This document contains an offer submission package for a Defense Logistics Agency Energy solicitation seeking aviation turbine fuel. The solicitation requests offers for approximately 10.5 million gallons of Jet Propellant Fuel Aviation (JAA) to be delivered to West Oahu, Hawaii between the date of award and September 30, 2023 with a 30-day carryover period. Offerors must submit pricing and additional details using the provided template by March 16, 2023. Pricing is requested on an FOB origin basis by shipping point, including additives and escalation costs. Additional requirements include minimum and maximum parcel sizes and lift intervals by mode of delivery, quality plans, turnaround schedules, and exceptions. The template collects shipping locations, sources of supply, conditions on awarding combinations of lines, and contact information from potential offerors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_SPE60223R0705_AMD 0004.pdf | ||
| Attachment 2 - OSP_AMD 0004.docx | DOCX document | |
| SF30_SPE60223R0705_AMD 0003.pdf | ||
| SF30_SPE60223R0705_AMD 0002.pdf | ||
| Attachment 2 - OSP_AMD 0001.docx | DOCX document | |
| SF30_SPE60223R0705_AMD 0001.pdf | ||
| SPE60223R0705 Solicitation Conformed AMD 0001.pdf | ||
| Attachment 3 - Fillable Clauses.docx | DOCX document | |
| Attachment 1 - E and C QAPs.pdf | ||
| SPE60223R0705 Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFER
SUBMISSION
PACKAGE
SOLICITATION: SPE602-23-R-0705
PURCHASE PROGRAM: 2.2B (JAA)
DELIVERY PERIOD:
DATE OF AWARD THROUGH MAY 14, 2023
TO BE TIMELY, OFFERS MUST BE RECEIVED AT THE DEFENSE LOGISTICS AGENCY BY:
March 16, 2023, at 1:00PM, Fort Belvoir, VA Local Time
INSTRUCTIONS
1. To be evaluated for award, one copy of this Offer Submission Package (OSP) must be returned to Defense Logistics Agency Energy. All documents to be completed and returned are contained in this Offer Submission Package or as an attachment to the solicitation on Sam.gov The following documents are needed by March 15, 2023, at 1:00PM, Fort Belvoir, VA Local Time:
· Signed Standard Form 1449
· Offer Submission Package
· All Applicable Fill-In Clauses (See Attachment 3 – Fillable Clauses)
· A signed copy of all Amendments (If applicable)
· Applicable letters of commitment (See L704 for requirements.)
· Applicable certificates of analysis
· Applicable transportation agreements
· Safety Data Sheet (SDS) for all offered products
2. Be sure to check your offer prices in Section B for accuracy and legibility prior to submission. Initial all changes and sign and date the Standard Form 1449.
3. Please type, DO NOT HAND WRITE ENTRIES.
4. By submitting this Offer Submission Package, you are stating ALL terms and conditions of the solicitation are accepted and apply to your offer, unless clearly stated herein.
5. The e-mail address to submit your offer are Jennifer.Arthur@dla.mil and Matthew.Padfield@dla.mil.
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS B1 SUPPLIES TO BE FURNISHED (BULK) (DLA ENERGY JAN 2012)
(a) The supplies to be furnished during the contract period and all associated data are as follows:
NOTE: Please review the Schedule of Requirements located in the Solicitation. After reviewing the requirements, complete the OFFER SCHEDULE below:
OFFER SCHEDULE
A – STANDARD OFFER SHEETS
1. Origin Offer Sheet
| Seq |
| Product |
| Shipping Point |
| Max Qty |
(USG)
Min Qty
(USG)
| Mode |
| Price W/O Additives (USD) |
| Total Additive |
Cost
| EPA Escalator |
| Total Offer |
Price
JAA
2. Destination Offer Sheet
| Seq |
| Product |
| Shipping Point |
| To Location |
| Line Item |
| Max Qty |
(USG)
Min Qty
(USG)
| Mode |
| Price W/O Additives (USD) |
| Total Additive |
Cost
| EPA Escalator |
| Total Offer |
Price
JAA
| DFSP West Oahu |
| 0001 |
B – ADDITIVE PRICES
| Seq |
| Mode |
| FSII Price |
| FSII Included / Optional / Not Included |
| SDA Price |
| SDA Included / Optional / Not Included |
| CI Price |
| CI Included / Optional / Not Included |
S1
C – PRICE ESCALATORS
| Seq |
| Ref Price Formulas Selected |
| Reference Price Date |
| Effective Reference Price |
| Adjustment Factor |
S1
E – OFFER CONDITIONS
1. Overall Min/Max Quantity Availability:
| Minimum Quantity Available (USG) |
| Maximum Quantity Available (USG) |
VENDOR NOTES:
2. Overall Max By Product:
| Product |
| Quantity (USG) |
JAA
3. Overall Max By Product and Shipping Location:
| Product |
| Shipping Location |
| Quantity (USG) |
JAA
4. Min/Max For A Combination Of Products:
| Products |
| Min (USG) |
| Max (USG) |
| Notes |
5. Min/Max For Individual Shipping Location:
| Products |
| Shipping Point |
| Mode |
| Minimum Quantity |
Available (USG) Maximum Quantity Available (USG) Notes
JAA
6. Would the quantity awarded out of any shipping point affect the quantity available for award out of any other shipping point?
7. Min / Max For Combination Of Bid Lines:
| Bid Lines / Sets |
| Quantity (USG) |
| Notes |
8. Offer Combinations That Must Be Awarded Together Or Not At All:
| Bid Lines / Sets |
| Notes |
9. Offer Combinations Where Only 1 Item From The Group Can Be Awarded:
| Bid Lines / Sets |
| Notes |
10. Offer Combinations Where 1 Must Be Awarded Before Another In Order (1 BEFORE 2 BEFORE 3 etc.):
| Bid Lines / Sets |
| Notes |
F - SOURCE OF SUPPLY
1. State the monthly production capacity for each source of supply:
| Product |
| Source Of Supply |
| Maximum Monthly Production (USG) |
2. List All Shipping Points Supplied by Each Refinery/Source of Supply:
| Product |
| Source / Refinery |
| Shipping Points Supported |
3. Refinery/source quantities available for award:
| Product |
| Source / Refinery |
| Minimum Quantity Available |
(USG)
Maximum Quantity Available
(USG)
G - PARCEL SHIPPING SIZES & DAILY CAPACITY
2. For Pipeline:
a. State the pipeline that the product will move through and the minimum and maximum quantities (parcel sizes) available in barrels (BBLS) for each delivery and the minimum number of days between lifts (deliveries) into each pipeline (please state if there is no interval):
| Product |
| Shipping Point and Pipeline |
| Minimum Qty (BBLS) |
| Maximum Qty(BBLS) |
| No. of Days Between Each Lift / Delivery |
NOTE: Unless you define otherwise, lift interval is the time between completion of loading (when cargo completes passing the custody transfer point) one delivery until the Scheduled Delivery Date of the next delivery for a specific product. Lift intervals are based on delivery of maximum parcel size for each shipping point. If a quantity less than the maximum parcel size is shipped, the lift interval shall be reduced on a pro-rata basis.
3. For Barge/Tanker/Shallow Draft Tanker:
b. State the minimum and maximum quantities (parcel sizes) available in barrels (BBLS) for each delivery and the minimum number of days between lifts (deliveries):
| Product / Mode |
| Shipping Point |
| Minimum Qty (BBLS) |
| Maximum Qty(BBLS) |
| No. of Days Between Each Lift / Delivery |
4. Would the quantity awarded out of any shipping point affect the quantity available for award out of any other shipping point: If YES please give details below:
Notes:
A. FOR EVALUATION PURPOSES ONLY: DLA ENERGY will add 5 days to offered FOB Origin tanker lift intervals and 3 days to offered FOB Origin barge/shallow draft tanker lift intervals to determine if the maximum total quantity offered for each offered item can be lifted under a resultant contract. Additionally, if multiple lift intervals are offered, DLA ENERGY will evaluate the maximum quantity for award based on the most restrictive lift interval. These evaluation factors were derived from operational scheduling realities and will be used only for evaluation purposes. The Government reserves the right to schedule lifts in accordance with the lift intervals indicated in the Schedule of the resultant contract. If the calculated max quantity available for award based on lift intervals is less than the total quantity offered for award, the Government will limit evaluation for award to the calculated maximum quantity based on parcel size and lift intervals. Offerors should consider the Government's evaluation factors for tanker, barge, and shallow draft tanker lift intervals to assure lift intervals and parcel sizes provide for full evaluation of total offered quantity for all items by all modes of delivery.
B. Unless you define otherwise, lift interval is the time between when the vessel completes loading (released by the Government Inspector) until the Scheduled Delivery Date of the next delivery for a specific product.
J – QUALITY ASSURANCE
Pursuant to FAR 52.212-1, the offeror must demonstrate an understanding of the quality assurance requirements in Quality Assurance Provisions (QAPs) E1 CONTRACTOR INSPECTION RESPONSIBILITIES and E1.21 CONTRACTOR INSPECTION RESPONSIBLITIES (JET A/A-1)(BULK/PC&S) of the solicitation. Accordingly, offerors must indicate one of the following and submit the required documentation for review with their initial offer:
Offeror certifies that it has a Quality Control Plan (QCP), applicable to a DLA Energy bulk petroleum contract, on file with DLA Energy that is no more than 24 months old.
An outline, an estimated two pages in length, of a proposed QCP describing the offerors current inspection system and quality assurance procedures, with references to the corresponding requirements in E1 and/or E1.21.
L - F92.02 SCHEDULE OF REFINERY SHUTDOWNS FOR TURNAROUNDS (DOMESTIC AND OVERSEAS BULK) (DLA ENERGY JULY 2019)
(a) The offeror shall furnish to the Contracting Officer a refinery shutdown schedule for the contract period. DLA Energy will review the offered quantity, parcel sizes, and lift intervals in conjunction with the turnaround period to ensure that the entire offered quantity can be delivered during the performance period and will meet operational requirements.
(b) The offeror shall provide the following information for each product offered:
(1) No shutdowns planned [ ]
(2) Shutdowns Planned [ ]
| (i) Refinery location: | ; |
| (ii) Shutdown period: | ; |
(iii) Impact of shutdown period on supply availability: .
(c) Unless the offeror states otherwise, the offer will be evaluated on the basis that there will be no refinery shutdowns for turnarounds that will have an impact on supply availability.
(End of F92.02 Text)
M - REQUESTS FOR EXCEPTION
All requests for exceptions to the solicitation and amendments must be included in this section. Please be a specific as possible when submitting a request for exception and use a separate line for each exception being requested.
Inclusion of the request for exception in the offer should not be construed as acceptance by the Government until such acceptance is expressly stated by the Contracting Officer.
Any exception stated elsewhere in the offer that is not included in section M of the Offer Submission Package will NOT be considered a valid request for exception and will not be considered for award.
1. SECTION B / SUPPLIES OR SERVICES AND PRICES/COST: List all exceptions to this section; identify the solicitation clause or provision applicable to each exception.
| Clause/Provision |
| Exception Requested |
2. SECTION C / DESCRIPTIONS/SPECIFICATIONS/STATEMENT OF WORK: List all exceptions to this section; identify the solicitation clause or provision applicable to each exception.
| Clause/Provision |
| Exception Requested |
3. SECTION E / INSPECTION AND ACCEPTANCE: List all exceptions to this section; identify the solicitation clause or provision applicable to each exception.
| Clause/Provision |
| Exception Requested |
4. SECTION F / DELIVERIES OR PERFORMANCE: List all exceptions to this section; identify the solicitation clause or provision applicable to each exception.
| Clause/Provision |
| Exception Requested |
5. OTHER EXCEPTIONS: List all exceptions to the solicitation and amendments other than those for Sections B, C, E or F of the Solicitation. Identify the solicitation section and clause or provision applicable to each exception requested.
| Clause/Provision |
| Exception Requested |
Any exception stated elsewhere in the offer that is not included in section M of the Offer Submission Package will NOT be considered a valid request for exception and will not be considered for award.
N – K CLAUSES
1. K1.01-7 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS (CONT’D)(DLA ENERGY FEB 2009)
SMALL BUSINESS CONCERN REPRESENTATION - OFFEROR’S MANUFACTURING SOURCE.
(a) The representation in (c) below concerning the offeror’s manufacturing source applies to Small Business Set- Aside (SBSA) line items, Small Disadvantaged Business Price Evaluation Adjustment (SDB PEA) line items, and HUBZone Small Business (HSB) line items only.
(1) To be eligible for either the SBSA or SDB PEA, the representation in (c)(1) below must state that all end items will be manufactured or produced by a small business concern in the United States, its territories and possessions, Puerto Rico, or the Trust Territory of the Pacific Islands.
(2) To be eligible for the HSB preference, the representation in (c)(2) below must state that all end items will be manufactured or produced by a HUBZone small business concern in the United States, its territories and possessions, Puerto Rico, or the Trust Territory of the Pacific Islands.
(b) Failure to complete (c) below and failure to submit same with the offer may render the offer ineligible for award in these programs.
(c) (1) SBSA/SDB PEA REPRESENTATION. The small business concern represents as part of its offer that—
[ ] all [ ] not all end items to be furnished will be manufactured or produced by a small business concern in the United States, its territories or possessions, Puerto Rico, or the Trust Territory of the Pacific Islands.
(2) HSB REPRESENTATIONS. The small business concern represents as part of its offer that—
[ ] all [ ] not all end items to be furnished will be manufactured or produced by a HUBZone small business concern in the United States, its territories or possessions, Puerto Rico, or the Trust Territory of the Pacific Islands.
(End of K1.01-7 Text)
2. K28 SHIPPING POINT AND REFINERY INFORMATION (BULK) (DLA ENERGY JULY 2019)
Offerors are required to submit the following information for all shipping points and refinery sources offered.
COMPLETE ADDRESS (INCLUDING NAME OF SHIPPING POINT OR REFINERY, STREET ADDRESS, CITY, COUNTY, STATE AND ZIP CODE, AND TELEPHONE NO.):
| Name of Refinery |
| Shipping Point |
| Street Address |
| City |
| County |
| State |
| Zip Code |
| Telephone No. |
(End of K28 Text)
3. K28.01 NOTIFICATION OF VESSEL EXPECTED TIME OF ARRIVAL (ETA) (DLA ENERGY JUNE 2022)
As required by the TANKER DEMURRAGE AND LOADING CONDITIONS contract text and/or the BARGE DEMURRAGE AND LOADING CONDITIONS contract text, when Government vessel loadings are involved, offerors shall submit the following information for each port offered (Check box for preferred communication method):
PORT: _______________________________________
[ ] NOTIFICATION TELEX/FAX NUMBER: _____________________________
[ ] EMAIL ADDRESS:________________________________________
(End of K28.01 Text)
4. K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007)
The offeror or quoter represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this request for proposals or quotations.
| Name |
| Title |
| Phone Number |
| E-Mail Address |
(End of K33.01 Text)
5. K86 FOREIGN TAXES (DLA ENERGY NOV 2014)
As stated in the TAXES - FOREIGN FIXED-PRICE CONTRACTS clause 52.229-6, unless the contract provides otherwise, the contract price must include all applicable foreign taxes, duties, fees, or foreign government-levied charges (“taxes and duties”). In accordance with the TAXES - FOREIGN FIXED- PRICE CONTRACTS clause 52.229-6, the offeror shall list below, in paragraph (a), the specific name and amount of the foreign taxes and duties included in the price. If, when permitted by the contract, foreign taxes and duties are not included in the offered price, but are expected to be invoiced separately, the offeror shall list the specific name and amount of these foreign taxes and duties in paragraph (b) below.
(a) Foreign taxes and duties included in the contract price are as follows:
| Name of Tax, Duty, Fee, or Foreign Government Levied Charge |
| Amount |
(b) Foreign taxes and duties invoiced separately are as follows:
| Name of Tax, Duty, Fee, or Foreign Government Levied Charge |
| Amount |
O. General Comments
Please include any general comments or notes that you wish to include in your offer in the area provided.
General Comments
(End of K86 Text)
File details come from the government source that posted it. Updated .