Attachment 21 - Post Allowance Processes.pdf
PDF 508 KB Posted
- Attached to
- Patent Data and Document Management (PDDM) Federal contract opportunity
- Solicitation number
- 1333BJ20R00151004
About this file
This document outlines the requirements and processes for the Patent Data and Document Management federal contract opportunity. Key details include that the United States Patent and Trademark Office seeks contractor support to manage the entire patent application lifecycle from initial filing through final disposition. Responsibilities will include data capture, file maintenance, final data capture, re-examination and post-grant review support, assembly of patent grants, notices to applicants, the weekly Official Gazette publication, and withdrawal processing. Offerors should thoroughly review the RFP and statement of work attachments to understand the full scope of requirements. The solicitation number is 1333BJ20R00151004 and is open to all responsible sources.
View the file
Other files for this federal contract opportunity
Show all 50
Patent Data and Document Management (PDDM) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor function review Data Capture (IDC) Co nt ra ct or
PT
O F un ct io n
O th er co nt ra ct or s
TC Mail notice of allowance
Retrieve electronic file from server and load into Contractor systems
Sets flag in system‐ PTO systems build IFW electronic export file place on server
(PALM Data, automated file creation) Possibly three attempts over 3 days for successful export prior to corrective action
PTO updates PALM with FIDC date (batched once a week)SCORE Electronic file export generated from matches and loaded to server (automated)
Generate PALM report and compare to SCORE content
Generate PALM report and compare to Comp. Readable
Formats (CRF) content entries (automated)
CRF Electronic file export generated and loaded to server
Record PALM contents entry (EIDC) that application was exported (weekly updated after the fact)
IFW export file exports every work day except Thursday.
Other reports generated daily (work day)
Start data capture and initiate FMF workflow processes Load success?
Data problems? May occur anytime during data capture
Yes
Report problem to
PTO
Investigate issue
No
Retrievable? Yes
No
Complete data capture and wait for fee payment
Report application numbers that have completed data capture No
Contractor correct?
Yes
CorrectYes
Applicant correction?
Prepare and mail NTF and deliver to IFW and report to
PTO
No
Yes
Examiner correction?
Examiner completes action to complete printer rush and delivers to IFW
Yes
No
No
PTO identifies artifacts for allowed applications (Palm report) Reviewed and sorted manually)
Send list to POSS contractor (Email)
POSS retrieves folders (hard copy) and prepares for pick‐up
Pick‐up artifact folders
Missing artifacts?
(Lost internally)
No
Notify ODM of missing artifacts Yes
Notify PTO
PTO investigates and resolves or provides direction
Input from
FMF
This process “end to end” should take less that five weeks for any individual application
Export successful? Yes
Problem is investigated and resolved
No
Placed on failed export report
Approximately 4% of applications combined IDC and FDC require applicant correction. Applicant has 2 months to respond to NTF and can purchase additional 2 month extension – Patents cannot abandon the case until 4 months have elapsed‐average time of completion is 30 days
Average 12 days for resolution
Prepare printer rush and deliver to IFW and report to PTO
Notify PTO for examiner action
After two notifications of missing artifacts ODM contacts applicant or examiner.
Some applications (32% or more combined from IDC and FDC) may have data issues which contractor has instructions within the data capture manuals for methods of resolution: contract can correct, applicant must correct or examiner must correct
(approx 1% require both an applicant and examiner correction)
Up to 10% combined from IDC and FDC may have data issues that require return to examiner
Approximately 19% combined from IDC and FDC may have data issues that the contractor can resolve
Contractor function review File Maintenance nt ra ct or
PT
O F un ct io n
Provide daily list of all papers loaded into IFW the previous day Placed on the server
Retrieve paper list from server
Load into workflow system
NTF response or Other submission?
Printer rush response?
Applicant submission
Printer rush Response resolve original issue?
Additional information submitted?
No Outgoing mailing required?Yes No
Yes
No
Yes
NTF
Other
Examiner consideration Yes
Outgoing mailing required?
No
Yes
Contractor reviews submission and takes action as appropriate
No
PTO Submission
Yes
No
Prepare and mail response and load to IFW
Is this the third query for same issue?
No
ODM prepares and sends email to examiner/SPE/
Director (1 hour)
Yes Notify ODM “other” includes: Issue fee, IDS, 312 amendment, FRPR etc….
Other PTO consideration
No
Send email or IFW message to PTO Yes
Is IDC complete? Yes All requirements met?
Including issue fee
Dispatch to FDC (Palm transaction and send daily list to
PTO)
Yes
Return to IDC Hold for receipt of documents or expiration of response period
(to IDC)
No No
This is a “just in time” process that occurs as needed/triggered via grouping and post allowance requirements etc...
TC resolves printer rush
(8 hours)
Loaded into
IFW
Prepare new printer rush and deliver to
IFW
Examiner completes action to complete printer rush and delivers to IFW
Average 12 days for resolutionNotify PTO for examiner action
FDC query?
No
Return to FDCYes
Return from abandonment review
Approximately 10% of applications have post allowance papers the must be returned to examiner for consideration
Approximately one‐third of applications have post allowance papers in addition to the issue fee payment.
Contractor function review Abandonment nt ra to r
PT
O F un ct io n
Time period for applicant response to PTO notice/ requirement has expired
Create and Load abandonment notice into
IFW
Prepare paper notification
Deliver to PTO for mailing
Mail paper notification
Review application to insure no response received
Timely , bona fide response received
No
Return to FMF
Contractor function review Final Data Capture nt ra ct or
PT
O F un ct io n
O th er c on tr ac to rs
Receive email list from Contractor of applications ready for FDC export
Retrieve electronic file from server and load into Contractor systems
PTO systems build IFW electronic FDC export file place on server
(CIO)
Start final data capture Load success? Data problems?Yes
Report problem to
PTO
Investigate issue
No
Retrievable?
Yes
No
Complete final data capture
Assign Patent number and issue date and load issue build (email and server)
No
Contractor correct?
Yes
CorrectYes
Applicant correction?
Prepare and mail NTF and deliver to IFW
No
Yes
Examiner correction?
Yes
No
No
IFW export file exports every work day
ODM Send list to POSS contractor
POSS retrieves folders (hard copy) and prepares for pick‐up
Pick‐up artifact folders
Missing artifacts?
No
Notify ODM of missing artifacts Yes
Notify PTO
PTO retrieves Patent issue list from server
Palm calculates PTA/ PTE for each application
ODM retrieve PTA/ PTE list
ODM verifies PTA/ PTE list and makes adjustments as necessary
Provide PTA/PTE list with adjustments to Contractor (email)
Capture PTA/PTE data
Update Palm with Patent number issue date and status and exception list generated
Exceptions with issue date load/ Patent number?
Issue Close ‐ Correct problem?
Yes
Yes
No
No
Withdraw applications and Email created with withdrawal numbers and send to Contractor
Prepare deliverables (Postscript file, red and yellow book files, CPC extract, eOG file, etc…)
Contractor completes issue build
Contrator withdraws application from build
Send postscipt file to designated contractor
Place all other files on servers for PTO
Print B/W and color ledger copies and soft copies
Soft copies placed in envelopes and delivered to PTO mail room
Send ledger copies to Review and Assembly process
Contractor in PTO mail room applies postage and mails
Retrieve files (30 min)
Validated?
Email to Contractor for correction
No
Make available on issue date (weekly)
Load to internal and External PTO systems
(CIO)
Yes
Send artifacts to warehouse file repository
Contractor receives and stores artifacts
Determine Patent number and issue date for plants
Create and apply headers to plant drawings Send to PTO
PTO creates delivery order and sends to printing contractor
Printing Contractor print proofs and send to PTO
PTO approves
No
Print plant color drawingsYes
Send to review and assembly process
Hold plant patents until assigned issue date build (Approximately 6 weeks for printing process)
Palm generates text file for label creation and placed on server
Palm generates issue notification for non exceptions (automated)
Issue notifications are loaded into IFW
(automated)
Production control prints non‐ electronic notifications and send email to ODM that job is complete and ready for pick up
Send labels to review and assembly process
Contractor retrieve text file and prints issue labels
Pick up non‐ electronic notifications and stuff into envelopes
Deliver to PTO mail room
Record PALM contents entry that application was exported to FDC (Weekly – CIO)
Approximately 4% of applications combined IDC and FDC. Applicant has 2 months to respond to NTF and can purchase additional 2 month extension
– Patents cannot abandon the case until 4 months have elapsed‐ average time of completion is 30 days
PTO investigates and resolves or provides direction
Examiner completes action to complete printer rush and delivers to IFW
Average 12 days for resolutionNotify PTO for examiner action
Prepare printer rush and deliver to IFW and report to PTO
Some labels must be manually created due to issue build exceptions
Some applications (32% or more combined from IDC and FDC) may still have data issues which contractor has instructions within the data capture manuals for methods of resolution: contract can correct, applicant must correct or examiner must correct (approx 1% require both an applicant and examiner correction)
Up to 10% combined from IDC and FDC may have data issues that require return to examiner
Approximately 19% combined from IDC and FDC may have data issues that the contractor can resolve
Contrator function review Re‐exam and PTAB O th er c on tr ac to rs
Co nt ra ct or
PT
O F un ct io n
Mail NIRC (Notice of intent to issue re‐exam certificate) or for PTAB Mail
Trial.cert
PTO systems build IFW electronic export file place on server
ODM receives email from CRU and ODM forwards to Contractor
Retrieve electronic file from server and load into Contractor systems
Load success?
Report problem to
PTO
No
Retrievable? Yes
Investigate issue Part of FDC process
Receive email and compare email contents to electronic file
Contents match? Yes
No
Start data capture Data problems? Complete data captureNo
Contractor correct?
Yes
CorrectYes
No
Examiner correction? Yes
No
Notify PTO
Assign “certificate” number based on re‐exam type and issue date and email ODM daily
ODM performs PALM transactions to update status and issue date
(30 min/day)
Prepare deliverables (PDF, yellow book files, daily eOG etc…)
Place all other files on servers for PTO and other contractor
Retrieve days certificate file and print
Place in envelopes and deliver to PTO mail center
Apply postage and mail
Retrieve files (30 min)
Loadable file?
Email to Contractor for correction
Make available on issue date (daily)
Load to internal and External PTO systems
(CIO)
Yes
No
Create and print mailing labels using
PALM data
For supplemental exams the issue date is the date of publication in IFW
Record PALM contents entry that application was exported to
Contractor
IFW export file exports every work day
As a part of the F‐Export
PTO investigates and resolves or provides direction (1 – 8 hours)
Process happens daily when re‐exams are present
Examiner completes action to complete printer rush and delivers to IFW
Average 11 days for resolution
Prepare printer rush and deliver to IFW and report to PTO
Notify PTO for examiner action
Contractor function review‐ Assembly of patent grants nt ra ct or
PT
O F un ct io n
O th er c on tr ac to rs
Print B/W and color ledger copies and plant color drawings and send to Contractor
Receive B/W and color ledger copies and plant color drawings
Quality check satisfactory?
Assemble into grant covers
Apply mailing data/ labels from FDC process to envelopes and place assembled patent grant into envelopes
Remove any withdrawals
Deliver to PTO mailroom on issue date
Apply postage and mail
Yes
Notify PTO of defective/missing grants
No
Notify printing contractor to reprint missing/ defective pages/ grants
Report to PTO any grants not sent to mail room on issue date
Create issue date exception report with reason for not being mailed and send to PTO (status of inventor’s copy report)
Regular or exception? Regular
Record PALM PGM contents entry and sent to mailroom
Exception
PTO deletes a PALM PGM contents entry
Information for tracking
PTO supplies grant covers.
Contractor and PTO are in weekly communication regarding grant cover needs
Contractor function review Notice to file nt ra ct or
PT
O F un ct io n
O th er c on tr ac to rs
Determine Notice to file needed
Mailing transaction in PALM (generates
PTOL90)
If paper notification Print copy and deliver to mail room
Create detailed notice
Deliver notice and PTOL 90 to IFW
E‐notification generated from IFW and PALM notifies
Applicant
Mailroom mails notice
Contractor uses internal DB to track notices and waiting for response
Responses to notices are processed in FMF process
Contractor function review eOG nt ra ct or
PT
O F un ct io n
ODM Receive electronic notices (word documents) from all over Patents/Trademarks etc.
Verify formatted correctly ‐ Send email files to Contractor (24 docs avg)
Contractor incorporates notices into weekly eOG publication
Create page layout screens/indexing with current weeks data
1 min
Accept?
Send files/screens to ODM for review (shared drive)
1‐ 2 days
No
Send email with okay to post to web services group to post (files are on shared drive)
Targeted review based on reviewers experience
(24 docs average)
Web services group posts on issue date
Contractor function review Withdrawal O th er c on tr ac to rs
Co nt ra ct or
PT
O F un ct io n
ODM receives request to withdraw application from issue via email or PALM report
Perform PALM transactions to update status to withdrawn and removes patent number and issue date from PALM (5 min per app)
Update internal database and creates withdrawal notice
(15 min/app)
ODM Sends email notices to
Contractor and DMB group and others
Receives email
Update workflow system with withdrawn application data
5 min
Notify Review and Assembly of withdrawals
1 min
Withdrawn application data is removed from PTO search systems
(CIO)
webservices receives data on Monday and Thursday. If they get data Thursday they prevent those applications from being posted on Tuesday. If they get data on Monday, they remove withdrawn data.
End
Notify ODM of withdrawals and create notification for webservices to update eOG
Web services updates eOG
ODM Review eOG withdrawals/late withdrawals twice a week
Not correct
Correct
50 apps/week on average
2‐3 days Thursdays and Mondays due to batching
System updates are sent to Review and Assembly as soon as received from PTO
Electronics Information and products division issues lists and notices of non issue to outside/inside entities (ODM/ webservices)
Tuesday notification
| Data Capture� |
| File Maintenance� |
| Abandonment� |
| Final Data Capture� |
| Re-exam and PTAB process� |
| Assembly of Patent Grants� |
| Notices to file� |
| Weekly Official Gazette� |
| Withdrawal process� |
File details come from the government source that posted it. Updated .