Attachment 9 Continuation of Section B Price Schedule.xls

XLS spreadsheet 41 KB Posted

Attached to
FLORIDA DITCH AND CANAL LINING Federal contract opportunity
Solicitation number
140R4021R0007
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document is a price schedule attachment for a federal contract solicitation to line canals in Florida. The solicitation is for lining approximately 11,444 linear feet of canals and includes various concrete and earthwork items. Price schedule line items include mobilization, removal of existing features, concrete cutoff walls, concrete structures for 270 canal sections, shotcrete, guardrails, grating walkways, safety pipes, ladders, water control, earthwork, underdrains, excavation of unsuitable material, refill material, geotextile, gravel surfacing, horizontal directional drilling, drain inlets, culverts, canal gates, and PVC liner. The total price is listed as $0.00 as unit pricing is not included. The solicitation number is 140R4021R0007 and was issued by the Department of the Interior Bureau of Reclamation for the Florida Ditch and Canal Lining project.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE

Florida Canal Lining Project
CLINSectionSupplies or ServicesQuantity and UnitUnit PriceAmountCost from GHC FishscreenSept. 2004 to present adjustmentmultiplication factoradjusted costCost from RWPC FishscreenSept. 2004 to present adjustmentmultiplication factoradjusted costCost from hogback estimateSept. 2009 to present adjustmentmultiplication factoradjusted cost
1WBR 1452.232-81Mobilization and preparatory work Est. 5% of SubtotalFor the lump sum of
202 41 07Removal and Disposal of Existing FeaturesFor the lump sum of
303 30 00Concrete for Cutoff WallFor the lump sum of471Canal Structures 270 to 3341.237582.63736.98Canal Structures 270 to 3341.237911.64736.98Canal Structures 329 to 3341.237911.64
403 30 00Concrete for Check 1 and Turnout Box17$ - 0
yd3
503 30 00Concrete for Check 2 and Turnout Structure Modifications12$ - 0
yd3
603 30 00Concrete for Culvert 1 Modifications5$ - 0
yd3
703 30 00Concrete for Culvert 3 Modifications5$ - 0
yd3
803 30 00Concrete for Culvert 4 Modifications6$ - 0
yd3
903 30 00Concrete for Culvert 5 Modifications4$ - 0
yd3
1003 37 10Shotcrete31,470$ - 0
yd2
1105 50 00Guardrail96$ - 0
Lf
1205 50 00Grating Walkway60$ - 0
Lf
1305 50 00Pipe Overchutes6$ - 0
Each
1405 50 00Additional 12-inch Pipe Sections2$ - 0
Each
1505 51 50Safety Ladders38$ - 0
Each
1631 03 33Removal and Control of WaterFor the lump sum of
1731 23 11Earthwork for Canal11444$ - 0
Lf
1831 23 11Canal Underdrain11550$ - 0
Lf
1931 23 11Earthwork for Cast-in-Place StructuresFor the lump sum of
2031 23 11Excavation of Unsuitable Material500$ - 0
yd3
2131 23 11Refill Material for Unsuitable Material500$ - 0
yd3
2231 32 32Geotextile11444$ - 0
Lf
2332 15 10Gravel Surfacing11,458$ - 0
Lf
2433 05 22Horizontal Directional DrillingFor the lump sum of
2533 42 30Corrugated Metal Pipe Drain Inlets12$ - 0
Each
2633 42 30Corrugated Metal Pipe Culverts2$ - 0
Each
2735 22 1010-inch Canal Gates2$ - 0
Each
2835 47 00PVC Canal Liner11444$ - 0
Lf
2935 69 20Safety Cables with Floats9$ - 0
Each
TOTAL FOR SCHEDULE$0.00