This is a solicitation for drydocking services for the USCGC THETIS. The Coast Guard is seeking drydocking services from July 28th to October 6th, 2021 for repairs and maintenance of the USCGC THETIS. The solicitation provides the name and contact information for the contracting point of contact and identifies the period of performance for the work.

View the file

Other files

File Type Posted
Amendment 4.pdf PDF
Amendment 3 Page 2 of 2.pdf PDF
Amendment 3 Page 1 of 2.pdf PDF
Amendment 2 Page 1 of 2.pdf PDF
Amendment 2 Page 2 of 2.pdf PDF
Amendment 1 Page 2 of 2.pdf PDF
Amendment 1 Page 1 of 2.pdf PDF
Attachment 1_Schedule of Services_Blank Price Schedule.xls XLS spreadsheet
70Z080-21-Q-P4583900.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC THETIS (WMEC 910)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2021

Developed By: Frederick J Lenihan

(Rev-0, 7 February 2021)

USCGC THETIS (WMEC-270B) DRYDOCK AVAILABILITY FY2021

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property .................................................................................. x Consolidated List of Critical Inspection Items .......................................................................................... xiii Principal Characteristics ............................................................................................................................. xiv General Requirements WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 3: U/W Body, Preserve (100%) WORK ITEM 4: Hull Plating Freeboard, Preserve “100%” WORK ITEM 5: Appendages (U/W), Preserve (Internal) and Leak Test WORK ITEM 6: Propulsion Shaft Fairwaters And Rope Guards, Inspect WORK ITEM 7: Voids (Non-Accessible), Preserve (Internal) and Leak Test WORK ITEM 8: Main Mast, Preserve, 100% WORK ITEM 9: Propulsion Shafting, Strain Gage Alignment, Inspect WORK ITEM 10: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 11: Propulsion Intermediate Shaft(s); Remove, Inspect, and Reinstall WORK ITEM 12: Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect and Repair or

Renew WORK ITEM 13: Propulsion Shaft Bearings (External), Check Clearances WORK ITEM 14: Propulsion Stern Tube Bearings, Check Clearances WORK ITEM 15: Controllable Pitch Propellers, Clean and Inspect WORK ITEM 16: Controllable Pitch Propeller (CPP) System, Inspect and Service WORK ITEM 17: Controllable Pitch Propeller (CPP) Hubs, Remove, Inspect and Reinstall WORK ITEM 18: Sea Valves and Waster Pieces, Overhaul Or Renew WORK ITEM 19: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 20: Sea Strainers - Simplex (All Sizes), Clean and Inspect WORK ITEM 21: Superstructure, Preserve “100%” WORK ITEM 22: Cathodic Protection, Zinc Anodes, Renew, WORK ITEM 23: Drydock WORK ITEM 24: Temporary Services, Provide - Cutter WORK ITEM 25: Sea Trial Performance, Support, Provide WORK ITEM 26: Hull Plating, Renew WORK ITEM 27: Hull Structure, Auxiliary Machinery Space, Renew WORK ITEM 28: Line Shaft (Pedestal) Bearings, Renew WORK ITEM 29: Fin Stabilizer (Bearings, Packing, Stock/Blade), Repair or Renew, STBD WORK ITEM 30: Mast Components, Renew WORK ITEM 31: Doppler Speed Log, Replace WORK ITEM 32: Deep Water Sounder, Remove WORK ITEM 33: Propulsion Shaft Coating, Renew WORK ITEM 34: Propulsion Shafting, Straighten WORK ITEM 35: Propeller Shaft Sleeve(s), Renew WORK ITEM 36: Propulsion Shafting, Optical or Laser Alignment Check WORK ITEM 37: Propulsion Shaft Bearings (External), Renew WORK ITEM 38: Propulsion Stern Tube Bearings, Renew WORK ITEM 39: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 40: Fathometer Transducer, Renew WORK ITEM 41: Rudder Assemblies; Remove, Inspect And Reinstall iii (Rev-0)

WORK ITEM 42: Water Tight Closures, Renew WORK ITEM 43: Pipe Hangers, Drain Piping, Renew WORK ITEM 44: Deck Plating, Foc’sle, Renew WORK ITEM 45: Deck Plating, Bos’n Workshop, Renew iv (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

v (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 901 WMEC 256-012, Rev -, Shaft Seal Vent Line Modification Coast Guard Drawing 901 WMEC 424-005, Rev -, ODOM DF3200 Fathometer System Removal Coast Guard Drawing 901 WMEC 451-010, Rev D, 1SG38-SINS2(V)45 Installation BWD & Details Coast Guard Drawing 901 WMEC 562-005, Rev J, Rudder Stock and Steering Gear A & D Coast Guard Drawing 901 WMEC 565-005, Rev -, Fin Stabilizer Hydraulic System Diagram Coast Guard Drawing 901 WMEC 565-031, Rev C, Fin Shaft Assembly, w/ Sleeve Fitted NSN 3040-01-

104-5121 Coast Guard Drawing 901 WMEC 565-034, Rev -, Fin Stabilizer Clevis Pin Coast Guard Drawing 905 WMEC 111-001, Rev E, Shell Expansion Fwd 101 Coast Guard Drawing 905 WMEC 111-002, Rev F, Shell Exp Aft 182 Coast Guard Drawing 905 WMEC 111-003, Rev F, Shell Exp FR 101-182 Coast Guard Drawing 905 WMEC 114-001, Rev D, Skeg Coast Guard Drawing 905 WMEC 114-002, Rev C, Bilge Keels Coast Guard Drawing 905 WMEC 114-003, Rev B, Shaft Fairwaters & Rope Guards Coast Guard Drawing 905 WMEC 116-004, Rev C, Bottom Long Frwk Fwd 101 Coast Guard Drawing 905 WMEC 117-006, Rev A, Web Fr & Stan, Fr 89, 96 Coast Guard Drawing 905 WMEC 122-002, Rev C, Transv Bhds 47, 78 & 82 Coast Guard Drawing 905 WMEC 131-001, Rev D, Main Deck, Plate & Frame, Fwd 101 Coast Guard Drawing 905 WMEC 136-001, Rev E, 01 Level Pl & Fr Fwd 101 Coast Guard Drawing 905 WMEC 151-001, Rev E, Structural Bhds Ext, 01 Lvl Fwd 103 Coast Guard Drawing 905 WMEC 162-001, Rev B, Stacks Coast Guard Drawing 905 WMEC 167-001, Rev M, List of Structural Closures Coast Guard Drawing 905 WMEC 171-001, Rev F, Main Mast Coast Guard Drawing 905 WMEC 184-010, Rev E, XDCR FDNS & Shell Mods Coast Guard Drawing 905 WMEC 184-014, Rev A, Struct Mods Incidental to DS60 Doppler Install &

ODOM DWDS Rip-out Coast Guard Drawing 905 WMEC 185-015, Rev F, Aux Mchry Space No 2 Fdn Coast Guard Drawing 905 WMEC 243-001, Rev B, Shafting Arrangement Coast Guard Drawing 905 WMEC 243-002, Rev F, Stern Tubes Strut Brng & Seal – A&D vi (Rev-0)

Coast Guard Drawing 905 WMEC 243-003, Rev -, Shaft Removal Arrangement Coast Guard Drawing 905 WMEC 243-005, Rev C, Shaft Alignment Analysis and Procedures Coast Guard Drawing 905 WMEC 243-006, Rev B, General Arrangement 12.125” Dia. Shaft Type MA

Water Lub., Inboard Stern Tube Seal Coast Guard Drawing 905 WMEC 243-007, Rev A, CPP Shaft Coupling Assemblies Coast Guard Drawing 905 WMEC 243-008, Rev B, Shaft & Rudder Removal Padeye A & D Coast Guard Drawing 905 WMEC 243-010, Rev A, General Arrangement of 10.500” Dia. Bulkhead

Stuffing Box Coast Guard Drawing 905 WMEC 243-012, Rev B, Controllable Pitch Propeller Shafting Details Coast Guard Drawing 905 WMEC 244-001, Rev A, Line Shaft Bearing Coast Guard Drawing 905 WMEC 245-001, Rev H, CPCH Prop Hyd Sys Diagram Coast Guard Drawing 905 WMEC 245-003, Rev C, Controllable Pitch Propeller Propeller Hub Assy Coast Guard Drawing 905 WMEC 245-004, Rev A, Controllable Pitch Propeller Blade & Palm Coast Guard Drawing 905 WMEC 245-007, Rev C, Controllable Pitch Propeller Special Tools Coast Guard Drawing 905 WMEC 245-008, Rev B, Controllable Pitch Propeller Actuating Unit 300.3GN Coast Guard Drawing 905 WMEC 245-009, Rev C, CPCH Prop Hyd Sys Power Plant A & D Coast Guard Drawing 905 WMEC 256-002, Rev J, Eng Rm SW Cooling Sys A&D Coast Guard Drawing 905 WMEC 256-004, Rev E, AMS SW Cooling Sys A&D Coast Guard Drawing 905 WMEC 256-011, Rev -, Mn and Aux SW Cooling Sys Diag Coast Guard Drawing 905 WMEC 259-002, Rev C, Diesel Exhaust System Arr & Det Coast Guard Drawing 905 WMEC 320-012, Rev F, 60 HZ Pwr Sply to ELEX Equip Coast Guard Drawing 905 WMEC 320-013, Rev AN, Electronic Power Distribution Coast Guard Drawing 905 WMEC 320-014, Rev AJ, Electrical One-line Diagram Coast Guard Drawing 905 WMEC 321-006, Rev B, Wireways - 02 LVL & Above Coast Guard Drawing 905 WMEC 321-108, Rev-, Cable Routing Coast Guard Drawing 905 WMEC 400-009, Rev Y, Command and Surveillance Wiring Data (COED)

VOL. 5 Navigation Equipment Wiring Data Coast Guard Drawing 905 WMEC 401-001, Rev AP, Arrangement Pilothouse & Bridge Wings Coast Guard Drawing 905 WMEC 401-002, Rev BC, Arrangement Sensor Room & Command Support

Center Coast Guard Drawing 905 WMEC 401-003, Rev L, ARR - ELEX EQPT Space & Store Room Coast Guard Drawing 905 WMEC 401-005, Rev AH, Arrangement Communication Center Coast Guard Drawing 905 WMEC 424-001, Rev K, Electronic Navigation Sys Acst Block & ISO Wrg

Diag Coast Guard Drawing 905 WMEC 424-002, Rev-, Electronic Navigation Sys Acst Wiring Data Coast Guard Drawing 905 WMEC 424-003, R901-WMEC-424-004?

ev-, Doppler Speed Log System Replacement Ripout, Installation, Arrangement, Wiring, and Details Coast Guard Drawing 905 WMEC 426-002, Rev H, Doppler Speed Log Block & Isometric Wiring

Diagram Coast Guard Drawing 905 WMEC 501-002, Rev C, Aux Mchry Sp No 2 Arrangement Coast Guard Drawing 905 WMEC 512-005, Rev E, Vent, Mn Dk Fwd 47 A & D Coast Guard Drawing 905 WMEC 516-002, Rev B, Air Conditioning Cooling Coil Drains, A&D Coast Guard Drawing 905 WMEC 521-013, Rev –, Fire Main and Sprinkler System Diagram vii (Rev-0)

Coast Guard Drawing 905 WMEC 524-003, Rev C, Sea Conn, Sea Chest and Waster Piece A&D Coast Guard Drawing 905 WMEC 562-001, Rev G, Rudder Coast Guard Drawing 905 WMEC 565-007, Rev H, Fin Stabilizer Mchry Installation A&D Coast Guard Drawing 905 WMEC 588-003, Rev E, Hlcptr Safety Net A & D Coast Guard Drawing 905 WMEC 593-004, Rev E, Sewage Transfer System- A&D Coast Guard Drawing 905 WMEC 602-002, Rev C, Distinguishing Figures Coast Guard Drawing 905 WMEC 631-001, Rev L, Paint Schedule Coast Guard Drawing 905 WMEC 633-001, Rev B, Cathodic Protection A & D Coast Guard Drawing 905 WMEC 635-001, Rev F, Hull Thermal & Acoustic Insulation A/D Coast Guard Drawing 905 WMEC 651-001, Rev J, Galley & Scullery Arr & Det Coast Guard Drawing 905 WMEC 665-004, Rev E, Anchor Windlass Room & Bosn’s Workshop – A&D Coast Guard Drawing 905 WMEC 801-004, Rev F, General Arrangement 01 Level Coast Guard Drawing 905 WMEC 801-005, Rev F, General Arrangement Main Deck Coast Guard Drawing 905 WMEC 801-009, Rev J, Outboard Profile Coast Guard Drawing 905 WMEC 801-012, Rev C, Curves of Form Coast Guard Drawing 905 WMEC 801-025, Rev A, Booklet Of General Plans Coast Guard Drawing 905 WMEC 801-037, Rev G, Docking Plan Coast Guard Drawing 905-WMEC 801-004, Rev F, General Arrangement 01 Level Coast Guard Drawing 905-WMEC 801-005, Rev F, General Arrangement Main Deck Coast Guard Drawing FL 184-002, Rev A, SS60 Transducer Install Adapter Assy Coast Guard Drawing FL 184-003, Rev A, DS-60 Doppler Shell Ring Fabrication, Dia 14” Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-22, Rev A, Consolidated Visual ID for Cutters NAVSEA Drawing 167-7379842, Rev A, Procedure & Welding Sequence for Non-Ballistic, Watertight

& Airtight Quick Acting or Individually Dogged Personnel Doors NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting and Components NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments Installation

Details

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jan 2014, Coatings and Color Manual Coast Guard Technical Publication (TP) 2719, Aug 2016, Manufacturer’s Instruction Book SWBS

Group(s) 565, 270’ WMEC “A” Class Cutters, Fin Stabilizer Machinery Coast Guard Technical Publication (TP) 2815, Oct 2017, Reduction Gear Coast Guard Technical Publication (TP) 2816, Oct 2012, Manufacturer’s Instruction Book - SWBS

Group(s) 242-244, SWBS 244, Section A, Technical Manual for Cooper Split Roller Bearings Coast Guard Technical Publication (TP) 2817, Feb 2018, Technical manual for the Controllable Pitch

Propeller Coast Guard Technical Publication (TP) 2835, Jan 2017, Manufacturer’s Instruction Book - SWBS

Group(s) 561-562, 270’ WMEC “B” Class Cutters Coast Guard Technical Publication (TP) 5454, Nov 2013, Technical Manual for Type MA Mechanical

Stern Tube Seal viii (Rev-0)

Coast Guard Technical Publication (TP) 5490, Apr 2018, Fin Stabilizer System Coast Guard Technical Publication E-424-027, 2012, SOUNDER, DEEP WATER - MODEL DF3200 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), 2020, General

Requirements for Drawing Preparation Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2020, Shipboard

Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2020, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary

Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2020, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary

Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2020, Temporary

Hull Accesses

OTHER REFERENCES

American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for

Personal Qualification and Certification in Nondestructive Testing American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and

Welding End ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component

Adhesives (AN) ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-

Petrolatum Commercial Item Description (CID) A-A-59316, 2016, Abrasive Materials; for Blasting Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert International Standard Organization (ISO) 4406, 2017, Hydraulic Fluid Power – Fluids – Method for

Coding the Level of Contamination by Solid Particles – Third Edition Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2018 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves ix (Rev-0)

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation

MIL PRF-16173, Oct 2017, Corrosion Preventive Compound, Solvent Cutback, Cold-Application MIL-A-18001, Dec 2015, Anodes, Sacrificial Zinc Alloy MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-PRF-16173E, Oct 2017, Corrosion Prevention Compound, Solvent Cutback, Cold-Application MIL-PRF-17672E, Oct 2012, Hydraulic Fluid, Petroleum, Inhibited MIL-PRF-24647, Jan 2018, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-1687, Sep 1994, Thermal Spray Process for Naval Ship Machinery Application MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main

Propulsion Shafting MIL-STD-2199A (SH), Jan 2020, Covering for Waterborne Main Propulsion Shafting on U.S. Naval

Surface Ships and Submarines NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for

Fabrication, Welding, and Inspection of Submarine Structure Society of Automotive Engineers (SAE) AMS-G-6032, August 2012, Grease, Plug Valve, Gasoline and

Oil Resistant, NATO Code Number G-363, Metric The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Standard No. 11 (SSPC-SP 11), 2013, Power-Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC)/NACE International (NACE) 2007, Joint Surface Preparation

Standard SSPC-SP 10/NACE No. 2, Near-White Metal Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation

Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning x (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

10 Y **Propeller shaft NSN: 2010-01-135-7065 2 ea. 158,558.75 11 Y **Intermediate Shaft NSN: 2010-01-365-3908 2 ea. 8,449.00 12 N Stern tube seal major overhaul kit NSN: 5330-01-527-0959 2 ea. 34,607.00

12 N **Stern tube seal split seat

NSN: 5330-01-359-5555 2 ea. 12,708.00

12 N **Stern tube seal face change out kit

NSN: 5330-01-527-0696 2 kt. 8,954.00

12 N Automatic Air Eliminator

PN: AE36 NSN: 4820-01-690-

2 ea. 543.00

16 N O.D. Box Inspection Kit

NSN: 3010-01470-3519 2 kt. 1,173.00

16 N Filter NSN: 4330-01-177-4069 12 ea. 97.00 16 Y **Oil Feed Bushing NSN: 3120-12-329-5287 2 ea. 14,800.00 16 N **Ball Bearing NSN: 3110-00-156-6745 2 pr. 120.00 16 N **Bearing Bushing NSN: 2010-01-469-8639 2 ea. 1,300.00 16 N **Bearing Bushing NSN: 3120-12-198-7607 8 ea. 1,300.00 16 N **Spool valve assembly NSN: 4820-01-513-2509 2 ay. 30,000.00

17 N Hub Installation kit NSN: 2010-01-470-3258 2 kt. 215.00 17 Y **Left hand hub assembly NSN: 2010-01-119-5469 1 ea. 304,313.00

17 Y **Right hand hub assembly

NSN: 2010-01-118-8538 1 ea. 304,313.00

17 N ***CPP Tool Kit N/A 1 se. 20,000.00 17 N *"Special tools" (see

4.2 (Government-loaned installation tools))

N/A 1 se. 1,000.00

17 Y **Propeller Blade-RH (Port)

NSN: 2010-01-119-3972 1 se. 40,000.00

17 Y Propeller Blade-LH (Stbd)

NSN: 2010-01-120-2871 1 se. 40,000.00

17 N O-Ring NSN: 5330-01-120-5229 8 ea. 97.00 17 N O-Ring NSN: 5330-01-118-8529 8 ea. 96.00 17 N Blade Washer NSN: 5310-01-335-4361 48 ea. 112.00 17 Y **Shoulder bolt NSN: 5306-01-118-8337 8 ea. 1,897.00 17 Y **Shoulder blade bolt NSN: 5306-01-119-3607 16 ea. 857.00 23 Y *Transducer Cover

Plate N/A 4 ea. 50.00

28 N **Pillow Block Roller NSN: 3130-01-359-5716 PN: 2 ea. 25,200.00 xi (Rev-0)

Bearing 01-BVP-1008-EXIG 29 N Seal, Plain PN: 1856959-3 (Sperry Marine)

= 17855H1L5 NSN: 5330-01-

625-6617

2 ea. 383.45

29 N O-Rings PN: MS9021-381 NSN: 5331- 00-763-2637

2 ea. 9.21

29 N Packing Material NSN: 5330-00-902-5505 1 Roll 885.14 29 N Packing Material NSN: 5330-00-527-7496 1 Roll 12.92 29 N Thordon Bearing Set

Assembly

PN: TBFINSTABTG13886BRG

NSN: 3110-01-599-8155

1 ea. 11,916.00

29 N Inflatable Seal NSN: 5330-01-103-6518 1 ea. 1,031.62 29 Y **Roller Bearing NSN: 3110-00-155-9065 1 ea. 897.92 29 N O-ring NSN: 5331-01-306-4879 1 ea. 9.02 29 N O-ring PN: MS9021-359 NSN: 5331-

00-435-0431 1 ea, 5.60

29 N O-ring PN: MS9021-377 NSN: 5331- 01-129-0629

1 ea. 9.58

29 N Seal, Plain PN: 1856959-2 (Sperry Marine)

= 17444H1L5 NSN: 5331-01-

625-4197

2 ea. 113.73

29 N Seal, Ring, Metal NSN: 5331-01-382-9160 1 ea. 1,622.64 29 N **Seal Retainer NSN: 5330-01-382-7103 1 ea. 228.00 29 N Lantern Rings NSN: 4320-01-377-2106 1 ea. 720.33 29 N **Seal Housing NSN: 5330-01-382-9160 1 ea. 1,622.00 29 N **Tiller Ram Pin NSN: 5315-01-419-1523 2 ea. 829.00 29 N **Tiller Ram Clevis

Pin NSN: 5315-01-685-7187 2 ea. 600.00

29 N **Hydraulic Cylinder NSN: 3040-01-103-6565 2 ea. 5,652.21 29 Y **Fin Stock with sleeves NSN: 3040-01-104-5121 1 ea. 17,849.79

29 Y *Fin Removal Tools NSN: 5180-01-F10-1826 1 set 15,000.00 31 N Display Unit, DS60 PN: DS600 1 ea. 1,200.00 31 N Distribution Unit, DS60

PN: DS610 1 ea. 1,200.00

31 N Transceiver Unit, DS60

PN: DS620 1.ea. 800.00

31 N Transducer w/30M Cable

PN: DS630-30 1 ea. 200.00

31 N Gate Valve, DS60 PN: DS661 1 ea. 300.00 31 N Hull ring N/A 1 ea. 350.00 35 N **Stern Tube Sleeve

(Forward) NSN: 2010-01-340-6083 1 ea. 10,792.56

35 N **Stern Tube Sleeve (Aft)

NSN: 2010-01-345-2315 1 ea. 12,725.00

35 N **Propeller Strut Sleeve (Forward)

NSN: 2010-01-345-2314 1 ea. 13,180.16

35 N **Propeller Strut Sleeve (Aft)

NSN: 2010-01-340-5362 1 ea. 8,865.14

37 N **Intermediate Strut NSN: 3120-01-189-1087 2 ea. 3,875.00 xii (Rev-0)

Bearing 37 Y **Propeller Strut

Bearing NSN: 3120-01-189-1088 2 ea. 6,317.00

38 N **Stern tube bearing NSN: 3120-01-189-1949 2 ea. 12,700.00 40 Y Fathometer transducer, shallow water, (FLIR Maritime SS60) (with adapter plate)

NSN: 5845-01-518-7245 1 ea. 1,884.26

41 Y **Rudder Assembly NSN: 2040-01-486-0550 2 ea. 182,000.00 41 N **Upper Bearing NSN: 3110-01-121-8032 2 ea. 3,910.00 41 N **Rudder Stock

Sleeve NSN: 2040-01-F91-0187 2 ea. 4,269.00

41 N John Crane Seal kit NSN: 5330-01-527-0778 2 ea. 5,955.00 41 N **Thordon Lower

Bearing (SXL 20.7" X 17.5" X 14)

PN: F546150102 2 ea. 1,000.00

42 N ***FWTH 1-24-1,

Watertight Hatch, Flush, 24 x 24, Steel

NSN: N/A PN: 805-1624142 1 ea. 5,500.00

42 N ***QAWTH 01-24-1,

Watertight Hatch, Raised, Quick-Acting, 24 x 24, Steel

NSN: N/A PN: 804-1624121 1 ea. 5,500.00

42 N ***QAWTH 01-44-2,

Watertight Hatch, Raised, Quick-Acting, 36 x 36, Steel

NSN: N/A PN: 805-1624070 1 ea. 5,500.00

42 N ***QAWTD 01-47-1,

Watertight Door, Quick-Acting, 26 x 66, Al, RH

NSN: N/A PN: 804-5184196 1 ea. 5,500.00

*Government-loaned property, which must be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xiii (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.1.4 (Inspection report particulars)):

Work Item Title

1 Hull Plating (Side Scan), Ultrasonic Testing

3 U/W Body, Preserve (100%)

5 Appendages (U/W), Preserve (Internal) and Leak Test

7 Voids (Non-Accessible), Preserve (Internal) and Leak Test

10 Propulsion Shafting; Remove, Inspect, and Reinstall

11 Propulsion Intermediate Shaft(s); Remove, Inspect, and Reinstall

12 Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect and Repair or Renew

13 Propulsion Shaft Bearings (External), Check Clearances

14 Propulsion Stern Tube Bearings, Check Clearances

15 Controllable Pitch Propellers, Clean and Inspect

16 Controllable Pitch Propeller (CPP) System, Inspect and Service

17 Controllable Pitch Propeller (CPP) Hubs, Remove, Inspect and Reinstall

19 Sea Strainers - Duplex (All Sizes), Overhaul

20 Sea Strainers - Simplex (All Sizes), Clean and Inspect

29 Fin Stabilizer (Bearings, Packing, Stock/Blade), Repair or Renew, STBD

41 Rudder Assemblies; Remove, Inspect And Reinstall xiv (Rev-0)

PRINCIPAL CHARACTERISTICS

270' WMEC (B-CLASS)

PHYSICAL

Length overall 270' 0" Length between perpendiculars 255' 0" Beam molded 38' 0" Depth molded, main deck amidships, 01 level amidships

23' 7" 31' 4"

Full load displacement 1,886 long tons Draft, full load to baseline amidships 14' 2" Highest projection above baseline *height approximated

≈ 110' 0"

Shore tie voltage requirements 2 cables, 400A / 450V, 3 phase Frame spacing 1' 0"

MACHINERY

Main propulsion 2 ALCO Model 18-251-F Diesel Engines, 3,650 BHP each Ship’s service generators 2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-1350 Generators. 475

KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle Emergency generators Caterpillar Model D-348-TA Diesel-driven KATO 4P4-1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle Number of propellers 2 Propeller diameter 9' 0" Number of blades, each 4 Pitch Controllable Shaft RPM 260 Shaft diameter 10.55" at exit of hull Anchor & chain Two 4,000 lb Navy Stockless Anchors, 8 shots of chain each

TANK CAPACITIES

Diesel fuel total (95%) 79,950 gal.

JP-5 total (95%) 19,626 gal.

Potable water total (100%) 8,553 gal.

Hydraulic & lube oil total (95%) 2,561 gal.

1 (Rev-0)

00000_0220_FLT

REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jan 2014, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

OTHER REFERENCES

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for

Fabrication, Welding, and Inspection of Submarine Structure

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

2 (Rev-0)

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to four Coast Guard fire watch personnel.

• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B- Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY- 130.

3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.

3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B- Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.

3 (Rev-0)

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 must be considered the same as those for welding HY-130.

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.2 Test and procedures. The Contractor must be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor must be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, and must be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

4 (Rev-0)

3.6 Local Policy. None.

3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:

None.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL # WORK ITEM

# WORK ITEM TITLE

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

7 (Rev-0)

QA-3A - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /

TIME

8 (Rev-0)

QA-3B - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

VESSEL NAME HULL # WORK ITEM

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

VESSEL NAME HULL # WORK ITEM

# WORK ITEM TITLE

COATING MFG PRODUCT NAME BATC

H #

INDUCTI

ON TIME

COATING SYSTEM

SEQUENCE

(PRIMER/TOUCHUP/3RD

COAT, ETC.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS,

CONVENTIONAL SPRAY, ROLLED)

AVERAGE DFT

11 (Rev-0)

11000_SideScan_0320_FLT REC_11000_Side_Scan_FLT_270’ WMEC ‘B’ Class (ALL) (0112)

WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater (U/W) hull plating by ultrasonic side scan method (See Paragraph 4.1 for definition of U/W body).

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 905 WMEC 111-001, Rev E, Shell Expansion FWD 101 Coast Guard Drawing 905 WMEC 111-002, Rev F, Shell Exp Aft 182 Coast Guard Drawing 905 WMEC 111-003, Rev F, Shell Exp FR 101-182 Coast Guard Drawing 905 WMEC 801-037, Rev G, Docking Plan USCGC THETIS

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements

OTHER REFERENCES

American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended

Practice for Personal Qualification and Certification in Nondestructive Testing

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):

• 3.3 Side scan requirements and procedures.

3.1.2 Tech Rep.

Not applicable.

12 (Rev-0)

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

• Hull zinc anode system

• Docking blocks

3.2 Work coordination and preparation. The Contractor must plan all specified vessel work detailed in this specification package to ensure the side scan survey does not necessitate a work stoppage. The Contractor must abide by the following guidance, to facilitate the ultrasonic survey:

• Prior to side-scan survey, inspect interior and bilge plating for the presence of bubbles of rusted metal. Break up and remove all rust bubbles to ensure accurate survey results.

• Ensure that all u/w body surface preparation and primer coat application tasks are completed within ten days of lifting the vessel.

• Provide a continuous supply of fresh water at .50 gpm within 50 feet of the vessel with standard hose bib fitting.

• Provide 110 VAC electrical power, and scaffolding or other suitable means of access to bring inspection personnel within one foot of all the body surface inspection areas that are five feet above ground level.

• After completion of the hull survey, and authorized hull repairs, resume/complete u/w body preservation process by applying the second coat of the anti-corrosive coating system, and all anti-fouling paint coats.

• Pay close attention to manufacturer’s recommended practices in regards to paint system overcoat time limitations and required degree of surface cleanliness prior to resuming u/w body coating application.

3.3 Side scan requirements and procedures. The Contractor must ensure the following referring to the Coast Guard drawings listed in Section 2 (References) herein as guidance during the performance of the tasks specified below and submit a CIR.

3.3.1 Testing company and personnel. Provide the services of a qualified ultrasonic testing company, with suitable side scan equipment, to conduct a “Scanning Crawler Automated Test” of the vessel’s u/w hull plating for the presence of metal corrosion and deterioration. Ensure the following:

• All scanning operations are completed by personnel meeting the personnel qualification and certification, as required by contractor process. This contractor developed personnel qualification and certification process must meet, at a minimum, ASNT Recommended Practice No. SNT-TC-1A.

• An SNT Level III Analyst is on site, to oversee the project and evaluate the collected data.

• An SNT Level III or II Analyst is on site, to verify with a hand held gauge all areas on the hull identified as thinner than the specified criteria, in order to expedite all repair procedures.

• Qualified personnel are provided to complete all on-site corrosion inspections.

3.3.2 Coast Guard notification. Accomplish all required tasks within 10 calendar days of the start of the availability.

13 (Rev-0)

3.3.2.1 Provide a daily update to the COR on all areas inspected and potential issues or schedule changes.

3.3.2.2 Notify the COR at least 3 days prior to completion for an onsite review of readings and repair areas.

3.3.3 Scanning parameters. Use the following parameters during the course of this inspection:

• Automated scanning resolution must be set to 0.5” x 0.5”

• Plates where scan data indicating wastage greater than or equal to 25% nominal plate thickness must be highlighted in “RED” and designated “repair areas”.

• Plates where scan data indicating wastage greater than or equal to 15% to 24% of nominal plate thickness must be highlighted in “YELLOW”.

• Plates where scan data indicating wastage greater than or equal to 10% to 14% of nominal plate thickness must be highlighted in DARK GREEN.

• Hand held UT readings must be taken to verify bad metal areas found with the side scan equipment. All readings must be provided to the COR and the lowest reading marked on the hull at the bad metal location.

• Areas that are accessible but cannot be reached by the automated scanner must be scanned with a hand-held meter at a resolution of 2” x 2”. Any repair areas found during the hand scan must be marked on the ship’s hull and their approximate positions recorded on the plate drawings and report summary..

3.3.3.1 Any scanning parameter or scope of work changes must be approved by the KO.

3.3.3.2 The echo to echo transducer is not authorized due to inconsistent readings and technical difficulties.

3.3.3.3 There must be no deviation from the color scheme specified above.

3.3.4 Ensure that the side scan inspection area includes the Port, Starboard, and Transom exterior shell plate below the water line, but must exclude the following list.

• Areas under and within 6-inches of blocks and side blocks (areas that are accessible 6 inches from blocks and side blocks must be hand scanned.)

• Areas up to 6-inches around any obstacle on the hull including sea suctions, discharges, rudderposts, knuckle, bow stem, stabilizer tubes, and stern tubes, as applicable.

• Any areas blocked by immovable scaffolding or shipyard activity.

3.3.5 Side scan reports. The Contractor must submit to the COR a final report within 3 working days after the side scan inspection is completed. A copy of all repair areas must be clearly marked, in yellow or white, on the provided shell plate drawing(s), and provide a summary document of same areas. Submit two hard copies of the report with two CD’s containing the electronic (raw) data, as part of the CIR submission prior to departing the job site. Ensure the reports include:

• Inspection overview.

• Data sheets for each plate with designated repair areas outlined in blue.

• Mosaic of scanned data overlaid on Coast Guard Drawings 905 WMEC 111-001, 905

WMEC 111-002 and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .