This is a long-form software development contract amendment template from the City and County of San Francisco, Office of Contract Administration, Purchasing Division. The agreement establishes terms for software development services through a competitive selection process, with work to be performed in discrete and sequential phases: Phase 1 involves development of Functional Specifications, Phase 2 requires creation of Design Specifications, and Phase 3 encompasses coding, system installation, and Documentation delivery. The contract includes acceptance testing procedures for each phase, with the City having defined review and acceptance windows. The agreement establishes a Project Schedule (detailed in Appendix C) that specifies timeframes for each phase completion, with Critical Milestones identified to trigger liquidated damages if not met. The contract term commences on a specified start date and expires on a defined expiration date, with City holding the option to renew for additional years at its sole discretion. The Maintenance Services component, if exercised by City, has a separate term with extension options of one year each. Contractor must designate a Project Manager available Monday through Friday, 9 a.m. to 5 p.m., with availability by phone or email when off-site.

Compensation shall not exceed a specified amount certified by the City Controller and is broken down in Appendix E. The contract specifies payment terms of thirty calendar days from service delivery or invoice receipt, whichever is later, with invoicing required no later than specified days after delivery and final invoices due fifteen days before fiscal year end. Retainage of a specified percentage of software development and license costs applies, payable following City's written Acceptance notice. Local Business Enterprise (LBE) subcontracting participation requirements apply with specified utilization percentages. Contractor must maintain insurance including Commercial General Liability ($1,000,000), Professional Liability ($1,000,000), Technology Errors and Omissions ($20,000,000), and Cyber and Privacy Liability ($20,000,000). The agreement incorporates multiple San Francisco Municipal Code mandatory requirements including minimum compensation ordinance, health care accountability ordinance, nondiscrimination provisions, and ADA compliance. City data security and confidentiality obligations are extensive, including restrictions on artificial intelligence use, notification requirements for data breaches within twenty-four hours, and requirement for secure disposal of City data within thirty days of contract termination. The contract requires annual cybersecurity risk assessments and compliance with Payment Card Industry standards where applicable.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City and County of San Francisco Office of Contract Administration Purchasing Division City Hall, Room 430 1 Dr. Carlton B. Goodlett Place San Francisco, California 94102-4685

Agreement between the City and County of San Francisco and

[Insert name of contractor] [Insert Department Contract ID, if any]

[Insert PeopleSoft Contract ID]

This Agreement is made this [insert day] day of [insert month], 20 [insert year], in the City and County of San Francisco (“City”), State of California, by and between [name of Contractor] (“Contractor”) and City.

Recitals WHEREAS, the [name of department making purchase] (“Department”) seeks to procure [insert short description of the services City intends to buy] from Contractor; and WHEREAS, Contractor represents and warrants that it is qualified to perform the Services required by City as set forth under this Agreement; and WHEREAS, Contractor was competitively selected pursuant to a Request for Qualifications entitled [enter RFQ name] issued through Sourcing Event ID [Enter Number] which resulted in a prequalified pool of suppliers from which Contractor was selected after a solicitation by the Department to the prequalified pool; and WHEREAS, this is a contract for Services and there is a Local Business Enterprise (“LBE”) subcontracting participation requirement with respect to the Services, as defined further herein; and WHEREAS, approval for the Agreement was obtained on [insert date of Civil Service Commission action or DHR approval date if under $200K] from the [Civil Service Commission or Department of Human Resources on behalf of the Civil Service Commission] under PSC number [insert DHR PSC number and legacy PSC number if applicable] which authorizes the award of multiple agreements, the total value of which cannot exceed [insert dollar amount] and the individual duration of which cannot exceed [insert number of years]; and WHEREAS, the City’s [name of Commission] approved this Agreement by [insert resolution number] on [insert date of Commission action] in the amount of [insert Dollar Amount] for the period commencing [Insert Start Date] and ending [Insert End Date]; and WHEREAS, the Department has filed Ethics Form 126f2 (Notice of Submission of Proposal) because this Agreement has a value of $100,000 or more in a fiscal year and will require the approval of an elected officer of the City, a board on which an elected officer of the City serves, a state agency on whose board an elected officer of the City’s appointee serves, and/or the Board of Supervisors; and WHEREAS, the Department will file Ethics Form 126f4 (Notification of Contract Approval) within five days of execution of the Agreement because this Agreement has a value of $100,000 or more in a fiscal year and will require the approval of an elected officer of the City, a board on which an elected officer of the City serves, a state agency on whose board an elected officer of the City’s appointee serves, and/or the Board of Supervisors; and WHEREAS, the City’s [Board of Supervisors] approved this Agreement by [insert resolution number] on [insert date of Commission or Board action] in the amount of [insert Dollar Amount] for the period commencing [Insert Start Date] and ending [Insert End Date].

Now, THEREFORE, the parties agree as follows:

Definitions Where any word or phrase defined below, or a pronoun used in place thereof, is used in any part of this Agreement, it shall have the meaning herein set forth. Whenever the words “as directed,” “as required,” “as permitted,” or words of like effect are used, it shall be understood as the direction, requirement, or permission of the [insert name of department]. The words “sufficient,” “necessary,” or “proper,” and the like, mean sufficient, necessary or proper in the judgment of the [insert name of department], unless otherwise indicated by the context. “Acceptance Tests” means the procedures and performance standards required for Acceptance by City of the Programs and the System as defined herein. These procedures and performance standards are set forth for each phase of System development, the Acceptance Test Plan. The following definitions apply to this Agreement:

“Acceptance” means notice from the City to Contractor that the [Licensed or developed] software meets the specifications contained in the Documentation. City’s Acceptance of the [Licensed or developed] software shall be governed by the procedures set forth in Article 4 (“Services, Software Implementation and Acceptance”).

“Acceptance Window” means the time period following completion of Phase 1 or 2 during which Contractor must secure Acceptance of the completed phase from City.

“Agreement” means this contract document, including all attached appendices, and all applicable City Ordinances and Mandatory City Requirements which are specifically incorporated into this Agreement by reference as provided herein, together with any future written and executed amendments.

“Appendices” means the appendices listed in Article 14 (“Appendices”) herein.

“Artificial Intelligence” or “Artificial Intelligence Model” means an engineered or machine-based system that varies in its level of autonomy and that can, for explicit or implicit objectives, infer from the input it receives how to generate outputs that can influence physical or virtual environments.

“Artificial Intelligence System” means a machine-based system that is designed to operate with varying levels of autonomy and that may exhibit adaptiveness after deployment, and that, for explicit or implicit objectives, infers, from the input it receives, how to generate outputs such as predictions, content, recommendations, or decisions that can influence physical or virtual environments.

“Business Associate” or “BAA” has the meaning given to such term under HIPAA and its implementing regulations, including 42 U.S.C. Section 17938 and 45 C.F.R. Section 160.103, as may be amended from time to time.

“Change Order” means a written instrument signed by the City’s Project Manager that modifies this Agreement through an adjustment to one or more of the following: (i) the Project Schedule; (ii) the Statement of Work; (iii) the Acceptance Criteria; or (iv) other requirements specified in this Agreement.

“City” means the City and County of San Francisco, a municipal corporation, acting by and through both its Director of the Office of Contract Administration or the Director’s designated agent, hereinafter referred to as “Purchasing” and [insert name of department].

“City Data” means all data collected, used, maintained, processed, stored, and/or generated by or on behalf of the City in connection with this Agreement. City Data includes, without limitation, Confidential Information and Deliverable Data.

“Confidential Information” means confidential City information including, but not limited to, personal identifiable information (“PII”), protected health information (“PHI”), or individual financial information (collectively, “Proprietary or Confidential Information”) that is subject to local, state or federal laws restricting the use and disclosure of such information. Confidential Information includes, without limitation, City Data.

“CMD” means the Contract Monitoring Division of the City.

“Contractor” means [insert name and address of contractor].

“Critical Milestones” means those milestones specified in the Project Schedule as Critical Milestones after which liquidated damages apply for failure to complete performance in accordance with this Agreement.

“Deliverable Data” means any data that is required to be delivered to City as a Deliverable, or as a part of a Deliverable, under this Agreement.

“Deliverables” means Contractor’s or its subcontractors’ work product, including any partially completed work product and related materials, resulting from the Services provided by Contractor to City during the course of Contractor’s performance of the Agreement, including without limitation, the work product described in the “Scope of Services” attached as Appendix A.

“Design Specifications” means the written design specifications to be prepared by Contractor to implement the Functional Specifications. The Design Specifications shall include descriptions of each Program to be developed hereunder together with descriptions of the hardware and software environment in which such Programs may be operated and the files or databases, if any, with which such Programs shall function.

“Documentation” means the technical publications relating to use of the System, such as reference, installation, administrative, maintenance, and programmer manuals, provided by Contractor to City.

“Equipment” means the central processing unit[s] and associated peripheral devices [or, computer hardware] on which the Programs will operate and with which the Programs must be compatible, to be purchased [or, leased] by Contractor for City [or, provided by City].

“Errors, Defects and Malfunctions” means either a deviation between the function of the developed Programs and the documentation furnished by Contractor for the Programs, or a failure of the Programs which degrades the use of the Programs.

“Fix” means repair or replace source, object or executable code in the Programs to remedy an Error, Defect or Malfunction.

“Functional Specifications” means the written description of City’s requirements, operations, and procedures, which document is to be prepared by Contractor, and upon approval by City, shall form the basis for the Design Specifications as defined herein.

“Generative Artificial Intelligence” means Artificial Intelligence that can generate derived synthetic content, such as text, images, video, and audio, that emulates the structure and characteristics of the Artificial Intelligence’s training data.

“Health Care Component” has the meaning given to such term under HIPAA and its implementing regulations, including 45 C.F.R. Section 164.103, as may be amended from time to time.

“Hybrid Entity” has the meaning given to such term under HIPAA and its implementing regulations, including 45 C.F.R. Section 164.103, as may be amended from time to time.

“Mandatory City Requirements” means those City laws set forth in the San Francisco Municipal Code, including the duly authorized rules, regulations, and guidelines implementing such laws, that impose specific duties and obligations upon Contractor.

“Party” or “Parties” means, respectively, the City and Contractor either individually or collectively.

“Patch” means temporary repair or replacement of code in the Programs to remedy an Error, Defect or Malfunction. Patches may be made permanent and released in Subsequent Releases of the Software.

“Performance Specifications” means the description of the minimum System characteristics and performance which must be achieved by the Functional Specifications.

“Personal Identifiable Information (PII)” means information that identifies, relates to, describes, is reasonably capable of being associated with, or could reasonably be linked, directly or indirectly, with a particular individual or household. Personal information includes, but is not limited to, the following if it identifies, relates to, describes, is reasonably capable of being associated with, or could be reasonably linked, directly or indirectly, with a particular individual or household as further defined in the California Consumer Privacy Act.

“Priority Category” means a priority assigned to an Error, Defect or Malfunction, designating the urgency of correcting an Error, Defect or Malfunction. Assignment of a Priority Category to an Error, Defect or Malfunction is based on City’s determination of the severity of the Error, Defect or Malfunction and Contractor’s reasonable analysis of the priority of the Error, Defect or Malfunction.

“Priority Protocol” means a Priority Protocol that is based on the Priority Category, rules specifying the turnaround time for correcting Errors, Malfunctions and Defects; escalation procedures, and personnel assignment.

“Programs” or “Software” means the software developed by Contractor and delivered to City, in the form of machine-executable instructions, to operate on the Equipment for purposes of accomplishing the functional capabilities set forth in Program Specifications.

“Project Schedule” means the schedule for Contractor’s completion of all phases of Work, and the Critical Milestones associated with such completion as specified in this Agreement.

“Review Period” means the time period during which City shall review the completed Work of Phase [1 or 2 (list number of phases if known)] and give notice to Contractor of its acceptance or rejection of the completed phase.

“Services” means the work performed by Contractor under this Agreement as specifically described in the “Scope of Services” attached as Appendices A-D, including all services, labor, supervision, materials, equipment, actions and other requirements to be performed and furnished by Contractor under this Agreement.

“Subsequent Release” means a release of the Software for use in a particular operating environment which supersedes the Software. A Subsequent Release is offered and expressly designated by Contractor as a replacement to a specified Software product. A Subsequent Release will be supported by Contractor in accordance with the terms of this Software Maintenance Attachment. Multiple Subsequent Releases may be supported by Contractor at any given time.

“Support Services” means the support service performed at the option of City. Support Services include correcting an Error, Defect or Malfunction; providing telephone and/or online support concerning the installation and use of the Programs; training in the installation and use of the Programs; on-site consulting and application development services; detection, warning and correction of viruses; and disabled/disabling code.

“System” means the Programs prepared by Contractor for City and the Equipment on which those Programs operate, the combination of which shall satisfy the requirements set forth in the Performance Specifications.

“Upgrade” means either an enhancement to the Programs code to add new features or functions to the system or software programming revisions containing corrections to Errors, Defects and Malfunctions that have been reported by users or discovered by the Contractor.

“Version Locking” means a mechanism that restricts access to a computer file by allowing only one user or process access at any specific time.

“Warranty Period” means a period commencing with the installation of the Software product during which reported Errors, Defects and Malfunctions for Software products are corrected without charge in accordance with the provisions below.

“Work” means the implementation, assembly, installation, optimization, and integration as required by this Agreement, whether completed or partially completed, including all labor, materials, and services provided, or to be provided, by Contractor to fulfill its obligations hereunder. The Work, therefore, constitutes all of the requirements for providing the System to the City.

“Workaround” means a change in the procedures followed or end user operation of the software to avoid an Error, Defect or Malfunction without significantly impairing functionality or degrading the use of the Software.

Term of the Agreement Term. The term of this Agreement shall commence on [insert Contractor’s start date] and expire on [insert expiration date], unless earlier terminated as otherwise provided herein.

Options to Extend. City has the option to renew the Agreement for a period of [enter number] (#) additional years. The City may exercise this option at the City’s sole and absolute discretion by modifying this Agreement as provided in Section 11.5, “Modification of this Agreement.” Extensions may be for the whole or partial period provided for above.

Maintenance Term. The term of the Maintenance Services Option (Section 4.7) if executed by City, shall commence on [insert commencement date] and expire on [insert expiration date], unless earlier terminated as otherwise provided herein. The City has [number of options] options to extend the Maintenance Services for a period of [one year or other time span] each. The City may extend this Agreement beyond the expiration date by exercising an option at the City’s sole and absolute discretion and by modifying this Agreement as provided in Section 11.5, “Modification of this Agreement.”

Financial Matters Certification of Funds; Budget and Fiscal Provisions.

Termination in the Event of Non-Appropriation. This Agreement is subject to the budget and fiscal provisions of Section 3.105 of the City’s Charter. Charges will accrue only after prior written authorization certified by the Controller, and the amount of City’s obligation hereunder shall not at any time exceed the amount certified for the purpose and period stated in such advance authorization. This Agreement will terminate without penalty, liability or expense of any kind to the City at the end of any fiscal year if funds are not appropriated for the next succeeding fiscal year. If funds are appropriated for a portion of the fiscal year, this Agreement will terminate, without penalty, liability or expense of any kind at the end of the term for which funds are appropriated. The City has no obligation to make appropriations for this Agreement in lieu of appropriations for new or other agreements. City budget decisions are subject to the discretion of the Mayor and the Board of Supervisors. Contractor’s assumption of risk of possible non-appropriation is part of the consideration for this Agreement.

THIS SECTION CONTROLS AGAINST ANY AND ALL OTHER PROVISIONS OF THIS AGREEMENT.

Maximum Costs. The City’s payment obligation to Contractor cannot at any time exceed the amount certified by City’s Controller for the purpose and period stated in such certification. Absent an authorized emergency per the City Charter or applicable Code, no City representative is authorized to offer or promise, nor is the City required to honor, any offered or promised payments to Contractor under this Agreement in excess of the certified maximum amount without the Controller having first certified the additional promised amount and the Parties having modified this Agreement as provided in Section 11.5, “Modification of this Agreement.”

Authorization to Commence Work. Contractor shall not commence any work under this Agreement until the City has issued formal written authorization to proceed, such as a purchase order, task order or notice to proceed. Such authorization may be for a partial or full scope of services.

Compensation.

Contract Not to Exceed Amount. The amount of this Agreement shall not exceed [insert whole dollar amount in numbers and words in bold – no pennies and no “.00”], the breakdown of which appears in Appendix E, “Calculation of Charges.” City shall not be liable for interest or late charges for any late payments. City will not honor minimum service order charges for any Services covered by this Agreement.

Payment Limited to Satisfactory Services. Contractor is not entitled to any payments until City approves the Services delivered. Payments to Contractor by City shall not excuse Contractor from its obligation to replace the unsatisfactory Services even if the unsatisfactory character was apparent or could have been detected at the time such payment was made. Non-conforming Services may be rejected by City and in such case must be replaced by Contractor without delay at no cost to the City.

Withhold Payments. If Contractor fails to provide the Services in accordance with Contractor’s obligations under this Agreement, the City may withhold any and all payments due to Contractor until such failure to perform is cured, and Contractor shall not stop work as a result of City’s withholding of payments as provided herein.

Invoicing. Contractor shall invoice the City for the [commodities/Services] provided under this Agreement on a timely basis, and in no event later than [30/45/60] days after delivery of the [commodities/Services] or as specified in Appendix B, Calculation of Charges, except for the last invoice of the fiscal year which must be submitted within [15] days before the end of July. Invoices submitted by Contractor under this Agreement must be in a form acceptable to the Controller and City and include a unique invoice number and a specific invoice date. Payment shall be made by City as specified in Section 3.3.7, or in such alternate manner as the Parties have mutually agreed upon in writing. All invoices must show the PeopleSoft Purchase Order ID Number, PeopleSoft Supplier Name and ID, Item numbers (if applicable), complete description of Services performed, sales/use tax (if applicable), contract payment terms and contract price. Invoices that do not include all required information or contain inaccurate information will not be processed for payment.

LBE Payment and Utilization Tracking System. LBE Subcontracting Participation Requirements apply to this Agreement. Contractor shall: (a) within three (3) business days of City’s payment of any invoice to Contractor, pay LBE subcontractors as provided under Chapter 14B.7(H)(9); and (b) within ten (10) business days of City’s payment of any invoice to Contractor, confirm its payment to subcontractors using the City’s Supplier Portal Payment Module, unless instructed otherwise by CMD. Failure to submit all required payment information to the City’s Supplier Portal Payment Module with each payment request may result in the withholding of twenty percent (20%) of subsequent payments due. Self-Service Training is located at this link: https://sfcitypartner.sfgov.org/pages/training.aspx.

Grant Funded Contracts.

Grant Terms. The funding for this Agreement is provided in full or in part by a Federal or State Grant to the City. As part of the terms of receiving the funds, the City is required to incorporate some of the terms into this Agreement. The incorporated terms may be found in Appendix [insert the Appendix letter], “Grant Terms.” To the extent that any Grant Term is inconsistent with any other provisions of this Agreement such that Contractor is unable to comply with both the Grant Term and the other provision(s), the Grant Term shall apply.

Disallowance. If Contractor requests or receives payment from City for Services, reimbursement for which is later disallowed due to Contractor’s non-compliance with the Grant Terms, Contractor shall promptly refund the disallowed amount to City upon City’s request. At its option, City may offset the amount disallowed from any payment due or to become due to Contractor under this Agreement or any other agreement between Contractor and City.

Subgrantees. Contractor shall insert each Grant Term into each lower tier subcontract. Contractor is responsible for compliance with the Grant Terms by any subcontractor, lower-tier subcontractor or service provider.

Payment Terms.

Payment Due Date. Unless City notifies the Contractor that a dispute exists, Payment shall be made within [Enter number of days, generally ≥ 30] calendar days, measured from (1) the rendering of the Services, or (2) the date of receipt of the invoice, whichever is later. Payment is deemed to be made on the date City issued a check to Contractor or, if Contractor agreed to electronic payment, the date City has posted electronic payment to Contractor.

Payment Discount Terms. The Payment Discount Terms for this Agreement are as follows: [___] %/[___]Days, Net [___]. The Payment Discount period begins upon date of completion of delivery of the Services on a purchase order for which payment is sought, or upon date of receipt of properly prepared invoices covering such items, whichever is later. Payment is deemed to be made, for the purpose of earning the discount, on the date City issued a check to Contractor or, if Contractor has agreed to electronic payment, the date City posted electronic payment to Contractor.

Retention. The final payment of [insert percent in words] percent ([insert percent in numbers]%) of the software development and license costs shall be paid [insert days in words and (numbers)] days after City issues its notice of Acceptance of the System.

Audit and Inspection of Records. Contractor agrees to maintain and make available to the City, during regular business hours, accurate books and accounting records relating to its Services. Contractor will permit City to audit, examine and make copies of such books and records, and to make audits of all invoices, materials, payrolls, records or personnel and other data related to all other matters covered by this Agreement, whether funded in whole or in part under this Agreement. Contractor shall maintain such data and records in an accessible location and condition for a period of not less than five years after final payment under this Agreement or until after final audit has been resolved, whichever is later. Contractor shall include the same audit and inspection rights and record retention requirements in all subcontracts.

Submitting False Claims. The full text of San Francisco Administrative Code Section 21.35, including the enforcement and penalty provisions, is incorporated into this Agreement. Any contractor or subcontractor who submits a false claim shall be liable to the City for the statutory penalties set forth in that section.

Services, Software Implementation and Acceptance Services Contractor Agrees to Perform. Contractor agrees to perform the Services provided for in Appendices A-D, “Scope of Services.” Officers and employees of the City are not authorized to request and the City is not required to compensate for Services beyond those stated.

Software Implementation.

Program Development. Subject to the terms and conditions of this Agreement, and in consideration for the payments to be made, Contractor agrees to design, develop, and install the Programs in the following discrete and sequential phases. In Phase 1, Contractor will develop Functional Specifications; in Phase 2, Contractor will create the Design Specifications; in Phase 3, Contractor will code the Programs, install the completed System at City’s site, and deliver the Documentation for the System. The Work covered under each phase is specified in [specify the document or Appendix which describes the scope of work]. Upon completion of Phase 3, the System will be subject to Acceptance Testing to verify conformity with the Design Specifications.

Interpretation of the Specifications. The City hereby acknowledges that the Functional Specifications will, upon acceptance by the City, provide the basis for the Design Specifications, and that the Design Specifications will, upon acceptance by the City, provide the basis for the coding and installation of the Programs. In the event of a variance between the written proposal Contractor submitted in response to City’s request for the services to be performed under this Agreement (the “Proposal”) and the Functional Specifications, the Functional Specifications shall be determinative. In the event of a variance between the Functional Specifications and the Design Specifications, the Design Specifications shall be determinative.

Interpretive Differences. In the event City and Contractor differ in their interpretations of the Proposal, Functional Specifications, Design Specifications, or Acceptance Tests, City’s interpretation, if reasonable, shall be determinative.

Change Orders.

City Proposed Change Order. The City may at any time, by written order, and without notice to Contractor’s sureties, submit a Change Order to Contractor. Within ten (10) working days of receiving a proposed Change Order, Contractor shall submit to City a written cost estimate, which shall include any adjustments to the Project price, the Project Schedule, the Statement of Work, the Acceptance Criteria or any other obligations of Contractor, as applicable.

Contractor Proposed Change Order. Contractor may also propose a Change Order involving either additions, deletions, or revisions to the Work, or any obligations imposed upon the Parties under this Agreement. Contractor’s proposed Change Order shall be in the form of a Request for Change (“RFC”) which shall explain, in writing, Contractor’s basis for requesting the Change Order and the impact of the proposed Change Order on the Project Schedule, the cost of Work, the Agreement documents and Deliverables, and any other interdependent Work, including but not limited to, the Acceptance Criteria, training, documentation, performance, resources, data conversion, users, re-engineering tasks, and all other aspects of the Project, as provided in this Agreement.

Any Change Order requiring a Project price adjustment that results in an overall increase to the not to exceed Project compensation (Section 3.3), shall be agreed to in writing by the Parties and executed in the same manner as this Agreement pursuant to Section 11.5, (“Modification of this Agreement”).

All Change Orders must be approved, in writing, by City’s Project Manager. Contractor shall not proceed with any work contemplated in any Change Order until it receives written notification to commence such work from City’s Project Manager.

The City shall have authority to order minor changes in the Work not involving either an adjustment in the total contract sum or an extension of the time for completion of the Work. The City’s Project Manager may waive a variation in the Work if, in his or her opinion, such variation does not materially change the Work or the Program’s performance.

Acceptance Procedure.

Acceptance of Phases 1 and Phase 2. Upon completion of Phases 1 and Phase 2 [add more phases if needed] of Program development, City shall, within the Review Period, review and give notice to Contractor of City’s acceptance or rejection of the specifications of each completed phase of Work. Should City reject either the Phase 1 or Phase 2 Work, then City is entitled to another Review Period upon receipt from Contractor of the revised Phase 1 or Phase 2 specifications. In the event that Contractor fails to provide Phase 1 or Phase 2 Work which meets the Acceptance Criteria of this Agreement during the Acceptance Window, City may, at its option, assess Liquidated Damages per Section 4.12 of this Agreement and/or terminate this Agreement under Section 8.2, “Termination for Default; Remedies.”

Final Acceptance of System. Upon completion of Phase 3 [update the phase number if needed], City and Contractor shall conduct Acceptance Testing of the System in accordance with the Acceptance Test Plan. City will not be deemed to have Accepted any Program or the System until Contractor receives written notice of Acceptance from City.

Data Conversion. [insert City or Contractor] shall be responsible for the timely and accurate conversion of City’s data to the format required by the Programs [or, System], and for providing the test data specified in the Acceptance Test Plan [or, Design Specifications].

Contractor’s Assistance in Acceptance Tests. Contractor must furnish all materials, equipment, and technical assistance necessary to conduct the Acceptance Tests. Test Equipment provided by Contractor for performance of the Acceptance Tests shall be currently certified as “calibrated” by the test equipment manufacturer, or its authorized calibration service agent. (See Section 4.5.8(b)) Failure to Pass Acceptance Tests. In the event that City determines that the System fails to meet the standards set forth in the Acceptance Test Plan, City shall promptly report to Contractor each deficiency, and Contractor will correct the reproducible aspects of the problem or failure within [insert number] days from date of Contractor’s receipt of notice of the problem or failure. Problems or failures that do not re-occur or cannot be repeated by Contractor, or by the City in Contractor’s presence, shall not be considered a failure. In the event that Contractor cannot achieve System Acceptance within [insert number] days following the commencement of Acceptance Testing, Contractor shall be in default under this Agreement and, in addition to those remedies set forth in Article 8 entitled “Termination and Default” City is further entitled to a refund of all payments made to Contractor under this Agreement.

Parallel Processing. The Parties contemplate that parallel processing will be used until both the Programs [or, the System] and its backup have completed the Acceptance Tests.

Documentation Delivery and Training.

Documentation Delivery. Contractor will deliver [insert number] copies of the completed Documentation for the Programs [or, the System] in accordance with the Documentation description, Appendix B, and the Project Schedule, Appendix C. The City may withhold its issuance of the notice of final Acceptance until City receives the completed Documentation.

City Training. Contractor will provide up to [insert number] hours of training to [insert number] City personnel at City’s [or, Contractor’s] premises at no charge [or, at the rates shown in Appendix E]. Upon request by the City, Contractor will provide additional training at its then prevailing rates.

Project Administration.

Project Schedule. The Project Schedule is set forth in Appendix C and may be amended by mutual agreement between City and Contractor.

Delays. To prevent slippage in the completion of the project, Contractor agrees that if such slippage occurs, it will assign additional qualified personnel to the project.

Time of the Essence. The Parties agree that time is of the essence, and that the System will be developed and implemented in accordance with the Project Schedule.

Critical Milestones. Contractor acknowledges and understands that the Project Schedule contains certain time-sensitive milestones (“Critical Milestones”) that must be attained by certain dates; otherwise, the City will suffer financial harm. Milestones that are Critical Milestones are so indicated in the Project Schedule. Notwithstanding City’s ability to assess liquidated damages for Contractor’s failure to meet any Critical Milestone, the time period for achieving final Acceptance shall not exceed [insert number] calendar days after initiation of System testing. In addition to any other remedy provided under this Agreement, Contractor’s inability to achieve final Acceptance of the System within [insert number] calendar days after the last Critical Milestone will be cause for immediate termination of this Agreement, and City shall be entitled to a full refund of any amounts paid to Contractor under this Agreement for the portion(s) of the Programs that are not accepted.

Progress Reports. Contractor will provide City with monthly [or, weekly] written status reports advising the City of its progress, which reports will be delivered [insert number] days following the month to which it relates.

Project Managers. Contractor and City shall each designate a Project Manager, who shall be accessible by telephone throughout the duration of the Agreement and shall be available 9 a.m. to 5 p.m. Monday through Friday, excluding City-designated holidays. These hours may be adjusted by mutual agreement of City and Contractor.

The City’s Project Manager will be authorized to make binding decisions for the City regarding this Agreement and will: (i) review all specifications, technical materials and other documents submitted by Contractor, request necessary corrections, and approve such documents; (ii) provide requested City information and data and assume responsibility on the adequacy of the same; (iii) advise Contractor of City’s requirements; and (iv) upon request provide access to City’s staff, facility and hardware. City’s Project Manager shall have the right to manage and direct any aspect of the Project as may be necessary, in his or her opinion, to safeguard the interest of the City. City’s Project Manager shall communicate all of his or her concerns to Contractor’s Project Manager. In the event Contractor believes that any direction being given by City’s Project Manager shall impair the performance of the Project or any phase thereof, Contractor shall immediately inform the City’s Project Manager of its concern. Except as specifically provided under this Agreement, City’s Project Manager’s management of the Project shall not relieve Contractor of any obligations or liabilities set forth in this Agreement and the Appendices or Exhibits thereto.

Throughout the term of this Agreement, whenever the Contractor’s Project Manager is not on site, he or she must be available by phone or e-mail. Whenever the Contractor’s Project Manager will be unavoidably absent or otherwise unavailable by phone or e-mail for more than eight hours, then a substitute Project Manager must be designated to respond to telephone calls and e-mails from the City. Contractor shall use its best efforts to maintain the same Project Manager until Final Acceptance of the Programs.

Contractor’s Project Manager:
[insert name

mailing address phone number e-mail address]

Changing Project Managers. The City and Contractor shall use their best efforts to maintain the same Project Manager until Final Acceptance of the System. However, if a Party needs to replace its Project Manager, the Party shall provide the other Party written notice thereof at least forty-five (45) days prior to the date the Project Manager shall be replaced. Such notice shall provide all the required information above. Notwithstanding the foregoing, the Parties have the right to appoint temporary Project Managers in connection with short term unavailability, sick leave or reasonable vacations. Parties shall notify each other in advance of any such temporary appointments. City may require Contractor to replace its Project Manager, by giving Contractor notification thereof and City’s objective reasons therefor.

Qualified Personnel. Contractor represents and warrants that it is qualified to perform the Services for which it is contracted to provide through this Agreement, and that all Services will be performed by competent personnel with the degree of skill and care required by current and sound professional procedures and practices. Contractor will comply with the City’s reasonable requests regarding assignment and/or removal of personnel, but all personnel, including those assigned at City’s request, must be supervised by Contractor. Contractor shall commit sufficient resources for timely completion within the project schedule.

Meetings. From the commencement date of the Project until the Final Acceptance of the Programs, the Project Managers shall communicate at times and locations designated by City to discuss the progress of the Project. Until the Final Acceptance of the Project, the Project Managers shall communicate, as required by the City, to discuss any operational problems or defects that City has encountered. City shall have the right to call a meeting at any time by providing Contractor forty-eight (48) hours written notice thereof. Such notice shall provide the time, place and the purpose of the meeting. Contractor and City’s Project team must be available to meet as often as is necessary to facilitate timely completion of the Project.

Inspection. City’s Project Manager shall have the right to inspect and/or test, at any time, all Work, Deliverables and materials to be provided for the Project, and the manufacture, assembly and installation of such Deliverables and materials. City’s Project Manager’s inspection shall be based on compliance with the Agreement. City’s Project Manager’s right to inspect all aspects of the Project shall not relieve Contractor of its obligation to furnish material and workmanship in accordance with this Agreement. City’s Project Manager may reject any portion of the Project, which fails to meet any applicable standard.

Defects Post-Inspection. Notwithstanding any previous inspection, acceptance, or payment by the City for any Work, or Deliverables found to be in non-compliance with the Agreement, or found to be defective before Final Acceptance of the Project, such Work or Deliverables shall be repaired or replaced within a reasonable period of time by Contractor at its own cost and expense.

Special Testing Tools. Contractor shall furnish all tools, labor and material which Contractor deems necessary to inspect any Deliverables, Work or material. Unless purchased by the City as part of the Project, Contractor shall provide all test equipment needed to verify Deliverables or Work at its sole cost and expense. The equipment provided by Contractor for performance test shall currently be certified as “calibrated” by the test equipment manufacturer, or its authorized calibration service agent. Unless purchased by the City, all test equipment shall remain the property of Contractor.

Right to Stop Work. City’s Project Manager shall have the right to stop any Work on the Project if: (i) City notifies Contractor of a defect in the Work or Deliverables and after such notice, Contractor fails to promptly commence correction of any identified defects in the Work or Deliverables; or (ii) Contractor fails to carry out any portion of the Project in accordance with this Agreement. All stop work orders from the City shall be in writing and signed by City’s Project Manager. City shall specifically state the cause for the order to stop work. Upon receiving a stop work order, Contractor shall immediately cease working on that portion of the Work specified in the order, until the cause for such order has been eliminated. City’s right to stop any work on the Project shall not give rise to a duty on the part of the City to exercise this right for the benefit of Contractor or any other person or entity. In the event City’s Project Manager orders work to be stopped without proper justification, City shall reimburse Contractor for the actual and direct costs incurred by Contractor due to the delay. Furthermore, Contractor will be entitled to a time extension equal to the number of days delay City has caused due to the unjustified work stoppage. In no event will a stop work order extend beyond 30 days.

City Facilities.

Subcontracting. Contractor may subcontract portions of the Services only upon prior written approval of City. Contractor is responsible for its subcontractors throughout the course of the work required to perform the Services. All subcontracts must incorporate the terms of Article 10 “Additional Requirements Incorporated by Reference” of this Agreement, unless inapplicable. Neither Party shall, on the basis of this Agreement, contract on behalf of, or in the name of, the other Party. Any agreement made in violation of this provision shall be null and void. City’s execution of this Agreement constitutes its approval of the subcontractors listed below and/or in Appendices.

Maintenance Services Option. City, at its sole discretion, reserves the right to obtain maintenance services from Contractor for a period up to [insert the number of years] years from final acceptance of the Programs by City [or, upon expiration of the performance warranty provided herein]. Contractor will provide maintenance services for the Programs in accordance with the terms and conditions of this Agreement and Appendix F (Maintenance Terms and Conditions). Annual maintenance and support charges shall not increase more than [insert percentage or CPI] % of the rate of the year immediately prior to such increase.

Consulting Services. Upon request by City, Contractor will provide programming, project management, consulting and other related services. The scope and charges for such services shall be the then prevailing best government rate [or, are specified in Appendix _ ].

Independent Contractor; Payment of Employment Taxes and Other Expenses.

Independent Contractor. For the purposes of this Section 4.9, “Contractor” shall be deemed to include not only Contractor, but also any agent or employee of Contractor. Contractor acknowledges and agrees that at all times, Contractor is an independent contractor and is wholly responsible for the manner and means by which it performs the Services and work required under this Agreement. Contractor, including its agents and employees will not represent or hold itself/themselves out to be employees of the City at any time. Contractor shall not have employee status with City, nor be entitled to participate in any plans, arrangements, or distributions by the City pertaining to or in connection with any retirement, health or other benefits that City may offer its employees. Contractor is liable for its acts and omissions. Contractor shall be responsible for all obligations and payments, whether imposed by federal, state or local law, including, but not limited to, FICA, income tax withholdings, unemployment compensation, insurance, and other similar responsibilities related to Contractor’s performing Services and work, or any agent or employee of Contractor providing same. Nothing in this Agreement shall be construed as creating an employment or agency relationship between City and Contractor, or any of its agents or employees. Contractor agrees to maintain and make available to City, upon request and during regular business hours, accurate books and accounting records demonstrating Contractor’s compliance with Section 4.9. Should the City determine that Contractor is not performing in accordance with the requirements of Section 4.9, City shall provide Contractor with written notice of such failure. Within five (5) business days of Contractor’s receipt of such notice, and in accordance with Contractor policy and procedure, Contractor shall remedy the deficiency. Notwithstanding, if City believes that an action of Contractor warrants immediate remedial action by Contractor, City shall contact Contractor and provide Contractor in writing with the reason for requesting such immediate action.

Payment of Employment Taxes and Other Expenses. Should City, in its discretion, or a relevant taxing authority such as the Internal Revenue Service or the State Employment Development Division, or both, determine that Contractor is an employee for purposes of collection of any employment taxes, the amounts payable under this Agreement shall be reduced by amounts equal to both the employee and employer portions of the tax due (and offsetting any credits for amounts already paid by Contractor which can be applied against this liability). City shall then forward those amounts to the relevant taxing authority. Should a relevant taxing authority determine a liability for past Services performed by Contractor for City, upon notification of such fact by City, Contractor shall promptly remit such amount due or arrange with City to have the amount due withheld from future payments to Contractor under this Agreement (again, offsetting any amounts already paid by Contractor which can be applied as a credit against such liability). A determination of employment status pursuant to this Section 4.9 shall be solely limited to the purposes of the particular tax in question, and for all other purposes of this Agreement, Contractor shall not be considered an employee of City. Notwithstanding the foregoing, Contractor agrees to indemnify and hold harmless City and its officers, agents and employees from, and, if requested, shall defend them against any and all claims, losses, costs, damages, and expenses, including attorneys’ fees, arising from Section 4.9.

Assignment. The Services to be performed by Contractor are personal in character. This Agreement may not be directly or indirectly assigned, novated, or otherwise transferred unless first approved by City by written instrument executed and approved in the same manner as this Agreement. Any purported assignment made in violation of this provision shall be null and void.

Liquidated Damages. By entering into this Agreement, Contractor agrees that in the event the Services are delayed beyond the Critical Milestones as provided in Appendices A-D, City will suffer actual damages that will be impractical or extremely difficult to determine. Contractor agrees that the sum of [insert whole dollar amount in words and numbers -- no pennies and no “.00”] per calendar day for each day of delay beyond scheduled milestones and timelines is not a penalty, but is a reasonable estimate of the loss that City will incur based on the delay, established in light of the circumstances existing at the time this Agreement was awarded. City may deduct a sum representing the liquidated damages from any money due to Contractor under this Agreement or any other contract between City and Contractor. Such deductions shall not be considered a penalty, but rather agreed upon monetary damages sustained by City because of Contractor’s failure to furnish deliverables to City within the time fixed or such extensions of time permitted in writing by City.

Emergency - Priority 1 Service. In case of an emergency that affects any part of the San Francisco Bay Area, Contractor will give the City and County of San Francisco Priority 1 service with regard to the Services procured under this Agreement unless preempted by State and/or Federal laws. Contractor will make every good faith effort in attempting to deliver Services using all modes of transportation available. In addition, the Contractor shall charge fair and competitive prices for Services ordered during an emergency and not covered under the awarded Agreement.

Insurance, Indemnity and Warranties Insurance.

Required Coverages. Without in any way limiting Contractor’s liability pursuant to the “Indemnification” section of this Agreement, Contractor must maintain in force, during the full term of the Agreement, insurance in the following amounts and coverages:

Commercial General Liability Insurance with limits not less than $1,000,000 each occurrence for Bodily Injury and Property Damage, including Contractual Liability, Personal…