Attachment A.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- HIGHWAY LIGHTING MAINTENANCE - D6
- Solicitation number
- 5400026244
- Issued by
- Richland County, South Carolina
About this file
This is a pricing schedule for highway lighting maintenance services in South Carolina District 6, encompassing four geographical lots across the state. Lot 1 covers the North Area (Charleston, Berkeley, Dorchester) for street and bridge lighting, Lot 2 covers the North Area for sign, high mast, and pavement markings, Lot 3 covers bridge lighting on specific structures (Don Holt, Arthur Ravenel, James Island Connector), and Lot 4 covers the South Area (Colleton, Beaufort, Jasper) for street and bridge lighting. The schedule itemizes materials, labor, equipment, and traffic control services required for the maintenance program. Item quantities vary significantly across lots, ranging from 10 to 1,500 units depending on the service type, and include components such as HPS and LED bulbs, ballasts, photo cells, conduit materials, light poles, electrical enclosures, and inspection services.
The pricing schedule presents all unit costs and total costs as "$-0," indicating this is a blank bid form awaiting contractor pricing submissions. The document outlines labor categories including supervisors, electricians, and laborers billed hourly, along with equipment charges for bucket trucks, pole trailers, auger trucks, and standard vehicles. Traffic control services are itemized by type, including shoulder closures, lane closures on interstate and multi-lane primary routes, and mobile operations. Each lot includes provisions for extraordinary maintenance, equipment rental, parts markup costs, and subcontractor markup fees. The schedule does not specify contract duration, renewal options, set-asides, incumbent contractor information, or funding sources within the document itself.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C.pdf | ||
| Amendment 1.pdf | ||
| Attachment D.pdf | ||
| Revised Award Date.pdf | ||
| Notice Regarding Award.pdf | ||
| Attachment B.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lot 1
| DISTRICT 6 NORTH AREA (Charleston, Berkeley, Dorchester) | ||||
| LOT 1 Charleston Lighting - Street and Bridge Lighting | ||||
| ITEM | QTY | UNIT COST | TOTAL | |
| A | Pole Mounted 100 watt HPS Bulb | 375 | $ - 0 | |
| A1 | LED Equivalent | 375 | $ - 0 | |
| B | Pole Mounted 100 watt HPS Ballast | 60 | $ - 0 | |
| C | Pole Mounted 250 watt HPS Bulb | 700 | $ - 0 | |
| C1 | LED Equivalent | 700 | $ - 0 | |
| D | Pole Mounted 250 watt HPS Ballast | 250 | $ - 0 | |
| E | Pole Mounted Photo Cell | 50 | $ - 0 | |
| F | Pole Mounted 360 watt Sulox Bulb | 25 | $ - 0 | |
| F1 | LED Equivalent | 25 | $ - 0 | |
| G | Pole Mounted 400 watt Metal Halide Ballast | 25 | $ - 0 | |
| H | Ground Mounted Photo Cell | 25 | $ - 0 | |
| I | Pole Mounted 175 watt Metal Hallide Bulb | 250 | $ - 0 | |
| I1 | LED Equivalent | 250 | $ - 0 | |
| J | Pole Mounted 175 watt Metal Halide Ballast | 25 | $ - 0 | |
| K | Tower Mounted 175 wastt Metal Halide Ballast | 25 | $ - 0 | |
| L | Tower Mounted 175 watt Meal Halide Bulb | 25 | $ - 0 | |
| M | Fuses | 1,125 | $ - 0 | |
| N | Fuse Holder | 50 | $ - 0 | |
| O | Pole Mounted 400 watt Metal Halide Bulb | 25 | $ - 0 | |
| O1 | LED Equivalent | 25 | $ - 0 | |
| P | Pole Mounted 400 watt HPS Ballast | 25 | $ - 0 | |
| Q | Pole Mounted 400 watt HPS Bulb | 25 | $ - 0 | |
| Q1 | LED Equivalent | 25 | $ - 0 | |
| R | Pole Mounted 400 watt MH Bulb | 400 | $ - 0 | |
| R1 | LED Equivalent | 400 | $ - 0 | |
| S | Pole Mounted 400 watt MH Ballast | 50 | $ - 0 | |
| T | 250 watt MH Bulb | 175 | $ - 0 | |
| T1 | LED Equivalent | 175 | $ - 0 | |
| U | 250 watt HH Ballast | 25 | $ - 0 | |
| V | Quarterly Inspection | 20 | $ - 0 | |
| W | Furnish and Install 13"X24"X18"D.Elec.Flush Undgrd Enclosure-(Str.Poly.Conc.)Hd | 50 | $ - 0 | |
| X | Furnish and Install 17"X30"X26"D.Elec.Flush Undgrd Enclosure-(Str.Poly.Conc.)Hd | 50 | $ - 0 | |
| Y | Furnish and Install 30" X 48" X 30' Electrical Enclosure Flush Undgrd Enclosure (Str.Poly.Con) Hd) | 50 | $ - 0 | |
| Z | Furnish & Install Single Aluminum Light Standard With Foundation – 35’- Breakaway- (Sgl.Light Std.35'ht.Al.Pole-Incl Top Tenon Mt.) | 50 | $ - 0 | |
| AA | Install Foundation for Aluminum Light Pole | 50 | $ - 0 | |
| BB | Furnish & Install Screw Anchor Foundation for 35’ Aluminum Pole | 50 | $ - 0 | |
| CC | Install 35’ Spun Brushed Aluminum Pole w/ Luminaire on Existing Foundation | 50 | $ - 0 | |
| DD | Remove Foundation for Aluminum Pole – 18” Below Grade | 50 | $ - 0 | |
| EE | Furnish & Install Street Luminaire Arm | 50 | $ - 0 | |
| FF | Furnish & Install Nema 4x Stainless Steel Enclosure for Lighting System (w/o Fnd.) | 50 | $ - 0 | |
| GG | Furnish & Install Photocell | 50 | $ - 0 | |
| HH | Furnish & Install Ground Rod, Inc Copper Wire & Clamp | 100 | $ - 0 | |
| II | Furnish & Install 1.0" Galvanized Rigid Conduit | 1,000 | $ - 0 | |
| JJ | Furnish & Install 2.0" Galvanized Rigid Conduit | 1,000 | $ - 0 | |
| KK | Furnish & Install 3.0" Galvanized Rigid Conduit | 1,000 | $ - 0 | |
| LL | Furnish & Install 1.0" Schedule 80 Pvc Conduit | 1,000 | $ - 0 | |
| MM | Furnish & Install 2.0" Schedule 80 Pvc Conduit | 1,000 | $ - 0 | |
| NN | Furnish & Install 3.0" Schedule 80 Pvc Conduit | 1,000 | $ - 0 | |
| OO | Furnish & Install 2.0" Schedule 80 Pvc Conduit (Direction Bored) | 1,000 | $ - 0 | |
| PP | Furnish & Install 3.0" Schedule 80 Pvc Conduit (Direction Bored) | 1,000 | $ - 0 | |
| Furnish Additional 2" Conduit within Directional Bore | 1,000 | $ - 0 | ||
| RR | Furnish Additional 3" Conduit within Directional Bore | 1,000 | $ - 0 | |
| SS | EXTRAORDINARY MAINTNENANCE | Hours | Rate | |
| Labor | ||||
| Supervisor | 1,000 | $ - 0 | ||
| Electrician | 1,000 | $ - 0 | ||
| Laborer | 1,000 | $ - 0 | ||
| Parts (i.e. Poles, Wires, etc.) - Annual Estimated Parts Markup Cost. Enter percent amount of markup in RATE column | 30,000 | $ - 0 |
| TT | EQUIPMENT | Hours | Rate | |
| Bucket Truck | 400 | $ - 0 | ||
| Pole Triler | 50 | $ - 0 | ||
| Auger Truck | 200 | $ - 0 | ||
| Trucks/Cars | 100 | $ - 0 | ||
| UU | TRAFFIC CONTROL | Each | Rate | |
| Shoulder Closure | 25 | $ - 0 | ||
| Daytime Interstate Lane Closure | 10 | $ - 0 | ||
| Nighttime Interstate Lane Closure | 50 | $ - 0 | ||
| Lane Closure Multi-Lane Primary Routes | 55 | $ - 0 | ||
| Mobile Operation Multi-Lane Primary Routes | 55 | $ - 0 | ||
| Mobile Operation Interstate | 50 | $ - 0 | ||
| Sub-Contractor Markup Cost | 50 | $ - 0 | ||
| TOTAL FOR LOT 1 | $ - 0 |
Lot 2
| DISTRICT 6 NORTH AREA (Charleston, Berkeley, Dorchester) | ||||
| LOT 2 - Charleston Lighting - Sign, High Mast, and Pavement Markings | ||||
| ITEM | QTY | UNIT COST | TOTAL | |
| A | Pole Mounted Photo Cell | 25 | $ - 0 | |
| B. | Sun Light 400 watt MV Bulb | 25 | $ - 0 | |
| B1 | LED Equivalent | 25 | $ - 0 | |
| C | Sun Light 400 watt MV Ballast | 25 | $ - 0 | |
| D | Sun Light 250 watt MV Bulb | 25 | $ - 0 | |
| D1 | LED Equivalent | 25 | $ - 0 | |
| E | Sun Light 250 watt MH Ballast | 25 | $ - 0 | |
| F | Sign Structure Mounted Photo Cell | 25 | $ - 0 | |
| G | Fuses | 125 | $ - 0 | |
| H | High Mast 1000 watt MH Lamp | 325 | $ - 0 | |
| H1 | LED Equivalent | 325 | $ - 0 | |
| I | High Mast 1000 watt MH Ballast | 125 | $ - 0 | |
| J | Fuses | 125 | $ - 0 | |
| K | Ground Mounted Photo Cell | 25 | $ - 0 | |
| L | Lighted Pavement Marker Bulb & Gasket | 1,500 | $ - 0 | |
| M | Lighted Pavement Marker (Optical Assembly) | 1,250 | $ - 0 | |
| N | Lighted Pavement Marker Transformer | 125 | $ - 0 | |
| O | Lighted Pavement Marker Fuse | 125 | $ - 0 | |
| P | Lighted Pavement Marker Bulb & Gasket (SCDOT Supplied) | 500 | $ - 0 | |
| Q | Quarterly Inspection | 20 | $ - 0 | |
| R | EXTRAORDINARY MAINTENANCE | Hours | Rate | |
| Labor | ||||
| Supervisor | 200 | $ - 0 | ||
| Electrician | 200 | $ - 0 | ||
| Laborer | 200 | $ - 0 | ||
| Parts (i.e. Poles, Wires, etc.) - Annual Estimated Parts Markup Cost. Enter percent amount of markup in RATE column | 1,000 | $ - 0 |
| S | EQUIPMENT | Hours | Rate | |
| Bucket Truck | 200 | $ - 0 | ||
| Pole Trailer | 200 | $ - 0 | ||
| Auger Truck | 200 | $ - 0 | ||
| Trucks/Cars | 200 | $ - 0 | ||
| T | TRAFFIC CONTROL | Each | Rate | |
| Shoulder Closure | 25 | $ - 0 | ||
| Daytime Interstate Closure | 10 | $ - 0 | ||
| Nighttime Interstate Lane Closure | 50 | $ - 0 | ||
| Lane Closure Multi-Lane Primary Routes | 250 | $ - 0 | ||
| Mobile Operation Multi-Lane Primary Routes | 250 | $ - 0 | ||
| Mobile Operation Interstate | 50 | $ - 0 | ||
| Sub Contractor Markup Cost | ||||
| TOTAL FOR LOT 2 |
Lot 3
| DISTRICT 6 NORTH AREA (Charleston, Berkeley, Dorchester) | ||||
| LOT 3 - Charleston Bridge Lighting (Don Holt, Arthur Ravenel, James Island Connector) | ||||
| ITEM | QTY | UNIT COST | TOTAL | |
| A | Single Luminaire 250 WMH | 25 | $ - 0 | |
| B. | Single Luminaire 250 WMH Ballast | 25 | $ - 0 | |
| C | 250 Watt MH Bulb | 1,000 | $ - 0 | |
| C1 | LED Equivalent | 1,000 | $ - 0 | |
| D | Flood Light 250 WPH #8393 (BEGA) Bulb | 75 | $ - 0 | |
| D1 | LED Equivalent | 75 | $ - 0 | |
| E | Flood Light 250 WPH Ballast | 100 | $ - 0 | |
| F | Flood Light with Narrow Beam 250 #8393 (BEGA) Bulb | 200 | $ - 0 | |
| F1 | LED Equivalent | 200 | $ - 0 | |
| G | Flood Light with Narrow Beam 250 | 25 | $ - 0 | |
| H | Flood Light with Wide Beam 250 WMH #8393 (BEGA) Bulb | 25 | $ - 0 | |
| H1 | LED Equivalent | 25 | $ - 0 | |
| I | Flood Light with Wide Beam 250 WMH | 15 | $ - 0 | |
| J | Adjusment of Light Beams | 25 | $ - 0 | |
| K | Cleaning of Aesthetic Light Lens | 100 | $ - 0 | |
| L | Fuses 10-Amp - 600 Volt - Type FNQ | 200 | $ - 0 | |
| M | Fuse Holder | 50 | $ - 0 | |
| N | EXTRAORDINARY MAINTENANCE | Hours | Rate | |
| Labor | ||||
| Supervisor | 200 | $ - 0 | ||
| Electrician | 200 | $ - 0 | ||
| Laborer | 200 | $ - 0 | ||
| Parts (i.e. Poles, Wires, etc.) - Annual Estimated Parts Markup Cost. Enter percent amount of markup in RATE column | 5,000 | $ - 0 |
| O | EQUIPMENT | Hours | Rate | |
| Bucket Truck | 200 | $ - 0 | ||
| Pole Trailer | 200 | $ - 0 | ||
| Auger Truck | 200 | $ - 0 | ||
| Trucks/Cars | 200 | $ - 0 | ||
| P | TRAFFIC CONTROL | Each | Rate | |
| Shoulder Closure | 25 | $ - 0 | ||
| Lane Closure Daytime Multi-Lane Primary Routes | 10 | $ - 0 | ||
| Lane Closure Nighttime Multi-Lane Primary Routes | 25 | $ - 0 | ||
| Mobile Operation Multi-Lane Primary Routes | 250 | $ - 0 | ||
| Sub Contractor Markup Cost | ||||
| TOTAL FOR LOT 3 |
Lot 4
| DISTRICT 6 SOUTH AREA (Colleton, Beaufort, Jasper) | ||||
| LOT 4 Lighting - Street and Bridge Lighting | ||||
| ITEM | QTY | UNIT COST | TOTAL | |
| A | Pole Mounted 100 watt HPS Bulb | 180 | $ - 0 | |
| A1 | LED Equivalent | 180 | $ - 0 | |
| B | Pole Mounted 100 watt HPS Ballast | 30 | $ - 0 | |
| C | Pole Mounted 250 watt HPS Bulb | 350 | $ - 0 | |
| C1 | LED Equivalent | 350 | $ - 0 | |
| D | Pole Mounted 250 watt HPS Ballast | 125 | $ - 0 | |
| E | Pole Mounted Photo Cell | 25 | $ - 0 | |
| F | Pole Mounted 360 watt Sulox Bulb | 25 | $ - 0 | |
| F1 | LED Equivalent | 25 | $ - 0 | |
| G | Pole Mounted 400 watt Metal Halide Ballast | 25 | $ - 0 | |
| H | Ground Mounted Photo Cell | 25 | $ - 0 | |
| I | Pole Mounted 175 watt Metal Hallide Bulb | 125 | $ - 0 | |
| I1 | LED Equivalent | 125 | $ - 0 | |
| J | Pole Mounted 175 watt Metal Halide Ballast | 25 | $ - 0 | |
| K | Tower Mounted 175 wastt Metal Halide Ballast | 25 | $ - 0 | |
| L | Tower Mounted 175 watt Meal Halide Bulb | 25 | $ - 0 | |
| M | Fuses | 600 | $ - 0 | |
| N | Fuse Holder | 25 | $ - 0 | |
| O | Pole Mounted 400 watt Metal Halide Bulb | 25 | $ - 0 | |
| O1 | LED Equivalent | 25 | $ - 0 | |
| P | Pole Mounted 400 watt HPS Ballast | 25 | $ - 0 | |
| Q | Pole Mounted 400 watt HPS Bulb | 25 | $ - 0 | |
| Q1 | LED Equivalent | 25 | $ - 0 | |
| R | Pole Mounted 400 watt MH Bulb | 200 | $ - 0 | |
| R1 | LED Equivalent | 200 | $ - 0 | |
| S | Pole Mounted 400 watt MH Ballast | 25 | $ - 0 | |
| T | 250 watt MH Bulb | 100 | $ - 0 | |
| T1 | LED Equivalent | 100 | $ - 0 | |
| U | 250 watt HH Ballast | 25 | $ - 0 | |
| V | Quarterly Inspection | 20 | $ - 0 | |
| W | Furnish and Install 13"X24"X18"D.Elec.Flush Undgrd Enclosure-(Str.Poly.Conc.)Hd | 50 | $ - 0 | |
| X | Furnish and Install 17"X30"X26"D.Elec.Flush Undgrd Enclosure-(Str.Poly.Conc.)Hd | 50 | $ - 0 | |
| Y | Furnish and Install 30" X 48" X 30' Electrical Enclosure Flush Undgrd Enclosure (Str.Poly.Con) Hd) | 50 | $ - 0 | |
| Z | Furnish & Install Single Aluminum Light Standard With Foundation – 35’- Breakaway- (Sgl.Light Std.35'ht.Al.Pole-Incl Top Tenon Mt.) | 50 | $ - 0 | |
| AA | Install Foundation for Aluminum Light Pole | 50 | $ - 0 | |
| BB | Furnish & Install Screw Anchor Foundation for 35’ Aluminum Pole | 50 | $ - 0 | |
| CC | Install 35’ Spun Brushed Aluminum Pole w/ Luminaire on Existing Foundation | 50 | $ - 0 | |
| DD | Remove Foundation for Aluminum Pole – 18” Below Grade | 50 | $ - 0 | |
| EE | Furnish & Install Street Luminaire Arm | 50 | $ - 0 | |
| FF | Furnish & Install Nema 4x Stainless Steel Enclosure for Lighting System (w/o Fnd.) | 50 | $ - 0 | |
| GG | Furnish & Install Photocell | 50 | $ - 0 | |
| HH | Furnish & Install Ground Rod, Inc Copper Wire & Clamp | 400 | $ - 0 | |
| II | Furnish & Install 1.0" Galvanized Rigid Conduit | 400 | $ - 0 | |
| JJ | Furnish & Install 2.0" Galvanized Rigid Conduit | 400 | $ - 0 | |
| KK | Furnish & Install 3.0" Galvanized Rigid Conduit | 400 | $ - 0 | |
| LL | Furnish & Install 1.0" Schedule 80 Pvc Conduit | 400 | $ - 0 | |
| MM | Furnish & Install 2.0" Schedule 80 Pvc Conduit | 400 | $ - 0 | |
| NN | Furnish & Install 3.0" Schedule 80 Pvc Conduit | 400 | $ - 0 | |
| OO | Furnish & Install 2.0" Schedule 80 Pvc Conduit (Direction Bored) | 400 | $ - 0 | |
| PP | Furnish & Install 3.0" Schedule 80 Pvc Conduit (Direction Bored) | 400 | $ - 0 | |
| Furnish Additional 2" Conduit within Directional Bore | 400 | $ - 0 | ||
| RR | Furnish Additional 3" Conduit within Directional Bore | 400 | $ - 0 | |
| SS | EXTRAORDINARY MAINTNENANCE | Hours | Rate | |
| Labor | ||||
| Supervisor | 1,000 | $ - 0 | ||
| Electrician | 1,000 | $ - 0 | ||
| Laborer | 1,000 | $ - 0 | ||
| Parts (i.e. Poles, Wires, etc.) - Annual Estimated Parts Markup Cost. Enter percent amount of markup in RATE column | 12,000 | $ - 0 |
| TT | EQUIPMENT | Hours | Rate | |
| Bucket Truck | 400 | $ - 0 | ||
| Pole Triler | 50 | $ - 0 | ||
| Auger Truck | 200 | $ - 0 | ||
| Trucks/Cars | 100 | $ - 0 | ||
| UU | TRAFFIC CONTROL | Each | Rate | |
| Shoulder Closure | 25 | $ - 0 | ||
| Daytime Interstate Lane Closure | 10 | $ - 0 | ||
| Nighttime Interstate Lane Closure | 50 | $ - 0 | ||
| Lane Closure Multi-Lane Primary Routes | 55 | $ - 0 | ||
| Mobile Operation Multi-Lane Primary Routes | 55 | $ - 0 | ||
| Mobile Operation Interstate | 50 | $ - 0 | ||
| Sub-Contractor Markup Cost | 50 | $ - 0 | ||
| TOTAL FOR LOT 4 | $ - 0 |
File details come from the government source that posted it. Updated .