ATTACHMENT A 834 CHNC FY21-SOW.doc

DOC document 283 KB Posted

Attached to
S208--Cave Hill National Cemetery GMS
Solicitation number
36C78621Q0091
Issued by

View the file

Other files

File Type Posted
36C78621Q0091 0003_1.docx DOCX document
36C78621Q0091 0002_1.docx DOCX document
36C78621Q0091_2.docx DOCX document
36C78621Q0091_1.docx DOCX document
Attachment D PAST PERFORMANCE QUESTIONNAIRE (May 2014).docx DOCX document
ATTACHMENT C PRICE COST SCHEDULE CAVE HIILL NC GMS.docx DOCX document
ATTACHMENT B SCA WD 2015-4717 REV 14 DATED 21 DEC 2020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grounds Maintenance / Cave Hill National Cemetery

PART II - DESCRIPTION I SPECIFICATION I WORK STATEMENT

The National Cemetery Administration (NCA) – Cave Hill National Cemetery located at 701 Baxter Avenue, Louisville, KY 40204, has an immediate need for Grounds, Tree and Headstone and Maintenance services. Date of award through September 30, 2021, with four (4) one-year Options through September 30, 2025 Offeror shall provide all labor, equipment, and supplies to complete grounds, headstone and tree maintenance. Services will include but are not limited to: Lawn/turf maintenance, mowing, trimming and edging, aerating, weeding, fertilizing, pest control, tree/shrub maintenance (includes mulching as required), snow and leaf removal, restoration of individual sunken gravesites, headstone raise and realignment, and trash/debris removal. (I expanded this section to include more CLINs items) Note: There are eight “Agronomic Protocols” that outline appropriate policies and procedures for proper lawn care operations at this Cemetery. In case of any discrepancies between procedures specified by the protocols and those specified in this part of the Performance Work Statement (PWS), this guidance takes precedence – see attachment called “P01 – Agronomic Protocols”.

SCOPE OF WORK

LAWN MAINTENANCE

LAWN MAINTENANCE - MOWING, EDGING AND TRIMMING

MOWING

The Offeror shall be responsible for mowing, edging and trimming all grass within the cemetery grounds and outside cemetery perimeter enclosure walls as specified by the Contracting Officer’s Representative (COR). This service area encompasses approximately 4.0 acres (Cutting heights of all mowing equipment shall be set per heights specified below also see attached Agronomic Protocols for additional information regarding all mowing specifications).

Riding mowers are permitted and must have mulching decks provided they are not operated within three (3) inches of headstones, markers, monuments, tree trunks or other vertical surfaces.

Regular mowing is required to be performed before trimming. If ground is wet, to the point of causing rutting, mowers will not be used until ground conditions permit. COR will be notified immediately.

Walk-behind, push type machines, handheld weed trimmers will be used to trim grass from around headstones, monuments, markers, etc.

Cutting blades on mowing and trimming equipment must be kept sharpened or replaced weekly so that grass tips are properly cut and not torn or damaged. Documentation must be provided upon request indicating weekly blade sharpening and/or replacement.

Turf shall be mowed to a height of 3.5 inches.

Areas of the Cemetery where the grass is NOT to be mowed, will be delineated by the COR.

Mowing of new sod, new seed, pine bark and mulched areas with riding mowers is not permitted until they have become established turf. When grass in these areas gets tall enough and requires mowing, it shall be carefully mowed with a push mower at 3.5 inches until sod is established well enough to support riding mowers without damage to the grass or soil surface.

Areas shall be properly marked by the Offeror “NEW SOD, etc., for public knowledge.

Offeror shall mow all turf areas so that no more than 1/3 of the height of grass is removed at anyone mowing. If grass clippings are evident, the Offeror is responsible for the removal of clippings at no extra cost to the Government. Grass clippings that adhere to headstones, markers and walkways are to be cleaned/removed after each mowing event.

TRIMMING

Grass areas not mowed around headstones, monuments, markers, and other vertical surfaces shall be trimmed with each mowing and within 3 days prior to Memorial Day, Veterans Day. Additional trimming outside of the regular schedule may be required for additional federal holidays as identified by the COR.

Trimming around headstones shall leave grass at 3.5 inches tall, the same height as mowing. Scalping is not acceptable. Where scalping is evident, Offeror will be responsible for repair of the damage at no cost to the Government.

Trimming must be performed after mowing not before. Trimming around headstones shall leave grass at 3.5 inches tall, the same height as mowing.

LAWN MAINTENANCE - FERTILIZATION, AEARATION, LIME APPLICATION, AND WEEDING AND PEST CONTROL

The Offeror will supply all necessary chemicals, materials, applicators, hoses and other equipment to successfully complete spraying, fertilization, and weeding requirements.

Offeror shall be responsible for maintaining the entire cemetery in a healthy condition by proper application of fertilizers, chemicals (to control weeds, diseases and insect pests) and lime (if soil tests indicate it is needed). This includes turf and non-turf areas.

The turf is to be aerated in late Fall (September or early October). Approximately 4.0 acres of turf area will be treated.

Note: Cave Hill National Cemetery does not have any water available to use.

Before any Fertilization chemicals are administered, documentation shall be provided to the COR by the Offeror PRIOR to application and must identify the following:

· What types of chemicals/treatments are being applied?

· Quantity (in fluid ounces)

· Dates of Application (See Chemical Application Schedule on Page #5)

· Location of applications (identify Cemetery section)

· How were chemicals/treatments applied Weather permitting fertilizer will be applied to all cemetery turf and landscape areas up to three times each year: mid-May, early September, and mid-November, unless unfavorable weather conditions persist or as otherwise directed by COR.

The nitrogen (N) component of the fertilizer is to be 30-50% slow release, and the ratio of N:P:K is to be approximately 4:1:2 (for example, a fertilizer with an N,P,K analysis of 24-6-12 has a 4:1:2 ratio).

The rate of fertilizer applied shall be based on its nitrogen content, with 1.0 pound of actual nitrogen applied per 1000 square feet in May and September, and 1.5 pounds actual nitrogen applied in November.

Documentation shall be sent to COR of what, how much, when, where, and how the fertilizer was applied, prior to application. (See Agronomic Protocol #3: “General Turf Grass Maintenance Operations” for additional information).

LIME APPLICATIONS

When soil tests indicate a need for lime, it shall be applied as pellet lime at the rate indicated in those tests and shall be applied immediately following aeration in September, unless otherwise approved by the COR.

Before any application of lime is administered, documentation shall be provided to the COR PRIOR to application and must identify the following:

· What type of lime product was applied?

· Quantity

· Date of Application (See Chemical Application Schedule on Page #5)

· Location of Application (identify Cemetery section)

· How was lime application administered?

WEED AND DISEASE CONTROL

All weed growth and disease shall be controlled by means of spray approved by the COR. This includes all turf and non-turf areas throughout the cemetery.

Any personnel administering weed control sprays, must have a current license by the State of Kentucky to administer herbicides/pesticides.

Before any Herbicide/Pesticide applications are administered, documentation shall be provided to the COR PRIOR to spraying and must identify the following:

· What type of lime was Herbicide/Pesticide will be applied?

· Quantity (fluid ounces, gallon, etc.)

· Date of Application (See Chemical Application Schedule on Page #5)

· Location of Application (identify Cemetery section)

· How Herbicide/Pesticide was applied Herbicide treatments for all weed control throughout the entire cemetery (turf and non-turf areas) will be applied in the Spring (March or April) and the Fall (Oct. or Nov.) of each year.

Spot treatments, throughout the entire cemetery (turf and non-turf) of individual escaped or late emerging weeds will be done as needed through the growing season (at least once per month) to maintain the cemetery in a generally weed-free condition. (See Agronomic Protocol #5 “Selective Weed Control in Established Stands of Turf grass” for additional details.)

Crabgrass: A pre-emergence herbicide treatment for control of annual grasses (crabgrass) shall be applied annually before crabgrass begins to germinate (usually mid-March, earlier if conditions are unusually warm).

The herbicide rate used will be the maximum allowed by the product label for cool-season grass in that region. (See Agronomic Protocol #6 “Pre-Emergent Control of Crabgrass and Other Annual Grass Weeds in Turf grass” for additional details.)

However, if the turf fertilizer contains broadleaf herbicide then a fertilizer without broadleaf herbicide shall be used in the shrub and landscape beds. Surface application of the fertilizer to the soil is adequate for application. Any fertilizer granules remaining on foliage of ornamentals shall be thoroughly brushed or washed off immediately after application.

Moles, if applicable, and any Other Pest:

Moles and any other pest shall be controlled by Talparid© and one (1) up to six (6) applications may be required annually depending on severity of pest infestation. Offeror must ensure that soil is tamped into holes and turf replaced or re-seeded to obtain an acceptable appearance at all times.

Care must be taken, especially with the early application, to not treat newly seeded areas or graves (or areas or graves to be seeded within 3 months, unless the topsoil will be replaced) because the herbicide will prevent growth of young turf grass as well as weedy grasses.

See Chemical Application Schedule below for an annual schedule of herbicide, lime, Talparid©, pesticide, and fertilizer applications.

CHEMICAL APPLICATION SCHEDULE

(This schedule is subject to change and is contingent upon favorable weather conditions at time of application):

JANUARY

No Chemical Applications Needed

FEBRUARY

No Chemical Applications Needed

MARCH

Identify and spot spray for and treat pockets of winter annual weeds with broadleaf herbicide (Momentum Q and Three Way Select)

Identify and spot spray trees and shrubs for insects and disease and treat as needed. (Contact COR for guidance)

APRIL/MAY

Apply fertilizer after turf is actively growing such as 24-6-16 at 4 lbs. per 1000sq. ft.

April-Spray selective herbicides (Momentum Q and Three Way Select) to control broadleaf weeds in turf during late April when dandelions are flowering and weeds are actively growing.

May- Apply a full rate of accepted crabgrass pre-emergence herbicide (Dimension)

JUNE/JULY/AUGUST

June- Continue to spot spray all grassy weeds (Q4 herbicide)

June- Early apply fertilizer 4-1-2 slow release to all turf at 1.0 per 100 sq. ft.

SEPTEMBER

Apply fall fertilizer to cemetery turf use a 4-1-2 at 1.0 per 1000 sq. ft.

Apply Lime only if needed, based on soil test results. If PH is 5.5 or higher no lime is needed.

OCTOBER

Apply Pre-emergent (Simazine) for Winter weeds.

NOVEMBER/DECEMBER

No Chemical Applications Needed

LAWN MAINTENANCE: OVERSEEDING (as needed) Work consists of over-seeding established turf bed. All seeding materials are to conform to those specified below, unless otherwise specifically approved in writing by the Contracting Officer Representative (COR).

Applied seed must have a minimum germination percentage of 85%. Specified materials are to be applied in amounts and methods herein stipulated. Tall Fescue Blend Select Certified seed will be used.

Offeror will be required to verify minimum germination requirements are met prior to application. Seed delivery tickets must be presented indicating date, weight, analysis, and Offeror’s name, etc., are to be submitted to the COR prior to application.

Grass seed shall be a fresh new-crop seed complying with purity and germination requirements stipulated by the State of Kentucky. Grass seed mix will be specified by the COR and is Tall Fescue Blend Select Certified.

Only strains of grass sod that have been adapted in the State of Kentucky and certified by the State Agronomy Testing Laboratory will be accepted. Weed seeds and inert matter must not exceed 0.24% of total weight (all percentages are by weight). Seed is to be free of any noxious weeds.

LAWN MAINTENANCE: LEAF COLLECTION

Work consists of collecting and removing from the cemetery grounds and the immediate area outside the cemetery wall all fallen leaves, branches, and twigs as needed or directed by the COR.

All fallen leaves must be collected and removed from the site daily or as needed until all fallen leaves are removed.

Leaves, branches, and twigs will be hand raked, vacuumed or blown by walk-behind push type machines from interment areas into the roadways, and then collected and properly disposed of from cemetery grounds daily.

Offeror will inspect all areas of the cemetery during this period and ensure that there is no accumulation of leaves in any area.

LAWN MAINTENANCE: TREE/SHRUB MAINTENANCE AND MULCHING

TREE/SHRUB MAINTENANCE

Work consists of but is not limited to, maintaining shrubs and trees in a healthy and attractive condition by proper watering, fertilizing, near-ground pruning, spraying for pests, cultivation and mulching.

Tree maintenance or removal services may also be required when felled and/or dead, diseased trees pose a potential safety hazard to the Cemetery staff and public.

All tree related services must be performed by a certified Arborist or Tree Specialist certified by the International Society of Arboriculture (ISA). All work must be done without disturbing or damaging existing gravesites and must be completed in accordance with the following specifications outlined in the American National Standards Institute (ANSI):

· ANSI A300 (Part 1) –2001 (see attached)

· A.23.1.1. American National Standards Institute (ANSI) Publications: ANSI A300:

Tree Care Operations‑Pruning, Trimming, Repairing, Maintaining, Removing Trees, and Cutting Brush ‑ Safety Requirements.

All necessary equipment for this maintenance performance shall be furnished by Offeror unless specifically stated otherwise. All cutting tools will be kept sharp and properly functioning.

Trees will be kept free of suckers. Low-hanging dead and broken branches (ones that can be SAFELY removed with a pole pruner or from a step ladder) will be removed. All cuts will be made cleanly.

Cuts for limb or branch removal will be made just outside the branch-bark collar to minimize wound closure time by the plant. All limbs one inch in diameter or over must be precut to prevent splitting. Branches 3.5 inches or larger in diameter should be lowered by ropes to the ground. Any structural weakness, decayed trunk of branches, split crotches, or branches should be immediately reported to the COR.

All new trees shall be staked. Young trees that have tipped or leaned shall also be staked back to a vertical position. Stakes should be needed for no longer than one year. Trees which have been damaged in any way will be reported to the COR. All existing tree damage by the

Offeror will be replaced at Offeror’s cost.

Shrub/Hedges will be trimmed to promote a healthy and attractive appearance and uniform growth over all parts of the plant, with the bottom wider than the top. Hedges and shrubs shall be kept free of dead branches and leaves.

Beds containing shrubs, ground cover and annual or perennial flowers shall be kept attractive and free of weeds. Any cultivation shall be generally shallow to avoid any damage to roots. Pre-emergence herbicides may be used if compatible with the plants in the beds and if authorized by the COR.

Dead or dying plant material shall be reported to the COR. Replacement plants, if needed, shall be furnished by the COR and planted by the Offeror when available.

All shrubs, ground cover and bedding plants shall be watered during the growing season to the degree needed to maintain an attractive appearance should natural rainfall fail to provide the moisture needed. A watering schedule shall be provided to the COR prior to watering and approved.

Fertilization of trees and shrubs (whether in turf areas or in their own beds) will be done at the same time and with the same fertilizer (and at the same rate) used for turf fertilization.

MULCHING

All trees located on the Cemetery grounds must be mulched annually.

Mulch around trees and in other beds will be maintained continuously (year around) in an attractive 3-4” thick layer. Mulch will be black mulch and beds constructed to be esthetically pleasing to the eye of the public and maintained free of weeds, sticks, stones, clippings and other foreign material.

Existing mulch/compost will be removed before any new mulch is placed. Mulch shall be pulled back 4” from the trunks of trees; level with the surrounding area (to reduce pest damage potential and allow the bark to dry) then sloped up to the 4” depth. Fresh, black mulch will be added one week before Memorial Day and/or as required by the

COR.

Offeror will provide all mulching materials. Mulch must be midnight black and not contain any grey or discolored mulch content.

No bark chips or nuggets or rubber mulch will be accepted COR will identify trees to be mulched.

A cemetery map identifying locations, number of trees, etc., requiring mulching will be provided by the Contracting Officer’s Representative (COR).

GRAVESITE RENOVATION

GRAVESITE RENOVATION: Sodding (for Gravesite Renovations) A gravesite needing renovation is defined as: any gravesite that has receded from original grade (adjacent with surrounding gravesites), leaving a washboard effect.

Gravesites with weed-free established sod will be leveled by removing existing sod, backfilling the grave, and replacing the sod that was removed, if sod is healthy and vigorous. Sod is to be removed with a sod cutting machine leaving the sod in a roll, not cut up in squares. Gravesites that do not have suitable, established sod, that can be reused, will have new sod properly installed on the graded and prepared gravesite. Gravesites to be renovated must be square, power tamped and free of all debris. Starter fertilizer will be included as part of the surface preparation prior to installing the sod. Installed sod and seeded areas must be kept moist until they are well established. Offeror is responsible for ensuring each renovated gravesite is maintained in a weed free established condition. If gravesite is lost due to Offeror negligence, Offeror will renovate the gravesite again at no cost to the government

For all gravesite’s renovations, rolled sod shall be installed by close of business on date specified and no later than that Friday (of the same week) to facilitate maintenance of a healthy and vigorous state. If sod cannot be purchased, black mulch may be approved to be used by the COR until sod can be purchased.

An area where sod is to be placed shall have a minimum of two (2) inches of topsoil placed on it and be prepared for sod by bringing ground surface to adjacent grades, (with allowances for sod thickness, where applicable) free of sticks, stones, or other foreign material. Note: If sod cannot be purchased, black mulch may be approved to be used by the COR until sod can be purchased.

Surface to conform to finish grade, free of water retaining depressions, soil friable, free of clumps and should be of a uniform firm texture. Gravesites are not to be mounded nor recessed, they should blend with adjacent gravesites. Soil is to be dampened before sod is installed.

Starter fertilizer (12-25-10) shall be applied to the soil surface at a rate of 1.0 lb N per 1000 square feet, before laying sod.

Sod shall be laid with seams tightly matched, then rolled, then watered thoroughly. Sod must be kept moist until it is well rooted and able to survive with standard watering.

GRAVESITE RENOVATION: Cemetery Sections and Casket Gravesites Dimensions:

Section A: 3X9

Section B: 3x9

Section C: 3x9

Section D: 3x9

Section E: 3X9

COR will indicate which gravesites need renovation and will give Offeror a list of gravesites to backfill monthly as needed. Approximately 10 up to 20 gravesites may need to be renovated per year.

HEADSTONE CLEANING

Work consists of cleaning all headstones and markers, removing objectionable material and discoloration, such as accumulations of bird droppings or mud, tire and hose marking, grass stains, residue from trees, fungus, etc. as per contract. There are approximately 5,863 marked gravesites in the 4.25-acre Cave Hill National Cemetery.

All headstones and markers shall be cleaned semi-annually in April and September. Thereafter COR may determine if individual headstones require additional cleaning (spot spraying) throughout the year to maintain a clean appearance overall at no cost to the government.

The natural surfaces of the headstones shall be preserved. They shall not be painted, whitewashed, or calcimined. Abrasive blasting is prohibited.

Procedure A. Clean water shall be used to ‘wash’ headstones, after stone is dry, a spray application of cleaning solution brand named “D-2” shall be applied. When spraying D2 the entire headstone will be sprayed. (front, back and both sides of the headstone/marker) B. When water under pressure is used, the pressure will not exceed 300 psi. Excessive soil may be removed with plain water and a natural bristle, medium stiff brush (no wire brushes), followed by rinsing with clear water.

C. If water, used in cleaning, should soften the soil around the base of the headstone so that the stone is loose, care shall be taken not to tip the stone out of plumb or alignment. If stone is loosened, Offeror will wait until area around stone is dry, then re-plumb and align stone.

D. Care shall be taken to protect the turf area from any damage. Any turf damaged by the Offeror shall be restored at Offeror’s cost.

**COR will provide onsite/hands on training for Offeror personnel at no additional cost to the Offeror

HEADSTONE HEIGHT & ALIGNMENT MAINTENANCE - (Raise and Realignment) Headstones shall be uniformly consistent in height and alignment while following the contour of the ground.

Maintenance under this category will consist of one of/or two methods: Raising or Realigning Headstones (R&R) OR Fine Tune Adjustments when existing headstones have shifted out of vertical or horizontal alignment (see descriptions below).

Both methods include checking then immediately reporting physical defects to the Contracting Officer’s Representative (COR) or his authorized representative.

Procedure – Raise and Realignment (R&R) A. Raise keystone(s) to proper height (24-26”) and plumbed and aligned.

B. Run a tight top line and front line to each keystone.

C. Raise all stones to the top line.

D. Align all stones to the front line.

COR will explain and train the procedure of using the top and sideline.

NOTE: **COR will provide onsite/hands on training for Offeror personnel at no additional cost to the Offeror** Headstones may require additional Raise and Realignment adjustments throughout the year as directed by COR.

All headstones that need replacement will be ordered and set by the COR.

COR is responsible for ordering headstones, checking for proper wording and initial inspection for damages, when received. Any headstones damaged or broken by the Offeror shall require identical replacement within 30 days by the Offeror at no additional cost to the Government.

Replacement cost for any breakage or damage in any form, due to the Offeror’s handling or negligence, will be borne by the Offeror, and must be reported to the COR immediately.

Alignment of all headstones at the cemetery will be maintained at all times using the “Fine Tune Adjust” method of precision fine tune adjustment.

This method requires the use of wood tamper to visually adjust individual headstones back into vertical position both “front to back” and “side to side” with the alignment of the other adjacent headstones in the same rows and in adjacent columns of the burial section.

After headstones have been adjusted back into position the ground surface is manually tamped with the board to tighten it around the headstone.

Headstones shall be lifted and transported or set by at least two (2) Offeror personnel unless special one-man devices are approved by COR.

All headstones will be realigned laterally, transversely and diagonally.

The COR will identify gravesites requiring renovation and submit to Offeror each month. Gravesites with weed-free established sod will be leveled by removing existing sod, backfilling the grave, and replacing the sod that was removed, if sod is healthy and vigorous. Sod is to be removed with a sod cutting machine leaving the sod in a roll, not cut up in squares.

Gravesites that do not have suitable, established sod that can be re-used, will have new sod properly installed on the graded and prepared gravesite. Starter fertilizer will be included as part of the surface preparation prior to installing the sod. Installed sod and seeded areas must be kept moist until they are well established.

Gravesites will be power tamped with a gas-powered tamper.

If gravesite is lost due to Offeror negligence, Offeror will renovate the gravesite again at no cost to the government. The Offeror shall be charged current replacement costs for headstones/ markers, other cemetery structures or property damaged as result of actions by Offeror personnel.

HEADSTONE HEIGHT & ALIGNMENT MAINTENANCE - (Fine Tune Adjust Method) Approximately 5,863 headstones (4.25 acres) will be continuously maintained in alignment using the “Fine Tune Adjust” method.

Offeror will receive onsite training from COR (at no additional charge), Cemetery Foreman and/or cemetery personnel of proper R&R and Fine Tune Adjusting (also known as “Bump and Run”) procedures in accordance to National Cemetery standards.

Procedure

This method will require the use of a wood 1”X4” tamper (with a tapered handle on one end) to visually adjust individual headstones back into vertical position both “front to back” and “side to side” with the alignment of the other adjacent headstones in the same rows and in adjacent columns of the burial section. Headstones will be realigned laterally, transversely and diagonally to ensure plumb.

In addition, the Offeror shall use small utility vehicle and/or walk-behind, manual application methods when making turf applications in any Specialty Area- so that damage to Government property does not occur. Similar judgment in equipment selection shall also be used in General Areas.

All completed gravesite R&R, Fine Tune Adjustments, or renovation work must be documented and submitted initially then daily (as performed) to COR. – See sample Initial and Daily Headstone/Marker Raise & Realign Verification Surveys below:

Initial Headstone/Marker Raise & Realign Survey

(SAMPLE USE ONLY)

INSTRUCTIONS:

The Contracting Officer’s Representative (COR) /Cemetery Director/Cemetery Foreman/ Work Leader/designee MUST conduct an initial survey of ALL headstones/markers included in the scope of work (SOW) before any work is performed.

Station Number: __________

Date: __________ Cemetery: _______________

Cemetery Director: __________________ Contracting Officer’s Representative (COR): __________________

The COR/Cemetery Director/Cemetery Foreman/Cemetery Work Leader/designee will use the Burial Register Report and the Gravesite Layout Map(s) for the initial survey.

Discrepancy/Issue Identified: Y/N

Date: ___________________

All discrepancies/issues resolved Y/N__________ Date: ___________________

I certify that the Initial Headstone/Marker verification survey was completed by the COR/Cemetery Director/Foreman or Work Leader/designee.

The Burial Register Report and the Gravesite Layout Map for the cemetery and sections listed in the SOW were used to complete the survey.

COR/Director/Foreman/Work Leader/designee Signature: _______________________

Date: ________

Daily Headstone/Marker Raise & Realign Verification Survey

(SAMPLE USE ONLY)

INSTRUCTIONS: Prior to the completion of the workday, a Daily Headstone/Marker R&R Verification Survey MUST be completed by the COR/Cemetery Director/Cemetery Foreman/Work Leader/designee utilizing the same Burial Register Report and Gravesite Layout Map as used in the initial survey for ALL completed work.

Station Number: ______

Date: __________

Cemetery: _______________

Cemetery Director: ________________

Contracting Officer’s Representative (COR): _________________

Instructions:

Prior to the completion of the workday, the Cemetery Director/COR/Foreman/Work Leader/designee MUST perform a re-verification survey for ALL completed work of headstones/markers included in the scope of work.

The Cemetery Director/COR/Foreman/Work Leader/designee will use the original Burial Register Report and Gravesite Layout Map used for the Initial Verification Survey.

List Sections and Headstones/Markers R&R: _______________________________

List discrepancy/issue: _________________________________________________

All discrepancies/issues resolved: Y/N ______

Cemetery Director/COR/Foreman/ Work Leader/designee informed MSN Director and Contracting Officer of all unresolved discrepancies/issues: Y/N _______

By signing below, I certify the Headstone/Marker re-verification survey was completed.

Daily Headstone Verification:

Date: __________

Time Completed: ______________

COR/Director/Foreman/Work Leader/Designee Signature: _____________________ the effects of storm, winds, and natural falling as soon as weather permits.

COR shall be notified immediately of any damage to Government property from any cause such as lightning, storm, fallen trees, vandalism or pilferage.

TRASH AND DEBRIS REMOVAL

Work consists of collecting and removing all trash, debris, dead or unsightly flowers, fallen tree limbs and fruit/seed pods as well as any other debris within area defined by the Contracting Officer’s Representative (COR) and in accordance with the NCA regulations.

Procedure A. All trash, debris, dead or unsightly flowers and fallen tree limbs will be removed from the cemetery areas daily.

B. All gravesite decorations will be removed twice a month or when they become unsightly (written floral regulations are to be adhered to -see COR).

C. The Offeror will provide the necessary labor and suitable conveyance each workday for pickup of this debris from cemetery grounds.

D. Removal of debris and disposal away from the cemetery grounds shall be the responsibility of the Offeror.

TRASH AND DEBRIS REMOVAL: Storm Damage and Debris Clean Up

In the event of severe weather, Offeror may be required to perform additional debris and clean up duties to restore the cemetery back to its original condition.

COR will identify locations throughout the cemetery where the Offeror will be required to pick up scattered debris, remove fallen trees, branches, limbs, twigs, leaves, etc., resulting from unexpected or adverse weather conditions.

GENERAL CONDITIONS

OFFEROR STAFFING REQUIREMENTS

Offeror will supply a minimum of one (1) employee and one (1) Site Supervisor dedicated to performing all services outlined in this PWS.

Contractor employee work may be supplemented with additional employees to accomplish ALL CLIN items successfully in a timely manner if required. The Contracting Officer must be notified immediately, and an appropriate contract modification issued to obligate additional funding if required prior to additional staff commencing any work.

SITE SUPERVISOR REQUIREMENTS

Site Supervisor: A competent and experienced English-speaking Site Supervisor shall be provided by the Offeror whenever work is being performed other than trash and debris pick-up.

The Site Supervisor must have not less than five (5) years of experience as a direct supervisor of grounds maintenance operations that included mowing, trimming, edging, and cleanup in industrial, commercial or public sites. The Site Supervisor shall ensure all specifications are being met, ensure contract work does not conflict with ceremonies and funerals, and ensure employees are adequately supervised and proper conduct is maintained.

Site Supervisor shall prevent any disruption to the cemetery operations, including funerals, visitor privacy, internal traffic, and utilities.

In the absence of the Site Supervisor, the Offeror shall appoint an English-speaking crew foreman or an employee who shall be responsible to ensure that work being accomplished is done so in an expeditious manner, is performed in accordance with the contract specifications and that the work will progress without undue delay.

EMPLOYEE REQUIREMENTS

The Offeror shall be responsible to ensure contracted employees providing work on this contract are fully trained and completely competent to perform the required work.

Labor Force and Equipment: The Offeror shall be aware of the intensive labor and equipment requirements needed to meet contract specifications. Offeror shall be responsible to provide all labor and equipment as necessary to meet deadlines. The Offeror will provide all necessary resources to complete the efforts assigned under the scope of this contract.

Employee Listing: The Offeror shall maintain and provide the COR a current list of all employees on site including subcontractor personnel. The list shall include the employee’s name, job title, and driver’s license number.

Employee Identification: The Offeror's employees shall wear visible identification always while on the premises of the Cemetery.

Permits and Licenses: The Offeror shall be responsible for obtaining all necessary and current licenses, permits, vehicular insurance and registration, Workman’s Compensatory Liability Insurance, property liability insurance etc., prior to the commencement of work. The Offeror shall provide the Contracting Officer copies of these required documents with his/her proposal or as other times where the COR deems necessary during the duration of the project.

OFFEROR/EMPLOYEE CODE OF CONDUCT

Offeror personnel shall park only in the COR approved “Offeror Staging Area” identified for this project. Offeror's employees shall park privately owned vehicles in area designated for parking by the COR. The Cave Hill National Cemetery will not validate or reimburse for parking violations of the Offeror's employees under any conditions.

The Offeror shall be responsible to ensure that his/her employees (including Offeror’s consultants, subcontractors, etc.) are aware of all the terms and conditions regarding their performance and conduct during the performance period of this contract.

Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation/summons answerable in the United Offeror personnel shall be required to adhere to the following standards of dress and conduct while performing work in the’ national cemetery. Offeror personnel shall be fully clothed at all times, to include an upper garment to cover body from waist to neck and long pants or slacks. T-shirts and/or tank tops as outer garments are prohibited, as are any garments which have a message or slogan affixed thereto.

Offeror personnel must maintain a neat and professional appearance throughout the workforce, vehicles, equipment, and staging areas. Matching uniforms (pants and shirt, plus jacket in the cool season) for all employees are required- in addition to all state and federally mandated Occupational Safety and Health Administration (OSHA) compliant protective gear.

Designated restroom facilities will be available to Offeror personnel. Locations will be COR identified at time of contract award.

The Government will not be responsible for any loss, damage, or theft of Offeror's items. Offeror shall be responsible for housekeeping and custodial maintenance of Department of Veterans Affairs facilities used by the Offeror's employees.

Electricity and phone service will NOT be furnished by the Government for the Offeror's work area. However, government will provide all electricity and water used on and for the cemetery facilities.

Smoking is prohibited inside any onsite buildings at the Cemetery.

CEMETERY ETIQUETTE

Offeror personnel shall have a clear understanding and adherence to the following:

DIGNITY CLAUSE

Respect for Headstones and Markers in National Cemeteries; Handling of Markers and Headstones

1. Every action by Offeror personnel at a national cemetery must be performed with the special care, reverence, dignity, and respect that acknowledges the cemetery as the final resting place that commemorates the service and sacrifice that service members, Veterans and their families made for our Nation. Critically important is the awareness required of the Offeror employees of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.

a. Offerors cannot walk, stand, lean, sit or jump on headstones or markers. Nor can they drive over them.

b. No tools, equipment or other items will be placed or leaned on headstones or markers.

c. Use care not to scratch or damage markers in any manner.

d. Offeror shall be responsible for replacing damaged headstones and markers and for restoring turf damaged during performance of this work.

e. Additionally, should any activity result in the exposure and/or damage to any remains, container for remains (e.g., casket or urn), or outer burial container, the Offeror must contact the COR, Director/Assistant Director, or Contracting Officer (CO) for guidance.

2. Any doubts as to proper procedures shall be brought to the attention of the COR, Director/Assistant Director, or CO for guidance or resolution.

3. The Offeror is required to discuss the guidance with employees and/or subcontractors and have each employee sign a statement of compliance and deliver the signed statement to the COR before work may begin.

Contracted Site Supervisor will ensure that no Offeror personnel work will cause any funeral, ceremony, procession or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity, security, or safety of the event or visit is compromised.

A list of scheduled ceremonies will be provided the week prior to the event, and a list of scheduled committal services will be provided on the day of the service. The Site Supervisor shall communicate not less than daily with the COR, to ask questions and ensure he/she and contracted personnel understands the off-limit areas.

WORK HOURS/SCHEDULE

Work may be performed between the hours of 8:00 a.m. to 4:30 p.m. local time, Monday through Friday during normal Federal workdays except observed Federal Holidays or unless otherwise directed by the COR.

When situations prohibit work completion during the normal work week, (such as weather-related or Offeror-caused delays), then the Offeror may request in writing to the COR at least 5 workdays in advance to work on weekends, as needed, to meet the requirements of performance within the period specified. The Government will not compensate the Offeror for any alternate work schedules needed for the Offeror to complete all contract work not completed within the specified period of performance. Inclement weather is not an excuse for not meeting contractual requirements.

After Normal Hours/On-Call/Emergency Situations: The Offeror shall establish and maintain a point-of-contact to receive emergency calls from the COR(s). The point-of-contact shall be available on a 24-hour basis including during weekends, Federal Holidays and after normal hours of operation. The Offeror shall provide the COR a valid point of contact phone or cell phone number for the designated Site Supervisor for emergency and/or after hour’s situations.

Holidays observed by the Federal Government:

New Year's Day
1 January
Martin Luther King's Birthday
Third Monday in January

President's Day

Third Monday in February

Memorial Day

Last Monday in May

Independence Day
4 July
Labor Day
First Monday in September
Columbus Day
Second Monday in October

Veterans Day

11 November

Thanksgiving Day
4th Thursday in November

Christmas Day

25 December

If a holiday falls on Sunday, the following Monday will be observed as the legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also included would be any day specifically declared by the President of the United States of America as a national holiday.

OFFEROR FURNISHED ITEMS

There are no storage building or facilities available for the storage of Offeror equipment, supplies or materials at Cave Hill National Cemetery. Offeror will be responsible for the maintenance and offsite storage of their supplies and equipment for all services related to this contract.

The Offeror shall safely store any chemicals, pesticides, herbicides, cleaning solutions, and of the like in accordance with the manufacturer's recommendations. An SDS (Safety Data Sheet) shall be required for all chemicals, pesticides, herbicides and cleaning solutions.

Equipment List: Offeror shall provide the COR with a complete list of equipment (mowers, trimmers, skid steers, etc.) that will be utilized to perform all services identified in this PWS within seven (7) business days of award of this contract.

SUBMITTALS: The Offeror shall submit the following documents or information in accordance with the table below.

Submittal
Frequency
Submittal Schedule
Work plan/Staffing plan (Employee List)
Initial and as revised
With proposal
Site Supervisor Qualifications (Resume if available)
Initial and as revised
With proposal
Site Supervisor Emergency Contact Info
Initial and as revised
Prior to beginning work
Current/valid licenses (includes driver’s license), permits, insurance on vehicles, liability/Workman’s Compensation insurance, etc.
Initial and as revised
With proposal
Equipment list
Initial and as revised
(7) business days after award of this contract
Work schedule
Daily
Every day by 8:00 A.M.
Flat marker survey; new lines and grades
Initial and as revised
Prior to R&R activities
Headstone/Marker Raise & Realign Verification Survey
Daily
By 3:00 P.M. during R&R activities
Headstone/Marker Raise & Realign Verification Survey – Initial
Initial and as revised
By 3:00 P.M. during R&R activities
Weekly report and rework list
Weekly
Every Friday by 3:00 P.M.
Sod provider and information sheet
Initial and as revised
Upon delivery
Sod delivery tickets and certification
As needed
Upon delivery
Topsoil provider and information sheet
Initial and as revised
Upon delivery
Fertilizer and herbicides information sheets/labels
In accordance with chart scheduled (Pg.5)
Prior to use
Safety Data Sheets (See FAR Clause 52.223-3)
As needed
Prior to chemical use

PRICE/COST SCHEDULE

BASE PERIOD: Date of Award thru September 30, 2021

CLIN
Description
EST QTY
Unit
Unit Price
Total Price
001
MOWING
32
WKS
002
TRIMMING
32
WKS
003
LAWN MAINTENANCE: AERATE, as per protocols.
1
JB
004
LAWN MAINTENANCE: LAWN MAINTENANCE: Over-seeding

(Spring/Fall)

1
JB
005
LAWN MAINTENANCE: Fertilize

(Spring/Late Summer/Fall) up to 3 times per year

2
JB
006
LAWN MAINTENANCE: LIME, SEPTEMBER Application as per protocols, if needed.
1
JB
007
LAWN MAINTENANCE: BROADLEAF WEED AND DISEASE CONTROL, SPRING/FALL, Applications as per protocols, if needed.
2
JB
008
LAWN MAINTENANCE: Pre-Emergent Crab Grass Control, (Spring)
1
JB
009
LAWN MAINTENANCE: Talparid© Mole, Insect & Pest Control Application
6
JB
010
LEAF COLLECTION
0
JB
011
LAWN MAINTENANCE: Tree & Shrub

Maintenance (Fertilizing/Spraying)

2
JB
012
LAWN MAINTENANCE: Mulching (as required)
2
JB
013
LAWN MAINTENANCE: Pruning

Maintenance (as needed)

1
JB
014
GRAVESITE RENOVATION: Sodding for Gravesite Renovations
1
EA
015
HEADSTONE CLEANING- April &

September (approximately 5,863 headstones up to two times annually)

2
JB
016
HEADSTONE HEIGHT AND

ALIGNMENT: Raise and Realignment

7
JB
017
HEADSTONE HEIGHT AND

ALIGNMENT: Fine Tune Adjust Method (approximately 5,863 headstones as required)

7
JB
018
TRASH AND DEBRIS REMOVAL
32
JB
019
TRASH AND DEBRIS REMOVAL: Storm

Damage and Large Debris Clean Up (as directed by COR)

5
JB
BASE YEAR: Date of Award thru September 2021
Total Estimated Price:

OPTION YEAR # 1: October 01, 2021 thru September 30, 2022

CLIN
Description
EST QTY
Unit
Unit Price
Total Price
001
MOWING
36
WKS
002
TRIMMING
36
WKS
003
LAWN MAINTENANCE: AERATE, as per protocols.
1
JB
004
LAWN MAINTENANCE: LAWN MAINTENANCE: Over-seeding

(Spring/Fall)

2
JB
005
LAWN MAINTENANCE: Fertilize

(Spring/Late Summer/Fall) up to 3 times per year

3
JB
006
LAWN MAINTENANCE: LIME, SEPTEMBER Application as per protocols, if needed.
1
JB
007
LAWN MAINTENANCE: BROADLEAF WEED AND DISEASE CONTROL, SPRING/FALL, Applications as per protocols, if needed.
2
JB
008
LAWN MAINTENANCE: Pre-Emergent Crab Grass Control, (Spring)
1
JB
009
LAWN MAINTENANCE: Talparid© Mole, Insect & Pest Control Application
6
JB
010
LEAF COLLECTION
10
JB
011
LAWN MAINTENANCE: Tree & Shrub

Maintenance (Fertilizing/Spraying)

2
JB
012
LAWN MAINTENANCE: Mulching (as required)
2
JB
013
LAWN MAINTENANCE: Pruning

Maintenance (as needed)

1
EA
014
GRAVESITE RENOVATION: Sodding for Gravesite Renovations
1
EA
015
HEADSTONE CLEANING- April &

September (approximately 5,863 headstones up to two times annually)

2
JB
016
HEADSTONE HEIGHT AND

ALIGNMENT: Raise and Realignment

12
JB
017
HEADSTONE HEIGHT AND

ALIGNMENT: Fine Tune Adjust Method (approximately 5,863 headstones as required)

12
JB
018
TRASH AND DEBRIS REMOVAL
52
WKS
019
TRASH AND DEBRIS REMOVAL: Storm

Damage and Large Debris Clean Up (as directed by COR)

5
JB
OPTION YEAR #1: October 2022-September 30, 2023
Total Estimated Price:

OPTION YEAR #2 October 01, 2022 thru September 30, 2023

CLIN
Description
EST QTY
Unit
Unit Price
Total Price
001
MOWING
36
WKS
002
TRIMMING
36
WKS
003
LAWN MAINTENANCE: AERATE, as per protocols.
1
JB
004
LAWN MAINTENANCE: LAWN MAINTENANCE: Over-seeding

(Spring/Fall)

2
JB
005
LAWN MAINTENANCE: Fertilize

(Spring/Late Summer/Fall) up to 3 times per year

3
JB
006
LAWN MAINTENANCE: LIME, SEPTEMBER Application as per protocols, if needed.
1
JB
007
LAWN MAINTENANCE: BROADLEAF WEED AND DISEASE CONTROL, SPRING/FALL, Applications as per protocols, if needed.
2
JB
008
LAWN MAINTENANCE: Pre-Emergent Crab Grass Control, (Spring)
1
JB
009
LAWN MAINTENANCE: Talparid© Mole, Insect & Pest Control Application
6
JB
010
LEAF COLLECTION
10
JB
011
LAWN MAINTENANCE: Tree & Shrub

Maintenance (Fertilizing/Spraying)

2
JB
012
LAWN MAINTENANCE: Mulching (as required)
2
JB
013
LAWN MAINTENANCE: Pruning

Maintenance (as needed)

1
EA
014
GRAVESITE RENOVATION: Sodding for Gravesite Renovations
1
EA
015
HEADSTONE CLEANING- April &

September (approximately 5,863 headstones up to two times annually)

2
JB
016
HEADSTONE HEIGHT AND

ALIGNMENT: Raise and Realignment

12
EA
017
HEADSTONE HEIGHT AND

ALIGNMENT: Fine Tune Adjust Method (approximately 5,863 headstones as required)

12
EA
018
TRASH AND DEBRIS REMOVAL
52
WKS
019
TRASH AND DEBRIS REMOVAL: Storm

Damage and Large Debris Clean Up (as directed by COR)

1
JB
OPTION YEAR # 2 October 2022-September 30, 2023
Total Estimated Price:

OPTION YEAR # 3 October 01, 2023 thru September 30, 2024

CLIN
Description
EST QTY
Unit
Unit Price
Total Price
001
MOWING
36
WKS
002
TRIMMING
36
WKS
003
LAWN MAINTENANCE: AERATE, as per protocols.
1
JB
004
LAWN MAINTENANCE: LAWN MAINTENANCE: Over-seeding

(Spring/Fall)

2
JB
005
LAWN MAINTENANCE: Fertilize

(Spring/Late Summer/Fall) up to 3 times per year

3
JB
006
LAWN MAINTENANCE: LIME, SEPTEMBER Application as per protocols, if needed.
1
JB
007
LAWN MAINTENANCE: BROADLEAF WEED AND DISEASE CONTROL, SPRING/FALL, Applications as per protocols, if needed.
2
JB
008
LAWN MAINTENANCE: Pre-Emergent Crab Grass Control, (Spring)
1
JB
009
LAWN MAINTENANCE: Talparid© Mole, Insect & Pest Control Application
6
JB
010
LEAF COLLECTION
10
JB
011
LAWN MAINTENANCE: Tree & Shrub

Maintenance (Fertilizing/Spraying)

2
JB
012
LAWN MAINTENANCE: Mulching (as required)
2
JB
013
LAWN MAINTENANCE: Pruning

Maintenance (as needed)

1
EA
014
GRAVESITE RENOVATION: Sodding for Gravesite Renovations
1
EA
015
HEADSTONE CLEANING- April &

September (approximately 5,863 headstones up to two times annually)

2
JB
016
HEADSTONE HEIGHT AND

ALIGNMENT: Raise and Realignment

12
JB
017
HEADSTONE HEIGHT AND

ALIGNMENT: Fine Tune Adjust Method (approximately 5,863 headstones as required)

12
JB
018
TRASH AND DEBRIS REMOVAL
52
WKS
019
TRASH AND DEBRIS REMOVAL: Storm

Damage and Large Debris Clean Up (as directed by COR)

5
JB
OPTION YEAR # 3 October 2023-September 30, 2024
Total Estimated Price:

OPTION YEAR # 4 October 01, 2024 thru September 30, 2025

CLIN
Description
EST QTY
Unit
Unit Price
Total Price
001
MOWING
36
WKS
002
TRIMMING
36
WKS
003
LAWN MAINTENANCE: AERATE, as per protocols.
1
JB
004
LAWN MAINTENANCE: LAWN MAINTENANCE: Over-seeding

(Spring/Fall)

2
JB
005
LAWN MAINTENANCE: Fertilize

(Spring/Late Summer/Fall) up to 3 times per year

3
JB
006
LAWN MAINTENANCE: LIME, SEPTEMBER Application as per protocols, if needed.
1
JB
007
LAWN MAINTENANCE: BROADLEAF WEED AND DISEASE CONTROL, SPRING/FALL, Applications as per protocols, if needed.
2
JB
008
LAWN MAINTENANCE: Pre-Emergent Crab Grass Control, (Spring)
1
JB
009
LAWN MAINTENANCE: Talparid© Mole, Insect & Pest Control Application
6
JB
010
LEAF COLLECTION
10
JB
011
LAWN MAINTENANCE: Tree & Shrub

Maintenance (Fertilizing/Spraying)

2
JB
012
LAWN MAINTENANCE: Mulching (as required)
2
JB
013
LAWN MAINTENANCE: Pruning

Maintenance (as needed)

1
EA
014
GRAVESITE RENOVATION: Sodding for Gravesite Renovations
1
EA
015
HEADSTONE CLEANING- April &

September (approximately 5,863 headstones up to two times annually)

2
JB
016
HEADSTONE HEIGHT AND

ALIGNMENT: Raise and Realignment

2
JB
017
HEADSTONE HEIGHT AND

ALIGNMENT: Fine Tune Adjust Method (approximately 5,863 headstones as required)

12
EA
018
TRASH AND DEBRIS REMOVAL
52
WKS
019
TRASH AND DEBRIS REMOVAL: Storm

Damage and Large Debris Clean Up (as directed by COR)

5
JB
OPTION YEAR # 4: October 2024-September 30, 2025
Total Estimated Price: