
RL
REFRIGERANT LIQUID
RS
REFRIGERANT SUCTION
CD
CONDENSATE DRAIN
SUPPLY MAIN OR BRANCH
RETURN MAIN OR BRANCH
MECHANICAL PIPING ACCESSORIES
MANUAL ISOLATION VALVE
CHECK VALVE (DIRECTION OF FLOW INDICATED)
PRESSURE RELIEF VALVE
PRESSURE REGULATING VALVE
AUTOMATIC BALANCING VALVE
MAN
MANUAL BALANCING VALVE
HEAT TRACING
UNION
TEMPERATURE & PRESSURE TEST PORT
FLOW DIRECTION
FLEX PIPING CONNECTOR
THERMOMETER
PRESSURE GAUGE
SOLENOID VALVE
M
WATER METER
Y-STRAINER
STRAINER WITH BLOW OFF
3 WAY CONTROL VALVE (2 POSITION)
DRAIN VALVE (3/4" UNLESS OTHERWISE NOTED)
MANUAL AIR VENT
STEAM TRAP (INVERTED BUCKET)
ST
3 WAY CONTROL VALVE (MODULATION)
MOD
2 WAY CONTROL VALVE (MODULATING)
2 WAY CONTROL VALVE (2 POSITION)
MECHANICAL AIR DEVICES
SUPPLY REGISTERSR
RR RETURN REGISTER
EXHAUST REGISTERER
RETURN GRILLERG
ROUND CEILING DIFFUSER
LINEAR SLOT DIFFUSER
MECHANICAL DUCTWORK
SUPPLY DUCT WITH ELBOW TURNED UPUP
SUPPLY DUCT WITH ELBOW TURNED DOWNDN
RETURN DUCT WITH ELBOW TURNED UPUP
RETURN DUCT WITH ELBOW TURNED DOWNDN
EXHAUST DUCT WITH ELBOW TURNED UPUP
EXHAUST DUCT WITH ELBOW TURNED DOWNDN
SUPPLY DUCT
RETURN DUCT
EXHAUST DUCT
OUTSIDE AIR DUCT
1" LINED DUCTWORK
FLEXIBLE DUCTWORK CONNECTION
BRANCH TAKEOFF
REDUCER, CONCENTRIC
MECHANICAL DUCTWORK ACCESSORIES
ROUND ELBOW WITH TURNING VANES
DUCT WITH MANUAL VOLUME DAMPER
ELBOW WITH TURNING VANES
MOTOR OPERATED DAMPER - LINE VOLTAGEM
BAROMETRIC DAMPERBD
FIRE DAMPER - 1.5 HRFD
MECHANICAL STATS & SENSORS
FLOW SENSORFS
CURRENT SENSORCS
END SWITCHES
TEMPERATURE SENSORTS
LOW VOLTAGE THERMOSTATT
R REVERSE ACTING THERMOSTAT
H HUMIDISTAT
PRESSURE STATP
PRESSURE SENSORPS
L LINE VOLTAGE THERMOSTAT
HUMIDITY SENSORHS
FLUID SENSORFL
CARBON MONOXIDE SENSORCO
CARBON DIOXIDE SENSORCO2
VOC SENSORVOC
SYMBOL
MECHANICAL MISCELLANOUS
DI
DIGITAL INPUT
DO
DIGITAL OUTPUT
AI
ANALOG INPUT
AO
ANALOG OUTPUT
I
HARD WIRE INTERLOCK
CONNECT TO EXISTING (FIELD VERIFY EXISTING UTILITY SERVICE TYPE, PRIOR TO
MAKING CONNECTION)
MOD
MOTOR OPERATED DAMPER - LOW VOLTAGEM
24X12 SA
24X12 RA
24X12 EA
24X12 OA
FIRE DAMPER - 3 HR
FD
1.5 HR
3.0 HR
REDUCER, NONCONCENTRIC
SMOKE CONTROL DAMPERSCD
IB
STEAM TRAP (THERMOSTATIC)
ST
THS
STEAM TRAP (THERMODYNAMIC)
ST
THD
RCD
HT
ENVIRONMENTAL CONTROL PANEL
ECP
REFRIGERANT MONITORRD
LOW VOLTAGE THERMOSTAT WITH LOCKABLE GUARDT
ANS
ANSUL PULL STATION
1" DOOR UNDERCUTUC 0'-1"
DUCT MOUNTED SMOKE DETECTOR (HARD WIRE INTERLOCK TO FAN MOTOR BY E.C.)
FURNISHED BY E.C., INSTALLED BY M.C.
SMOKE DAMPER
COMBINATION FIRE/SMOKE DAMPER - 1.5 HR
COMBINATION FIRE/SMOKE DAMPER - 3 HR
S
S F
F 1.5
S
S
F 1.5
F
DESCRIPTION DESCRIPTION
DRAWING SET APPEARANCE
TO BETTER COMMUNICATE SCOPE TO PERMIT AGENCIES AND CONTRACTORS, EACH DRAWING IN THIS DRAWING SET HAS BEEN CREATED IN BOTH "COLOR" AND "BLACK AND WHITE". THERE EXISTS A COLOR LAYER WITHIN EACH DRAWING WHERE VISIBILITY IS CONTROLLED THROUGH THE PDF LAYER MANAGER. THIS LAYER VISIBILITY CAN BE TOGGLED DISPLAYING EITHER "COLOR" OR "BLACK AND WHITE". TO MAINTAIN SCOPE BASED SHADING WHEN PRINTING TO PAPER, BLACK AND WHITE NEEDS TO BE VISIBLE.
FOR FURTHER INSTRUCTIONS, REFER TO CONTRACTOR RESOURCES ON OUR WEBSITE AND DOWNLOAD "DRAWING COLOR
INSTRUCTIONS".
WWW.KLHENGRS.COM - CONTRACTOR RESOURCES (RIGHT HAND SIDE OF PAGE).
MECHANICAL LEGEND MECHANICAL LEGEND
POINT OF DEMOLITION TO EXISTING (FIELD VERIFY EXISTING UTILITY
SERVICE TYPE, PRIOR TO TERMINATING CONNECTION)
ELECTRONIC DRAWING REQUEST
ELECTRONIC COPIES OF THESE DRAWINGS MAY BE REQUESTED AT:
APPS.KLHENGRS.COM/DRAWINGREQUESTS.
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KSL
AJK
M-001
MECHANICAL COVER SHEET05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
MECHANICAL DRAWING INDEX
SHEET
NUMBER SHEET NAME
M-001 MECHANICAL COVER SHEET
M-101 MECHANICAL DUCTWORK LEVEL 01 PLAN OVERALL
M-102 MECHANICAL DUCTWORK LEVEL 02 PLAN OVERALL
M-103 MECHANICAL DUCTWORK LEVEL 03 PLAN OVERALL
M-104 MECHANICAL DUCTWORK ROOF PLAN OVERALL
M-501 MECHANICAL - DETAILS
M-601 MECHANICAL - SEQUENCES
MP101 MECHANICAL PIPING LEVEL 01 PLAN OVERALL
MP102 MECHANICAL PIPING LEVEL 02 PLAN OVERALL
MP103 MECHANICAL PIPING LEVEL 03 PLAN OVERALL
MP104 MECHANICAL PIPING LEVEL 04 PLAN OVERALL
10 11 12 13
ELEC.
IDF
FIRE SERVICE
WELL PUMP
DOAS
MAIN ELEC.
EM. ROOM
BIO WASTE
CHEM WASTE
W
JANITOR STORAGE
DOAS-1
EXAM
EXAM
EXAM
WAITING
WSHP
M
OFFICE
BREAK
OFFICE
OFFICE
299 OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ROOM
ROOM
RR
BD
STORAGE
RR
JAN.
CWP-1A
CWP-1A
HR-1
MANIFOLD AREA
CHEMICAL
FEED TANK
HEAT RECOVERY SYSTEM
AND PUMP FOR HOT
WATER TO LAB
HWP-1
GEOTHERMAL WELL FIELD
OUTLINED (~40,000SQFT)
GEOTHERMAL WELL FIELD
OUTLINED (~40,000SQFT)
GEOTHERMAL WELL FIELD
OUTLINED (~40,000SQFT)
GROUPED WATER
SOURCE HEAT PUMPS
GROUPED WATER
SOURCE HEAT PUMPS
DUCTLESS SPLIT SYSTEM
FOR EACH ELEC / IDF ROOM
DUCTLESS
SPLIT SYSTEM
FOR EACH
ELEC / IDF
ROOM
60"x84" OA
REC
WAITING
60"x30" EA 42"x36" EA
42"x30" OA
24"x14" EA
24"x14" OA
INTAKE LOUVER
EXHAUST
LOUVER
36"x18" OA
36"x18" EA
40"x22" EA
42"x30" OA
EXHAUST AIR OPEN TO
PLENUM FOR ENERGY
RECOVERY
DECOUPLED
OUTSIDE AIR TO BE
DELIVERED TO EACH
OCCUPIED SPACE
DEDICATED OUTDOOR AIR
SYSTEM WITH ENERGY
RECOVERY TO VENTILATE
ENTIRE FIRST FLOOR AND
PARTIAL SECOND FLOOR
GROUPED
WATER-
SOURCE HEAT
PUMPS
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KSL
AJK
M-101
MECHANICAL DUCTWORK LEVEL 01 PLAN OVERALL05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
KEYED NOTES
3/32" = 1'-0"
MECHANICAL PLAN - LEVEL 01 - OVERALL
10 11 12 13
ELEC.
IDF
FIRE SERVICE
WELL PUMP
DOAS
MAIN ELEC.
EM. ROOM
BIO WASTE
CHEM WASTE
W
JANITOR STORAGE
DOAS-1
EXAM
EXAM
EXAM
WAITING
WSHP
M
OFFICE
BREAK
OFFICE
OFFICE
299 OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ROOM
ROOM
RR
BD
STORAGE
RR
JAN.
CWP-1A
CWP-1A
HR-1
MANIFOLD AREA
CHEMICAL
FEED TANK
HEAT RECOVERY SYSTEM
AND PUMP FOR HOT
WATER TO LAB
HWP-1
GEOTHERMAL WELL FIELD
OUTLINED (~40,000SQFT)
GEOTHERMAL WELL FIELD
OUTLINED (~40,000SQFT)
GEOTHERMAL WELL FIELD
OUTLINED (~40,000SQFT)
GROUPED WATER
SOURCE HEAT PUMPS
GROUPED WATER
SOURCE HEAT PUMPS
DUCTLESS SPLIT SYSTEM
FOR EACH ELEC / IDF ROOM
DUCTLESS
SPLIT SYSTEM
FOR EACH
ELEC / IDF
ROOM
60"x84" OA
REC
WAITING
60"x30" EA 42"x36" EA
42"x30" OA
24"x14" EA
24"x14" OA
INTAKE LOUVER
EXHAUST
LOUVER
36"x18" OA
36"x18" EA
40"x22" EA
42"x30" OA
EXHAUST AIR OPEN TO
PLENUM FOR ENERGY
RECOVERY
DECOUPLED
OUTSIDE AIR TO BE
DELIVERED TO EACH
OCCUPIED SPACE
DEDICATED OUTDOOR AIR
SYSTEM WITH ENERGY
RECOVERY TO VENTILATE
ENTIRE FIRST FLOOR AND
PARTIAL SECOND FLOOR
GROUPED
WATER-
SOURCE HEAT
PUMPS
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KSL
AJK
M-101
MECHANICAL DUCTWORK LEVEL 01 PLAN OVERALL05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
KEYED NOTES
3/32" = 1'-0"
MECHANICAL PLAN - LEVEL 01 - OVERALL
10 11 12 13
TRAINING LAB
TRAINING LAB
TRAINING LAB
TRAINING LAB
CLASSROOM
CLASSROOM
ANATOMAGE
CLASSROOM
ELEC.
IDF
WSHP
JAN.
GROUP STUDY
WSHP
ELEC
M
W
STORAGE
STORAGE
STORAGE
GROUP STUDY
STORAGE
GROUPED WATER
SOURCE HEAT PUMPS
GROUPED WATER
SOURCE HEAT PUMPS
GROUPED WATER
SOURCE HEAT PUMPS
DUCTLESS SPLIT SYSTEM
FOR EACH ELEC / IDF ROOM
24"x14" EA
24"x14" OA
20"x20" EA
20"x18" OA
DECOUPLED
OUTSIDE AIR TO BE
DELIVERED TO EACH
OCCUPIED SPACE
EXHAUST AIR OPEN TO
PLENUM FOR ENERGY
RECOVERY
EXHAUST AIR OPEN TO
PLENUM FOR ENERGY
RECOVERY
18"x14" OA
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KSL
AJK
M-102
MECHANICAL DUCTWORK LEVEL 02 PLAN OVERALL05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
KEYED NOTES
3/32" = 1'-0"
MECHANICAL PLAN - LEVEL 02 - OVERALL
10 11 12 13
TRAINING LAB
TRAINING LAB
TRAINING LAB
TRAINING LAB
CLASSROOM
CLASSROOM
ANATOMAGE
CLASSROOM
ELEC.
IDF
WSHP
JAN.
GROUP STUDY
WSHP
ELEC
M
W
STORAGE
STORAGE
STORAGE
GROUP STUDY
STORAGE
GROUPED WATER
SOURCE HEAT PUMPS
GROUPED WATER
SOURCE HEAT PUMPS
GROUPED WATER
SOURCE HEAT PUMPS
DUCTLESS SPLIT SYSTEM
FOR EACH ELEC / IDF ROOM
24"x14" EA
24"x14" OA
20"x20" EA
20"x18" OA
DECOUPLED
OUTSIDE AIR TO BE
DELIVERED TO EACH
OCCUPIED SPACE
EXHAUST AIR OPEN TO
PLENUM FOR ENERGY
RECOVERY
EXHAUST AIR OPEN TO
PLENUM FOR ENERGY
RECOVERY
18"x14" OA
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KSL
AJK
M-102
MECHANICAL DUCTWORK LEVEL 02 PLAN OVERALL05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
KEYED NOTES
3/32" = 1'-0"
MECHANICAL PLAN - LEVEL 02 - OVERALL
10 11 12 13
BED
NUTRITION LAB
RESPIRATORY
THERAPY
COMPUTER LAB
DOAS
ELEC.
IDF
JAN.
DOAS-2
DOAS-3
GROUP STUDY
STORAGE
ELEC
ISO
DEBREIF
DEBREIF
CONTROL ROOM
DEBRIEF
DEBRIEF
BED
BED
BED
BED
BED
ANTEROOM
GROUP STUDY
IT / STORAGE
CHEM. STORAGE
CONSUMABLES
IMAGING
517LER
CELL CULTURE
CELL CULTURE
AUTOCLAVE/GLASSWASH
CYLINDER
PI OFFICE
PI OFFICE
RR
OB
GROUPED WATER
SOURCE HEAT PUMPS
DUCTLESS SPLIT SYSTEM
FOR EACH ELEC / IDF ROOM
60"x30" OA
30"x20" OA
30"x22" OA
30"x20" OA
42"x30" OA
24"x20" OA
60"x30" OA
60"x30" EA
DEDICATED DOAS FOR
LAB AREA (DASHED
OUTLINE)
PROVIDE PHOENIX
VALVES FOR SUPPLY
BRANCHES SERVING
EACH LAB AREA SPACE
GROUPED WATER
SOURCE HEAT PUMPS.
UNITS MAY BE
SUSPENDED FROM DECK
DEPENDING ON STORAGE
SPACE NEEDED
20"x20" EA
42"x30" EA
EXHAUST AIR OPEN TO
PLENUM FOR ENERGY
RECOVERY
DEDICATED DOAS WITH
ENERGY RECOVERY TO
VENTILATE THIRD FLOOR
SPACES (OUTSIDE OF
LAB) AND PARTIAL
SECOND FLOOR
DECOUPLED
OUTSIDE AIR TO BE
DELIVERED TO EACH
OCCUPIED SPACE
NOTE: CHEMICAL
STORAGE EXHAUST
REQUIREMENTS TO
BE COORDINATED IN
PHASE B
LAB EA SIZING
TO BE
COORDINATED IN
PHASE B
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KSL
AJK
M-103
MECHANICAL DUCTWORK LEVEL 03 PLAN OVERALL05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
KEYED NOTES
3/32" = 1'-0"
MECHANICAL PLAN - LEVEL 03 - OVERALL
10 11 12 13
BED
NUTRITION LAB
RESPIRATORY
THERAPY
COMPUTER LAB
DOAS
ELEC.
IDF
JAN.
DOAS-2
DOAS-3
GROUP STUDY
STORAGE
ELEC
ISO
DEBREIF
DEBREIF
CONTROL ROOM
DEBRIEF
DEBRIEF
BED
BED
BED
BED
BED
ANTEROOM
GROUP STUDY
IT / STORAGE
CHEM. STORAGE
CONSUMABLES
IMAGING
517LER
CELL CULTURE
CELL CULTURE
AUTOCLAVE/GLASSWASH
CYLINDER
PI OFFICE
PI OFFICE
RR
OB
GROUPED WATER
SOURCE HEAT PUMPS
DUCTLESS SPLIT SYSTEM
FOR EACH ELEC / IDF ROOM
60"x30" OA
30"x20" OA
30"x22" OA
30"x20" OA
42"x30" OA
24"x20" OA
60"x30" OA
60"x30" EA
DEDICATED DOAS FOR
LAB AREA (DASHED
OUTLINE)
PROVIDE PHOENIX
VALVES FOR SUPPLY
BRANCHES SERVING
EACH LAB AREA SPACE
GROUPED WATER
SOURCE HEAT PUMPS.
UNITS MAY BE
SUSPENDED FROM DECK
DEPENDING ON STORAGE
SPACE NEEDED
20"x20" EA
42"x30" EA
EXHAUST AIR OPEN TO
PLENUM FOR ENERGY
RECOVERY
DEDICATED DOAS WITH
ENERGY RECOVERY TO
VENTILATE THIRD FLOOR
SPACES (OUTSIDE OF
LAB) AND PARTIAL
SECOND FLOOR
DECOUPLED
OUTSIDE AIR TO BE
DELIVERED TO EACH
OCCUPIED SPACE
NOTE: CHEMICAL
STORAGE EXHAUST
REQUIREMENTS TO
BE COORDINATED IN
PHASE B
LAB EA SIZING
TO BE
COORDINATED IN
PHASE B
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KSL
AJK
M-103
MECHANICAL DUCTWORK LEVEL 03 PLAN OVERALL05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
KEYED NOTES
3/32" = 1'-0"
MECHANICAL PLAN - LEVEL 03 - OVERALL
10 11 12 13
INTAKE AIR PENTHOUSE
FOR DOAS-3
INTAKE AIR PENTHOUSE
FOR DOAS-2
RELIEF AIR PENTHOUSE
FOR DOAS-2
LAB-EF-1
DEDICATED DUCTLESS
SPLIT SYSTEMS FOR
ELECTRIC / IDF ROOMS
DEDICATED DUCTLESS
SPLIT SYSTEMS FOR
ELECTRIC ROOMS
DEDICATED DUCTLESS
SPLIT SYSTEM FOR IT
ROOM
LAB FUME EXHAUST FAN
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KSL
AJK
M-104
MECHANICAL DUCTWORK ROOF PLAN OVERALL05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
KEYED NOTES
3/32" = 1'-0"
MECHANICAL PLAN - LEVEL 04 - OVERALL
10 11 12 13
INTAKE AIR PENTHOUSE
FOR DOAS-3
INTAKE AIR PENTHOUSE
FOR DOAS-2
RELIEF AIR PENTHOUSE
FOR DOAS-2
LAB-EF-1
DEDICATED DUCTLESS
SPLIT SYSTEMS FOR
ELECTRIC / IDF ROOMS
DEDICATED DUCTLESS
SPLIT SYSTEMS FOR
ELECTRIC ROOMS
DEDICATED DUCTLESS
SPLIT SYSTEM FOR IT
ROOM
LAB FUME EXHAUST FAN
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KSL
AJK
M-104
MECHANICAL DUCTWORK ROOF PLAN OVERALL05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
KEYED NOTES
3/32" = 1'-0"
MECHANICAL PLAN - LEVEL 04 - OVERALL
A. WALL LOUVERS ARE FURNISHED AND
INSTALLED BY THE GENERAL CONTRACTOR.
REFER TO ARCHITECTURAL DRAWINGS FOR
SIZES AND LOCATIONS, UNLESS SPECIFIED
IN SECTION 23 37 13.00.
1. CAULKING
2. EXTERIOR WALL MOUNTED LOUVER
3. EXTENDED SILL
4. PITCH INSULATED DUCT 10 DEGREES
TOWARD LOUVER AND SEAL WATERTIGHT
5. MOTOR OPER. DAMPER
6. CLIP ANGLE
7. ANCHOR TO WALL AT 12" O.C.
KEYED NOTES: WALL
GENERAL NOTES:
4 3
A. REFER TO ARCHITECTURAL
DRAWINGS FOR SIZES AND
LOCATIONS.
1. EXTERIOR WALL MOUNTED LOUVER
2. MOTOR OPER. DAMPER
3. CAULKING
4. ANCHOR TO WALL AT 12" O/C
5. PROVIDE INSULATED SHEET METAL
PLENUM, FULL SIZE OF LOUVER, (MIN
12" DEEP)
6. TRANSITION INSULATED DUCT
CONNECTION WITH ANGLED FITTING
TO PLENUM FOR UNIFORM AIR FLOW
7. 3/4" PIPING TO FLOOR DRAIN
KEYED NOTES:
WALL
GENERAL NOTES:
6 5
4 3
1. ROOF MEMBRANE UP AND OVER WOOD
NAILER, FLASH PER ROOFING MFG'R
REQMTS.
2. SHEET METAL SCREWS. 4" O/C, 4 SIDES
3. PREFABRICATED, INSULATED ROOF CURB
4. INSULATED GALVANIZED SHEET METAL DUCT
5. COUNTER FLASHING
6. PENTHOUSE THROAT
A. CONTRACTOR SHALL PROVIDE CURB TO
MAINTAIN 10" MINIMUM ABOVE FINISHED
ROOFING SYSTEM. PROVIDE ADDITIONAL
BLOCKING AS REQUIRED TO ACCOMMODATE
ROOF INSULATION THICKNESS.
GENERAL NOTES:KEYED NOTES:
2 6
A. CONTRACTOR SHALL PROVIDE CURB TO
MAINTAIN 10" MINIMUM ABOVE FINISHED
ROOFING SYSTEM. PROVIDE ADDITIONAL
BLOCKING AS REQUIRED TO ACCOMMODATE
ROOF INSULATION THICKNESS.
1. ALUMINUM JACKETING
2. RIGID FIBERGLASS INSULATION
3. ROOF MEMBRANE UP AND OVER NAILER,
FLASH PER ROOFING MFGR. RQMTS.
4. SHEET METAL SCREWS. 4" O/C, 4 SIDES
5. PREFABRICATED, INSULATED ROOF CURB
6. INSULATED GALVANIZED SHEET METAL DUCT.
7. COUNTER FLASHING
KEYED NOTES: GENERAL NOTES:
1. FLEXIBLE CONNECTION
2. RETURN PLENUM, PROVIDE 1" ACOUSTIC
LINING
3. FOUR 4"x4" VIBRATION ISOLATION PADS BY
MANUFACTURER.
4. SHUT-OFF VALVE
5. COPPER CONDENSATE DRAIN, MINIMUM 3/4"
PIPE. TRAP NOT REQUIRED IF UNIT IS
INTERNALLY TRAPPED.
6. CONDENSATE DRAIN, COPPER PIPING , PIPE
TO FLOOR DRAIN TRAP
7. EVAPORATOR COIL
8. SUPPLY PLENUM
9. CONDENSER WATER SUPPLY AND RETURN
PIPING
10. HEAT PUMP
11. FILTER AND RACK
12. FLEXIBLE BRAIDED PIPE TO HEAT PUMP
13. AUTOMATIC BALANCING VALVE WITH
PRESSURE TEST PORTS (TO BE PROVIDED
AND INSTALLED BY MC.)
14. UNION
15. PROVIDE SHUTOFFS WITH QUICK
DISCONNECTS ON PIPING SIDE. PROVIDE
CONNECTION TO FLEXIBLE BRAIDED PIPE
ON UNIT SIDE
16. PROVIDE QUICK DISCONNECTS ON SUPPLY
AND RETURN DUCT TO ALLOW FOR UNIT
REPLACEMENT.
17. LINE SIZE, FULL PORT, 2 POSITION, 2-WAY
CONTROL VALVE
18. STRAINER
KEYED NOTES:
14 15
A. IF HOT WATER PIPING IS ON THE SAME
RACK AS OTHER PIPING, THE HOT
WATER SHALL BE ON ROLLER
SUPPORTS.
B. REGARDLESS OF WHAT IS INDICATED
ON ANY FLOOR PLANS OR OTHER
DETAILS THE ACTUAL INSTALLATION OF
ANY HYDRONIC PIPING SHALL
CONFORM TO WHAT IS SHOWN BELOW
KEYED NOTES:
GENERAL NOTES:
1 3
1. CONNECT TO STRUCTURE TYP.
2. GALVANIZED THREADED HANGER
RODS, TYP. SEE SPECS.
3. INSULATION PROTECTIVE SADDLE, TYP.
4. 1-1/2" x 1-1/2" x 1/4" STEEL ANGLE
HANGER PRIME PAINTED.
5. PLATED BUT & WASHER TOP &
BOTTOM,
6. TYP. VIBRATION ISOLATORS IN MECH.
ROOMS, TYP.
7. INSULATION AS SPECIFIED, TYP.
8. REFER TO SPECS FOR CLAMP SPACING,
TYP.
9. SADDLE
10. CLEVIS TYPE HANGER (PRIME PAINTED)
11. PLATED DOUBLE NUT AND WASHER
BYPASS
FULL
4" PURGE
PORT
PORT
4" PURGE
PROVIDE
ISOLATION VALVES
AT ALL BRANCH MAINS
WITH DRAIN VALVES
(TYPICAL)
PROVIDE
ISOLATION VALVES
AT ALL BRANCH MAINS
WITH DRAIN VALVES
(TYPICAL)
SHUTOFF
VALVES
(PER CCT)
(TYPICAL)
BALANCING/
SHUTOFF
VALVES
(PER CCT)
(TYPICAL)
PT PORTS
(TYPICAL)
SEQUENCE OF OPERATION
TO PURGE EARTH COIL:
OPEN - V1, V2, V3, V4, V6, V7, V8
CLOSE - V5, V9, V10
TO PURGE HEAT PUMP:
OPEN - V1, V2, V3, V4, V5, V9, V10
CLOSE - V6, V7, V8
TO ADD ANTIFREEZE:
OPEN - V6, V7, V8
CLOSE - V1, V4, V5, V9, V10
TO PLACE SYSTEM IN OPERATING MODE:
CLOSE V5, V6; OPEN ALL OTHERS
PRESSURIZE SYSTEM TO 10 PSI
SUPPLY WATER
V2
P-2
V1
P
V7
V4
P-1
P
V8
V5
INDIRECT WATER
SUPPLY
V6
V9
V3
TO CITY WATER
V10
FULL BYPASS
3"
1-1/2" MAKE-UP
KEYED NOTES:
1. PRESSURE GAGE (4" FACE) WITH
PETCOCK
2. UNION
3. BUTTERFLY
4. WATER LOOP DRAIN
5. GLYCOL FEEDER PUMP STATION
6. AIR SEPARATOR
7. CHECK VALVE
8. SEE PUMP DETAIL
9. THERMOMETER
10. 4" HOUSE-KEEPING PAD
11. 45 GALLON EXPANSION TANK
K = MINIMUM OF 1/2"
M = 1/2" PLUS MAXIMUM TOTAL STATIC
PRESSURE
H = (1" FOR EACH 1" OF MAXIMUM
NEGATIVE STATIC PRESSURE) + 1"
J = HALF OF H
L = H + J + PIPE DIAMETER +
INSULATION
NOTE: OUTDOOR UNITS AND UNITS LOCATED IN UNCONDITIONED SPACES WHICH PROVIDE
COOLING IN THE WINTER MUST HAVE HEAT TRACE ON THE CONDENSATE PIPING.
NEGATIVE PRESSURE
POSITIVE PRESSURE
L
J
CAP
CAP
PIPE FULL SIZE
OF AIR UNIT DRAIN
CONNECTION
AIR UNIT CASING
SEE NOTE B
FLOW
H
GENERAL NOTES:
M
CAP
CAP
PIPE FULL SIZE
OF AIR UNIT DRAIN
CONNECTION
AIR UNIT CASING
SEE NOTE B
FLOW
K
A. LOCATE TRAPS SO AS TO BE
ACCESSIBLE FOR CLEANING.
B. CONDENSATE PIPING SHALL
GRADUALLY SLOPE DOWN FROM
DRAIN TRAP.
C. CONFIRM TRAP REQUIREMENTS
WITH EQUIPMENT MANUFACTURER.
D. REFER TO SPECIFICATIONS FOR
MATERIAL AND INSULATION
REQUIREMENTS.
E. PROVIDE UNION UPSTREAM AND
DOWNSTREAM OF TRAP.
GENERAL NOTES:KEYED NOTES:
12"
MIN.
MIN.
12"
CONDENSING UNIT
/ HEAT PUMP
1. ANCHOR UNIT TO CURB
2. PRESSURE TREATED WOOD NAILER
3. VIBRATION ISOLATORS
4. ROOF DECK
5. PREFABRICATED EQUIPMENT
SUPPORT
6. SINGLE MEMBRANE ROOFING, FLASH
PER MFG'R RECOMMENDATIONS.
FLASH UP AND OVER WOOD NAILER.
7. PREFABRICATED DOG HOUSE
8. SEAL AND FLASH OPENING
A. ON PROJECTS WITH BUILT-UP ROOFS,
ADD CANT ON EQUIPMENT SUPPORTS
AND PREFABRICATE PIPING CHASE
B. PLACE EQUIPMENT ACROSS BAR JOIST
OR ADD ADDITIONAL STRUCTURAL
STRUCTURAL STEEL AS NECESSARY TO
CARRY EQUIPMENT WEIGHT
C. LOCATE A MINIMUM OF 10'-0" FROM EDGE
OF ROOF AND ROOF HATCH.
GENERAL NOTES:
KEYED NOTES:
COMPRESSOR/
CONDENSER
DIRECT
EXPANSION
EVAPORATOR COIL
LIQUID LINE
1. FIELD SUPPLIED FILTER DRIER, UNLESS
PROVIDED INTERNALLY BY THE
EQUIPMENT MANUFACTURER.
2. SIGHT GLASS
3. EXPANSION VALVE
4. SUCTION LINE W/FLEXIBLE CLOSED
CELL ELASTOMER INSULATION
5. EXPANSION VALVE THERMAL BULB
6. TRAP FOR LONG VERTICAL RUNS (PER
MFG. RECOMMENDATIONS)
7. EXPANSION VALVE EQUALIZER LINE
8. PROVIDE APPROPRIATELY SIZED DOG
HOUSE CONSTRUCTION FOR ROOF
PENETRATIONS.
A. PIPE SIZES SHALL BE PER MFGR'S
RECOMMENDATIONS.
B. PROVIDE 4" CONCRETE PAD ALL EXTERIOR
UNITS ON GRADE.
C. PIPING LAYOUT AND CONFIGURATION SHALL BE
INSTALLED PER MFGR'S RECOMMENDATIONS.
D. REFRIGERANT SPECIALTIES ARE SHOWN FOR
SCHEMATIC PURPOSES ONLY AND SHALL BE
COORDINATED PER MFGR'S INSTALLATION
INSTRUCTIONS.
E. PROVIDE LOCKING-TYPE TAMPER RESISTANT
CAPS ON ALL OUTDOOR REFRIGERANT CIRCUIT
ACCESS PORTS.
RTA DATE
DRAWN BY
CHECKED BY
A & E FILE NO
COMMONWEALTH OF KENTUCKY
FINANCE AND ADMINISTRATION CABINET
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING & CONTRACT ADMINISTRATION
FRANKFORT, KENTUCKY
AS BUILT DATE
DECA LOG #
ACCOUNT NO.
DRAWING NO.
DESCRIPTION OF REVISIONS DATE
DRAWING DATE
PHASE
REVISION HISTORY OF THIS DRAWING
DESCRIPTION OF REVISIONS DATE
DRAWING INFORMATION
435-CBQA-KS64-00
A
1538 ALEXANDRIA PIKE,
SUITE 11
FT. THOMAS, KENTUCKY
41075 859-442-8050
WWW.KLHENGRS.COM
O W
N E
R S
H
IP
O F
I N
S T
R U
M E
N T
S O
F S
E R
V
IC
E A ll re p o rt s p la n s s p e c ifi c a tio n s c o m p u te r fil e s fie ld d a ta n o te s a n d o th e r d o c u m e n ts a n d in s tr u m e n ts p re p a re d b y t h e C o n s u lt a n t a s in s tr u m e n ts o f s e rv ic e s h a ll re m a in t h e p ro p e rt y o f th e C o n s u lt a n t.
T h e C o n s u lt a n t s h a ll re ta in a ll c o m m o n l a w s ta tu to ry a n d o th e r re s e rv e d ri g h ts in c lu d in g w ith o u t lim ita tio n th e c o p y ri g h t th e re to
KOHRS LONNEMANN HEIL
ENGINEERS, INC.
KSL
AJK
M-501
MECHANICAL - DETAILS05/15/26
R25092.00
KSU - HEALTH SCIENCE CENTER
KLH PROJECT # 27734
SCALE: NONE
233713.00-07 - EXHAUST LOUVER DETAIL
SCALE: NONE
233713.00-11 - INTAKE LOUVER
SCALE: NONE
233723.00-04 - LOUVERED PENTHOUSE W CURB A
SCALE: NONE
233723.00-05 - LOUVERED PENTHOUSE W CURB B
SCALE: NONE
238146.00-05 - VERTICAL WATER SOURCE HEAT PUMP
SCALE: NONE
232113.23-14 - PIPE HANGERS TYPICAL
SCALE: NONE
232113.33-07 - TYPICAL GROUND SOURCE GEO WATER LOOP PIPE DIAGRAM NO
VAULT
SCALE: NONE
232113.23-05 - CONDENSATE DRAIN TRAP POSITIVE & NEGATIVE
SCALE: NONE
236213.00-02 - EQUIPMENT SUPPORT
SCALE: NONE
232313.00-03 - REFRIGERANT PIPING A
A. WALL LOUVERS ARE FURNISHED AND
INSTALLED BY THE GENERAL CONTRACTOR.
REFER TO ARCHITECTURAL DRAWINGS FOR
SIZES AND LOCATIONS, UNLESS SPECIFIED
IN SECTION 23 37 13.00.
1. CAULKING
2. EXTERIOR WALL MOUNTED LOUVER
3. EXTENDED SILL
4. PITCH INSULATED DUCT 10 DEGREES
TOWARD LOUVER AND SEAL WATERTIGHT
5. MOTOR OPER. DAMPER
6. CLIP ANGLE
7. ANCHOR TO WALL AT 12" O.C.
KEYED NOTES: WALL
GENERAL NOTES:
4 3
A. REFER TO ARCHITECTURAL
DRAWINGS FOR SIZES AND
LOCATIONS.
1. EXTERIOR WALL MOUNTED LOUVER
2. MOTOR OPER. DAMPER
3. CAULKING
4. ANCHOR TO WALL AT 12" O/C
5. PROVIDE INSULATED SHEET METAL
PLENUM, FULL SIZE OF LOUVER, (MIN
12" DEEP)
6. TRANSITION INSULATED DUCT
CONNECTION WITH ANGLED FITTING
TO PLENUM FOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .