This document outlines temporary construction easements for the Florida Ditch and Canal Lining Phase 2, Part 1 project. The Florida Water Conservancy District has obtained easements along existing canal alignments within 30 feet of the center of the canal on both sides, as shown on the provided drawings. The easements grant access to the areas for construction activities but do not allow their use for borrow materials. Two executed easement agreements are included, one with Cowboy Church and one with the Colorado Division of Parks and Wildlife, detailing the rights and responsibilities within the easement areas. The related federal contract opportunity is solicitation number 140R4021R0007 for the Florida Ditch and Canal Lining project through the Department of the Interior Bureau of Reclamation.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Water Conservancy District Florida Ditch and Canal Lining Phase 2, Part 1

Temporary Construction Easements

51 00 10 - 1

SECTION 51 00 10

TEMPORARY CONSTRUCTION EASEMENTS

PART 1 GENERAL

1.01 PROJECT CONDITIONS

A. FCDC has obtained temporary construction easements along existing canal alignment.

The right-of-way limits shall be 30 feet from center of canal, each side, as shown on Drawing Numbers 519-417-23 through 36.

B. See section 01 14 10 1.02 for details on staging areas.

C. These areas shall not be used for borrow materials.

The Government assumes no responsibility for deductions, interpretations, or conclusions made by the Contractor based on information made available by the Government, in accordance with the clause at FAR 52.236-3 “Site Investigations and Conditions Affecting the Work.”

PART 2 AGREEMENTS

2.01 COWBOY CHURCH

51 00 10 - 2

51 00 10 - 3

51 00 10 - 4

51 00 10 - 5

2.02 COLORADO DIVISION OF PARKS AND WILDLIFE

51 00 10 - 6

51 00 10 - 7

51 00 10 - 8

PART 3

Not Used

END OF SECTION