Attachment 3 AF Form 66 - MBMV222320.pdf

PDF 62 KB Posted

Attached to
MBMV223220 Install Surge Suppression B6900
Solicitation number
W50S84-22-R-0002
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

MBMV223220

APPROVED DISAPPROVED

1 Submittal Schedule - AF Form 66 1 x

2 Transfer and Acceptance of DOD Real Property - DD Form 1354 1 x

3 Contractor Hazardous Material Identification 1 x

4 Solid Waste Recycling and Disposal Reporting Form 1 x

5 Affirmative Procurement Reporting Form 1 x

6 Construction Schedule 1 x

7 Construction Photos 1

8 Safety Documentation as stated 1 x

9 Permits, Licenses and Certificates 1 x

10 Quality Control Plan 1 x

11 Parallel connected Surge Suppression Device 1 1 1

12 Parallel-Tapped Connected Surge Suppression Device 1 1 1

SOLICITATION/CONTRACT NO.PROJECT TITLE

INSTALL SURGE SUPPRESSION B6900,

6906, 6914, 6922, & 6923

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L

O R

D

AT

A

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U

T REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

File details come from the government source that posted it. Updated .