Attachment 8 - Section M - 8_10_2020 -- 3pgs..pdf

PDF 94 KB Posted

Attached to
RPR Chiller Building 10504 Federal contract opportunity
Solicitation number
FA301620B0018
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document contains an evaluation criteria attachment and related federal contract opportunity solicitation for an air-cooled chiller replacement project. The Air Force will award a contract valued between $500,000 and $1,000,000 to replace an existing chiller at building 10504 to the offeror providing the lowest total evaluated price. The solicitation is set aside for women-owned small businesses certified through the SBA WOSB program. Offerors must submit electronic bids by the closing date, including a detailed cost proposal in RS Means format and completed SF-1442 forms. Price will be the sole evaluation factor, and the contractor must pay all applicable Davis-Bacon prevailing wages.

View the file

Other files for this federal contract opportunity

Other files attached to RPR Chiller Building 10504, newest first.
File Type Posted
Attachment 9 - Wage determination TX20200231 Rev28Aug2020.docx DOCX document
Amendment 0006 FA301620B00180006.pdf PDF
Questions and Answers - FA301620B0018.pdf PDF
Attachment 1 - Statement of Work Rev 04Sep2020.pdf PDF
Solicitation Amendment FA301620B00180005.pdf PDF
Attachment 7 - Section L Rev2 Sept2020.pdf PDF
Solicitation Amendment FA301620B00180004.pdf PDF
FA301620B00180003.pdf PDF
Solicitation Amendment FA301620B00180002 SF 30 (1).pdf PDF
Solicitation Amendment FA301620R00920001.pdf PDF
Attachment 7 - Section L Rev21Aug2020.pdf PDF
Solicitation Amendment 001 FA301620B00180001 SF 30 (1).pdf PDF
Attachment 3 DD 1354 5_4_2020 2.pdf PDF
FA301620B0018.pdf PDF
Attachment 4 climo 8_10_2020 1.pdf PDF
Attachment 6 Asbestos Survey 2020 6_17_2020 8.pdf PDF
HVAC Chiller Justification and Approval.pdf PDF
Attachment 1 statement of work 6_17_2020 306.pdf PDF
Attachment 2 Submittal Register 5_4_2020 32.pdf PDF
Attachment 10 - Construction Cost Estimate Breakdown - 8_11_2020 - NA.xls XLS spreadsheet
Attachment 9 - Wage Determination TX20200231 - 2_14_2020 - 7pgs..pdf PDF
Attachment 5-- Backflow Device Test Form - NA -- 1pgs..pdf PDF
Attachment 7 - Section L-- 8_10_2020 -- 2pgs..pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 8

FA301620B0018 Page 1 of 2

Section M – Evaluation for Award

Evaluation and Basis for Award. The 502d CONS/JBKAD will issue an award to the offeror who is determined to offer the best value to the Government.

1. The Government will perform a general review of each bid, as follows:

a) Only bids that are specific to this effort will be evaluated.

b) This acquisition is restricted for Woman Owned Small Businesses as determined by the

Small Business Administration (SBA) in accordance with 13 CFR Part 125. Therefore, only offer from WO Small Businesses will be eligible for award.

c) Offerors will be checked against the List of Parties Excluded From Federal Procurement and Nonprocurement Programs. Any offeror who is listed will be eliminated without further consideration.

d) Bids will be checked for minor informalities or irregularities. The Contracting Officer either will give the offeror an opportunity through a clarification to cure any defect resulting from a minor informality or irregularity, whichever is to the advantage of the Government. The Government plans on awarding a contract without conducting discussions.

e) Price will be the sole evaluation factor evaluated.

f) Offerors shall submit all required bid documentation to be considered responsive (Volume I and II).

2. Only electronic copies will be evaluated. The response shall consist of two (2) separate volumes:

a) Volume I – Pricing (Contractor Detailed Cost Breakdown): The offeror shall submit a detailed cost breakdown displaying the essential elements of work with pricing.

b) Volume II – Contract Documentation (Filled SF 1442): The offeror shall submit the SF 1442 with all required fill ins.

(i) Section A: SF 1442 with completed blocks 14, 15, 16 (if different than block 14), 17, 20a, 20b, 20c, and block 19 if amendments have been issued. An authorized official of the firm must sign SF 1442 block 20b.

(ii) Section B: Complete pricing information for all CLINs.

(iii) Section I: Complete appropriate certifications.

(iv) Section K: Complete all appropriate and applicable Representations and Certifications.

(vi) Bid Guarantee: An electronic copy of the bid guarantee shall be included in the electronic bid. The original sealed copy should be mailed out addressed to the official POCs and received no later than the time and day of bid opening.

3. Price Evaluation. Price will be the sole factor evaluated to determine best value for the Government.

The evaluated price shall be the total price proposed by the offeror in Section B as supplemented by the Construction Cost Estimate Breakdown.

3.1 Price Factor: Prices will be evaluated based on the Total Evaluated Price (TEP), which will be calculated by multiplying the quantities for CLIN 0001 by the CLIN’s unit price to determine the total amount for CLIN0001. The total amount for CLIN0001 will then equal the TEP.

3.2 Best Value: The offeror that provides the lowest Total Evaluated Price (TEP) for all items covered in the solicitation will represent the best value and be considered for an award.

3.3 Price Reasonableness: The contracting officer will make a determination that a prospective contractor is responsible in accordance with FAR Subpart 9.1 and that the prices offered are reasonable and balanced using one or more of the techniques defined in FAR 15.404-1. Note that unreasonably high prices, initially or subsequently, may be grounds for the Government not to proceed with award. The burden of proof for credibility of prices rests with the Offeror.

Attachment 12

FA301620B0018 Page 2 of 2

3.4 Adequate price competition for this acquisition per FAR 15.403-1(c)(1) is anticipated; therefore, certified cost or pricing data are not required per FAR 15.403-1(b)(1). If at any time, however, during this competition the CO determines that adequate price competition no longer exists, or if price reasonableness cannot be determined offerors may be required to submit certified cost or pricing data or additional data other than certified cost or pricing data (as appropriate) for the CO to determine price reasonableness.

(End of Evaluation)

File details come from the government source that posted it. Updated .