Attachment 5_Pricing Matrix Worksheet.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- AEWS AN/FPS-117 Radome Replacement Program Federal contract opportunity
- Solicitation number
- FA821725RB002
About this file
The file is a Pricing Matrix Worksheet for an Indefinite Delivery/Indefinite Quantity (ID/IQ) contract for the Air Force Life Cycle Management Center's Atmospheric Early Warning System (AEWS) Program. The solicitation covers the AN/FPS-117 Long Range Radar System, which involves 27 operational radar sites across Canada. The contract will procure and install 28-foot composite radome assemblies, including services such as site surveys, radome procurement and installation, training, spare parts, and associated logistics. The contract is a five-year base period with a two-year extension option, using a mix of fixed-price and cost-reimbursement pricing arrangements.
The pricing matrix details multiple contract line items (CLINs) across seven years, including site survey reports, radome procurement and installation, training, and an "Over and Above" cost-plus fixed fee line item. Key components include 25 radome installations (varying from 2-5 per year), training services, and a $2.7 million placeholder for over and above work. The solicitation is set for full and open competition, with a small business size standard of $34 million. Offerors must submit questions by 22 August 2025 and submit proposals electronically through the PIEE Solicitation Module, with all pricing to be submitted using this specific pricing matrix worksheet.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instruction
| NOTES AND INSTRUCTIONS | |
| 1. | Offerors shall complete the Pricing Matrix Worksheet in accordance with the instructions at the top of each worksheet. |
| 2. | Ensure the pricing information is complete, reasonable, and balanced. |
| 3. | The Government will be evaluating your submission based on the inputs in the TEP tab. |
| 4. | "Parts Pricing" tab inputs will not be included in the TEP calculation but will be used for spare parts purchases on future orders. |
| 5. | Awardable Task Order Tab - No inputs necessary on this tab. This tab is simply to show the Government's notional awardable task order at time of basic award. |
TEP
| Instructions |
| 1. The below Contracting Line Item Number (CLIN) structure is reflective of the basic CLIN structure for the ID/IQ. |
| 3. The yellow cells represent fields for input to assist in calculating the TEP. |
| 5. The unit price for Over and Above (O&A) is a place holder for evaluation purposes. On future orders, O&A is subject to adjustments based on needs/performance as installations progresses through the completion of this contract. The proposed profit rate is binding for use on future contracting actions. |
| 6. The proposed unit prices for Site Survey, Radome Procurement, Radome Installation, and Training, will be used for awarding future contract actions. |
| 7. Any deviation or modification to this table will be solely at the Government's discretion |
| 8. Do not extend prices beyond two decimal places. |
| CLINS | NOUN | PRICING ARRANGEMENT | PSC | Best Estimated QTY | U/I | POP | Unit Price | Profit Rate Percentage | Total Cost | Acceptance | Point of Acceptance |
| 0001 | Data | Not Separately Priced | DATA | 1 | LO | As Required | NSP | NSP | NSP | Destination | PMO |
| 5001 | Data | Not Separately Priced | DATA | 1 | LO | As Required | NSP | NSP | NSP | Destination | PMO |
| 0002 | Travel | CRNF | TRAV | 1 | LO | To be negotiated on applicable orders | To be negotiated on applicable orders | NF | To be negotiated on applicable orders | Destination | PMO |
| 5002 | Travel | CRNF | TRAV | 1 | LO | To be negotiated on applicable orders | To be negotiated on applicable orders | NF | To be negotiated on applicable orders | Destination | PMO |
| 0003 | Shipping | CRNF | SHIP | 1 | LO | To be negotiated on applicable orders | To be negotiated on applicable orders | NF | To be negotiated on applicable orders | Destination | PMO |
| 5003 | Shipping | CRNG | SHIP | 1 | LO | To be negotiated on applicable orders | To be negotiated on applicable orders | NF | To be negotiated on applicable orders | Destination | PMO |
| 0004 | Year 1 Site Survey and Installation Plan Report | FFP | R425 | |||
| 7 | Each | TBP | $ - 0 | Destination | PMO | |
| 1004 | Year 2 Site Survey and Installation Plan Report | FFP | R425 | |||
| 1 | Each | TBP | $ - 0 | Destination | PMO | |
| 2004 | Year 3 Site Survey and Installation Plan Report | FFP | R425 | |||
| 1 | Each | TBP | $ - 0 | Destination | PMO | |
| 3004 | Year 4 Site Survey and Installation Plan Report | FFP | R425 | |||
| 1 | Each | TBP | $ - 0 | Destination | PMO | |
| 4004 | Year 5 Site Survey and Installation Plan Report | FFP | R425 | |||
| 1 | Each | TBP | $ - 0 | Destination | PMO | |
| 5004 | Year 6 Site Survey and Installation Plan Report | FFP | R425 | |||
| 1 | Each | TBP | $ - 0 | Destination | PMO | |
| 6004 | Year 7 Site Survey and Installation Plan Report | FFP | R425 | |||
| 1 | Each | TBP | $ - 0 | Destination | PMO |
| 0005 | Year 1 Radome Procurement | FFP | 5840 | 3 | Each | TBP | $ - 0 | Origin | DCMA Contractor Facility |
| 1005 | Year 2 Radome Procurement | FFP | 5840 | 5 | Each | TBP | $ - 0 | Origin | DCMA Contractor Facility |
| 2005 | Year 3 Radome Procurement | FFP | 5840 | 5 | Each | TBP | $ - 0 | Origin | DCMA Contractor Facility |
| 3005 | Year 4 Radome Procurement | FFP | 5840 | 5 | Each | TBP | $ - 0 | Origin | DCMA Contractor Facility |
| 4005 | Year 5 Radome Procurement | FFP | 5840 | 5 | Each | TBP | $ - 0 | Origin | DCMA Contractor Facility |
| 5005 | Year 6 Radome Procurement | FFP | 5840 | 5 | Each | TBP | $ - 0 | Origin | DCMA Contractor Facility |
| 6005 | Year 7 Radome Procurement | FFP | 5840 | 2 | Each | TBP | $ - 0 | Origin | DCMA Contractor Facility |
| 0006 | Year 1 Radome Installation | FFP | J059 | |||
| 3 | Each | TBP | $ - 0 | Destination | PMO | |
| 1006 | Year 2 Radome Installation | FFP | J059 | |||
| 5 | Each | TBP | $ - 0 | Destination | PMO | |
| 2006 | Year 3 Radome Installation | FFP | J059 | |||
| 5 | Each | TBP | $ - 0 | Destination | PMO | |
| 3006 | Year 4 Radome Installation | FFP | J059 | |||
| 5 | Each | TBP | $ - 0 | Destination | PMO | |
| 4006 | Year 5 Radome Installation | FFP | J059 | |||
| 5 | Each | TBP | $ - 0 | Destination | PMO | |
| 5006 | Year 6 Radome Installation | FFP | J059 | |||
| 5 | Each | TBP | $ - 0 | Destination | PMO | |
| 6006 | Year 7 Radome Installation | FFP | J059 | |||
| 2 | Each | TBP | $ - 0 | Destination | PMO |
| 0007 | Year 1-5 Training | FFP | R499 | 3 | Each | TBP | $ - 0 | Destination | PMO |
| 5007 | Year 6-7 Training | FFP | R499 | 3 | Each | TBP | $ - 0 | Destination | PMO |
| 0008 | Over and Above | CPFF | R425 | 27 | LO | To Be Negotiated | $ 100,000.00 | $ 2,700,000.00 | Destination | PMO |
| 5008 | Over and Above | CPFF | R425 | 1 | LO | To Be Negotiated | Destination | PMO |
| 0009 | Engineering Change Proposal | FFP | R425 | 1 | Each | To be negotiated on applicable orders | To be negotiated on applicable orders | To be negotiated on applicable orders | Destination | PMO |
| 5009 | Engineering Change Proposal | FFP | R425 | 1 | Each | To be negotiated on applicable orders | To be negotiated on applicable orders | To be negotiated on applicable orders | Destination | PMO |
| 0010 | Spare Parts | FFP | 5840 | TBD | Each | See Spares Parts Pricing sheet |
| 5010 | Spare Parts | FFP | 5840 | TBD | Each | See Spares Parts Pricing sheet |
Parts Pricing
| Instructions | |
| 1. Submit a detailed list of Firm Fixed Price (FFP) parts. Include the part number, description, delivery schedule, and associated yearly pricing. | |
| 2. The FFP should not include shipping as exact destinations are unknown at this time. | |
| 2. This attachment provides the required template for submitting your pricing information. | |
| 3. This price list will be attached to the basic contract for the use of buying spare parts on future orders. | |
| 4. Do not extend prices beyond two decimal places. |
Part Number: Description: Delivery Schedule: Year 1 Price: Year 2 Price: Year 3 Price: Year 4 Price: Year 5 Price: Year 6 Price: Year 7 Price:
Awardable Task Order
| Instructions |
| 1. No input necessary. This is for information purposes only. |
2. The below represents the Government's notional awardable task order/minimum guarantee and is subject to change.
| CLINS | NOUN | PRICING ARRANGEMENT | PSC | Best Estimated QTY | U/I | POP | Unit Price | Profit Rate Percentage | Total Cost | Acceptance | Acceptor | Cost Plus |
| 0001 | Data | Not Separately Priced | DATA | 1 | LO | As Required | NSP | NSP | NSP | Destination | COR |
0002 Travel CRNF TRAV 1 LO TBD TBD NF TBD Destination COR
0003 Shipping CRNF SHIP 1 LO TBD TBD NF TBD Destination COR
| 0004 | Year 1 Site Survey and Installation Plan Report | FFP | R425 | |||
| 7 | Each | TBD | TBP | TBP | Destination | COR |
0005 Year 1 Radome Procurement FFP 5840 3 Each TBD TBP TBP Origin DCMA
0006 Year 1 Radome Installation FFP J059 3 Each TBD TBP TBP Destination COR
0008 Over and Above CPFF J059 1 LO TBP $ 100,000.00 TBP TBP Destination COR
0010 Spare Parts FFP 5840 TBD Each TBP TBP TBP TBP TBD TBD