Attachment 2 -RCC QASP.docx
DOCX document 63 KB Posted
- Attached to
- Regional Climate Centers Services Federal contract opportunity
- Solicitation number
- 1332KP20BNEEN0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30Amendment 003_1332KP20BNEEN00050003_Final.pdf | ||
| SF33_B_redlined_per Amendment 002.docx | DOCX document | |
| SF30Amendment 002_1332KP20BNEEN00050001_Final.pdf | ||
| Attachment 4 - RCC Past Performance Questionnaire_8-20-20_Redlined per Amendment 001.docx | DOCX document | |
| SF33_B_redlined_per Amendment 001.docx | DOCX document | |
| SF30Amendment001_1332KP20BNEEN00050001_Final.pdf | ||
| Attachment 4 - RCC Past Performance Questionnaire.docx | DOCX document | |
| SF33_B.pdf | ||
| Attachment 3 - RCC Pricing Matrix.xls | XLS spreadsheet | |
| Attachment 1 - RCC Performance Work Statement.docx | DOCX document | |
| Attachment 5 - RCC Data Management Plan.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOAA’s National Centers for Environmental Information (NCEI) Regional Climate Center (RCC) Support Services Quality Assurance Surveillance Plan (QASP) Version – May 26, 2020 For: Regional Climate Centers Re-Compete Contracts Contract Number: < upon award, enter contract number> Contract Description: Regional Climate Services Contractor’s name: < upon award, enter contractor name > (hereafter referred to as the contractor).
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance-based Indefinite Delivery Indefinite Quantity (IDIQ) contract and in subsequent additional work requirements issued thereunder. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
This contract requirement is for contractor regional climate services to NOAA’s National Centers for Environmental Information. The resulting vehicle will be a performance-based IDIQ with the core requirements (Task Order 001) being FFP; while task orders may be issued as T&M, LH, or FFP. This contract is for a base period of 12 months with four, 12 month, option periods. A properly executed QASP will assist the Government in achieving the objectives of this procurement.
The Contractor shall perform all Project Management functions including contract, technical, personnel, administrative, logistical, quality, business, and other management functions that are necessary to execute the total effort required by this PWS.
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Sarah McKim Organization or Agency: Satellite and Information Acquisition Division Telephone: 301-628-1443 Email: Sarah.McKim@noaa.gov
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide this documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.
Assigned COR: Robin Burress Telephone: 828-271-4695 Email: robin.burress@noaa.gov
c. Other Key Government Personnel – Tamara Houston Title: Program Technical Lead Telephone: 828-271-4266 Email: Tamara.Houston@noaa.gov
3. CONTRACTOR REPRESENTATIVES:
The following employees of the contractor serve as the contractor’s representatives for this contract. <Communication should occur with them during QASP development. It will help if they review the draft QASP and accept (not approve) the final version.>
a. Director - <upon award, enter name> Telephone: <enter number> Email: <enter address>
b. Director - <upon award, enter name> Telephone: <enter number> Email: <enter address>
c. Director - <upon award, enter name> Telephone: <enter number> Email: <enter address>
d. Director - <upon award, enter name> Telephone: <enter number> Email: <enter address>
e. Director - <upon award, enter name> Telephone: <enter number> Email: <enter address>
f. Director - <upon award, enter name> Telephone: <enter number> Email: <enter address>
4. PERFORMANCE STANDARDS.
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards.
The Performance Requirements Summary, Schedule of Deliverables, sections 7 and 8 in the Performance Work Statement, includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL) in Section 7 of this document.
5. INCENTIVES.
Not Applicable.
6. METHODS OF QUALITY ASSURANCE SURVEILLANCE.
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
Partner Feedback - The Program Manager and/or Technical Lead shall obtain feedback from NCEI’s Partner’s in the region and appropriate federal and state partners who routinely engage with the contractor on activities covered by the contract. This feedback will be provided to the COR, who will create a summary of all formally received feedback.
Director Meetings – The Program Manager and/or Technical Lead and COR shall meet with the RCC Directors on a monthly basis. This level of monitoring shall promote accountability regarding the deliverables in the contract. The COR shall document the dates and agenda for the meetings, which will be provided by the Program.
Random Monitoring - The random monitoring shall be performed by the COR.
Contractor Performance Assessment Report System (CPARS) – The Government will evaluate the Quality of Service; Schedule; Cost Control, Business Relations, Management, and other important areas. As this information may affect future source selections throughout the Government, annual evaluations will be used appropriately as a complementary performance oversight and communication tool with the QASP.
QASP - The Quality Assurance Surveillance Plan, section 7, Enclosure (1), shall be used by the Government in the technical administration of this QASP. In addition to the below instruction, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist provided as Enclosure (2) below.
Regardless of the surveillance method, the COR shall always contact the Regional Climate Center Director when a defect is identified and inform the director of the specifics of the problem. The COR, with assistance from the CO, if needed, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.
Additionally, surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the CO’s actions.
7. QUALITY ASSURANCE SURVEILLANCE PLAN TABLE
Enclosure (1): Performance Requirements Summary
Section 7: Regional Services Requirements
| Performance Objective |
| Related NCEI/NOAA |
Performance Measure Performance Standard (Acceptable Quality Level) Method of Performance Assessment*
Support Climate Monitoring Reports
| On-time reporting [100% on-time] |
| RCC monitoring input to NCEI Monthly and Annually - No later than the 5th business day of the following month and calendar year |
| NCEI Climate Monitoring Team, PM, COR |
| Support Quarterly Progress Reports |
| On-time reporting [100% on-time] |
| RCC input to NCEI - No later than the 10th business day following the end of the fiscal quarter |
| PM, COR, appropriate RCSD |
Support Climate Impact and Outlook Summaries
| On-time reporting [100% on-time] |
| RCC compiles and synthesizes season-scale climate impact and outlook information for their region. Input to NCEI Quarterly – No later than Monday following the 3rd Thursday of March, June, September and December. |
| PM, COR, appropriate RCSD |
Summary List of User Needs
| On-time reporting [100% on-time] |
| RCC input to NCEI - Monthly through NCEI requirements tool – No later than 10th business day of the following month |
| NCEI requirements tool |
Maintain and Deliver Inventory of products and services
| Maintain and Deliver Inventory Information [100% on-time] |
| RCC reporting to be provided Semi-Annually (include in quarterly reports for Jan/Feb/Mar and Jul/Aug/Sep) |
| PM, COR, appropriate RCSD |
Maintain and Deliver Prioritized List of User Needs
| Prioritized List of User Needs [100% on-time] |
| RCC reporting to be provided Semi-Annually (include in quarterly reports for Jan/Feb/Mar and Jul/Aug/Sep) |
| PM, COR, appropriate RCSD |
| Organize Workshop(s) |
| On-time reporting [100% on-time] |
| RCC to organize and host a workshop Annually – No later than December 31st |
Develop and Deliver Summary Workshop Report(s)
| On-time reporting [100% on-time] |
| RCC provides report(s), at a minimum, within 4 weeks of workshop completion and no later than February 1st |
| PM, COR, appropriate RCSD |
Provide Security Audit Report
| On-time reporting [100% on-time] |
| RCC provides an annual Security Audit Report such as that required under Statements on Auditing (SAS70) Purchase Card Industry (PCI) Compliance and state or local government independent financial statement or performance audit that includes review of general an application IT controls. Annually - No later than November 30th |
| COR |
Develop and Maintain a Transition Plan
| On-time reporting [100% on-time] |
| RCC shall ensure that resources and capabilities submitted for transition comply with NCEI standards and policies; Annually - Three Months Prior to Contract Expiration. |
| PM, COR |
*PM: RCS Program Manager, COR: Contracting Officer’s Representative, RCSD: Regional Climate Services Director
Section 8: National Capabilities Requirements
| Performance Objective |
| Related NCEI/NOAA |
Performance Measure Performance Standard (Acceptable Quality Level) Method of Performance Assessment*
| Maintain and Deliver Updates and Corrections to Threaded Database |
| Reporting (3 business days for acknowledgements, annual threaded database update) [100% on-time] |
| RCC shall acknowledge in writing within three (3) business days receipt of NCEI and NWS station thread modification and correction request(s) and provide a report detailing the update of ‘threaded’ databases to NCEI and NWS; Annually – No later than March 1 |
| NCEI Operations |
| Maintain and Deliver Error Reporting and Tracking Status Reports |
| On-time reporting [100% on-time] |
| RCC provides Monthly - No later than the 5th business day of the following month |
| PM, COR |
| Collect Cooperative Observing Stations – Update Database Daily |
| Collect observations in near-real time; provide once a day collections |
| RCC reporting of data; Daily |
| NCEI Operations |
*PM: RCS Program Manager, COR: Contracting Officer’s Representative.
All PWS tasks will be assessed focusing on the following:
Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.
Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., systems down-time), discuss causes, and assess the effectiveness of contractor corrective actions.
Cost Control – Cost control measures apply to non-firm-fixed price requirements.
Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.
Other Important Areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.
8. RATINGS.
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
| EXCEPTIONAL: |
| Performance significantly exceeds contract requirements to the Government’s benefit. |
| VERY GOOD: |
| Performance exceeds contract requirements to the Government’s benefit. |
| SATISFACTORY: |
| Performance meets contractual requirements. |
| MARGINAL: |
| Performance does not meet some contractual requirements. |
| UNSATISFACTORY: |
| Performance does not meet most contractual requirements. |
9. DOCUMENTING PERFORMANCE.
a. ACCEPTABLE PERFORMANCE.
The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, time and material, labor hour, or other contractual actions.
b. UNACCEPTABLE PERFORMANCE.
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager or on-site representative. A CDR template is attached to this QASP.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other contractual actions deemed necessary by the CO.
10. FREQUENCY OF MEASUREMENT.
a. Frequency of Measurement.
During contract/order performance, the COR shall take periodic measurements, quarterly, or as specified in the AQL column of the Performance Standards Summary Matrix, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.
Enclosure (2): Surveillance Activity Checklist
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Quality |
| Schedule |
| Cost Control |
| Mgmt. |
Other
| Climate Monitoring Reports |
| NCEI Climate Monitoring Team, PM, COR |
| Monthly and Annually - No later than the 5th business day of the following month and calendar year |
Quarterly Progress Reports
PM, COR, appropriate RCSD and Partner Feedback Quarterly - No later than the 10th business day following the end of the fiscal quarter
Climate Impact and Outlook Reports
PM, COR, appropriate RCSD and Partner Feedback Quarterly – No later than Monday following the 3rd Thursday of March, June, September and December
Summary of User Needs
NCEI requirements tool, COR random Monthly through NCEI requirements tool – No later than 10th business day of the following month
| Inventory of Products and Services |
| PM, COR, appropriate RCSD and Partner Feedback |
| Semi-Annually (include in quarterly reports for Jan/Feb/Mar and Jul/Aug/Sep) |
| Prioritized List of User Needs |
| COR Random Monitoring, RCSD and Partner Feedback |
| Semi-Annually (include in quarterly reports for Jan/Feb/Mar and Jul/Aug/Sep) |
| Workshops |
| PM, COR Random Monitoring |
| Annually – No later than December 31st |
| Workshop Reports |
| PM, COR Random Monitoring, RCSD and Partner Feedback |
| Within 4 weeks of workshop completion and no later than February 1st |
| Security Audits |
| PM, COR |
| Annually - No later than November 30th |
Transition Plan
Annually - Three Months Prior to Contract Expiration
PM, COR
Updates and Corrections to Threaded Database
NCEI Operations, PM, COR Random Monitoring
Annually – No later than March 1
Error Reporting and Tracking Status Reports
PM, COR Random Monitoring
Monthly - No later than the 5th business day of the following month
Cooperative Observing Stations – Update Database Daily
NCEI Operations, PM, COR Random Monitoring, RCSD and Partner Feedback
Monthly NLT the following 5th business day
NWS COOP Support Reports
PM, COR Random Monitoring, RCSD and Partner Feedback
Monthly - No later than the 5th business day of the following month
b. Frequency of Performance Assessment Meetings.
The COR shall provide an interim written CPARS assessment annually, and a final written assessment at the end of the contract.
Prepared by: Robin Burress
Signature - Contracting Officer’s Representative Date
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)
PERFORMANCE REPORT
1. CONTRACT NUMBER: <insert number>
2. Prepared by: (Name of COR) <insert name>
3. Date and time of observation:
4. Observation:
<Examples of items to include in a report are:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results.
- Number of observations.> Prepared by: <Enter COR’s name>
| ________________________________________ | ________________ |
| Signature - Contracting Officer’s Representative | Date |
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)
CONTRACT DISCREPANCY REPORT (CDR)
1. Contract Number: <insert number>
2. To: (Contractor Program Manager, Task Manager or on-site representative) <insert name>
3. FROM: (Name of COR) <insert name>
4. Date and time observed discrepancy:
5. Discrepancy or Problem:
<Describe in detail, including reference to contract requirement. Identify any attachments.>
6. Corrective Action Plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this
CDR. >
Prepared by: <Enter COR’s name>
| _______________________________________ | ________________ |
| Signature - Contracting Officer’s Representative | Date |
Received by:
Signature - Contractor Program Manager, Task Manager or Date On-site representative
The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.