Attachment 2 Submittal Register 5_4_2020 32.pdf

PDF 108 KB Posted

Attached to
RPR Chiller Building 10504 Federal contract opportunity
Solicitation number
FA301620B0018
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is a submittal register for a federal contract to replace an existing air-cooled chiller at a building on a military base. The contract requires demolition of the existing chiller and replacement with a new chiller. It has a value between $500,000 and $1,000,000 and is set aside for women-owned small businesses. The submittal register lists over 100 items requiring approval at various stages of the project, including plans, reports, certifications, designs, manuals, and closeout documents. It identifies the item, specification section, required material and approval dates, and spaces for tracking the review and approval process. The level of detail in the submittal register indicates the project has significant preconstruction, construction, and closeout requirements that will require careful scheduling and coordination between the contractor and the federal agency.

View the file

Other files for this federal contract opportunity

Other files attached to RPR Chiller Building 10504, newest first.
File Type Posted
Attachment 9 - Wage determination TX20200231 Rev28Aug2020.docx DOCX document
Amendment 0006 FA301620B00180006.pdf PDF
Questions and Answers - FA301620B0018.pdf PDF
Attachment 1 - Statement of Work Rev 04Sep2020.pdf PDF
Solicitation Amendment FA301620B00180005.pdf PDF
Attachment 7 - Section L Rev2 Sept2020.pdf PDF
Solicitation Amendment FA301620B00180004.pdf PDF
FA301620B00180003.pdf PDF
Solicitation Amendment FA301620B00180002 SF 30 (1).pdf PDF
Solicitation Amendment FA301620R00920001.pdf PDF
Attachment 7 - Section L Rev21Aug2020.pdf PDF
Solicitation Amendment 001 FA301620B00180001 SF 30 (1).pdf PDF
Attachment 3 DD 1354 5_4_2020 2.pdf PDF
FA301620B0018.pdf PDF
Attachment 4 climo 8_10_2020 1.pdf PDF
Attachment 6 Asbestos Survey 2020 6_17_2020 8.pdf PDF
HVAC Chiller Justification and Approval.pdf PDF
Attachment 1 statement of work 6_17_2020 306.pdf PDF
Attachment 10 - Construction Cost Estimate Breakdown - 8_11_2020 - NA.xls XLS spreadsheet
Attachment 9 - Wage Determination TX20200231 - 2_14_2020 - 7pgs..pdf PDF
Attachment 8 - Section M - 8_10_2020 -- 3pgs..pdf PDF
Attachment 5-- Backflow Device Test Form - NA -- 1pgs..pdf PDF
Attachment 7 - Section L-- 8_10_2020 -- 2pgs..pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMIT

Approval

Needed By Material

Needed By Action Code Date of Action

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

Action Code

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

01 14 00 SD-01 Preconstruction Submittals list of Contract Personnel G Installation Access 1.4.1.2

01 30 00 SD-01 Preconstruction Submittals View Location Map 1.3 G Progress and Completion 1.4 G Pictures

01 33 00 SD-01 Preconstruction Submittals Submittal Register 1.7 G

01 33 16.00 10 SD-01 Preconstruction Submittals Design Quality Control Plan 1.4.1 G Initial Design Conference 1.4.2.2 Preconstruction Conference 1.4.2.3 DCM Procedures 3.4.1 G Submittal Register 3.7.4 G

SD-05 Design Data Design and Code Checklists 1.6.1 C Sustainable Design 2.3 C Interim Design Submittals 3.2.1 R Interior And Exterior Building 3.5.6.1.1 G Finishes Scheme Furniture, Fixtures & Equipment 3.5.6.2.3 G Conference Documentation 3.6.3 Final Design Submittals 3.7 R Design Complete Documents 3.8 C

SD-11 Closeout Submittals

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

(l)

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

MPLS203738-1093738 RPR Chiller B10504

CONTRACTOR

Activity No.

N O

Submittal No.

N O

S P E C S E C T DESCRIPTION ITEM SUBMITTED Paragraph No.

Gov't Classification of Review

CONTRACTOR: SCHEDULE

DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APR

AUTH REMARKS

DATE FWD TO APR

AUTH/

DATE RCD FROM

CONTR

Needed By Material

Needed By Action Code Date of Action

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

Action Code

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

01 33 16.00 10 DD Form 1354 3.7.5 G 01 35 26 SD-01 Preconstruction Submittals

Accident Prevention Plan (APP) 1.6 G SD-06 Test Reports

Notifications and Reports 1.11 Accident Reports 1.11.2 G LHE Inspection Reports 1.11.3

SD-07 Certificates Crane Operators/Riggers 1.5.1.3 Standard Lift Plan 1.6.6.2 G Critical Lift Plan 1.6.6.3 G Naval Architecture Analysis G Activity Hazard Analysis (AHA) 1.7 Confined Space Entry Permit 1.8.1 Hot Work Permit 1.8.1 Certificate of Compliance 1.11.4 License Certificates Radiography Operation Planning G Work Sheet Portable Gauge Operations G Planning Worksheet

01 35 29.13 SD-02 Shop Drawings Work Zones 3.9.1 G Decontamination Facilities 3.10.1 G

SD-03 Product Data Amendments to the APP/SSHP 1.4

(l)

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

Activity No.

N O

Submittal No.

N O

S P E C S E C T DESCRIPTION ITEM SUBMITTED Paragraph No.

Gov't Classification of Review

CONTRACTOR: SCHEDULE

DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APR

AUTH REMARKS

DATE FWD TO APR

AUTH/

Needed By Material

Needed By Action Code Date of Action

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

Action Code

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

01 35 29.13 Exposure Monitoring/Air 3.5 Sampling Program Site Control Log 3.9.2 SSHO's Daily Inspection Logs 1.8

SD-07 Certificates Certificate Of Worker/Visitor 1.7 Acknowledgement

SD-11 Closeout Submittals Safety And Health Phase-Out 1.9 Report

01 45 00.00 10 SD-01 Preconstruction Submittals Contractor Quality Control (CQC) 3.2 G Plan Additional Requirements for 3.2.2 G Design Quality Control (DQC) Pl n

SD-05 Design Data Discipline-Specific Checklists 3.2.2 Design Quality Control 3.8.1

SD-06 Test Reports Verification Statement 3.8.2

01 45 00.00 20 SD-01 Preconstruction Submittals Contractor Quality Control (CQC) G Plan

01 45 00.00 40 SD-01 Preconstruction Submittals Quality Assurance (QA) Plan 2.1.1 G

SD-06 Test Reports a

(l)

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

Activity No.

N O

Submittal No.

N O

S P E C S E C T DESCRIPTION ITEM SUBMITTED Paragraph No.

Gov't Classification of Review

CONTRACTOR: SCHEDULE

DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APR

AUTH REMARKS

DATE FWD TO APR

AUTH/

Needed By Material

Needed By Action Code Date of Action

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

Action Code

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

01 45 00.00 40 Quality Control Data 2.1.2 G Quality Control Coordinating 2.1.2 G Actions Quality Control Training 2.1.2 G Inspection Records 2.1.2 G

Letters of Authority or Delegation 2.1.2.3 G Field Tests 2.1.2 G Factory Tests 2.1.2 G

SD-07 Certificates Quality Representative 1.4.1 Qualifications Special Certifications 1.4.1 Monthly Performance Report 2.1.2.2

01 45 35 SD-01 Preconstruction Submittals SIOR Letter of Acceptance 3.1.1 G Project Manual 3.1.1 G Project Manual 3.1.1 G Written Practices 3.1.1 Written Practices 3.1.3

NDT Procedures and Equipment 3.1.1 Calibration Records

NDT Procedures and Equipment 3.1.3 Calibration Records

SD-06 Test Reports Daily Reports 3.1.1 Daily Reports 3.1.3

(l)

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

Activity No.

N O

Submittal No.

N O

S P E C S E C T DESCRIPTION ITEM SUBMITTED Paragraph No.

Gov't Classification of Review

CONTRACTOR: SCHEDULE

DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APR

AUTH REMARKS

DATE FWD TO APR

AUTH/

Needed By Material

Needed By Action Code Date of Action

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

Action Code

DATE OF

ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

01 45 35 Daily Reports 3.1.3 Biweekly Reports 3.1.1 Biweekly Reports 3.1.2

SD-07 Certificates Fabrication Plant 2.1 Steel Truss Plant 2.1 Wood Truss Plant 2.1 AC472 Accreditation 2.1 Steel Joist Institute Membership 2.1 Certified Plant 2.1 Certificate of Compliance 2.1 Special Inspector of Record 1.5.17 G Special Inspector 1.5 G Qualification Records 3.1.1 Qualification Records 3.1.3

SD-11 Closeout Submittals Interim Final Report 3.1.1 Interim Final Report 3.1.3 Comprehensive Final Report 3.1.1 G Comprehensive Final Report 3.1.3 G

01 50 00 SD-01 Preconstruction Submittals Construction Site Plan 1.3 G Traffic Control Plan 3.4.1 G Haul Road Plan 2.2.1 G

SD-06 Test Reports Backflow Preventer Tests 2.4

(l)

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

Activity No.

N O

Submittal No.

N O

S P E C S E C T DESCRIPTION ITEM SUBMITTED Paragraph No.

Gov't Classification of Review

CONTRACTOR: SCHEDULE

DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

MAILED TO

CONTR/

DATE RCD

FRM APR

AUTH REMARKS

DATE FWD TO APR

AUTH/

Approva l

Needed By

Material Needed By

Action Code

Date of Action

DATE

FWD

TO

OTHE

R

REVIE

WER

DATE RCD

FROM OTH

REVIEWER Action Code DATE OF ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

01 50 00 SD-07 Certificates Backflow Tester 1.4.1 Backflow Preventers 1.4

01 54 23.00 SD-01 Preconstruction Submittals For each type of product G indicated

01 57 19 SD-01 Preconstruction Submittals Preconstruction Survey 1.6.1

Solid Waste Management Permit 1.10 G Regulatory Notifications 1.6.2 G Environmental Protection Plan 1.7 G

Stormwater Pollution Prevention 3.2.1.1 G Plan Stormwater Notice of Intent 3.2.1.2 G Dirt and Dust Control Plan 1.7.9.1 G Employee Training Records 1.6.5 G Environmental Manager 1.6.4 G Qualifications

SD-06 Test Reports Laboratory Analysis 3.7.1.1.2 Inspection Reports 3.2.1.3 Monthly Solid Waste Disposal 1.10.1 G Report

SD-07 Certificates Employee Training Records 1.6.5 G

DATE FWD TO APR

AUTH/

DATE RCD FROM CONTR

(l)

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L N O

Activity No.

N O

Submittal No.

N O

S P E C S E C T

DESCRI

PTION

ITEM

SUBMIT

TED

CONTRACTOR

ACTION

Paragraph No.

Gov't Classificatio n of Review

CONTRACTOR: SCHEDULE

DATES

APPROVING AUTHORITY

l

Needed By

Material Needed By

Action Code

Date of Action

DATE

FWD

TO

OTHE

R

REVIE

WER

DATE RCD

FROM OTH

REVIEWER Action Code DATE OF ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

01 57 19 Erosion and Sediment Control 1.6.5 Inspector

SD-11 Closeout Submittals Stormwater Pollution Prevention 3.2.1.4 G Plan Compliance Notebook Stormwater Notice of Termination 3.2.1.5 G Waste Determination 3.7.1 G Documentation Disposal Documentation for 3.7.3.6 G Hazardous and Regulated Waste Assembled Employee Training 1.6.5 G Records Solid Waste Management Permit 1.10 G Project Solid Waste Disposal 3.7.2.1 G Documentation Report Hazardous Waste/Debris 3.7.3.1 G Management Regulatory Notifications 1.6.2 G Sales Documentation 3.7.2.1 G Contractor Certification 3.7.2.1 As-Built Topographic Survey 3.2.1.5

01 57 20 SD-01 Preconstruction Submittals Asbestos Hazard Abatement 3.11.1.4 G Plan Asbestos Certifications G Asbestos Transporter License G

Paragraph No.

Gov't Classificatio n of Review

CONTRACTOR: SCHEDULE

DATES

APPROVING AUTHORITY

DATE FWD TO APR

AUTH/

DATE RCD FROM CONTR

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L N O

Activity No.

N O

Submittal No.

N O

S P E C S E C T

DESCRI

PTION

ITEM

SUBMIT

TED

CONTRACTOR

ACTION

(l) l

Needed By

Material Needed By

Action Code

Date of Action

DATE

FWD

TO

OTHE

R

REVIE

WER

DATE RCD

FROM OTH

REVIEWER Action Code DATE OF ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

01 57 20 Asbestos Medical clearances G (may be reviewed on site) Asbestos Training Certificates G Asbestos TDSHS License as G applicable Environmental Protection Plan 1.6 G Environmental Protection Plan 3.16 G Fish and Wildlife 3.1.7 G Environmental Permits 1.5.1 G Equipment Inventory 3.7.2

SD-06 Test Reports Any Asbestos Inspection reports G that have not been provided by t e area specific Environmental Offic e.

Any Asbestos Inspection Reports that were not included in the original assessment or a results t o a change in the scope of work.

G Unsigned copy of State Renovation, Demolition Notifications 15 days prior; G Lead Work Plans G Lead Occupant Protection Plan. G Texas Department of State G Health Services Lead Licenses Lead Notifications G h

DATE FWD TO APR

AUTH/

DATE RCD FROM CONTR

(l)

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L N O

Activity No.

N O

Submittal No.

N O

S P E C S E C T

DESCRI

PTION

ITEM

SUBMIT

TED

CONTRACTOR

ACTION

Paragraph No.

Gov't Classificatio n of Review

CONTRACTOR: SCHEDULE

l

Needed By

Material Needed By

Action Code

Date of Action

DATE

FWD

TO

OTHE

R

REVIE

WER

DATE RCD

FROM OTH

REVIEWER Action Code DATE OF ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

01 57 20 Lead Training Certificates G Lead Based Paint Reports G Lead Inspection reports G

SD-03 Product Data Asbestos Air Monitoring reports G Lead Air Monitoring reports G

SD-04 Samples Lead OSHA Negative Exposure G Assessment or Lead Work Plan. G EPA Lead Training Lead Awareness Training G certificates OSHA Air Monitoring G Lead Training Certificates G Waste Disposal Plan, May be G included in work plan Lead Inspection reports G Lead Based Paint Reports G

SD-06 Test Reports Analytical Results 3.1.4.1 G

01 78 00 SD-03 Product Data Warranty Management Plan 1.4.1 Warranty Tags 1.4.3 Spare Parts Data

SD-08 Manufacturer’s Instructions

Paragraph No.

Gov't Classificatio n of Review

CONTRACTOR: SCHEDULE

DATES

APPROVING AUTHORITY

DATE FWD TO APR

AUTH/

DATE RCD FROM CONTR

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L N O

Activity No.

N O

Submittal No.

N O

S P E C S E C T

DESCRI

PTION

ITEM

SUBMIT

TED

CONTRACTOR

l

Needed By

Material Needed By

Action Code

Date of Action

DATE

FWD

TO

OTHE

R

REVIE

WER

DATE RCD

FROM OTH

REVIEWER Action Code DATE OF ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

01 78 00 Instructions 1.4.1 SD-10 Operation and Maintenance

Data Operation and Maintenance 3.2 G Manuals

SD-11 Closeout Submittals As-Built Drawings 3.1 G Record Drawings G As-Built Record of Equipment 1.4.1 and Materials Final Approved Shop Drawings Construction Contract Specifications Certification of EPA Designated 2.1 G Items

22 05 48.00 20 SD-02 Shop Drawings Inertia Bases 2.7 Machinery Bases 2.6 Platforms 2.6 Rails 2.6 Saddles 2.6

SD-03 Product Data Isolators 2.3 Flexible Connectors 2.8 Flexible Duct Connectors 2.9 Pipe Guides 2.11

DATE FWD TO APR

AUTH/

DATE RCD FROM CONTR

(l)

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L N O

Activity No.

N O

Submittal No.

N O

S P E C S E C T

DESCRI

PTION

ITEM

SUBMIT

TED

CONTRACTOR

ACTION

Paragraph No.

Gov't Classificatio n of Review

CONTRACTOR: SCHEDULE

l

Needed By

Material Needed By

Action Code

Date of Action

DATE

FWD

TO

OTHE

R

REVIE

WER

DATE RCD

FROM OTH

REVIEWER Action Code DATE OF ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

22 05 48.00 20 Seismic Snubbers 2.10 Vertical Stops 3.1.3 Thrust Restraints 2.12 Inertia Bases 2.7 Machinery Bases 2.6 Machinery Foundations and 3.1.13 Subbases Platforms 2.6 Rails 2.6 Saddles 2.6 Machinery Manufacturer's Sound 1.4.2 Data

SD-05 Design Data Inertia Bases 2.7 Machinery Bases 2.6 Platforms 2.6 Rails 2.6 Saddles 2.6 Machinery 1.4.3 Machinery Over 300 Pounds 1.4.4

SD-06 Test Reports Seismic Snubbers 2.10 Equipment Vibration Tests 3.2.3.1 Equipment Sound Level Tests 3.2.3.2 Protected Spring Isolators 2.4

SD-08 Manufacturer’s Instructions

Paragraph No.

Gov't Classificatio n of Review

CONTRACTOR: SCHEDULE

DATES

APPROVING AUTHORITY

DATE FWD TO APR

AUTH/

DATE RCD FROM CONTR

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L N O

Activity No.

N O

Submittal No.

N O

S P E C S E C T

DESCRI

PTION

ITEM

SUBMIT

TED

CONTRACTOR

l

Needed By

Material Needed By

Action Code

Date of Action

DATE

FWD

TO

OTHE

R

REVIE

WER

DATE RCD

FROM OTH

REVIEWER Action Code DATE OF ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

22 05 48.00 20 Vibration and Noise Isolation 3.1.1 Components Seismic Protection Components 2.13

23 05 93 SD-01 Preconstruction Submittals Records of Existing Conditions G

SD-02 Shop Drawings TAB Schematic Drawings and 1.3.3 G Report Forms

SD-03 Product Data Equipment and Performance 1.3 G Data TAB Related HVAC Submittals G

SD-06 Test Reports Completed Pre-Final DALT 3.3.5 G Report Certified Final DALT Report 3.3.8 G

SD-07 Certificates Independent TAB Agency and 1.5.1 G Personnel Qualifications DALT and TAB Submittal and G Work Schedule TAB Pre-Field Engineering G Report

23 09 00 SD-02 Shop Drawings DDC Contractor Design Drawings 3.3 G Draft As-Built Drawings 3.3 G

DATE FWD TO APR

AUTH/

DATE RCD FROM CONTR

(l)

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L N O

Activity No.

N O

Submittal No.

N O

S P E C S E C T

DESCRI

PTION

ITEM

SUBMIT

TED

CONTRACTOR

ACTION

Paragraph No.

Gov't Classificatio n of Review

CONTRACTOR: SCHEDULE

l

Needed By

Material Needed By

Action Code

Date of Action

DATE

FWD

TO

OTHE

R

REVIE

WER

DATE RCD

FROM OTH

REVIEWER Action Code DATE OF ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

23 09 00 Final As-Built Drawings 3.3 G SD-03 Product Data

Programming Software 1.8.3 G Controller Application Programs 1.8.4 G Configuration Software 1.8.1 G Controller Configuration Settings 1.8.2 G Manufacturer's Product Data 2.2 G Niagara Framework Supervisory 1.8.5 G Gateway Backups Niagara Framework Engineering 1.8.6 G Tool Niagara Framework Wizards G

SD-05 Design Data Boiler Or Chiller Plant Gateway 1.9 Request

SD-06 Test Reports Existing Conditions Report 3.1.1 Start-Up Testing Report 3.5.2 G PVT Procedures 3.6.1 G PVT Report 3.6.3 G Pre-Construction Quality Control 1.10.1 G (QC) Checklist Post-Construction Quality Control 1.10.2 G (QC) Checklist

SD-10 Operation and Maintenance Data

Paragraph No.

Gov't Classificatio n of Review

CONTRACTOR: SCHEDULE

DATES

APPROVING AUTHORITY

DATE FWD TO APR

AUTH/

DATE RCD FROM CONTR

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L N O

Activity No.

N O

Submittal No.

N O

S P E C S E C T

DESCRI

PTION

ITEM

SUBMIT

TED

CONTRACTOR

l

Needed By

Material Needed By

Action Code

Date of Action

DATE

FWD

TO

OTHE

R

REVIE

WER

DATE RCD

FROM OTH

REVIEWER Action Code DATE OF ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

23 09 00 Operation and Maintenance 3.7 G (O&M) Instructions Training Documentation 3.9.1 G

SD-11 Closeout Submittals Enclosure Keys 2.5 G Password Summary Report 3.2.6.1 G Closeout Quality Control (QC) 1.10.3 G Checklist

23 09 33.00 40 SD-01 Preconstruction Submittals Material, Equipment, and Fixture 2.3 G Lists Records of Existing Conditions 1.5 G

SD-02 Shop Drawings Fabrication Drawings 2.2 G Installation Drawings 3.1 G

SD-03 Product Data Control Components 2.3 G Thermometers 2.3 G Thermometers 2.3.1 G Pressure Gages 2.3 G Pressure Gages 2.5.4 G Valves 2.3 G Valves 2.5.2 G Dampers 2.3 G Dampers 2.3.5 G Operators 2.3 G

DATE FWD TO APR

AUTH/

DATE RCD FROM CONTR

(l)

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L N O

Activity No.

N O

Submittal No.

N O

S P E C S E C T

DESCRI

PTION

ITEM

SUBMIT

TED

CONTRACTOR

ACTION

Paragraph No.

Gov't Classificatio n of Review

CONTRACTOR: SCHEDULE

l

Needed By

Material Needed By

Action Code

Date of Action

DATE

FWD

TO

OTHE

R

REVIE

WER

DATE RCD

FROM OTH

REVIEWER Action Code DATE OF ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

23 09 33.00 40 Operators 2.3.6.1 G SD-04 Samples

Manufacturer's Standard Color 2.4.5.3 G Charts Thermostat Covers 2.4.5.3 G Thermostat Guards 2.4.5.3 G Room Humidistats 2.4.13 G

SD-06 Test Reports Set Points and Final Adjustments 3.2 G Of Controls Test Reports 3.2 G

SD-07 Certificates Listing of Product Installations 1.3.1 G Qualified Permanent Service 1.3.4 G Organizations Manufacturer's Standard Factory 2.3.7.2 G Finishing

SD-10 Operation and Maintenance Data Operation and Maintenance 3.3.3 G Manuals Scheduled Instructional Services 3.3.1 G Air Supply Source 2.3.4.1 G Mechanical Refrigeration-Type 2.3.4.2 G Air Dryer Pneumatic Operators 2.3.6.2 G

Paragraph No.

Gov't Classificatio n of Review

CONTRACTOR: SCHEDULE

DATES

APPROVING AUTHORITY

DATE FWD TO APR

AUTH/

DATE RCD FROM CONTR

(l)

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L N O

Activity No.

N O

Submittal No.

N O

S P E C S E C T

DESCRI

PTION

ITEM

SUBMIT

TED

CONTRACTOR

l

Needed By

Material Needed By

Action Code

Date of Action

DATE

FWD

TO

OTHE

R

REVIE

WER

DATE RCD

FROM OTH

REVIEWER Action Code DATE OF ACTION

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (m) (n) (o) (p) (q) (r)

23 09 33.00 40 Electric Operators 2.3.6.3 G

DATE FWD TO APR

AUTH/

DATE RCD FROM CONTR

SUBMITTAL REGISTER CONTRACT NO.

Doug Smith

TITLE AND LOCATION

1080797 LAK RPL Chiller B10056

CONTRACTOR

A C T I V I T Y

N O

T R A N S M I T T A L N O

Activity No.

N O

Submittal No.

N O

S P E C S E C T

DESCRI

PTION

ITEM

SUBMIT

TED

(l)

CONTRACTOR

ACTION

Paragraph No.

Gov't Classificatio n of Review

CONTRACTOR: SCHEDULE

MAILED TO

CONTR/

DATE RCD

FRM APR

AUTH REMARKS

DATE RCD

DATE RCD

DATE RCD

DATE RCD

DATE RCD

DATE RCD

DATE RCD

DATE RCD

DATE RCD

DATE RCD

File details come from the government source that posted it. Updated .