About this file

This is a request for quotation for maintenance services for electronic security, closed circuit television, key control, and mass notification systems at Hill Air Force Base in Utah. The Defense Logistics Agency seeks to award a firm fixed price purchase order from April 2023 through April 2026, with optional annual extensions, for maintenance of a Vindicator electronic security system, Pelco CCTV system, Morse keywatcher system, and mass notification system. Services include preventative maintenance, corrective maintenance, operations support, IT support, and cybersecurity documentation updates. Responses are due on an unrestricted basis under NAICS code 561621.

View the file

Other files

File Type Posted
CSS SP330023Q0081 - final.pdf PDF
Attachment 3 - Equipment List.xls XLS spreadsheet
Amedment 1.pdf PDF
Attachment 6 - CAC Procedures.pdf PDF
Attachment 5 Wage Determination.pdf PDF
Attachment 4 - PM Log Master.xls XLS spreadsheet
CSS SP330023Q0081.pdf PDF
Attachment 7 - Contractor Personnel Security.pdf PDF
Attachment 3 - Equipment List.xls XLS spreadsheet
Attachment 1 Schedule of Supplies.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

MAINTENANCE SUPPORT SERVICES

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

AT

DLA DISTRIBUTION HILL, UTAH

1.0 BACKGROUND

The Defense Logistics Agency (DLA) is a United States (U.S.) Department of Defense (DoD) agency providing worldwide logistics support to the missions of the Military Departments and the Combatant Commands.

In support of these missions, DLA Installation Management (DM) maintains a presence at most DLA locations for the life, health, and safety systems including Electronic Security Systems (ESS) and Electronic Key Systems (EKC). DM serves as the functional proponent for all ESS/EKC requirements, policy, and procedures.

In support of DM, DLA Information Operations Enterprise Capabilities Portfolio (J62B) executes program and technology management responsibility for ESS/EKC. ESS encompasses Intrusion Detection Systems (IDS), Access Control Systems (ACS), Closed Circuit Television (CCTV) systems, intercoms, and other alert type systems and EKC includes various type key control systems for DLA facilities, personnel, and property.

2.0 SCOPE

This Performance Work Statement (PWS) outlines requirements for the Contractor to provide maintenance and repair services for the Vindicator Electronic Security System (ESS), Pelco CCTV System, Morse Keywatcher System and the Mass Notification System at DLA Distribution Hill, Utah

(DDHU).

The Contractor shall provide maintenance and technical support services, to include but not limited to, Preventive Maintenance (PM) scheduled and on call Remedial Maintenance (RM) unscheduled, daily operations support in support of achieving a 99.6% uptime and system availability metric, providing routine testing, inspection, and maintenance of all physical hardware and mechanical items, providing Information Technology (IT) support including cybersecurity, accreditation documentation, upgrades, patches, migrations, enhancements, and technology road map planning. The DLA Distribution Hill, Utah equipment inventory list is provided to identify each piece of equipment that requires maintenance services and the preventive maintenance schedule requirements (Attachment 2). The DLA Distribution Hill, Utah equipment inventory list is subject to change by the Government when equipment addition(s) and/or deletion(s) are required due to equipment disposal or replacement. The Contractor shall assist with developing information protection needs, defining system security requirements for Commercial

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

Off the Shelf (COTS) items including designing system security architecture of ESS and EKC solutions.

With the ongoing effort of building consolidation and expansion, the Government reserves the right to ADD to or DELETE from the ESS maintenance and repair contract anytime during the period of the contract as the need arises.

For this effort the Contractor will provide the personnel, hardware support, software/firmware support, and technical services for Vindicator ESS, Pelco CCTV System, Morse Keywatcher System and the Mass Notification System, and assist in migrating these standalone systems over to a DLA approved network at DLA Distribution Hill, Utah. All servers, switches, and workstations are normally provided by the Government. Software/firmware, in all instances, shall be approved by a J6 Technical Point of Contact (TPOC).

This PWS contains task requirements for Project Management, Operations, Sustainment, And Maintenance Support, Hardware Procurement, Installation, And Configuration, Application Network And Infrastructure Support, and Cybersecurity Requirements.

3.0 TASK REQUIRMENTS

The Contractor shall adhere to the following requirements and definitions for all Tasks within this PWS:

3.1 TASK 1 – PROJECT MANAGEMENT

The Contractor shall provide sufficient project management to ensure that all contract task requirements are performed efficiently, accurately, on time, and in compliance with the requirements of this document. The Contractor shall support the following:

3.1.1 Contract Project Manager (CPM)

The Contractor shall provide a Contract Project Manager (CPM) who shall be responsible for the performance of the work. The CPM shall provide project management support for all contract personnel and all items detailed in this PWS. This support includes providing planning, direction, coordination, and the control necessary for effective and efficient accomplishment of all contract requirements. The CPM shall be the senior subject matter expert and monitor, control and report status on cost, schedule, and performance. The CPM will coordinate with the Contracting Officer (KO), the Contracting Officer Representative (COR), and the J6 Technical Point of Contact (TPOC). The CPM shall attend meetings and provide support on task requirements as needed to meet the requirements of this contract. The CPM or alternate shall have full authority to act for the Contractor on all contract matters relating to the operations of this contract. The CPM or alternate shall normally be available as required Monday through Friday, normally excluding Federal holidays, between the hours of 0600- and

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

1830-hours local time at DLA Distribution Hill, Utah, which is a tenant activity of Hill Air Force Base, Utah. Most systems are “next business day” for support; however, in emergency situations support may be required within four hours (emergency repairs). Upon request of the KO or COR, the Contractor shall provide personnel to meet on the installation as required to discuss problem areas. DLA Distribution areas include five (5) buildings, and two outdoor storage lots. All five buildings, all of which are both Administrative and Warehouse areas include ESS/ID/CCTV components. The Vindicator ESS connectivity between buildings consists of DLA network communication lines.

3.1.2 Work Effort

The Contractor shall manage the total work effort associated with the PWS herein to assure fully adequate and timely completion of all Tasks including, but not limited to, planning, developing, and implementing project plans, scheduling, report preparation, communication and coordinating with stakeholders, escalation procedures, establishing and maintaining records, monitoring, and quality control. The Contractor shall provide an adequate staff of personnel with the necessary management expertise, training, and certifications to assure the performance of the work in accordance with sound and efficient management practices.

3.1.3 Work Control

The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking of work in progress. The Contractor shall plan and schedule work to assure material, labor and equipment of all contracted items are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein.

3.1.4 Enterprise Configuration Management (ECM)

The Contractor shall adopt DLA ECM plans ensuring all hardware and software changes are approved by the J6 TPOC and coordinated with the COR. The Contractor shall use the DLA IT Service Management Ticketing Systems (ITSM) currently ServiceNow, Change Implementation Plans (CIPs), and provide technical expertise in Enterprise Change Requests (ECRs) that addresses product management and version control for software (changes) and hardware. The Contractor shall support business processes documentation such as Scheduled Maintenance Requests and Information Technology Operations Center (ITOC) notice (Infospot) and all other control items such as customer notifications. The Contractor shall evaluate all changes to the approved system requirements baseline for risk to security, and for schedule and cost impact, provide evaluations in writing and with sufficient detail to allow for review and approval by the configuration governance structure as required. CIPs and ECRs are normally required 21 business days in advance of required change.

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

3.1.5 Configuration Audit

A configuration audit is an inventory of all existing hardware, software, data, drawings, devices, and technical documentation and is a function of Configuration Management. The Contractor shall perform an initial configuration audit and provide to the COR within ten (10) business days of performance start.

Asset lists shall be provided upon request and include product details such as hosting location, model, versioning, product type, and other details about the product, software, hardware, or device. The Contractor shall report the updates to asset list(s) within the monthly status reports. Additionally, a data dictionary is required.

3.1.6 Work Schedule

The Contractor shall schedule and arrange work to cause the least interference with the normal occurrence of Government business and mission. In those cases where some interference may be essentially unavoidable, the Contractor shall make every effort to minimize the impact of the interference, inconvenience, equipment downtime, interrupted service, and/or customer discomfort.

Non-scheduled visits will be coordinated with the COR at least five (5) working days in advance and notify the COR if the work being performed may cause interference. Notification shall include the type of work to be done and the estimated completion date/time. The Contractor shall reschedule any work that the KO/COR deems necessary to avoid unacceptable disruptions in the Government's business.

3.1.7 Work Records/Reports

The Contractor shall maintain management, maintenance, repair records, and reports as set forth herein.

All records and copies of reports shall be turned over to the COR within seven (7) calendar days prior to contract completion.

3.1.8 Staffing

The Contractor shall continuously maintain an adequate staff with expertise and certifications to assure work is scheduled and completed in accordance with these specifications. The Contractor shall maintain a certified work force to complete work in accordance with the time and quality standards specified.

3.1.9 Project Schedule/Plan

The Contractor shall create, maintain, and submit project plan(s)/schedule(s). Initial plans and schedules are due within five (5) business days after award and will be updated monthly until the final inspection is completed. The Contractor shall create, maintain, and submit project plan(s)/ schedule(s) fifteen (15) business days following a request for any upgrade, installation, or replacement of device(s) and or application(s). Microsoft Project is the preferred software/format for project plans/schedules. Project

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

plans/schedules shall include Task ID, Task Name, Actual Start, Actual Finish, Baseline Start, Baseline Finish, % complete, resource name/title, with the critical path defined utilizing predecessors and/or successors. The Government may return unacceptable plans and schedules for re-work, and the Contractor shall update and re-submit project plans and schedules within five (5) business days of request.

3.1.10 Meetings

The Contractor shall coordinate a post award Kickoff meeting prior to the initiation of work and conduct monthly In Process Review (IPR) meetings. These meetings will be held with the Contractor, CPM, KO, Contract Specialist (KS), COR, and the J6 TPOC to discuss an overview of Contractor’s plans to manage scope, schedule, and resources. The Contractor will discuss stakeholders’ expectations, details of contract execution including incident management, triage support, technology road map plans including current and future software/hardware landscape general conditions, project schedule/plan, work schedules, coordination, security, safety, deliverables, permits, and other matters pertinent to work accomplishments shall be discussed in this meeting. Contractor shall attend other meetings as required in support of contract tasks.

3.1.11 Phase In Training

A phase-in period shall be established to allow the Contractor sufficient time to integrate personnel and transition into duties required to perform the requirements of the contract and ensure employees who will require access to the Installation and Government Information Technology (IT) systems obtain a Common Access Card (CAC) In Accordance With (IAW) this PWS. Instructions for all Phase In Training are available upon request.

1. The phase-in period shall begin at the effective date of the contract and shall not exceed one (1) month, at which time full performance shall commence.

2. The Contractor shall ensure that all Contractor personnel are ready to begin working on the first day of full performance including obtaining any account access, permissions, and/or roles required to administer the application software/hardware. Training and documentation such as rules of behavior and cyber awareness may be required for accesses.

3. During the phase-in period, Contractor personnel shall complete security and safety training on site. Training will be scheduled through the DLA Distribution site training office and will at a minimum include the following classes. Estimated in class time is three (3) hours.

a. Active Shooter Briefing

b. Safety Briefing

c. Shelter in Place/Evacuation Awareness Briefing

4. During the one month phased-in period to ensure all Contractor personnel know and understand regulations and policy pertaining to physical, information, operations, and personnel security.

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

The Contractor shall provide security and antiterrorism training to all employees in accordance with applicable DOD regulatory requirements. At a minimum, estimated in class time is eight (8) hours, security training requirements as required by the DLA Issuances and other applicable DOD guidance will be completed annually for the following on-line training. If the Contractor has previously taken this training valid copies of certification of completion training completion is allowed.

a. Cyber Awareness Challenge

b. Safety Briefing

c. Shelter in Place/Evacuation Awareness Briefing

d. Antiterrorism (AT) Level 1

e. Operations Security (OPSEC)

f. Counterintelligence Awareness Training

g. Personally Identifiable Information Awareness

h. Trafficking in Persons

The security training is web-based, and access will be provided by the Government. The Contractor shall ensure Contractor personnel have taken the required security training to meet DoD guidance and that the personnel continue to maintain their certifications. The Government may add, delete or change the annual training requirements.

3.1.12 Transition Support

The Contractor shall provide knowledge transfer and training to any follow-on provider to include all the necessary documentation, orientation, collaboration, and training to facilitate the comprehensive understanding and execution of tasks, processes, procedures, schedules, and deliverables in a timely and orderly fashion. All transition activities shall be coordinated with and approved by the COR. This task may start up to ninety (90) days before the end of a base or option period.

The support services provided under this contract are critical to the DLA mission. It is vital that to ensure continuation of services without interruption or dramatic effort be provided. To maintain continuity of services the following requirements will be provided by the Contractor:

1. Continue to perform all services as prescribed within the PWS and existing Task Orders without reduction of manpower, quality of services and interruption to customers.

2. Provide a transition plan to include risks and costs associated with the transition of Contractor support within fifteen (15) business days of request for a transition plan from the COR. The transition plan shall address impacts including:

a. Provide current active project transition services associated with any break/fix, upgrade, migration, and/or enhancements planned or in-process.

b. Assist secure required permission, roles, account accesses required for administration of software/hardware.

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

c. Provide landscape and asset documentation, data dictionaries, or other system documentation for DLA equipment, hardware, software, processes, and overall environment

d. Provide transition cost analysis, propose schedules, and document risks associated with such transition.

3. The Contractor shall provide a written Transition Plan for the transition of services to perform all services required. The Transition Plan shall be provided withing fifteen (15) days of the Governments request and shall describe all training requirements/personnel that will be provided by the Contractor to execute the transfer of knowledge as well as processes and schedule.

During the transition phase the Contractor shall provide weekly transition progress reports. The Contractor shall submit all written plans, updates, and progress reports electronically to the KO, COR, and J6 TPOC.

3.2 TASK 2 – OPERATIONS, SUSTAINMENT, AND MAINTENANCE SUPPORT

The Contractor shall provide operations, sustainment, and maintenance support including mechanical Preventative Maintenance (PM), Corrective Maintenance (CM), and technical services support of software/hardware. Specifically, the Contractor shall provide the personnel, equipment, spares, mechanical hardware, software/firmware including licensing required for fully operational ESS/EKC systems including, but not limited to, testing, inspection, maintenance, services, patching, upgrading, migrating, and/or enhancing ESS/EKC systems.

Preventative Maintenance (PM) includes a recurring set of scheduled services and actions which the Contractor shall provide to keep systems fully operational and compliant.

Corrective Maintenance (CM) is the non-recurring unscheduled repairs or services required to make the systems fully operational.

Technical services support includes daily operations support, version upgrades, patching, security updates, enhancements, data migrations, and/or network migrations required for ESS/EKC systems and subsystems. All required cyber updates and patches shall be done through Preventative Maintenance including Information Assurance Vulnerability Alert (IAVMs), Cyber Task Order (CTO), Assured Compliance Assessment Solution (ACAS) scan remediations or any other cyber requirements to include updating or creating any supporting cybersecurity documentation required for accreditation.

3.2.1 Operations

The Contractor shall support daily operations of systems including system monitoring, break/fix triage support, incident management, project management, configuration management and PM/CM required in day-to-day operations support.

3.2.2 Sustainment

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

The Contractor shall develop and implement a Sustainment Plan for all systems, subsystems, and equipment IAW with original equipment manufacturer and/or Federal/DoD/DLA policies and procedures. The Sustainment Plan shall include the periodic maintenance, repair, replacement, and overhaul of existing systems, hardware, and software including planned version upgrades of the application and Operating System (OS). Unless there are security risks to consider, the Contractor shall sustain software at latest version (N) minus one version (N-1). The Contractor shall provide the Sustainment Plan which includes the technology road map for N-1 support, the PM schedule, and CM approach to the COR for approval within thirty (30) days of contract award. The CM approach should include:

1. Positions, qualifications, and certifications of personnel, test equipment, and other pertinent information needed to quickly diagnose and make repairs.

2. Plans and documentation for systems testing and/or diagnoses.

3. Identify critical system operations and implement strategies to prevent potential failures or administrative downtime from creating a critical system outage.

4. Analyze fault histories and fault trends to proactively predict and mitigate repetitive issues.

5. Plan to respond to and take corrective action to resolve cybersecurity vulnerabilities and mechanical emergency repairs identified by the Contractor or the Government both during normal hours and after hours.

The Contractor will be responsible for all version upgrades, patching, device enhancements, device replacements that reach end of life/support and for device replacements of hardware equipment that does not meet cyber standards/requirements including migrations required for ESS/EKC systems and subsystems compliance. As a software upgrade becomes available, the Contractor shall develop a plan for the upgrade and present that plan to the COR for approval. Once approved the Contractor shall execute their plan to install the upgrade(s) and return the ESS/EKC system(s) to an operational state.

3.2.3 Maintenance

The Contractor shall perform Preventive Maintenance (PM) services on all equipment which consists primarily of routine recurring inspection, testing, cleaning, lubrication, adjustment, and calibration to verify proper system operation to minimize malfunction, breakdown, and deterioration of systems and equipment. The Contractor shall perform PM in accordance with the preventive maintenance tasks (Attachment 3). The Contractor shall submit and maintain an up-to-date schedule with status for all PM tasks. Any modifications, changes, additions, or deletions shall be submitted to the COR for approval and once approved and implemented, documented in as-built drawings, and provided to the site.

3.3 TASK 3 – APPLICATION NETWORK AND INFRASTRUCTURE SUPPORT

The Contractor shall support application network and infrastructure requirements including:

3.3.1 Application System and Network Requirements

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

The Government provides system administration support for most OS at both the application server, the database server, and the client workstations. The Contractor shall receive a network assignment and provide the Government system administration support as required and will assist in migrating standalone systems onto a DLA approved network, if required by DLA J6. The Contractor shall support the following system and network requirements including, but not limited to:

1. All system/network components and applications shall be compatible with all applicable Defense Information System Agency (DISA) Security Technical Implementation Guides (STIGs). Any STIG exceptions must be identified as part of the Contractor’s proposal to the Government and approved by J6 Cybersecurity. Exceptions incurring risk found unacceptable to the DLA Authorizing Official are not permitted.

2. All network components and applications shall be IPv4 and IPv6 compatible.

3. Network components shall allow configuration of IEEE 802.1x or port security for authentication.

4. The Contractor shall provide a complete list of all ports, protocols and services required for any computer system running control system applications or required to interface the control system applications. The listing shall include all ports and services required for normal operation as well as any other ports and services required for emergency operation. The listing shall also include an explanation or cross reference to justify why each service is necessary for operation. When standard PPS is not utilized for any computer system running control system applications or required to interface the control system applications, then the Contractor shall provide a written justification for deviation from standard PPS.

5. Wireless communications are normally not permitted. The Contractor shall identify any system wireless communication capability, enabled, or disabled. All wireless communications shall meet applicable STIG requirements to include FIPS 140-2 certification. Any requirement to use wireless or cellular must be approved in writing by DLA J6, coordinated with the J62B PM and documented with the DLA Frequency Manager.

6. All application wiring and/or cabling shall be in Electric Metal Tubing (EMT) type conduit.

7. The Contractor shall provide any patch cabling required.

8. All application network components shall be connected using copper 100/1000 or fiber optic

Small Form Factor Pluggable (SFP)-based Gigabit Ethernet ports.

9. Hardware and controller systems must be capable of operating on separate Virtual Local Area

Network (VLAN)s if required.

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

10. The Contractor shall provide a Bill of Materials (BOM) and other network documentation to the COR in support of these requirements

3.3.2 INFORMATION AND OPERATIONAL TECHNOLOGY INFRASTRUCTURE

REQUIREMENTS

In general, the DLA expects to furnish the IT Infrastructure to host the ESS/EKC solution(s) and/or system(s) (including VLANs, and Virtual Machines (VMs)) unless there is a hardware, compatibility, or mission issue preventing it. As such, the Contractor must clearly identify “what” anticipated Government IT Infrastructure is required to host and operate the ESS/EKC solution(s) and/or system(s) within the design documentation submitted for Government approval at time of award. These anticipated designs will be incorporated into the system CONOPs. The Contractor will be responsible for all installation, configuration, and deployment of the ESS/EKC solution(s) and/or system(s) (including but not limited to) its subsystem(s), application(s), and patch cabling, if required.

Any requirement for the Contractor to provide their own IT Infrastructure, standalone server, or management workstation hardware due to compatibility issues must be documented in the Contractor’s proposal and approved by J6 prior to contract award. All Contractor provided IT Infrastructure must meet DoD STIG requirements. If the Contractor provides their own IT Infrastructure for the OT solution(s) and/or system(s), upon AO approval of the security authorization package (and prior to final OT solution(s) and/or system(s) acceptance or go-live), all Contractor provided IT Infrastructure will become the property of the Government.

All specialized software provided by the Contractor to the Government must have the applicable license key(s) as well as sales/transaction records, ownership control(s), manuals, technical publications, documentation, and any other information supporting ownership accompanying it. At the time of Contractor hand-off of Contractor owned IT Infrastructure to the Government, all design information for Enterprise Architecture (EA) for the “as built” OT solution(s) and/or system(s) will be provided. Any Contractor provided operating system (OS), software, and firmware throughout the duration of the contract will be upgraded by the Contractor prior to the Contractor’s end of mainstream support for the OS, software, or firmware.

DLA’s preference is for maximized virtual IT Infrastructure. As such, the Government will provide the virtual infrastructure to support deployment of Contractor supplied virtual servers or virtual appliance (OVA files). DLA will provide a virtual server up to the following:

1. CPU: 12

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

2. RAM: 32GB

3. Disk 1 (OS Drive): 100 GB

4. Disk 2 (Data Drive): 100 GB

Any requirements exceeding these specifications shall be submitted in writing and approved by the DLA J6 with supporting documentation prior to contract award. The Contractor will be responsible for the implementation including meeting all required STIG compliance.

The Contractor shall be responsible for all configuration and deployment which meet DoD, NIST and USG regulatory and cybersecurity policy requirements.

Any OT solution(s) and/or system(s) with IT Infrastructure provided by the Contractor must be upgradeable and remain compliant to cybersecurity specifications during the lifecycle of the solution.

Contractor supplied systems must meet DoD STIG requirements, with any exceptions noted in the design documentation.

The Contractor shall be responsible for all software maintenance activities for any/all appliances including but not limited to, firmware updates, OS patching, software patches etc. for the duration of the contract period.

The Contractor will be responsible for all physical maintenance activities for any/all appliances including but not limited to, replacement of defective components such as hard drives (to be destroyed onsite per DoD policy, guidance), motherboards, daughter cards etc. for the duration of the contract period.

System(s) shall operate using a fully supported operating system (OS), software, and firmware throughout the duration of the contract. All operating systems, software, and firmware shall be upgraded prior to the Contractor’s end of mainstream support for the operating system, software, or firmware. The solution must be upgradeable and remain compliant to DoD cybersecurity specifications during the lifecycle of the solution.

Any removable flash media required for system operation must be reviewed and approved in writing by the DLA J6 Flash Media Approval Program prior to implementation.

All OT solution(s) and/or system(s) must use the Purdue Enterprise Reference Architecture (PERA) Model for Control Hierarchy (reference ISBN 1-55617-265-6) to provide logical and/or physical architecture for networking, security hardware, software, and methods. The PERA Model is an industry

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

standard for manufacturing and/or industrial control systems that segments hardware, devices, and equipment into a hierarchical based design.

The Contractor shall support the following application infrastructure requirements to include, but not limited to:

11. DLA shall furnish all application and database servers and laptop/workstation hardware as required. Any requirement for the Contractor to provide their own server or laptop/workstation hardware due to compatibility issues shall be documented in the proposal and approved by the J6 TPOC/ISSM prior to any procurements and/or network installations. Contractor supplied systems must meet DoD STIG requirements, with any exceptions noted in their proposal.

12. The application software shall be capable of operating on DLA’s approved operating systems, virtual environments, and databases listed below:

e. Workstations/laptops shall operate on Windows 10 (or higher), with minimum system requirements of: processor: Intel i5 -6200u @ 2.3 GHZ, 2 Cores, RAM: 8GB, Hard Drive:

256 GB.

f. Windows Server 2016 Operating System (OS) (or higher versions).

g. For virtualized appliances or virtualized servers, the system shall be capable of running on

VMware ESXi hosts v6.0 or VMware vSphere v6.0 virtual server environment (or higher versions).

h. Database shall operate using SQL Server 2016 or 2019 or Oracle Database v19c or 21c (or higher versions).

i. System must be capable of operating with McAfee ePolicy Orchestrator enabled.

13. Any removable flash media required for system operation must be reviewed and accepted by the

DLA Flash Media Approval Program in advance. Coordination for approval shall be processed through the J6 TPOC/ISSM.

14. Application video appliance(s) and network recording requirements:

a. In some instances (such as video surveillance) where there is a requirement for a large amount of storage, the preferred solution will be available as an appliance that includes compute/storage in one physical appliance that meets DoD, National Institute of Standards and Technology (NIST) and Under Secretary General (USG) regulatory and cybersecurity policy requirements.

b. The appliance will not be used as a combined server and shall be sized adequately to store video feed data for up to 30 calendar days.

c. All videos will be stored under DLA requirements.

d. The Contractor shall be responsible for configuration and deployment.

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

e. The Contractor shall be responsible for all software maintenance activities for the appliance including, but not limited to, firmware updates, OS patching support, software patches, security updates, and other enhancements throughout the duration of the contract.

f. The Contractor will be responsible for all physical maintenance activities for the appliance including, but not limited to, replacement of defective components such as hard drives (to be destroyed onsite), motherboards, daughter cards, and other related system components for the duration of the contract period.

g. All operating systems, software, and firmware shall be upgraded prior to the Contractor’s end of mainstream support for the OS, software, or firmware.

h. The solution must be upgradeable and remain compliant to cyber security specifications during the lifecycle of this contract period.

3.4 TASK 4 - CYBERSECURITY REQUIREMENTS

The Contractor shall provide the following cybersecurity support including, but not limited to the following:

1. The Contractor shall provide cybersecurity that is in accordance with current policies, procedures, and statutes, to include, but not limited to, the following or most current version:

a. 44 U.S.C. § 3542, January 2012

b. Committee on National Security Systems Instruction 1253, Security Categorization and

Control Selection for National Security Systems, March 15, 2012, as amended

c. Federal Information Processing Standards Publication 199, Standards for Security

Categorization of Federal Information and Information Systems, February 2004

d. Federal Information Processing Standards Publication 200, Minimum Security

Requirements for Federal Information and Information Systems, March 2006

e. Federal Information Security Management Act (P.L. 107-347, Title III), December 2002

f. Department of Defense Instruction 5000.02, Operation of the Defense Acquisition

System, January 7, 2015

g. Department of Defense Instruction 5200.39, Critical Program Information (CPI)

Identification and Protection within the Research, Development, Test, and Evaluation

(RDT&E)

h. Department of Defense Instruction 5200.44, Protection of Mission Critical Functions to Achieve Trusted Systems & Networks, July 27, 2017

i. Department of Defense Directive 8140.01, Cyberspace Workforce Management, August 11, 2015

j. Department of Defense Instruction 8330.01, Interoperability of Information Technology (IT), Including National Security Systems (NSS), May 21, 2014

k. Department of Defense Instruction 8500.01, Cybersecurity, dated 14 March 14

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

l. Department of Defense Instruction 8510.01, Risk Management Framework (RMF) for DoD Information Technology, dated 12 Mar 14

m. Department of Defense DoD 8570.01-M, Information Assurance Workforce Improvement Program, Change 3 dated 24 Jan 2012

n. Department of Defense Instruction 8580.1, Information Assurance (IA) in the Defense Acquisition System, July 9, 2004

o. DoD Program Manager’s Guidebook for Integrating the Cybersecurity Risk Management Framework (RMF) into the System Acquisition Lifecycle

p. Defense Acquisition Guidebook (DAG)

q. Deputy Under Secretary of Defense (Installations and Environment) Memo dated 19 Mar

14, subject: Real Property Related ICS Cybersecurity

r. Defense Information Systems Agency (DISA) Secure Technical Implementation Guides

(STIGs)

s. National Institute of Standards and Technology Special Publication 800-30, Guide for

Conducting Risk Assessments, September 2012

t. National Institute of Standards and Technology Special Publication 800-37, Revision 1, Guide for Applying the Risk Management Framework to Federal Information Systems: A Security Life Cycle Approach, February 2010

u. National Institute of Standards and Technology Special Publication 800-39, Managing Information Security Risk: Organization, Mission, and Information System View, March

v. National Institute of Standards and Technology Special Publication 800-53, Revision 4, Security and Privacy Controls for Federal Information Systems and Organizations, April

w. National Institute of Standards and Technology Special Publication 800-82 Revision 2, Guide to Industrial Control Systems (ICS) Security, February 2015

x. National Institute of Standards and Technology Special Publication (SP) 800-171 Revision 2, Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations, January 2021

y. UFGS-25 50 00.00 20 Cybersecurity of Facility-Related Control Systems

z. United Facilities Criteria (UFC) 4-010-06, Cybersecurity of Facilities-Related Control

Systems

aa. Defense Logistics Agency Risk Management Framework Standard Operating Procedures, April 2021

bb. Office of the Assistant Secretary of Defense Facility Related Control Systems (FRCS)

Master List Memo, October 2020

cc. Defense Logistics Agency Approved Cybersecurity Computing Environment List, October 2021

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

dd. Department of Defense Control Systems Security Requirements Guide Version 1, Release 1, July 14, 2021

2. The Contractor shall not permit user credentials to be transmitted in clear text. Encryption shall at a minimum meet Advanced Encryption Standard (AES) 256 and comply with Federal Information Processing Standard (FIPS) 140-2. If this is not technically feasible, the Contractor shall provide the J6 TPOC/ISSM a recommendation for the strongest encryption method commensurate with the technology platform and response time constraints and document the encryption used in a POAM.

3. The Contractor shall identify heartbeat signals or protocols and recommend whether any should be included in application network monitoring. The Contractor shall provide packet definitions of the heartbeat signals and examples of the heartbeat traffic if the signals are included in the application network monitoring.

4. The Contractor shall recommend which accounts need to be active and those that can be disabled, removed, or modified. The J6 TPOC shall approve in writing the Contractor’s recommendation. The Contractor shall disable, remove, or modify all the accounts pursuant to the approved recommendation. The Contractor shall disable or remove all default and guest accounts. Once changed, new accounts will not be published except that new account information and passwords will be provided by the Contractor via protected media. At delivery, the Contractor shall disable, remove, or modify all Contractor-owned accounts or negotiate account ownership with the COR. Contractor updates shall not re-enable or re-install any of these accounts.

5. The Contractor shall manage sessions and not allow multiple concurrent logins, applications to retain login information between sessions, provide any auto-fill functionality during login, or allow anonymous logins. The Contractor shall provide user account-based logout and timeout settings.

6. The Contractor shall implement two-factor authentication using DoD Common Access Card where technically feasible, with exceptions noted in the proposal for approval by the J6 TPOC/ISSM. The Contractor shall provide a configurable account password management system that allows for selection of password length, frequency of change, setting of required password complexity, number of login attempts, inactive session logout, screen lock by application, and denial of repeated or recycled use of the same password. The Contractor shall not store passwords electronically or in Contractor-supplied hardcopy documentation in clear text unless the media is physically protected.

7. The Contractor shall provide physical and cyber security features for end devices (i.e., the source or destination of network traffic) including, but not limited to, authentication, encryption, access control, event and communication logging, monitoring, and alarming to protect the device and configuration computer from unauthorized modification or use. The Contractor shall clearly identify the physical and cybersecurity features and provide the methodology for maintaining the

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

features including the methods to change settings from the Contractor-configured or manufacturer default conditions. The Contractor shall verify that the addition of security features does not adversely affect connectivity, latency, bandwidth, response time, and throughput. The Contractor shall remove or disable all software components that are not required for the operation and maintenance of the device prior to delivery. The Contractor shall provide documentation on what is removed and/or disabled. The Contractor shall provide appropriate supported software, service updates, security updates, and/or implement workarounds to mitigate all vulnerabilities associated with the product to maintain the established level of system security.

8. The Contractor shall utilize standard ports, protocols, and services listed in the DISA Common Access List (CAL) to the greatest extent possible. When standard PPS are not used, then the Contractor shall provide a justification statement in PPSM submissions for J6 TPOC/ISSM approval.

9. The Contractor shall provide a detailed plan for physical security mechanisms appropriate for the type of devices being installed (enclosures, etc.).

10. The Contractor shall provide the following accreditation artifacts:

a. System Diagrams:

b. Architecture Network Diagram

c. Authorization Boundary Diagram

d. Data Flow Diagram

e. Purdue Diagram

f. Comprehensive Hardware Inventory Report

g. Comprehensive Software Inventory Report

h. Incident Response Plan (IRP)

i. Concept of Operations (CONOPS)

j. Plan of Actions and Milestones (POAM)

k. Software Upgrade and Support Plan (SUSP)

l. Ports, Protocols, and Services (PPSM) Documentation for Registration

m. Federal Information Processing Standard 199 (FIPS-199)Cybersecurity Strength

Requirements

n. PII Confidentiality Impact Level (PCIL) Categorization Worksheet

3.4.1 Cybersecurity Strength Requirements

The Contractor shall provide the following cybersecurity strength requirements including, but not limited to the following:

1. The Contractor shall adhere to all existing authorities and policies of the Director of National Intelligence regarding the protection of sensitive compartmented information (SCI), as directed by

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

Executive Order 12333 and other laws and regulations.

2. The Contractor shall satisfy the Risk Management Framework (RMF) requirements of subchapter III of chapter 35 of Title 44, United States Code (U.S.C.), also known as the “Federal Information Security Management Act (FISMA) of 2002”.

3. The Contractor shall enable DLA to meet the standards required by the Office of Management and Budget (OMB) and the Secretary of Commerce, pursuant to FISMA and section 11331 of Title 40, U.S.C.

4. FIPS 199 / CNSSI 1253 Security Categorization: The Contractor shall participate in categorization discussions with the DLA J6 PM, functional lead, and the Information System Security Manager (ISSM) and provide all required FIPS 199 documentation as requested to support security categorization.

5. The Contractor shall provide a recommendation on system categorization based on sound technical expertise in accordance with FIPS 199 then work in coordination with the prescribed DLA System Owner (SO) and ISSM to support the categorization IAW FIPS 199, CNSSI 1253 and OSD Facility Related Control Systems (FRCS) Master List including DLA specific systems, then document the results of the security categorization in the System DLA FIPS 199 document and the Concept of Operations (CONOPs).

6. DLA J6 PM will coordinate with the Contractor to identify and document Confidentiality, Availability, Integrity (CIA) of the system in a DLA FIPS 199 document for approval by DLA ISSM personnel.

7. The Contractor shall in coordination with the prescribed System Owner (SO) and Authorizing Official (AO) support categorization IAW FIPS 199, FIPS 200, FIPS 201 and CNSSI 1253 of the CS and document the results of the security categorization in the security plan.

8. The Contractor shall ensure that a written subsection of the security plan covers FIPS 199 / FIPS 200 / FIPS 201 CNSSI 1253 Security Categorization and Threat Assessment. DLA and or the SO will provide a C-I-A concurrence memorandum from SO respective AO agreeing with their determination of controls (Confidentiality, Integrity, and Availability with any overlays and tailoring).

3.4.2 Completion Of System Hardening (Scan/Fix/Scan) Testing And Analysis

The Contractor shall harden systems using a scan, fix, scan methodology remediating findings IAW current DOD, DLA, and Defense Information Systems Agency (DISA) standards. This includes automated and manual STIG application, Assured Compliance Assessment Solution (ACAS) scanning, and any other hardening efforts required to make the system ready to connect to a DOD network.

Whenever findings occur, as required periodically, and/or following any major system change, the Contractor shall scan/fix/scan until all issues have been fixed and/or properly and acceptably mitigated.

Any Critical or High impact level findings that cannot be fixed are to be reported to the J6 TPOC/ISSM

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

immediately along with a valid reason the vulnerability cannot be fixed and a POAM. Once the Contractor has completed hardening efforts, system monitoring and audits shall occur to ensure STIG compliance is maintained.

Upon connection to the production network, the Contractor is expected to maintain the current approved settings. The Contractor is expected to notify the J6 TPOC/ISSM of any known published system patches and OS updates that will negatively impact the cybersecurity posture of the system. Any identified issues should be documented in advance to the J6 TPOC/ISSM with a valid reason the system patch or OS update cannot be applied and a mitigation plan to fix the pending vulnerability with the date to be fixed.

3.4.3 Cybersecurity Assurance Requirements

The Contractor shall design, develop, and integrate cybersecurity solutions supporting the Department of Defense and all other applicable Government agencies. This will be achieved through abiding by all applicable cybersecurity policies, regulations, and directives to ensure a favorable Assessment and Authorization (A&A), Assessment and Incorporate (A&I), or FRCS Assess Only Risk Assessment (FRCS AORA) decision, as well as obtaining an Authority to Connect (ATC) to DLA’s network. The Contractor shall mitigate risk identified through the RMF authorization process down to a level acceptable to the DLA Authorizing Official (AO).

Coding for Security. The Contractor shall provide documentation of development practices and standards applied to Government approved Contractor-written control system software, including firmware, used to ensure a high level of defense against unauthorized access.

The solution shall comply with the security control requirements documented in National Institute of Standards and Technology (NIST) Special Publication (SP) 800-53r4, “Security and Privacy Controls for Federal Information Systems and Organizations” and NIST 800-82r2, “Guide to Industrial Control Systems (ICS) Security”. The Contractor shall provide details of any alternative but equally effective security measures used to compensate for the inability to satisfy a particular derived security requirement (mitigation to control compliance findings). This information shall be submitted in writing to the DLA J6 PM for cybersecurity approval as soon as the alternative is identified. Guidance on the applicability and enforcement of controls by Purdue Enterprise Reference Architecture (PERA) level can be found in the United Facilities Criteria (UFC) 4-010-06, Cybersecurity of Facilities-Related Control Systems.

FOR

VINDICATOR ELECTRONIC SECURITY SYSTEM (ESS),

PELCO CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, MORSE KEYWATCH SYSTEM

AND MASS NOTIFICATION SYSTEM

The DoD Control Systems Security Requirements Guide (SRG) shall be used as appropriate for the system.

The Contractor shall protect unclassified DoD data from unauthorized access or disclosure in accordance with DoDI 8582.01, “Security of Unclassified Information on Non-DoD Information Systems.” Controlled Unclassified Information: All Government controlled unclassified information obtained by the Contractor shall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .