Attachment 6 - Bid Schedule WAAR162010.docx

DOCX document 15 KB Posted

Attached to
Seal Roads and Parking
Solicitation number
W50S8Q-22-B-0006
Issued by

About this file

This solicitation package outlines requirements for a federal contract to seal roads and parking areas at Springfield Air National Guard Base. The 178th Wing Contracting Office is seeking bids to perform asphalt crack sealing, surface sealing, and re-striping of painted areas across the installation under project number WAAR1162010. The base map identifies the specific locations to be treated. The contractor will have 180 calendar days from notice to proceed to complete the work and address any punch list items. This will be a small business set-aside solicited on SAM.gov with a NAICS code of 237310 and size standard of $39.5 million average annual revenue. The total magnitude is estimated between $500,000 and $1 million. Interested parties must register in SAM to access the full solicitation package and plans. Bids are due by the specified date and time. The selected contractor will perform the work at Springfield Air National Guard Base located in Springfield, Ohio under the Department of the Army National Guard.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT BID SCHEDULE

Project Number: WAAR162010

Project Title: Seal Roads and Parking

Bid Structure:

Item Number Description Quantity Unit Amount

0001 Base Bid Asphalt Crack Sealing 1 JOBLump Sum $___________
Base Bid Asphalt Sealing 1 JOBLump Sum $___________
Base Bid Asphalt Striping 1 JOBLump Sum $___________
Base Bid Total1 JOBLump Sum $___________
0002 Option 1 Asphalt Crack Sealing 1 JOBLump Sum $___________
Option 1 Asphalt Sealing 1 JOBLump Sum $___________
Option 1 Asphalt Striping 1 JOBLump Sum $___________
Option 1 Total1 JOBLump Sum $___________
0003 Option 2 Asphalt Crack Sealing 1 JOBLump Sum $___________
Option 2 Asphalt Sealing 1 JOBLump Sum $___________
Option 2 Asphalt Striping 1 JOBLump Sum $___________
Option 2 Total1 JOBLump Sum $___________
0004 Option 3 Asphalt Crack Sealing 1 JOBLump Sum $___________
Option 3 Asphalt Sealing 1 JOBLump Sum $___________
Option 3 Asphalt Striping 1 JOBLump Sum $___________
Option 3 Total1 JOBLump Sum $___________
0005 Option 4 Asphalt Crack Sealing 1 JOBLump Sum $___________
Option 4 Asphalt Sealing 1 JOBLump Sum $___________
Option 4 Asphalt Striping 1 JOBLump Sum $___________
Option 4 Total1 JOBLump Sum $___________

File details come from the government source that posted it. Updated .