This is a comprehensive facility assessment report prepared by GRW Engineering, Architecture, and Geospatial for the Kentucky Administrative Office of the Courts (AOC), focusing on the Owsley County Court of Justice Courthouse located in Booneville, Kentucky. The assessment, conducted on February 2, 2022, provides a detailed evaluation of the existing courthouse facility, examining multiple aspects including structural soundness, mechanical and electrical systems, security needs, building code and ADA compliance, space adequacy, and potential environmental hazards. The report includes a thorough analysis of the current facility's capabilities, deficiencies, and recommended improvements, with a total facility assessment score of 31.97% out of a possible 366 points.
The report highlights significant deficiencies across multiple areas, with an estimated total project concept budget of approximately $14,172,573 for a potential renovation or stand-alone facility. Key findings include substantial shortfalls in space requirements, with many critical courthouse areas providing less than 50% of the recommended space, including judges' chambers (5% of required space), non-jury trial courtroom (0% of required space), and prisoner handling facilities (0% of required space). The facility also lacks critical security features such as a defendant sallyport, separate staff and defendant circulation, and comprehensive security screening. Environmental hazards assessments identified potential asbestos-containing materials and lead-containing paint, recommending further testing and potential remediation. The comprehensive report serves as a critical planning document for potential future courthouse improvements or replacement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFP_025_2500000288_1_SO_FORM.PDF | ||
| RFP for Facilities Assessment - Attachment C.xlsx | XLSX spreadsheet | |
| RFP for Facilities Assessmenst - Attachment D Cost Proposal.pdf | ||
| Attachment E.pdf | ||
| RFP for Facilities Assessments - Attachment B.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRW, Inc., All Rights Reserved
Final Report of Facility Assessment
OWSLEY COUNTY COURT OF JUSTICE
COURTHOUSE FACILITY
20 Main Street, Booneville, Kentucky
Project No. 4903-23
February 2, 2022
Prepared For
Administrative Office of the Courts 1001 Vandalay Drive, Frankfort, Kentucky 40601 www.courts.ky.gov
Prepared By
GRW Engineering | Architecture | Geospatial 801 Corporate Drive, Lexington, Kentucky 40503
Attachment A
TABLE OF CONTENTS
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility ii
0.0 Facility Assessment Overview
0.1.1 Cover Sheet ................................................................................................... i
0.1.2 Table of Contents ......................................................................................... ii
0.1.3 Cover Letter ................................................................................................ vi
0.1.4 Facility Assessment Overview
0.1.5 Facility Assessment Score Sheet
1.0 Age and History
1.1.1 Age and History of Facility
1.1.2 County Population and Growth History
1.1.3 Facility Case Load Data and History
2.0 Structural Soundness
2.1.1 Basement Level
2.1.2 First Level
2.1.3 Second Level
2.1.4 Third Level
2.1.5 Roof Level
3.0 Performance and Lifecycle Assessment of Mechanical and Electrical Systems
3.1 Plumbing
3.1.1 Plumbing Fixtures
3.1.2 Domestic Water Distribution
3.1.3 Sanitary Waste
3.1.4 Rainwater Drainage
3.1.5 Other Plumbing Systems
3.2 HVAC
3.2.1 Energy Supply
3.2.2 Heat Generating Systems
3.2.3 Cooling Generating Systems
3.2.4 Distributions Systems
3.2.5 Terminal and Package Units
3.2.6 Controls and Instrumentation
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility iii
3.2.7 Systems Testing and Balancing
3.2.8 Other HVAC Systems and Equipment
3.3 Fire Protection
3.3.1 Sprinklers
3.3.2 Standpipes
3.3.3 Fire Protection Specialties
3.3.4 Fire Alarm System
3.3.5 Other Fire Protection Systems
3.4 Electrical
3.4.1 Electrical Service and Distribution
3.4.2 Lighting and Branch Wiring
3.4.3 Communications and Security
3.4.4 Standby Power
3.4.5 Other Electrical Systems
4.0 Security Needs
4.1.1 Secure Staff Parking Area
4.1.2 Separate Staff Building Circulation
4.1.3 Defendant Sallyport
4.1.4 Separate Defendant Building Circulation
4.1.5 Single Point Public Entry / Security Screening
4.1.6 Camera System
4.1.7 Courtroom Party Separation
5.0 Building Code and ADA Compliance
5.1 Building Code
5.1.1 Building Code Height and Area
5.1.2 Building Code Fire Suppression
5.1.3 Building Code Fire Alarm
5.1.4 Building Code Egress
5.2 ADA Compliance
5.2.1 ADA Accessible Route
5.2.2 ADA Public
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility iv
5.2.3 ADA Staff
5.2.4 ADA Restrooms
6.0 Space Adequacy of the Facility Relative to AOC Program Space Requirements.
6.1 Spaces
6.1.1 Jury Trial Courtroom
6.1.2 Non-Jury Trial Courtroom / Formal Hearing Room
6.1.3 Grand Jury Area
6.1.4 Judge’s Chambers
6.1.5 Conference / Resource Room
6.1.6 Prisoner Handling Facilities
6.1.7 Circuit Court Clerk Area
6.1.8 Court Affiliated and Support Offices
6.1.9 Facility Support Area
6.1.10 Public Area
6.1.11 Factored Area (Net Functional Times %)
6.1.12 County Support Area
7.0 Interior and Exterior Quality of Existing Court Facility
7.1 Interior Quality
7.1.1 Interior Finish Durability
7.1.2 Interior Finishes in Keeping with the Dignity of the Court
7.2 Exterior Quality
7.2.1 Site
7.2.2 Exterior Envelope Roof
7.2.3 Exterior Envelope Walls
7.2.4 Exterior Envelope Doors and Windows
8.0 Potential Environmental Hazards
8.1.1 Environmental Hazardous Materials
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility v
9.0 Cost Estimates
9.1 Probable Cost Estimate – Renovation / Addition.
9.1.1 Probable Cost Estimate – Existing Facility Renovation / Addition
9.1.2 Probable Cost Estimate – Stand Alone Facility with AOC Program
10.0 Schedules and Floor Plans
10.1 Schedules
10.1.1 Existing Room Schedule
10.1.2 AOC Program Space Requirements Schedule
10.2 Floor Plans
10.2.1 Cover Sheet .......................................................................................... GI001
10.2.2 First Level – Life Safety ........................................................................ GK101
10.2.3 Second Level – Life Safety ................................................................... GK102
10.2.4 Existing Room Schedule ...................................................................... GK601
10.2.5 First Level – Floor Plan ........................................................................ AD101
10.2.6 Second Level – Floor Plan ................................................................... AD102
10.2.7 AOC Program Space Requirements .................................................... AD601
11.0 Hazardous Materials Site Visit
11.1.1 Hazardous Materials Walkthrough Survey Report
12.0 Caseload and Population
12.1.1 Caseload Data
12.1.2 Population Data
12.1.3 Census Data
COVER LETTER
GRW Inc. / 801 Corporate Drive / Lexington, KY 40503 / P 859.223.3999 / www.grwinc.com
February 2, 2022
Administrative Office of the Courts
1001 Vandalay Drive
Frankfort, Kentucky 40601
Attention: Mr. Danny Rhoades – Facilities Division, AOC
Subject: Report of Facility Assessment
Owsley County Courthouse Facility 20 Main Street, Booneville, Kentucky
GRW Project No. 4903-23
Dear Mr. Rhoades:
GRW Engineering | Architecture | Geospatial Inc. has completed the facilities assessment for the Owsley
County Courthouse Facility. The purpose of the facility assessment was to inspect and assess the courthouse facility currently housing the Kentucky Court of Justice personnel, specifically identified as the Owsley County Courthouse, located at 20 Main Street, Booneville, Kentucky The purpose of the inspection and assessment is to identify building deficiencies including but not limited to the following areas of concern; Age and History, Structural Soundness, Performance and Lifecycle Assessment of
Mechanical and Electrical Systems, Security Needs, Building Code and ADA Compliance, Space
Adequacy of Facilities Relative to AOC Space Program Requirements, Interior and Exterior Quantity of
Existing Court Facilities and Potential Environmental Hazards. Recommended potential solutions for the deficiencies identified during the inspection and assessment have been included in this report including a probable construction cost estimate as applicable.
GRW Engineering | Architecture | Geospatial Inc. appreciates the opportunity to be of continued service to the Owsley County Courthouse Facility and the Administrative Office of the Courts. We look forward to helping you through project completion. If you have any questions, please call.
Respectfully submitted, GRW Engineering | Architecture | Geospatial
James K. Piper, AIA David R. Vaught, Assoc. AIA
Project Architect Project Manager
Licensed Kentucky 4447
Attachments: Report of Facility Assessment
FACILITY ASSESSMENT OVERVIEW
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 1
Assessment Format:
The Assessment Team collaborated on a system for documentation and assessment.
Below is a description of each assessment category and assessment item:
1. Age and History: this assessment category will address the age and history of the facility. The assessment items in this category are indicated below:
1.1.1. Age and History of Facility: this assessment item will address the age and history of the facility. This item will provide a general overview to the age and history of the facility including the year the facility was built and additions or renovations to the facility over its history.
1.1.2. County Population and Growth History: this assessment item will address the county population and growth history. This item will review the population and growth of the county.
1.1.3. Facility Case Load Data and History: this assessment item will address the facility case load data and history.
2. Structural Soundness: this assessment category will address the structural soundness of the existing facility. The structural soundness review is not a complete structural review of the existing facility. A complete structural review of this facility is not included in the scope of this report. The structural review is limited only to the assessment items indicated below:
2.1.1. Basement Level: this assessment item will address the structural soundness of the basement level. No structural testing or analysis was included in the scope of this report.
Items noted are based on visual review of the existing facility only. Any recommendation would require further testing and analysis.
2.1.2. First Level: this assessment item will address the structural soundness of the first level.
No structural testing or analysis was included in the scope of this report. Items noted are based on visual review of the existing facility only. Any recommendation would require further testing and analysis.
2.1.3. Second Level: this assessment item will address the structural soundness of the second level. No structural testing or analysis was included in the scope of this report. Items noted are based on visual review of the existing facility only. Any recommendation would require further testing and analysis.
2.1.4. Third Level: this assessment item will address the structural soundness of the third level.
2.1.5. Roof Level: this assessment item will address the structural soundness of the roof level.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 2
3. Performance and Lifecycle Assessment of Mechanical and Electrical Systems: this assessment category will address the performance and lifecycle assessment of mechanical and electrical systems of the facility. The assessment items in this sub-category are indicated below:
3.1. Plumbing: this assessment sub-category will address the plumbing of the facility. The assessment items in this sub-category are indicated below:
3.1.1. Plumbing Fixtures: this assessment item will address the plumbing fixtures of the existing facility. The age of the fixtures as well as the condition they are in will be evaluated per the current Kentucky State Plumbing Law, Regulations, and Code. The
ADA compliance will be noted as well.
3.1.2. Domestic Water Distribution: this assessment item will address the domestic water distribution of the existing facility. The age of the domestic water piping and condition that the current piping is in will be addressed. All components of the domestic water distribution system will be evaluated per the current Kentucky State Plumbing Law, Regulations, and Code.
3.1.3. Sanitary Waste: this assessment item will address the sanitary waste of the existing facility. The age of the sanitary sewer piping and condition that the current piping is in will be addressed. If there have been any incidents of clogging, odors, etc.; they will be noted and evaluated. All components of the sanitary waste system will be evaluated per the current Kentucky State Plumbing Law, Regulations, and Code.
3.1.4. Rainwater Drainage: this assessment item will address the storm water piping and roof drains for the existing facility. The age and condition of the existing roof leader piping and roof drains will be evaluated per the current Kentucky State Plumbing Law, Regulations, and Code.
3.1.5. Other Plumbing Systems: this assessment item will address other plumbing systems of the existing facility. The domestic water heaters will be evaluated and listed. Any other plumbing systems of note will be evaluated and listed. All items will be assessed per the current Kentucky State Plumbing Law, Regulations, and Code.
3.2. HVAC: this assessment sub-category will address the HVAC of the facility. The assessment items in this sub-category are indicated below:
3.2.1. Energy Supply: this assessment item will address the energy supply of the existing facility. The energy supply to the existing building will be noted as to whether it is all electric, gas service, or a combination for the existing HVAC system.
3.2.2. Heat Generating Systems: this assessment item will address the heat generating system of the existing facility. The existing heat generating equipment will be evaluated based on age and condition in the existing building. The lifespan of the existing equipment will be based on the ASHRAE – Owning and Operating Costs - Table 4 – Comparison of
Service Life Estimates.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 3
3.2.3. Cooling Generating Systems: this assessment item will address the cooling generating systems of the existing facility. The existing cooling generating equipment will be evaluated based on age and condition in the existing building. The lifespan of the existing equipment will be based on the ASHRAE – Owning and Operating Costs - Table
4 – Comparison of Service Life Estimates.
3.2.4. Distribution Systems: this assessment item will address the distribution systems of the existing facility. The existing distribution equipment piping will be evaluated based on age and condition in the existing facility. If there are any incidents of leaking, clogging, etc.; they will be noted and evaluated.
3.2.5. Terminal and Package Units: this assessment item will address the terminal and package units of the existing facility. The existing distribution equipment and/or piping will be evaluated based on age and condition in the existing facility. The lifespan of the existing equipment will be based on the ASHRAE – Owning and Operating Costs - Table
4 – Comparison of Service Life Estimates.
3.2.6. Controls and Instrumentation: this assessment item will address the controls and instrumentation of the existing facility. The type of existing controls will be noted and evaluated based on age and condition for the facility.
3.2.7. Systems Testing and Balancing: this assessment item will address the systems testing and balancing of the existing facility. The existing balance of the air and/or hydronic water systems throughout the existing facility will be evaluated based on performance of the equipment in the building.
3.2.8. Other HVAC Systems and Equipment: this assessment item will address the other
HVAC systems and equipment of the existing facility. Any other HVAC items of note, such as Elevator Equipment Room HVAC, will be listed and evaluated.
3.3. Fire Protection: this assessment sub-category will address the fire protection of the facility. The
3.3.1. Sprinklers: this assessment item will address the sprinklers systems of the existing facility. The existing sprinkler system will be evaluated based on age and condition for the existing facility per National Fire Protection Association (NFPA) standards. If there is no existing sprinkler system, this will be noted and the cost to include a new system will be added to the cost estimate. Per the Rules of Administrative Procedure – Court
Facilities Criteria all new, renovated, adapted, or expanded facilities shall have installed a fire suppression sprinkler system.
3.3.2. Standpipes: this assessment item will address the standpipes systems of the existing facility. If a standpipe is in the existing facility, it will be evaluated based on age and condition per the National Fire Protection Association (NFPA) standards.
3.3.3. Fire Protection Specialties: this assessment item will address the fire protection specialties of the existing facility.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 4
3.3.4. Fire Alarm System: this assessment item will address the fire alarm system of the existing facility. Assessment will identify condition and any deficiencies regarding
National Fire Protection Association (NFPA) standards for locations and American with
Disabilities Act (ADA) requirements for mounting heights.
3.3.5. Other Fire Protection Systems: this assessment item will address other fire protection systems of the existing facility. Any other fire protection systems of note will be listed and evaluated per the National Fire Protection Association (NFPA) standards.
3.4. Electrical: this assessment sub-category will address the electrical systems of the facility. The
3.4.1. Electrical Service and Distribution: this assessment item will address the electrical service and distribution systems of the existing facility as it pertains to condition, current capacity, current capacity as related to a potential expansion and/or renovation, National
Electrical Code (NEC) review regarding working (and dedicated) space and address any safety concerns.
3.4.2. Lighting and Branch Wiring: this assessment item will address the lighting and branch wiring systems of the existing facility. Assessment will identify condition of luminaires, energy efficiency of existing luminaires, foot-candle level adequacy, emergency lighting, exit signage and current lighting controls.
3.4.3. Communications and Security: this assessment item will address the communication and security systems of the existing facility. Assessment will address systems condition, current capacity, current capacity as related to an expansion and/or renovation, grounding adequacy, air conditioning adequacy, and recommendations based on staff’s concerns/comments.
3.4.4. Standby Power: this assessment item will address the standby power systems of the existing facility. Assessment will identify any backup power equipment present (battery or generator) and whether equipment capacity is meeting current and potential future needs.
3.4.5. Other Electrical Systems: this assessment item will address other electrical systems and special needs or recommendations of the existing facility.
4. Security Requirements: this assessment category will address the security requirements of the existing facility per the Administrative Office of the Courts Program Guidelines. The security requirements review is not a complete security review of the existing facility. A complete security review of this facility is not included in the scope of this report. The security requirements review is limited only to the assessment items indicated below:
4.1.1. Secure Staff Parking Area: this assessment item will address the Secure Staff Parking
Area at the existing facility per the Administrative Office of the Courts Program
Guidelines.
4.1.2. Separate Staff Building Circulation: this assessment item will address the Separate Staff
Building Circulation at the existing facility per the Administration Office of the Courts
Program Guidelines.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 5
4.1.3. Defendant Sallyport: this assessment item will address the Defendant Sallyport at the existing facility per the Administration Office of the Courts Program Guidelines.
4.1.4. Separate Defendant Building Circulation: this assessment item will address the
Separate Defendant Building Circulation at the existing facility per the Administration
Office of the Courts Program Guidelines.
4.1.5. Single Point Public Entry / Security Screening: this assessment item will address the
Single Point Public Entry / Security Screening at the existing facility per the
Administration Office of the Courts Program Guidelines.
4.1.6. Security Camera System: this assessment item will address the security camera system at the existing facility per the Administration Office of the Courts Program Guidelines.
4.1.7. Courtroom Party Separation: this assessment item will address the courtroom party separation at the existing facility per the Administration Office of the Courts Program
4.1.8. Guidelines.
5. Building Code and ADA Compliance:
5.1. Building Code Requirements: this assessment sub-category will address the building code requirements per the current Kentucky Building Code regulations. The building code review is not a complete code review of the existing facility. A complete code review of this facility is not included in the scope of this report. The code review is limited only to the assessment items indicated below:
5.1.1. Building Code Height and Area: this assessment item will address the building code height and area limitations per the current Kentucky Building Code regulations.
5.1.2. Building Code Fire Suppression: this assessment item will address the building code fire suppression requirements per the current Kentucky Building Code regulations.
5.1.3. Building Code Fire Alarm: this assessment item will address the building code fire alarm requirements per the current Kentucky Building Code regulations.
5.1.4. Building Code Egress: this assessment item will address the building code egress requirements including egress path, travel distances, and number of exits required per the current Kentucky Building Code regulation.
5.2. ADA Compliance: this assessment sub-category will address the buildings ADA Compliance per the current ADA Standards for Accessible Design. The ADA compliance review is not a complete ADA Compliance review of the existing facility. A complete ADA Compliance review of this facility is not included in the scope of this report. The ADA Compliance review is limited only to the assessment items indicated below:
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 6
5.2.1. ADA Accessible Route: this assessment item will address the ADA Accessible Routes at the existing facility. The ADA accessible route will include the path from site arrival at the designated ADA parking spaces to all location within the facility requiring an ADA accessible route.
5.2.2. ADA Public: this assessment item will address the ADA Public Spaces in the existing facility.
5.2.3. ADA Staff: this assessment item will address the ADA Staff Spaces in the existing
5.2.4. ADA Restrooms: this assessment item will address the ADA restrooms in the existing
6. Space Adequacy of the Facility Relative to AOC Program Space Requirements: this assessment category will address the Space Adequacy of the Facility Relative to AOC Program Space
Requirements. The assessment items for this category are indicated below:
6.1.1. Jury Trial Courtroom: this assessment item will address the size, condition and functional performance of the existing Jury Trial Courtroom and Support Spaces. The actual area of this space will be compared to the minimum rural court facility program requirements per the Administration Office of the Courts Program Guidelines.
6.1.2. Non-Jury Trial Courtroom / Formal Hearing Room: this assessment item will address the size, condition and functional performance of the existing Non-Jury Trial Courtroom /
Formal Hearing Room and Support Spaces. The actual area of this space will be compared to the minimum rural court facility program requirements per the Administration Office of the Courts Program Guidelines.
6.1.3. Grand Jury Area: this assessment item will address the size, condition and functional performance of the existing Grand Jury Area and Support Spaces. The actual area of this space will be compared to the minimum rural court facility program requirements per the
6.1.4. Judge’s Chambers: this assessment item will address the size, condition and functional performance of the existing Judges Chambers and Support Spaces. The actual area of this
6.1.5. Conference / Resource Room: this assessment item will address the size, condition and functional performance of the existing Conference / Resource Room. The actual area of this space will be compared to the minimum rural court facility program requirements per the Administration Office of the Courts Program Guidelines.
6.1.6. Prisoner Handling Facilities: this assessment item will address the size, condition and functional performance of the existing Prisoner Handling Facilities and Support Spaces.
The actual area of this space will be compared to the minimum rural court facility program
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 7
6.1.7. Circuit Court Clerk Area: this assessment item will address the size, condition and functional performance of the existing Circuit Court Clerk Area and Support Spaces. The actual area of this space will be compared to the minimum rural court facility program
6.1.8. Court Affiliated and Support Offices: this assessment item will address the size, condition, and functional performance of the existing Court Affiliated and Support
Offices. The actual area of this space will be compared to the minimum rural court facility program requirements per the Administration Offcie of the Courts Program Guidelines.
6.1.9. Facility Support Areas: this assessment item will address the size, condition, and functional performance of the existing Facility Support Areas. The actual area of this
6.1.10. Public Area: this assessment item will address the size, condition, and functional performance of the existing Public Area. The actual area of this space will be compared to the minimum rural court facility program requirements per the Administration Office of the Courts Program Guidelines.
6.1.11. Factored Area (net function times %): this assessment item will address the size, condition, and functional performance of the existing Factored Area. The actual area of this space will be compared to the minimum rural court facility program requirements per the Administration Office of the Courts Program Guidelines.
6.1.12. Non-AOC County Support Areas: this assessment item will address the size of the existing Non-AOC County Support Areas. The condition and functional performance of this space was not included in the scope of this assessment except for common areas shared by both county support areas and administration of the courts support areas. The area of this space will be compared to the total area of the entire facility.
7. Interior and Exterior Quality of Existing Court Facility: this assessment category will address the conditions and performance of the interior and exterior quality of the existing court facility. The assessment items for this category are indicated below:
7.1. Interior Quality: this assessment sub-category will address the condition and performance of the interior quality of the existing finishes.
7.1.1. Interior Finish Durability: this assessment item will address the condition and functional performance of the existing interior finishes durability.
7.1.2. Interior Finishes in Keeping with the Dignity of the Court: this assessment item will address the quality of the interior finished in keeping with the dignity of the court.
7.2. Exterior Quality: this assessment sub-category will address the condition, functional performance, and exterior quality of the existing facility.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 8
7.2.1. Site: this assessment item will address the condition and functional performance of the courthouse site.
7.2.2. Exterior Envelope Roof: this assessment item will address the condition and functional performance of the exterior envelope roof.
7.2.3. Exterior Envelope Walls: this assessment item will address the condition and functional performance of the exterior envelope walls.
7.2.4. Exterior Envelope Doors and Windows: this assessment item will address the condition and functional performance of the exterior envelope door and windows.
8. Potential Environmental Hazards: this assessment category will address the building materials for potential environmental hazards. The assessment items for this category are indicated below:
8.1.1. Environmental Hazards: this assessment item will address identifying existing building materials that may be potential environmental hazards. Materials identified in this assessment item have not been tested for environmental hazards. It is only recommended that material identified in the assessment item be tested for environmental hazards prior to any remediation work.
FACILITY ASSESSMENT SCORE SHEET
GOOD (5-6)
FAIR (3-4)
POOR (1-2)
NONE ( 0 )
Assessment Item
Number Assessment Item
Assessment Item
Score (0-6)
1.1.1 Age and History of Facility 3
1.1.2 County Population and Growth History 5
1.1.3 Facility Case Load Data and History 5
2.1.1 Basement Level (n/a)
2.1.2 First Level 3
2.1.3 Second Level 3
2.1.4 Third Level (n/a)
2.1.5 Roof Level 3
3.1.1 Plumbing Fixtures 2
3.1.2 Domestic Water Distribution 1
3.1.3 Sanitary Waste 1
3.1.4 Rainwater Drainage 2
Total Structural Soundness Assessment Score (out of 18 point)
3.0 Performance and Lifecycle Assessment of Mechanical and Electrical Systems
Facility Assessment Score Sheet
Assessment Item is in working order and requires limited or no repair.
Assessment Item shows signs of damage or repair but still functions within an acceptable tolerance and would be recommended for renovation or minor facility repair work.
Assessment Item is in disrepair or shows signs of significant damage. Assessment Item is recommended for immediate repair or replacement.
Assessment Item is a minimum standard requirement for the facility that has not been provided.
The Assessment Items below are intended to give an overview of the assessment score assigned to each assessment Item. Additional remarks have been provided in the supporting documents that follow. See the corresponding assessment Item Number. For the purpose of this report the following terms and scoring will be used.
2.0 Structural Soundness
1.0 Age and History
Total Age and History Assessment Score (out of 18 point)
3.1 Plumbing
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility
3.1.5 Other Plumbing Systems 1
3.2.1 Energy Supply 2
3.2.2 Heat Generating Systems 3
3.2.3 Cooling Generating Systems 3
3.2.4 Distribution Systems 2
3.2.5 Terminal and Package Units 3
3.2.6 Controls and Instrumentation 2
3.2.7 Systems Testing and Balancing 2
3.2.8 Other HVAC Systems and Equipment 1
3.3.1 Sprinklers 0
3.3.2 Standpipes N/A
3.3.3 Fire Protection Specialties 2
3.3.4 Fire Alarm Systems 1
3.3.5 Other Fire Protection Systems N/A
3.4.1 Electrical Service and Distribution 1
3.4.2 Lighting and Branch Wiring 1
3.4.3 Communications and Security 1
3.4.4 Standby Power 1
3.4.5 Other Electrical Systems 1
4.1.1 Secure Staff Parking Area 1
4.1.2 Separate Staff Building Circulation 1
4.1.3 Defendant Sallyport 1
4.1.4 Separate Defendant Building Circulation 1
4.1.5 Single Point Public Entry / Security Screening 1
4.1.6 Security Camera System 1
Total Plumbing Assessment Score (out of 30 point)
Total HVAC Assessment Score (out of 48 point)
Total HVAC Assessment Score (out of 18 point)
Total Electrical Assessment Score (out of 30 point)
3.4 Electrical
4.0 Security Requirements
3.2 HVAC
3.3 Fire Protection
4.1.7 Courtroom Party Separation 1
5.1.1 Building Code Height and Area 3
5.1.2 Building Code Fire Suppression 5
5.1.3 Building Code Fire Alarm 3
5.1.4 Building Code Egress 3
5.2.1 ADA Accessible Route 2
5.2.2 ADA Public 2
5.2.3 ADA Staff 2
5.2.4 ADA Restrooms 2
6.1.1 Jury Trial Courtroom 2
6.1.2 Non - Jury Trial Courtroom / Formal Hearing Room 0
6.1.3 Grand Jury Area 4
6.1.4 Judge's Chambers 1
6.1.5 Conference / Resource Room 0
6.1.6 Prisoner Handling Facilities 0
6.1.7 Circuit Court Clerk Area 3
6.1.8 Court Affiliated and Support Offices 0
6.1.9 Facility Support Areas 0
6.1.10 Public Area 1
6.1.11 Factored Area (Net Function Times %) 2
6.1.12 Non AOC County Support Areas 4
5.0 Building Code and ADA Compliance
5.1 Building Code Requirements
5.2 ADA Compliance
6.0 Space Adequacy of the Facility Relative to AOC Program Space Requirements
Total Security Requirements Assessment Score (out of 42 point)
Total Building Code Assessment Score (out of 24 point)
Total ADA Compliance Assessment Score (out of 24 point)
7.0 Interior and Exterior Quality of Existing Court Facility
7.1 Interior Quality
Total Space Adequacy Assessment Score (out of 72 point)
7.1.1 Interior Finish Durability 2
7.1.2 Interior Finishes in Keeping with the Dignity of the Court 1
7.2.1 Site 2
7.2.2 Exterior Envelope Roof 1
7.2.3 Exterior Envelope Walls 3
7.2.4 Exterior Envelope Doors and Windows 3
8.1.1 Environmental Hazards 4
31.97%Total Facility Assessment Score
Total Facility Assessment Score (out of 366 point)
Total Exterior Quality Assessment Score (out of 24 point)
Total Environmental Hazards Assessment Score (out of 6 point)
7.2 Exterior Quality
8.0 Potential Environmental Hazards
Total Interior Quality Assessment Score (out of 12 point)
1.0 AGE AND HISTORY
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 13
Item # 1.1.2 – County Population and Growth History: GOOD
Based on Kentucky State Data Center, University of Louisville
2016 Projections of Population by County
CY 2010 – CY 2040
4,755 – 3,463 = 1,292/4,755 = 23% decrease projected
Remarks Photo
Item # 1.1.3 – Facility Case Load Data and History: GOOD
Owsley County All Cases Filed
CY 2011 – CY 2020
1,229 – 982 = 247/1,229 = 20% overall decrease cases filed
991 average yearly cases filed
Item # 1.1.1 – Age and History of Facility: FAIR
The first courthouse was built in 1844. The courthouse was destroyed by fire in 1929. The second courthouse was built in
1930. This facility was a two-story brick structure on the
Colonial Revival Style fronted by a portico of eight Doric columns. The second courthouse burned in 1967. The current courthouse was built in 1970 of a modern design, a two-story brick building covered with a flat roof. 1983 Addition for first level court support office spaces / mechanical room, second level circuit clerk offices, and an additional egress stair.
Renovation of Courtroom, Judge’s office, and Jury Rm.
2.0 STRUCTURAL SOUNDNESS
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 14
Item # 2.1.1 - Basement Level: N/A
Item # 2.1.2 - First Level: FAIR
Poured in place concrete foundation, 8” CMU bearing wall masonry, 1.5” rigid cavity wall insulation, brick veneer exterior, concrete floor slab on grade.
Item # 2.1.3 - Second Level: FAIR
Masonry bearing walls supporting steel bar joists w/ metal deck
/ concrete floor slab.
2.0 STRUCTURAL SOUNDNESS
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 15
Item # 2.1.4 - Third Level: N/A
Item # 2.1.5 - Roof Level: FAIR
Masonry bearing walls supporting steel bar joists w/ metal roof deck.
3.0 PERFORMANCE AND LIFECYCLE
ASSESSMENT OF MECHANICAL AND ELECTRICAL SYSTEMS
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 16
Item # 3.1.2 - Domestic Water Distribution: POOR
The domestic water distribution throughout the building is in poor condition. The domestic water piping is a mixture of copper and PVC.
The different materials indicate previous renovations, repairs, etc. The occupants stated that there is no hot water upstairs.
Due to the age and condition of all the domestic water distribution piping, it is recommended that a complete new domestic water system be installed as part of a new plumbing system design.
Item # 3.1.1 - Plumbing Fixtures: POOR
The existing plumbing fixtures for the Courthouse are in poor condition. The fixtures are dated (some are original to the 1973 building, and some are from a 1984 renovation) and many do not comply with current ADA guidelines. The occupants stated that the fixtures are in bad shape and have leaks. Some fixtures have been replaced over time making the fixtures inconsistent throughout the building.
Due to the age, condition, and code deficiencies of all the plumbing fixtures, new plumbing fixtures are recommended as part of a new plumbing system design.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 17
Item # 3.1.3 - Sanitary Waste: POOR
The sanitary waste system for the Courthouse building is in poor condition. The sanitary waste piping is original to the building. The occupants stated that there are odor issues regularly and were noticeable during the site visit.
Due to the age and condition of all the sanitary waste piping, it is recommended that a complete new waste piping system be installed as part of a new plumbing system design.
Item # 3.1.4 - Rainwater Drainage: POOR
The rainwater drainage for the existing building is provided by roof drains which are in poor condition. The roof repair/replacement has been approved in 2020, but the repair/replacement has not taken place. There are roof leaks when it rains.
Due to the age and condition of the roof drains, it is recommended that a complete new roof drainage system, along with a code required secondary drainage system, be installed as part of a new plumbing system design.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 18
Item # 3.1.5 – Other Plumbing Systems: POOR
The existing domestic hot water for the building is served by electric water heaters. One heater is located above ceiling. The hot water serving the upstairs in no longer working.
Due to the age and condition of the water heaters, it is recommended that all domestic water heaters be replaced as part of a new plumbing
Item # 3.2.1 - Energy Supply: POOR
This Courthouse building is being fed by an electrical service. The required amount of outside air per the Energy Codes is not being supplied to this building. The codes have been updated since these systems were installed, and the amount of outside air required has increased.
There is no dehumidification cycle on any of the systems to help with potential humidity issues of the untreated outside air entering the building.
It is recommended that the correct amount of ventilation/outside air be provided to the building with proper dehumidification as part of a new HVAC system design.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 19
Item # 3.2.2 - Heat Generating Systems: FAIR
The heating for the Courthouse building is served by electric rooftop units connected to ductwork that distributes the air throughout the building. There are two units for this building, one for each floor. The unit feeding the first floor was replaced in 2019 by a Carrier rooftop unit. The other unit has also been previously replaced; however, it has exceeded its life span.
Due to age and condition, it is recommended that all the heat generating systems for the building be replaced as part of a new HVAC
Item # 3.2.3 - Cooling Generating Systems: FAIR
The cooling for the Courthouse building is served by electric air-cooled
DX rooftop units connected to ductwork that distributes the air throughout the building. There are two units for this building, one for each floor. The unit feeding the first floor was replaced in 2019 by a
Carrier rooftop unit. The other unit has also been previously replaced;
however, it has exceeded its life span.
Due to age and condition, it is recommended that all the cooling generating systems for the building be replaced as part of a new HVAC
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 20
Item # 3.2.4 - Distributions Systems: POOR
The air distribution system for the Courthouse building is connected to the existing rooftop units. The rooftop units are serving zones that are too large with mixed uses in the spaces.
This results in thermal comfort issues. The occupants stated portable heaters and fans are being used to help with thermal comfort.
Due to the age and condition of all the distribution systems, it is recommended that they be replaced as part of a new HVAC
Item # 3.2.5 - Terminal and Package Units: FAIR
The terminal and packaged units for the Courthouse building are electric rooftop units connected to ductwork that distributes the air throughout the building. There are two units for this building, one for each floor. The unit feeding the first floor was replaced in 2019 by a Carrier rooftop unit. The other unit has also been previously replaced; however, it has exceeded its life span.
Due to age and condition, it is recommended that all the terminal and package units for the building be replaced as part of a new HVAC system design.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 21
Item # 3.2.6 - Controls and Instrumentation: POOR
The HVAC system in the building is controlled by local thermostats that are of various types and ages. Because the zones of the buildings are so large and feed multiple use spaces, these thermostats cannot be accessed by all occupants making thermal comfort difficult. All these devices are in poor condition.
Per the AOC – Rules of Administrative Procedure – Court Facilities
Criteria, a new Direct Digital Control (DDC) system is recommended in all new and renovated facilities.
It is recommended to install a new DDC system as part of a new HVAC system design for this building.
Item # 3.2.7 - Systems Testing and Balancing: POOR
The existing building has issues with air circulation. The existing distribution system has exceeded its life span and over time, the ductwork can become dirty and airflow is less than designed.
Due to the age and condition of this system, it is recommended that the entire HVAC system be replaced and at that time a new test and balance evaluation will be performed as part of the new system for this building.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 22
Item # 3.2.8 - Other HVAC Systems and Equipment: POOR
The existing elevator equipment room in this building does not have any ventilation or HVAC. Per the Kentucky Building Code and the
International Mechanical Code, either a dedicated exhaust or dedicated HVAC unit is required to be installed in this room.
A new dedicated exhaust or HVAC is recommended to be installed as part of a new HVAC system design.
The existing data closets throughout the building do not have separate
HVAC units feeding these spaces. The occupants state that the rooms get too hot. New dedicated HVAC units are recommended to be installed as part of a new HVAC system design.
The original coal fired boiler and associated piping has been left abandoned in the original mechanical room. This equipment and piping will need to be removed as part of a new HVAC system design.
Item # 3.3.1 - Sprinklers: NONE
There is no sprinkler system in the existing Courthouse
Building. Per the Kentucky Building Code and the AOC –
Rules of Administrative Procedure – Court Facilities Criteria, a fire sprinkler system is required for new, renovated, adapted, or expanded facilities and shall be installed per
NFPA 13.
It is recommended that a new 100% coverage automatic wet sprinkler system be installed for the buildings.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 23
Item # 3.3.2 - Standpipes: NA
The existing building does not have a standpipe and per code one is not required.
Item # 3.3.3 - Fire Protection Specialties: POOR
Portable fire extinguishers shall be installed in use groups A and B.
Portable fire extinguishers shall be selected and installed in accordance with NFPA 10 guidelines.
The size and distribution of portable fire extinguishers shall be in accordance with Class A fire hazards. The minimum sizes and distribution of portable fire extinguishers for occupancies that involve primarily Class A fire hazards shall comply with the following:
Maximum floor area per fire extinguisher is 3000 square feet with a travel distance of 75 feet.
Courthouse Building = 11,346 / 3,000 = 4 minimum fire extinguishers.
Annex Building = n/a
This assessment item is receiving a score of 2 because the facility does not have the minimum number of fire extinguisher required with in the 75-foot travel distance.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 24
Item # 3.3.4 - Fire Alarm System: POOR
The existing fire alarm system was controlled via a zone type Simplex
2001 panel.
The existing system failed to have the required smoke detector at the main panel and annunciator location(s). The pull stations were non-
ADA compliant. There are no visual or auditory field devices in restrooms. There seemed to be an adequate number of field devices in the general areas.
It is recommended that any renovation include a new up-to-date fire alarm system that is addressable and corrects the issues above.
Courthouse
Item # 3.3.5 - Other Fire Protection Systems: NA
There are no fire protection systems that would fall under the “other” category for this building.
Remarks Photo:
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 25
Item # 3.4.1 - Electrical Service and Distribution: POOR
The electric system is serviced by Jackson Energy. The service is stepped down via a 300KVA pad mounted transformer, to a
480Y/277V, 1000A, 3P, 4W main distribution panelboard. The
MDP then feeds multiple 208Y/120V, 3P, 4W branch panelboards (400A &100A). The MDP and branch panel boards seem to be original to the building and were manufactured by
Federal Pacific Energy. All panelboards are in poor condition.
The MDP is lacking in capacity for spare breakers and space.
The branch panel boards have slightly more capacity but lacking if any renovation is planned.
Branch panelboards, disconnects, and transformers are located in a janitors closet and have severe clearance and spacing issues. No surge protection is present
Any major renovation should completely replace the existing distribution system. The Federal Pacific Energy panelboards are obsolete, and it is recommended that they are replaced with new panelboards with more capacity for breakers. It is also recommended that a designated area for electrical equipment be created to accommodate NEC clearance requirements and general safety concerns.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 26
Item # 3.4.2 - Lighting and Branch Wiring: POOR
The facility primarily had T8 lamps throughout. No LED replacements seemed to have been made. Lighting levels in the facility are generally low, especially the stairs, which don’t have functional lighting.
There are no lighting controls other than basic switches.
Exit signs and emergency egress lighting are fed from either integral battery packs or remote mounted battery units;
however, several areas are lacking in emergency lighting. The emergency lighting that is existing seems to be non-functional.
Exterior emergency egress lighting is lacking per NEC requirements.
Due to updated energy codes (currently 2012 International
Energy Conservation Code (IECC)), it is recommended to replace the existing lighting with energy efficient LED luminaires and provide updated lighting controls. Lighting controls should consist of occupancy sensors, daylight sensors and dimming capabilities.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 27
Item # 3.4.3 - Communications and Security: POOR
The primary telecommunications are provided underground to a janitor’s closet. It had some ventilation, but no temperature control. The grounding bar was undersized based on telecommunication standards.
Horizontal cabling is Category 6 cabling, which meets the requirements in Section III: Court Facilities Design guide.
Several rooms/areas are lacking in telecommunication outlets.
The phone system has been converted to VoIP.
Internal Security Systems (ISS) is present for the facility, although extremely lacking. Restricted access areas were controlled with electric strike locks activated by card readers.
There are panic alarms in the judge’s chambers and in the clerk area. It was not confirmed to be functioning. There is no intercom system.
Any renovation project should incorporate a replacement/upgrade of the existing telecommunications system, providing an intrusion detection system, and replacement/upgrading of the existing Internal Security System
(ISS) and associated intercom system to comply with the current Court Facilities Design guide.
In conjunction with the above improvements, a future project shall include providing dedicated telecommunications equipment rooms as required. Each room shall be provided with HVAC equipment sized as necessary to accommodate heat rejection of the active equipment. Sizing of these new rooms shall be based on meeting present and future needs.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 28
Item # 3.4.4. - Standby Power: POOR
There is not a generator for this facility. There were emergency lighting wall packs in some areas, but no indication of any other emergency luminaires. The wall packs did not seem to be functioning.
Item # 3.4.5 - Other Electrical Systems: POOR
The JAVs systems seems to be outdated. In addition to the
JAVS equipment rack within the courtrooms, there are supplement equipment racks for courtroom camera system.
System has been not yet been upgraded to incorporate HDMI connectivity. Wires to multiple areas were brought across the floor, in the walkway.
It is recommended that the JAVs systems be upgraded to incorporate HMDI capabilities and include wireways that can avoid tripping hazards in the courtroom.
No lightning protection is present.
Many receptacles are in poor condition and pose some safety concerns.
4.0 SECURITY NEEDS
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 29
Item # 4.1.3 – Defendant Sallyport: POOR
A vehicular sallyport for the defendant has not been provided at this facility. It is recommended that a vehicular sallyport is provided for defendant security and safety per the Administrative Office of the
Courts Facilities Criteria and Design Guidelines.
Item # 4.1.1 - Secure Staff Parking Area: POOR
A designated secure staff parking area has not been provided at the current facility. It is recommended that secure staff parking is provided per the Administrative Office of the Courts Facilities Criteria and Design Guidelines.
Item # 4.1.2 - Separate Staff Building Circulation: POOR
A designated staff building entrance and circulation space has not been provided for the staff and judges at the current facility. It is recommended that designated staff and judges building circulation is provided per the Administrative Office of the Courts Facilities Criteria and Design Guidelines.
AOC Facility Assessment: Owsley County Court of Justice Courthouse Facility 30
Item # 4.1.4 – Separate Defendant Building Circulation: POOR
A separate defendant circulation space and holding areas has not been provided at this facility. It is recommended that a separate defendant circulation space and holding area is provided for defendant security and safety. per the Administrative Office of the Courts Facilities
Criter…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .