Attachment 9 - FXSB211098 AF 66.pdf
PDF 140 KB Posted
- Attached to
- INSTALL DOOR IG OFFICES, BLDG 10480 Federal contract opportunity
- Solicitation number
- FA500022R0024
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Install IG Door Offices Questions.pdf | ||
| Solicitation Amendment - FA500022R0024000.pdf | ||
| Attachment 1 - Statement of Work.pdf | ||
| Attachment 4 - Contractors Fire Safety Guide (2017 ed).pdf | ||
| Attachment 6 - Environmental Protection Specifications on JBER (28 Oct 2020 Rev 3).pdf | ||
| Attachment 2 - Project Drawings.pdf | ||
| Attachment 3 - JBER Lock Standards.pdf | ||
| Attachment 7 - Open Market General Specifications_10 Feb 2021.pdf | ||
| Solicitation - FA500022R0024.pdf | ||
| Attachment 5 - Supplemental Specs FXSB211098.pdf | ||
| Attachment 8 - Wage Determinations.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
FXSB 21-1098
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L I N E
N U M B E R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C
ER
TI
FI
C
A
TI
O N
O F
C O
M
PL
IA
N
C E
D R
A W
IN
G
S
PL
A
N
D
ES
IG
N
C A
LC
U
LA
TI
O N
S
M A
N F'
R R
EC
O
M M
EN
D
A
TI
O N
S
R
EQ
U
ES
T
LE
TT
ER
C A
TA
LO
G D
A
TA
R
EP
O R
TS
TE
ST
D A
TA
O
TH
ER
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW‐UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR
RE‐SUBMITTAL
FINAL APPROVAL REMARKS
Notice of Start of Work 1 10 days prior to start of any work
Quality Control Plan 1 20 Days after NTP
HAZMAT Approval
NLT 10 working days prior to material being brought onto installation
HAZMAT Usage Report
NLT 7 Working Days After Final Acceptance
5 Project Schedule AF3064 1 10 Days after NTP
6 Door and frame 1 10 Days prior to installation
7 Manual pull station 1 10 Days prior to installation
Environmental Pre‐Construction Checklist 1 10 Days after NTP
9 As‐Built Drawings with Details 1 Prior to Close Out
10 AF Form 1354 1 Prior to Close Out
INSTALL DOOR IG OFFICES, BLDG
10480