ATTACHMENT 2 - Drawings 1 of 2.pdf

PDF 22 MB Posted

Attached to
Y1LZ--Construct Parking Structure for Patient Access (Minor) - St Cloud VAMC Federal contract opportunity
Solicitation number
36E77620B0006
Issued by
Department of Veterans Affairs Headquarters

About this file

This document provides details for a federal contract solicitation to construct a parking structure for patient access at the St. Cloud VA Medical Center in Minnesota. The contractor will furnish all labor, materials, tools and equipment required for the general construction project, including demolition, site utilities, and architectural, structural, mechanical, plumbing and electrical work. The solicitation will be issued as an Invitation for Bid and evaluated according to procedures in the solicitation. It is a total Service-Disabled Veteran-Owned Small Business set-aside with an anticipated issuance date in late July or early August 2020. The period of performance is approximately 487 calendar days from the notice to proceed. The magnitude of construction is expected to be between $10-20 million. All questions must be submitted in writing by the specified date.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--Construct Parking Structure for Patient Access (Minor) - St Cloud VAMC, newest first.
File Type Posted
36E77620B0006 0003.docx DOCX document
Technical Questions - FINAL No. 2 - St. Cloud Parking 8-28-2020.pdf PDF
Pavement Sections.pdf PDF
079200 JointSealants ADDENDUM.pdf PDF
071800 Traffic Coatings ADDENDUM.pdf PDF
Addendum Cover Sheet.pdf PDF
36E77620B0006 0002.docx DOCX document
Technical Questions - FINAL - St. Cloud Parking 8-26-2020.pdf PDF
071916 Silane Water Repellent Sealer ADDENDUM.pdf PDF
36E77620B0006 0001.pdf PDF
Sign In Sheet Site Visit.pdf PDF
ATTACHMENT 4 - Brand Name Justification - St. Cloud Parking.pdf PDF
36E77620B0006_1.docx DOCX document
ATTACHMENT 5 - Construction Wage Rates - Stearns County - 7-10-20.pdf PDF
ATTACHMENT 6 - Contractor Safety - Environmental Record Evaluation Form.docx DOCX document
ATTACHMENT 7 - Campus Map - COVID Security Information.pdf PDF
ATTACHMENT 1 - Specifications.pdf PDF
ATTACHMENT 3 - Drawings 2 of 2.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Ken Noel (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

VA FORM 08-6231

CONSULTANTS:

ACG Project Number

© COPYRIGHT Apogee- CEMS JV, LLC

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: NURSE EXECUTIVE DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS COORDINATOR

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BYBUILDING No

LOCATION

DATE:

DATE: DRAWING NO.

DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

DATE

DATE:

/2

/2

:3

:1

A

M

G-001

COVER

1 4

RC MK

CONSTRUCT PARKING

STRUCTURE FOR PATIENT

ACCESS

ST. CLOUD VA HEALTHCARE SYSTEM

ST. CLOUD, MINNESOTA

05/27/2020

BID DOCUMENTS

656-344

18-063

N/A

CONSTRUCT PARKING STRUCTURE

FOR PATIENT ACCESS

ST. CLOUD VA HEALTHCARE SYSTEM

ST. CLOUD, MINNESOTA

VA PROJECT #: 656-344 APOGEE PROJECT #: 18-063

DRAWING LIST

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 24

A-101 OVERALL FLOOR PLANS 2 24

A-102 FLOOR PLAN- GROUND FLOOR AREA A 3 24

A-103 FLOOR PLAN- GROUND FLOOR AREA B 4 24

A-104 FLOOR PLAN- BASEMENT AREA A 5 24

A-105 FLOOR PLAN- BASEMENT AREA B 6 24

A-110 ENLARGED PLANS 7 24

A-111 REFLECTED CEILING PLANS, ROOF PLANS 8 24

A-201 EXTERIOR ELEVATIONS 9 24

A-202 EXTERIOR ELEVATIONS 10 24

A-301 OVERALL BUILDING SECTIONS 11 24

A-310 WALL SECTIONS 12 24

A-311 WALL SECTIONS 13 24

A-312 WALL SECTIONS 14 24

A-313 DETAILS 15 24

A-314 DETAILS 16 24

A-601 SCHEDULES AND DETAILS 17 24

A-701 ENLARGED STAIR PLANS 18 24

A-702 STAIR SECTIONS 19 24

A-703 RAILING ELEVATIONS AND DETAILS 20 24

A-704 STAIR AND RAILING DETAILS 21 24

A-901 SIGNAGE PLANS 22 24

A-902 SIGNAGE DETAILS 23 24

A-910 STRIPING PLANS 24 24

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 10

PP101 GROUND FLOOR AREA A PLUMBING PLAN 2 10

PP102 GROUND FLOOR AREA B PLUMBING PLAN 3 10

PP103 BASEMENT AREA A PLUMBING PLAN 4 10

PP104 BASEMENT AREA B PLUMBING PLAN 5 10

P-401 ENLARGED PLUMBING PLANS 6 10

P-501 PLUMBING DETAILS 7 10

P-901 STORM PIPE RISER - GROUND FLOOR 8 10

P-902 SANITARY PIPE RISER - BASEMENT 9 10

PP105 UNDER GARAGE DETENTION PIPING 10 10

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 7

MH101 GROUND FLOOR AREA A MECHANICAL PLAN 2 7

MH102 GROUND FLOOR AREA B MECHANICAL PLAN 3 7

MH103 BASEMENT AREA A MECHANICAL PLAN 4 7

MH104 BASEMENT AREA B MECHANICAL PLAN 5 7

M-401 ENLARGED MECHANICAL PLANS 6 7

M-501 MECHANICAL DETAILS 7 7

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 14

ES101 ELECTRICAL DEMOLITION SITE PLAN 2 14

ES102 ELECTRICAL SITE PLAN 3 14

E-101 GROUND LEVEL AREA A ELECTRICAL PLAN 4 14

E-102 GROUND LEVEL AREA B ELECTRICAL PLAN 5 14

E-103 BASEMENT AREA A ELECTRICAL PLAN 6 14

E-104 BASEMENT AREA B ELECTRICAL PLAN 7 14

E-105 TECHNOLOGY ROUTING PLANS 8 14

E-401 ELECTRICAL ENLARGEMENTS 9 14

E-402 ELECTRICAL ENLARGEMENTS 10 14

E-501 ELECTRICAL DETAILS 11 14

E-502 ELECTRICAL DETAILS AND WAN RISERS 12 14

E-601 SINGLE LINE DIAGRAM AND EQUIPMENT CONDUCTOR SCHEDULE 13 14

E-602 PANEL SCHEDULES 14 14

DRAWING LIST

GENERAL

G-001 COVER 1 4

G-100 GENERAL INFORMATION 2 4

LS101 LIFE SAFETY PLANS 3 4

LS102 LIFE SAFETY ELEVATIONS 4 4

CIVIL

GI002 GENERAL NOTES 1 18

VF101 EXISTING TOPOGRAPHY 2 18

CD101 DEMOLITION PLAN 3 18

CS101 SITE PLAN 4 18

CS110 TEMPORARY PARKING MAP 5 18

CG101 GRADING PLAN 6 18

CG201 STORM SEWER PLAN AND PROFILES 7 18

CG202 STORM SEWER PLAN AND PROFILES 8 18

CG203 STORM SEWER PLAN AND PROFILES 9 18

CU101 UTILITY PLAN 10 18

CU201 SANITARY SEWER PLAN AND PROFILES 11 18

CE101 EROSION CONTROL PLAN 12 18

CE102 TEMPORARY ARKING EROSION CONTROL PLAN 13 18

CG001 STORMWATER POLLUTION PREVENTION PLAN 14 18

CE501 EROSION CONTROL DETAILS 15 18

CS501 SITE DETAILS 16 18

CS502 SITE DETAILS 17 18

CS503 SITE DETAILS 18 18

LANDSCAPE

LP101 PLANTING PLAN 1 4

LP102 MEMORIAL TREE RELOCATION PLAN 2 4

LP501 PLANTING DETAILS 3 4

IR101 IRRIGATION STRATEGY PLAN 4 4

STRUCTURAL

S001 ABBREVIATIONS AND SYMBOLS 1 36

S002 GENERAL NOTES 2 36

S003 GENERAL NOTES 3 36

S004 SPECIAL INSPECTION REQUIREMENTS 4 36

S005 LOAD MAPS 5 36

S006 LOAD MAPS 6 36

S007 AXONOMETRICS 7 36

S008 AXONOMETRICS 8 36

S101A FOUNDATION PLAN- AREA A 9 36

S101A.SOG 1ST FLOOR FRAMING PLAN- AREA B 10 36

S101B FOUNDATION PLAN- AREA B 11 36

S101B.SOG SLAB ON GRADE PLAN- AREA B 12 36

S102A 1ST FLOOR FRAMING PLAN- AREA A 13 36

S102A.R 1ST FLOOR REINFORCING PLAN AREA A 14 36

S102B 1ST FLOOR FRAMING PLAN- AREA B 15 36

S102B.R 1ST FLOOR REINFORCING PLAN AREA B 16 36

S103A ROOF FRAMING PLAN- AREA A 17 36

S103B ROOF FRAMING PLAN-AREA B 18 36

S201 WALL PLAN 19 36

S211 BUILDING SECTIONS 20 36

S212 BUILDING SECTIONS 21 36

S301 FOUNDATIONS SCHEDULES, SECTIONS, AND DETAILS 22 36

S302 FOUNDATION SECTIONS AND DETAILS 23 36

S311 CONCRETE COLUMN SCHEDULES, SECTIONS, AND DETAILS 24 36

S321 CONCRETE WALL SECTIONS AND DETAILS 25 36

S322 CONCRETE WALL SECTIONS AND DETAILS 26 36

S323 CONCRETE WALL SECTIONS AND DETAILS 27 36

S324 CONCRETE WALL SECTIONS AND DETAILS 28 36

S325 CONCRETE WALL SECTIONS AND DETAILS 29 36

S331 POST-TENSIONED CONCRETE BEAM SCHEDULE 30 36

S332 MILD REINFORECED BEAM SCHEDULE 31 36

S341 TYPICAL CONCRETE FRAMING DETAILS 32 36

S342 TYPICAL CONCRETE FRAMING DETAILS 33 36

S343 TYPICAL CONCRETE FRAMING DETAILS 34 36

S401 CMU SCHEDULES, SECTIONS, AND DETAILS 35 36

S511 ROOF FRAMING DETAILS 36 36

PROJECT:

PROJECT

LOCATION

24514

LICENSED

ARCHITECT

DocuSign Envelope ID: 18C7CDD7-AE55-432E-94A9-C15EEF7C0A15

5/29/2020

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

PROJECT NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTH

PLAN

0 4 8 16

GOVERNING CODES:

NFPA 101, LIFE SAFETY CODE (LSC), 2018 EDITION

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS

NFPA 30, FLAMMABLE AND COMBUSTIBLE LIQUIDS, 2018 EDITION

NFPA 30A, MOTOR FUEL DISPENSING FACILITIES AND REPAIR GARAGES, 2018 EDITION

NFPA 70, NATIONAL ELECTRIC CODE (NEC), 2017 EDITION

NFPA 72, NATIONAL FIRE ALARM CODE, 2019 EDITION

NFPA 80, FIRE DOORS AND OTHER OPENING PROTECTIVES, 2019 EDITION

NFPA 88A, STANDARD FOR PARKING STRUCTURES, 2019 EDITION

NFPA 90A, INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS, 2018

NFPA 99, HEALTH CARE FACILITIES CODE, 2018 EDITION

NFPA 220, TYPES OF BUILDING CONSTRUCTION, 2018 EDITION

MINNESOTA BUILDING CODE, 2015 EDITION

MINNESOTA MECHANICAL AND FUEL GAS CODE, 2015 EDITION

MINNESOTA PLUMBING CODE, 2015 EDITION

MINNESOTA ELECTRICAL CODE

INTERNATIONAL MECHANICAL CODE, 2018 EDITION

INTERNATIONAL BUILDING CODE, 2018 EDITION

INTERNATIONAL FIRE CODE, 2018 EDITION

ASHRAE 90.1 - 2016 ENERGY EFFICIENT DESIGN OF NEW LOW-RISE RESIDENTIAL BUILDINGS

ASHRAE STANDARD 170, 2017 - VENTILATION FOR HEALTH CARE FACILITIES

ASME B31.9, BUILDING SERVICES PIPING

ILLUMINATING ENGINEERING SOCIETY (IES) LIGHTING HANDBOOK, 10TH EDITION

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS), 2006 EDITION

VA DESIGN MANUALS:

VA PARKING DESIGN MANUAL & DEMAND MODEL, APRIL 2013

VA BARRIER FREE DESIGN GUIDE (SUPPLEMENT TO ABAAS), JANUARY 2017

FIRE PROTECTION DESIGN MANUAL, 2015 EDITION

ARCHITECTURAL DESIGN MANUAL, AUGUST 2014

STRUCTURAL DESIGN MANUAL FOR PARKING STRUCTURES, OCTOBER 2013

SITE DEVELOPMENT DESIGN MANUAL, FEBRUARY 2013

ELECTRICAL DESIGN MANUAL, DECEMBER 2015

INFORMATION AND TECHNOLOGY DESIGN GUIDE, FEBRUARY 2016

TELECOMMUNICATIONS DESIGN MANUAL, FEBRURARY 2016

HVAC DESIGN MANUAL, MAY 2019

PLUMBING DESIGN MANUAL, NOVEMBER 2014

PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015

VA SIGNAGE DESIGN MANUAL

BUILDING CODE SUMMARY:

OCCUPANCY TYPE: STORAGE - ORDINARY HAZARD (NFPA 101)

OPEN PARKING STRUCTURE (NFPA 88A)

CONSTRUCTION TYPE: II (0,0,0) NONCOMBUSTIBLE

NFPA 88A: 5.1.2 Open parking structures shall be of type I or Type II construction.

ALLOWABLE AREA:

NFPA 88A: 5.1.4 Open parking structures of Type II (000) shall be permitted to be of unlimited area where height does not exceed 75ft, and the horizontal distance from any point on any parking level to an exterior wall opening on a street, an alley, a courtyard, or other similar open space does not exceed 200 ft.

AUTOMATIC SPRINKLER SYSTEM: NOT SPRINKLERED

NFPA 88A: 6.4.4 Automatic sprinkler systems shall not be required in open parking structures.

FIRE ALARM SYSTEM:

NFPA 88A: 6.6.3 Fire alarm systems shall not be required in open parking structures.

TRAVEL DISTANCE:

NFPA 101 TABLE 42.2.6 - MAXIMUM TRAVEL DISTANCE TO AN EXIT = 200 FT

NATURAL VENTILATION REQUIREMENTS FOR OPEN PARKING STRUCTURES PER NFPA 88A SECTION 5.5:

NFPA 88A 5.5.1 THE EXTERIOR SIDES OF THE STRUCTURE SHALL HAVE UNIFORMLY DISTRIBUTED OPENINGS ON TWO OR MORE SIDES.

NFPA 88A 5.5.2 THE AREA OF SUCH OPENINGS IN EXTERIOR WALLS ON A LEVEL SHALL NOT BE LESS THAN 20 % OF THE TOTAL PERIMETER WALL AREA OF EACH

LEVEL.

NFPA 88A 5.5.3 THE AGGREGATE LENGTH OF THE OPENINGS CONSIDERED TO BE PROVIDING NATURAL VENTILATION SHALL NOT BE LESS THAN 40 PERCENT OF THE

PERIMETER OF THE LEVEL.

NFPA 88A 5.5.4 WHERE THE REQUIRED OPENINGS ARE UNIFORMLY DISTRIBUTED OVER TWO OPPOSING SIDES OF THE BUILDING. 5.5.3 SHALL NOT APPLY.

NATURAL VENTILATION CALCULATIONS:

TOTAL AREA OF BASEMENT PERIMETER WALL:

11,660 SF

TOTAL AREA OF VENTILATION OPENINGS IN BASEMENT WALL:

1,895 SF ON SOUTH SIDE

1,770 SF ON NORTH SIDE

3,665 SF TOTAL = 31%

DESIGN MEETS REQUIREMENT OF 5.5.2

TOTAL LENGTH OF PERIMETER WALL: 972'

TOTAL AGGREGATE LENGTH OF VENTILATION OPENINGS:

NORTH WALL: 192'

SOUTH WALL: 210'

TOTAL LENGTH OF OPENINGS: 402' = 41.4%

DESIGN MEETS REQUIREMENT OF 5.5.3

FIRE RESISTANCE RATING OF ELEMENTS:

CONSTRUCTION TYPE II (0,0,0)

STRUCTURAL COLUMNS/BEAMS: 0

BEARING WALLS: 0

NON-BEARING WALLS: 0

FLOOR ASSEMBLY: 0

ROOF ASSEMBLY: 0

FIRE RESISTANCE RATED SEPARATIONS:

STAIRS: NO RATED ENCLOSURE IS REQUIRED

NFPA 88A: 4.1.5 Open stairs shall be permitted in open parking structures.

ELEVATOR: NO RATED ENCLOSURE IS REQUIRED

NFPA 88A: 5.4.8 Unprotected vertical openings through floors in open parking structures shall be permitted.

MEANS OF EGRESS:

NFPA 88A: 4.1.2 Means of Egress to comply with NFPA 101 NFPA 88A: 4.1.4 For parking structures extending only one floor level below the level of exit discharge, a vehicle ramp leading directly to the outside shall be permitted to serve in lieu of the second means of egress, provided that no door or shutter is installed.

NFPA 101: 42.8.2.4.1: Not less than two means of egress shall be provided from every floor or section of every parking structure.

GROUND FLOOR

114 STANDARD SPACES

15 ACCESSIBLE SPACES

TOTAL SPACES MAIN LEVEL = 129

BASEMENT

111 STANDARD SPACES

14 ACCESSIBLE SPACES

TOTAL SPACES LOWER LEVEL = 125

TOTAL SPACES = 254

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Ken Noel (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

VA FORM 08-6231

CONSULTANTS:

SHEET NOTES:

ACG Project Number

© COPYRIGHT Apogee- CEMS JV, LLC

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: NURSE EXECUTIVE DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS COORDINATOR

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BYBUILDING No

LOCATION

DATE:

DATE: DRAWING NO.

DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

DATE

DATE:

PROJECT:

/2

/2

:0

:1

A M

G-100

GENERAL INFORMATION

2 4

RC MK

CONSTRUCT PARKING

STRUCTURE FOR PATIENT

ACCESS

ST. CLOUD VA HEALTHCARE SYSTEM

ST. CLOUD, MINNESOTA

05/27/2020

BID DOCUMENTS

656-344

18-063

N/A

GENERAL SYMBOL LEGEND

SEE SHEET LS101 FOR LIFE SAFETY PLANS. A.

PARKING COUNT SUMMARY

24514

LICENSED

ARCHITECT

DocuSign Envelope ID: 144E4883-9CEF-48A0-9193-D293A51D342C

DN

UP

EGRESS PATH

FIRE EXTINGUISHER ON BRACKET

FIRE EXTINGUISHER CABINET

CONTROLLED ACCESS - ALWAYS

UNLOCKED IN DIRECTION OF EGRESS

CA

FE

FEC

STAIR # 1

19'-0" 2'-0" 25'-4" 25'-4" 25'-4" 23'-4" 23'-4" 23'-4" 3'-0" 20'-4" 23'-4" 23'-4" 23'-4" 23'-4" 23'-4" 19'-5" 8'-7" 18'-0" 10"

1 2 3 3.9 4 5 6 7 8 9 9.1 10 11 12 13 14 15 16 16.3

AA

A.8

B.5B.5

CC

C.7C.7

D.5D.5

EE

FF

0.5A

190 FT

160 FT

160 FT

200 FT

ELEV/LOBBY

PG-G01

FEC

FEC

FEC

FEC

FEC

DN

STAIR #2

PG-G03

354'-6"

"2

OPENING IN WALL

FOR PEDESTRIAN

EXIT PATH TO

PUBLIC WAY

EXIT DOOR AT

INTERMEDIATE

LANDING

STAIR #2

IT/SEC

PG-B09

PG-B05

HSKPG/

STORAGE

ELEC

PG-B10

PG-B02

STORAGE

UP

ELEV/

LOBBY

PG-B01

PG-B07

PUMP ROOM

10" 19'-0" 2'-0" 25'-4" 3'-8" 21'-8" 25'-4" 23'-4" 23'-4" 23'-4" 3'-0" 20'-4" 23'-4" 23'-4" 23'-4" 23'-4" 23'-4" 19'-5" 8'-7" 18'-0" 10"

PG-B04

ELEV/ EQUIP

PG-B03

FUTURE

TUNNEL

1 2 3 3.9 4 6 7 8 9 9.1

10 11 12 13 14 15 16 16.3

AA

A.8A.8

A.7

B.5B.5

CC

C.7C.7

D.5D.5

EE

FF

0.5A0.5A

160 FT

190 FT

180 FT

170 FT

FUTURE

TUNNEL

CONNECTION

STAIR # 1

FE

FEC

FEC FEC

FEC

FEC

UP

CA

10" 6"

44'-0" 3'-2"

EXIT DOOR AT

INTERMEDIATE

LANDING

355'-4"

310'-8"

AREA WELL

GROUND FLOOR

114 STANDARD SPACES

15 ACCESSIBLE SPACES

TOTAL SPACES MAIN LEVEL = 129

BASEMENT

111 STANDARD SPACES

14 ACCESSIBLE SPACES

TOTAL SPACES LOWER LEVEL = 125

TOTAL SPACES = 254

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Ken Noel (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

VA FORM 08-6231

CONSULTANTS:

SHEET NOTES:

ACG Project Number

© COPYRIGHT Apogee- CEMS JV, LLC

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: NURSE EXECUTIVE DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS COORDINATOR

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BYBUILDING No

LOCATION

DATE:

DATE: DRAWING NO.

DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

DATE

DATE:

PROJECT:

/2

/2

:1

:3

A M

LS101

LIFE SAFETY PLANS

3 4

RC MK

CONSTRUCT PARKING

STRUCTURE FOR PATIENT

ACCESS

ST. CLOUD VA HEALTHCARE SYSTEM

ST. CLOUD, MINNESOTA

05/27/2020

BID DOCUMENTS

656-344

18-063

N/A

0 2010 40

NORTH

PLAN

LIFE SAFETY LEGEND

Scale: 1" = 20'-0"

GROUND FLOOR- LIFE SAFETY PLAN

Scale: 1" = 20'-0"

BASEMENT FLOOR- LIFE SAFETY PLAN 0 2010 40

NORTH

PLAN

SEE SHEET G-100 FOR LIST OF GOVERNING

CODES AND BUILDING CODE SUMMARY.

PROJECT:

PARKING COUNT SUMMARY

A.

DN

24514

LICENSED

ARCHITECT

1233.94567899.11011121314151616.3

119 SF119 SF119 SF119 SF118 SF 102 SF 119 SF 119 SF

OPENINGS FOR NATURAL VENTILATION

1052.00

21'-8"

21'-6" 21'-8" 21'-8" 21'-8" 18'-8" 21'-8"

119 SF

21'-8" 21'-8"

50 SF50 SF50 SF42 SF50 SF50 SF50 SF50 SF50 SF

1 2 3 3.9 4 5 6 7 8 9 9.1 10 11 12 13 14 15 16 16.3

190 SF190 SF190 SF210 SF 165 SF 190 SF 190 SF 190 SF

380 SF

OPEN AREA FOR NATURAL VENTILATION, TYP

1052.00

23'-8" 21'-8" 21'-8" 21'-8" 18'-8" 21'-8" 21'-8" 21'-8"

STAIR # 1

PG-G02

ELEV/LOBBY

PG-G01

AREA WELL BAR GRATE COVER: 8' X 208' = 1,664 SF

BAR GRATE TYPE 2: 83% OPEN AREA = 1,380 SF OPEN AREA

A-101

IT/SEC

PG-B09

ELEC

PG-B10

PG-B02

STORAGE

UP

PG-B01

ELEV/

LOBBY

ELEV/

EQUIP

PG-B04

B09 B10

FUTURE

TUNNEL

PG-B03

FD FDFDFDFD

21'-8" 21'-8" 21'-8" 18'-8" 21'-8" 21'-8" 21'-8" 21'-8" 21'-6"

CUMULATIVE OPENINGS IN NORTH WALL:

193'-2" (TOTAL LENGTH OF OPENINGS) X 5'-6" = 1062 SF

193'-2" X 2'-10" (HEIGHT OF VERTICAL BAR GRATE) = 547 SF X .85 = 465 SF.

1'-4"

1151 Kildaire Farm Rd.

Suite 120 Raleigh, NC 27511 www.acg-pa.com (919)858-7420

320-C Midland Pkwy Summerville, SC 29485 www.cemsengineering.com (843)875-3637Project Mgr: Ken Noel (APOGEE)

Joint Venture An Alliance for Success

Revisions: Date

VA FORM 08-6231

CONSULTANTS:

SHEET NOTES:

ACG Project Number

© COPYRIGHT Apogee- CEMS JV, LLC

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: NURSE EXECUTIVE DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS COORDINATOR

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BYBUILDING No

LOCATION

DATE:

DATE: DRAWING NO.

DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

DATE

DATE:

PROJECT:

/2

/2

:4

:2

A M

LS102

LIFE SAFETY ELEVATIONS

4 4

RC MK

CONSTRUCT PARKING

STRUCTURE FOR PATIENT

ACCESS

ST. CLOUD VA HEALTHCARE SYSTEM

ST. CLOUD, MINNESOTA

05/27/2020

BID DOCUMENTS

656-344

18-063

N/A

Scale: 1/16" = 1'-0"

OPEN PARKING STRUCTURE CALCULATIONS - NORTH ELEVATION

Scale: 1/16" = 1'-0"

OPEN PARKING STRUCTURE CALCULATIONS - SOUTH ELEVATION

NATURAL VENTILATION REQUIREMENTS FOR OPEN

PARKING STRUCTURES PER NFPA 88A SECTION 5.5:

5.5.1 THE EXTERIOR SIDES OF THE STRUCTURE SHALL

HAVE UNIFORMLY DISTRIBUTED OPENINGS ON TWO

OR MORE SIDES.

5.5.2 THE AREA OF SUCH OPENINGS IN EXTERIOR

WALLS ON A LEVEL SHALL NOT BE LESS THAN 20 % OF

THE TOTAL PERIMETER WALL AREA OF EACH LEVEL.

5.5.3 THE AGGREGATE LENGTH OF THE OPENINGS

CONSIDERED TO BE PROVIDING NATURAL

VENTILATION SHALL NOT BE LESS THAN 40 PERCENT

OF THE PERIMETER OF THE LEVEL.

5.5.4 WHERE THE REQUIRED OPENINGS ARE

UNIFORMLY DISTRIBUTED OVER TWO OPPOSING

SIDES OF THE BUILDING. 5.5.3 SHALL NOT APPLY.

NATURAL VENTILATION CALCULATIONS:

TOTAL AREA OF BASEMENT PERIMETER WALL:

11,660 SF

TOTAL AREA OF VENTILATION OPENINGS IN

BASEMENT WALL:

1,895 SF ON SOUTH SIDE

1,770 SF ON NORTH SIDE

3,665 SF TOTAL = 31%

DESIGN MEETS REQUIREMENT OF 5.5.2

TOTAL LENGTH OF PERIMETER WALL:

972'

TOTAL AGGREGATE LENGTH OF VENTILATION

OPENINGS:

NORTH WALL: 192'

SOUTH WALL: 210'

TOTAL LENGTH OF OPENINGS: 402' = 41.4%

DESIGN MEETS REQUIREMENT OF 5.5.3

Scale: 1/16" = 1'-0"

GROUND FLOOR - AREA WELL

Scale: 1/16" = 1'-0"

BASEMENT PLAN - AREA WELL

24514

LICENSED

ARCHITECT

Revisions: Date

CONSULTANTS:

DJK NRS

05/27/2020

BID DOCUMENTS

FULLY SPRINKLERED

656-344

18-063

ACG Project Number

N/A

# © COPYRIGHT Apogee- CEMS JV, LLC

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS COORDINATOR

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BY

BUILDING No

LOCATION

DATE:

DATE:

DRAWING NO.

DRAWN

PROJECT TITLE

PLOT SCALE

PROJECT NO.

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

DATE

DATE:

PROJECT:

1151 Kildaire Farm

Rd.

Suite 120

Raleigh, NC 27511 www.acg-pa.com

(919)858-7420

320-C Midland Pkwy

Summerville, SC 29485 www.cemsengineering.com

(843)875-3637

Project Mgr: Ken Noel (APOGEE)

Joint Venture An Alliance for Success

9025 River Road, Suite 200 | Indianapolis, Indiana 46240

TEL 317.547.5580 | FAX 317.543.0270

www.structurepoint.com

CONSTRUCT PARKING

STRUCTURE FOR PATIENT

ACCESS

ST. CLOUD VA HEALTH CARESYSTEM

ST. CLOUD, MINNESOTA

DWG. OF 18

EXISTING LEGEND

BOLLARD

LIGHT

GAS

WATER

SANITARY SEWER

FIBER OPTIC

ELECTRIC

ELECTRIC METER

GAS METER

SIGN

CONCRETE CURBING

CURB INLET

HANDICAP PARKING

STORM SEWER

DECIDUOUS TREE

BUSH LINE

SANITARY MH

F.E.S.

HAND HOLE

WATER MH

SIGN

MAJOR CONTOUR INTERVAL

MINOR CONTOUR INTERVAL

ELECTRIC HANDHOLE

CONTROL POINT

WATER VALVE

SOIL BORING

CONIFEROUS TREE

FENCE

Initial site control established by MnDOT GNSS CORS Network on

11/08/2018.

Benchmarks:

NGS Cast Iron Monument - APOLLO

Located at the Southwest quadrant of 12th St. North and Highway 15.

BM Elevation.=1038.46.

Datums:

Horizontal: Stearns County Coordinate System, NAD83 (2011 Adj), Lambert Conformal Conic, Minnesota. 5th Principal

Meridian, Ground distances, U.S. Survey Foot.

Vertical: NAVD88

Geoid: Geoid12a

BENCHMARK

GENERAL NOTES:

1. CONTRACTOR SHALL PROTECT AND NOT DESTROY

THE PROPERTY CORNER MONUMENTS DURING

CONSTRUCTION.

2. CONTRACTOR TO VERIFY LOCATION, SIZE AND

DEPTH OF EXISTING UTILITIES PRIOR TO

COMMENCING ANY CONSTRUCTION. CONTACT

ENGINEER IF VARIATION EXISTS.

CAUTION !!

THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES

SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND

EVIDENCE ( including, but not limited to, manholes, inlets, valves, and marks made upon the ground by others ) AND ARE SPECULATIVE IN

NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND

UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE

OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED.

THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND

UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO

ANY AND ALL CONSTRUCTION.

GENERAL NOTES

DEMOLITION NOTES

SITE NOTES

GRADING NOTES

UTILITY NOTES

EXISTING TOPOGRAPHY NOTES

GENERAL NOTES

GI002

AutoCAD SHX Text No.

AutoCAD SHX Text

STATE OF

AutoCAD SHX Text 11200301

AutoCAD SHX Text

EM

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text H

AutoCAD SHX Text W

AutoCAD SHX Text

WV

AutoCAD SHX Text

1. ALL WORK TO CONFORM TO FEDERAL, STATE, LOCAL AND ST. CLOUD VA HEALTHCARE SYSTEM REGULATIONS. ALL WORK TO CONFORM TO FEDERAL, STATE, LOCAL AND ST. CLOUD VA HEALTHCARE SYSTEM REGULATIONS. 2. CONTRACTOR SHALL KEEP ADJOINING PROPERTIES CLEAN OF CONSTRUCTION DEBRIS AND CONSTRUCTION CONTRACTOR SHALL KEEP ADJOINING PROPERTIES CLEAN OF CONSTRUCTION DEBRIS AND CONSTRUCTION TRAFFIC AT ALL TIMES. 3. THE CONTRACTOR SHALL PROTECT AND NOT DESTROY THE BASE SURVEY CONTROL POINTS DURING DEMOLITION THE CONTRACTOR SHALL PROTECT AND NOT DESTROY THE BASE SURVEY CONTROL POINTS DURING DEMOLITION AND CONSTRUCTION. 4. ALL UTILITY INFORMATION SHALL BE VERIFIED BY THE CONTRACTOR. CONTACT ENGINEER IMMEDIATELY IF ANY ALL UTILITY INFORMATION SHALL BE VERIFIED BY THE CONTRACTOR. CONTACT ENGINEER IMMEDIATELY IF ANY VARIATION EXISTS. 5. MAINTAIN EXISTING UTILITIES TO REMAIN IN SERVICE AND PROTECT AGAINST DAMAGE DURING DEMOLITION AND MAINTAIN EXISTING UTILITIES TO REMAIN IN SERVICE AND PROTECT AGAINST DAMAGE DURING DEMOLITION AND CONSTRUCTION OPERATIONS. 6. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION. THE THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY.

AutoCAD SHX Text

1. CLEAR AND GRUB ALL TREES AND VEGETATION NECESSARY FOR CONSTRUCTION. CLEAR AND GRUB ALL TREES AND VEGETATION NECESSARY FOR CONSTRUCTION. 2. PROTECT TREES TO REMAIN DURING CONSTRUCTION. PROTECT TREES TO REMAIN DURING CONSTRUCTION. 3. PLANT MATERIALS TO REMAIN, TO BE PROTECTED BY TREE FENCE WHICH ENCOMPASSES IT'S DRIP LINE. NO PLANT MATERIALS TO REMAIN, TO BE PROTECTED BY TREE FENCE WHICH ENCOMPASSES IT'S DRIP LINE. NO CONSTRUCTION EQUIPMENT, MATERIALS OR DEBRIS SHALL BE LOCATED WITHIN TREE PROTECTION BOUNDARIES. NO DEMOLITION CAN OCCUR UNTIL TREE PROTECTION IS APPROVED BY THE OWNER. 4. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL EXISTING STRUCTURES, FENCES, CONCRETE, ASPHALT THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL EXISTING STRUCTURES, FENCES, CONCRETE, ASPHALT PAVEMENT AND OTHER MISCELLANEOUS APPURTENANCES OFF SITE, UNLESS NOTED TO REMAIN ON THE CONTRACT DRAWINGS. 5. DEMOLISH FOUNDATIONS AND OTHER BELOW-GRADE CONSTRUCTION, INCLUDING CONCRETE SLABS, TO A DEPTH DEMOLISH FOUNDATIONS AND OTHER BELOW-GRADE CONSTRUCTION, INCLUDING CONCRETE SLABS, TO A DEPTH OF NOT LESS THAN 48 INCHES BELOW LOWEST FOUNDATION LEVEL. 6. COMPLETELY FILL BELOW-GRADE AREAS AND VOIDS RESULTING FROM DEMOLITION OF STRUCTURES, WITH COMPLETELY FILL BELOW-GRADE AREAS AND VOIDS RESULTING FROM DEMOLITION OF STRUCTURES, WITH COMPACTED GRANULAR BACKFILL. 7. THE USE OF ANY TYPE OF EXPLOSIVES WILL NOT BE PERMITTED. THE USE OF ANY TYPE OF EXPLOSIVES WILL NOT BE PERMITTED. 8. CONDUCT DEMOLITION AND CONSTRUCTION OPERATIONS TO ENSURE MINIMAL INTERFERENCE WITH STREETS, WALKS CONDUCT DEMOLITION AND CONSTRUCTION OPERATIONS TO ENSURE MINIMAL INTERFERENCE WITH STREETS, WALKS AND OTHER ADJACENT OCCUPIED FACILITIES. 9. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS OR OTHER OCCUPIED FACILITIES WITHOUT PERMISSION FROM THE DO NOT CLOSE OR OBSTRUCT STREETS, WALKS OR OTHER OCCUPIED FACILITIES WITHOUT PERMISSION FROM THE LOCAL AUTHORITIES HAVING JURISDICTION. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS, IF REQUIRED BY GOVERNING AUTHORITIES. 10. ENSURE SAFE PASSAGE OF PERSONS AROUND AREAS OF DEMOLITION AND CONSTRUCTION. CONDUCT OPERATIONS ENSURE SAFE PASSAGE OF PERSONS AROUND AREAS OF DEMOLITION AND CONSTRUCTION. CONDUCT OPERATIONS TO PREVENT DAMAGE TO ADJACENT STRUCTURES AND OTHER FACILITIES AND INJURY TO PERSONS. 11. PROMPTLY REPAIR DAMAGE TO ADJACENT FACILITIES CAUSED BY DEMOLITION AND CONSTRUCTION OPERATIONS. PROMPTLY REPAIR DAMAGE TO ADJACENT FACILITIES CAUSED BY DEMOLITION AND CONSTRUCTION OPERATIONS. 12. ALL UTILITIES TO BE REMOVED SHALL BE DISCONNECTED AND CAPPED AT THE NEAREST CONNECTION POINT. ALL UTILITIES TO BE REMOVED SHALL BE DISCONNECTED AND CAPPED AT THE NEAREST CONNECTION POINT. 13. NO ON-SITE BURNING IS PERMITTED. NO ON-SITE BURNING IS PERMITTED. 14. CONTRACTOR SHALL USE MEASURES TO CONTROL DUST AT ALL TIMES. CONTRACTOR SHALL USE MEASURES TO CONTROL DUST AT ALL TIMES. 15. DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATED ON THIS PLAN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE OR RELOCATE ITEMS WHICH INTERFERE WITH NEW CONSTRUCTION. 16. ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING DEMOLITION.ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING DEMOLITION.

AutoCAD SHX Text

1. ALL PARKING STRIPES ARE TO BE 4" PAINTED (WHITE). ADA ACCESSIBLE PARKING STRIPES SHALL BE 4" ALL PARKING STRIPES ARE TO BE 4" PAINTED (WHITE). ADA ACCESSIBLE PARKING STRIPES SHALL BE 4" PAINTED (BLUE). 2. ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT OR FACE OF CURB, UNLESS NOTED OTHERWISE. ALL DIMENSIONS ARE TO THE EDGE OF PAVEMENT OR FACE OF CURB, UNLESS NOTED OTHERWISE. 3. ALL DIMENSIONS ARE TO FACE OF BRICK OR FACING MATERIAL, WHERE APPLICABLE. ALL DIMENSIONS ARE TO FACE OF BRICK OR FACING MATERIAL, WHERE APPLICABLE. 4. ALL DIMENSIONS ARE PARALLEL WITH, OR PERPENDICULAR TO BASE LINES, PROPERTY LINES OR BUILDING LINES, ALL DIMENSIONS ARE PARALLEL WITH, OR PERPENDICULAR TO BASE LINES, PROPERTY LINES OR BUILDING LINES, UNLESS OTHERWISE NOTED. 5. PROVIDE SMOOTH TRANSITIONS FROM NEW AREAS TO EXISTING FEATURES AS NECESSARY. PROVIDE SMOOTH TRANSITIONS FROM NEW AREAS TO EXISTING FEATURES AS NECESSARY. 6. RESURFACE OR RECONSTRUCT AT LEAST TO ORIGINAL CONDITIONS ALL AREAS WHERE THE EXISTING PAVEMENT RESURFACE OR RECONSTRUCT AT LEAST TO ORIGINAL CONDITIONS ALL AREAS WHERE THE EXISTING PAVEMENT OR LAWNS ARE DAMAGED DURING CONSTRUCTION FROM TRAFFIC BY CONTRACTORS, SUBCONTRACTORS OR SUPPLIERS AFTER CONSTRUCTION WORK IS COMPLETE. 7. EXISTING PAVEMENT TO BE SAW CUT IN ALL AREAS WHERE INDICATED NEW PAVEMENT TO JOIN EXISTING. EXISTING PAVEMENT TO BE SAW CUT IN ALL AREAS WHERE INDICATED NEW PAVEMENT TO JOIN EXISTING. 8. THE EDGE OF THE EXISTING ASPHALT PAVEMENT SHALL BE PROPERLY SEALED WITH A TACK COAT MATERIAL IN THE EDGE OF THE EXISTING ASPHALT PAVEMENT SHALL BE PROPERLY SEALED WITH A TACK COAT MATERIAL IN ALL AREAS WHERE NEW ASPHALT PAVEMENT IS INDICATED TO JOIN EXISTING ASPHALT. 9. CONCRETE SAW CUTTING SHALL BE DONE AS SOON AS POURED CONCRETE HAS CURED AND CAN SUPPORT CONCRETE SAW CUTTING SHALL BE DONE AS SOON AS POURED CONCRETE HAS CURED AND CAN SUPPORT WEIGHT. PROVIDE A NEAT CUT WHICH IS TRUE IN ALIGNMENT. 10. ALL JOINTS ARE TO CONTINUE THROUGH THE CURB. ALL JOINTS ARE TO CONTINUE THROUGH THE CURB. 11. RADIAL JOINTS SHALL BE NO SHORTER THAN 1.5'. RADIAL JOINTS SHALL BE NO SHORTER THAN 1.5'. 12. CONTRACTOR SHALL USE A THICKENED EXPANSION JOINT AROUND THE PERIMETER OF ANY BLOCK OUT IN THE CONTRACTOR SHALL USE A THICKENED EXPANSION JOINT AROUND THE PERIMETER OF ANY BLOCK OUT IN THE CONCRETE PAVING. 13. ALL CONSTRUCTION JOINTS SHALL BE SAWN, CLEANED OF DEBRIS, BLOWN DRY AND IMMEDIATELY SEALED WITH ALL CONSTRUCTION JOINTS SHALL BE SAWN, CLEANED OF DEBRIS, BLOWN DRY AND IMMEDIATELY SEALED WITH THE APPROPRIATE SEALANT ACCORDING TO MANUFACTURER'S DIRECTIONS. 14. ALL MATERIALS TO BE IN ACCORDANCE WITH LOCAL DEPARTMENT OF TRANSPORTATION STANDARD ALL MATERIALS TO BE IN ACCORDANCE WITH LOCAL DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS RELATIVE TO MATERIAL, MIX, PLACEMENT AND WORKMANSHIP. 15. ALL SIDEWALKS SHALL COMPLY WITH ADA STANDARDS. MAXIMUM CROSS SLOPE OF 1:50 AND MAXIMUM ALL SIDEWALKS SHALL COMPLY WITH ADA STANDARDS. MAXIMUM CROSS SLOPE OF 1:50 AND MAXIMUM LONGITUDINAL SLOPE OF 1:20. 16. CHAMFER ALL ENDS OF CURBS.CHAMFER ALL ENDS OF CURBS.

AutoCAD SHX Text

1. SITE GRADING SHALL NOT PROCEED UNTIL EROSION CONTROL MEASURES HAVE BEEN INSTALLED. SITE GRADING SHALL NOT PROCEED UNTIL EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 2. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 3. CONTRACTOR TO ADJUST ALL EXISTING SURFACE INFRASTRUCTURE (HYDRANTS, VALVES, HANDHOLES, CASTINGS, CONTRACTOR TO ADJUST ALL EXISTING SURFACE INFRASTRUCTURE (HYDRANTS, VALVES, HANDHOLES, CASTINGS, IRRIGATION SYSTEM, UTILITY PEDESTALS, ETC.) AS REQUIRED TO MEET PROPOSED GRADE AT HIS/HER OWN COST. 4. AFTER STRIPPING TOPSOIL MATERIAL, PROOFROLL SHALL BE PERFORMED BY A LOADED TANDEM PNEUMATIC TIRE AFTER STRIPPING TOPSOIL MATERIAL, PROOFROLL SHALL BE PERFORMED BY A LOADED TANDEM PNEUMATIC TIRE DUMP TRUCK MINIMUM GROSS VEHICLE WEIGHT OF 15 TONS. THE TIRES SHALL BE OPERATED AT INFLATION PRESSURES BETWEEN 70-80 PSI UNLESS OTHERWISE NOTED BY THE GEOTECHINICAL ENGINEER. THE TIRES SHALL BE INFLATED WITH AIR ONLY, NO LIQUID SHALL BE USED. THE PROOFROLL SHALL BE COMPLETED UNDER INSPECTION OF SOILS FIRM TO DETERMINE LOCATIONS OF ANY POCKETS OF UNSUITABLE MATERIAL. THE NECESSITY FOR SUBDRAINS AND/OR REMOVAL OF ANY UNSUITABLE MATERIAL WILL BE DETERMINED AT THE TIME OF CONSTRUCTION. 5. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING IN ALL AREAS. AFTER INSTALLATION, CONTRACTOR TO TEST PROVIDE POSITIVE DRAINAGE WITHOUT PONDING IN ALL AREAS. AFTER INSTALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, STANDING WATER CONDITIONS. 6. ALL PROPOSED SPOT ELEVATIONS OR CONTOURS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS. ALL PROPOSED SPOT ELEVATIONS OR CONTOURS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS. 7. SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. 8. TRENCHES FOR ALL STORM DRAIN LINES SHALL BE BACKFILLED COMPLETELY WITH SELECT GRANULAR MATERIAL TRENCHES FOR ALL STORM DRAIN LINES SHALL BE BACKFILLED COMPLETELY WITH SELECT GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT. 9. CONTRACTOR TO PERPETUATE ANY SUBSURFACE DRAIN TILES OR PIPES ENCOUNTERED DURING CONSTRUCTION CONTRACTOR TO PERPETUATE ANY SUBSURFACE DRAIN TILES OR PIPES ENCOUNTERED DURING CONSTRUCTION AND PROVIDE POSITIVE OUTLET TO DOWNSTREAM RECEIVING SYSTEM. CONTRACTOR TO NOTIFY THE ENGINEER WITH ANY CIRCUMSTANCES WHERE THIS CANNOT BE ACCOMPLISHED. 10. DUE TO SITE CONSTRAINTS, THE EARTHWORK FOR THE SITE AS DESIGNED MAY OR MAY NOT BALANCE. IT IS DUE TO SITE CONSTRAINTS, THE EARTHWORK FOR THE SITE AS DESIGNED MAY OR MAY NOT BALANCE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW THE EXISTING CONDITIONS AND INCLUDE IN THEIR BID ALL EARTHWORK COSTS INCLUDING IMPORTS AND/OR EXPORTS NECESSARY TO MAKE THE SITE BALANCE. 11. CONTRACTOR TO STABILIZE EXPOSED EARTH AS INDICATED BY THE STORMWATER POLLUTION PREVENTION PLAN CONTRACTOR TO STABILIZE EXPOSED EARTH AS INDICATED BY THE STORMWATER POLLUTION PREVENTION PLAN OR GOVERNING AUTHORITY. 12. CONTRACTOR TO SCHEDULE 3rd PARTY TESTING FOR INFILTRATION RATE OF PROPOSED INFILTRATION BASIN AND CONTRACTOR TO SCHEDULE 3rd PARTY TESTING FOR INFILTRATION RATE OF PROPOSED INFILTRATION BASIN AND PROVIDE RESULTS TO ENGINEER FOR REVIEW PRIOR TO FINAL GRADING OPERATIONS.

AutoCAD SHX Text

1. SITE UTILITIES SHALL NOT PROCEED UNTIL EROSION CONTROL MEASURES HAVE BEEN INSTALLED. SITE UTILITIES SHALL NOT PROCEED UNTIL EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 2. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 3. CONTRACTOR TO ADJUST ALL EXISTING SURFACE INFRASTRUCTURE (HYDRANTS, VALVES, HANDHOLES, CASTINGS, CONTRACTOR TO ADJUST ALL EXISTING SURFACE INFRASTRUCTURE (HYDRANTS, VALVES, HANDHOLES, CASTINGS, IRRIGATION SYSTEM, UTILITY PEDESTALS, ETC.) AS REQUIRED TO MEET PROPOSED GRADE. 4. ALL UTILITY MATERIALS AND INSTALLATION SHALL CONFORM TO LOCAL STANDARDS FOR EACH UTILITY AGENCY ALL UTILITY MATERIALS AND INSTALLATION SHALL CONFORM TO LOCAL STANDARDS FOR EACH UTILITY AGENCY HAVING JURISDICTION. 5. TRENCHES FOR ALL UTILITY LINES SHALL BE BACKFILLED COMPLETELY WITH SELECT GRANULAR MATERIAL IF TRENCHES FOR ALL UTILITY LINES SHALL BE BACKFILLED COMPLETELY WITH SELECT GRANULAR MATERIAL IF THE TOP OF THE TRENCH IS WITHIN 5 FEET OF PAVEMENT. 6. CONTRACTOR SHALL COORDINATE INSTALLATION OF UTILITIES AND CONDUITS TO AVOID CONFLICTS AND PROVIDE CONTRACTOR SHALL COORDINATE INSTALLATION OF UTILITIES AND CONDUITS TO AVOID CONFLICTS AND PROVIDE REQUIRED MINIMUM DEPTHS OF COVER. THE CONTRACTOR SHALL PROVIDE ANY ADDITIONAL BENDS WITH THRUST BLOCKS REQUIRED TO ASSURE PROPER INSTALLATION OF WATER MAINS AND LATERALS. 7. IN THE EVENT OF A CONFLICT BETWEEN WATER LINES AND STORM DRAINS, THE CONTRACTOR SHALL EITHER IN THE EVENT OF A CONFLICT BETWEEN WATER LINES AND STORM DRAINS, THE CONTRACTOR SHALL EITHER ADJUST THE WATER LINE DOWNWARD IN SUCH A MANNER SO THAT THE PIPE MANUFACTURER'S RECOMMENDATIONS ON PIPE DEFLECTION AND JOINT STRESS ARE NOT EXCEEDED OR THE CONTRACTOR SHALL PROVIDE APPROPRIATE BENDS AND CROSSINGS. 8. ALL COORDINATES AND DIMENSIONS ARE TO THE CENTERLINE OF UTILITIES AND STRUCTURES. ALL COORDINATES AND DIMENSIONS ARE TO THE CENTERLINE OF UTILITIES AND STRUCTURES. 9. ALL PROPOSED STORM SEWER AND DRAINAGE APPURTENANCES SHALL BE IN CONFORMANCE WITH THE CITY OF ALL PROPOSED STORM SEWER AND DRAINAGE APPURTENANCES SHALL BE IN CONFORMANCE WITH THE CITY OF ST. CLOUD AND ST. CLOUD VA HEALTHCARE SYSTEM STORMWATER SPECIFICATIONS, LATEST EDITION. DISCREPANCIES BETWEEN THE PLANS AND THE STORMWATER SPECIFICATIONS SHALL NOT ALLEVIATE THE CONTRACTOR FROM ADHERING TO THE REQUIREMENTS AS SET FORTH IN THE STORMWATER SPECIFICATIONS.

AutoCAD SHX Text

1. EXISTING TOPOGRAPHY IS PROVIDED BY:EVS, INC., PROJECT: 2018-262.2 DATED: 11.13.2018EXISTING TOPOGRAPHY IS PROVIDED BY:EVS, INC., PROJECT: 2018-262.2 DATED: 11.13.2018

A

S

H

P

I N

E

P

IN

E 12"

P

I

PINE 12"

S

P

R

U

C

P

I

P

I

P I N

E

W

H

E

L

M

E

B A

S S

W O

O D

" 16

B A

S S

W O

O D

L

O

C

U

T

MAPLE 12"

MAPLE 16"

M

A

P

Pt#: 1

N: 207560.5760

E: 739744.1910

Elev: 1047.520

CP

WV

E

E

L

O

C

U

E

C r a b

A p p l e

ELM 10"

M

APLE 4

LOCUST 14"

M

A

P

E

E

L

O

C

U

L

O

C

U

L

O

C

U

MAPLE 36"

M

A

P

S

P

R

U

S P

R U

C E

SPR

U

C E 4

S

P

R

U

D

E

A

D

S

P

R

U

S

P

R

U

P

I

P

I

P

I

P

I

P

I

P

I

P

I

Pt#: 3

N: 207474.8110

E: 740303.1750

Elev: 1043.347

CP

W

M

A

P

P

I

P

I

P

I

P

I

J U

N

IP

E R

M

A

P

E

MAPLE 18"

E

ELM 14"

MAPLE 22"

G

E

E

E

E

E

E

E

E

E

P

I

E

E L M

E

E

W

H

E

Pt#: 6

N: 207548.6080

E: 740157.8040

Elev: 1045.485

CP

BASKETBALL

HOOP

CB

RIM=1047.21

8" PVC INV=1045.71

CB

RIM=1047.07

10" PVC INV E.=1043.82

8" PVC INV N.=1043.87

6" PVC INV NE=1044.07

CB

RIM=1046.98

10" PVC INV W=1044.18

10" PVC INV SE=1043.13

CB

RIM=1046.27

10" PVC INC NW=1044.07

12" RCP INV S=1044.07

CULVERT 12" CMP

INV=1043.87

CULVERT 8" PVC

INV=1045.11

SMH

RIM=1043.24

12" RCP Inv=1035.74

EXISTING BUILDING

FFE=1043.56

GRILLGRILL

OPEN

GRATE

GARBAGE

PLANTERS

PLANTERS

P

LA

N T

E R

S

SMALL ROCK

MEMORIAL

H O

R S

E S

H O

E P

IT

S

GAS

GAS

G

A S

G

A S

G

A

S

G

A

S

G

A

S

G

A

S

G

AS

G A

S

GAS

G A

S

G A

S

GAS

GAS

GAS

G A

S

G A

S

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

L I L A C B U S H E S

59.9

59.9

TRUNCATED

DOMES

TRUNCATED

DOMES

CB

RIM=1046.99

6" PVC INV SE=1044.39

CB

RIM=1046.71

8" PVC INV S.=1044.11

8" PVC INV NE=1044.21

CB

RIM=1047.27

8" PVC INV SW.=1044.67

E

M

A

P

S

P

R

U

P

I

P

I

P

I

P

I

P

I

P

I

P

I

P

I

P

I

E

E L M

E

E

P

I

E

E

E

E

P

I

E

I

N

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

P

I

P

I

P

I

S

P

R

U

P

I

S

P

R

U

P

I

P

I

M

A

P

E

E

E

E

M

A

P

E

E

E

P

I

E

E

P

I

P

IN

E

PIN

E 3

0"

P

I

SAND VOLLEYBALL

COURT

I

B

U

SMH

RIM=1042.23

18" RCP Inv=1033.83

SMH

RIM=1040.65

18" RCP Inv=1033.05

S

S

S

S

S

E

E

E

E

E

E

E

E

E

APPROX LOCATION PER VA AS-BUILTS

BASKETBALL

COURT

L I L A C

B U S H E S

4"PVC

S

E

E

E x x x x x x x x x x x x x x x x x x x

GAS

G

AS

GAS

G

AS

G

AS

G

A

S

G

A

S

G R A VE L S U R F A C E

SMH

RIM=1042.86

E. W. 12" RCP=1034.76

NW. 4" PVC=1040.16

H

A

C

K

B

E

R

R

Y

M

A

P

B

U

C

K

T

H

O

R

N

H

O

N

C

K

L

E

E

W

L

N

U

T

S

P

R

U

A

M

A

P

H

A

C

K

B

E

R

S

P

R

U

S

P

R

U

S

P

R

U

T

W

I

N

L

N

U

T

L

N

U

T

J

U

N

I

P

H

A

C

K

B

E

R

Pt#: 25

N: 207314.3310

E: 740054.5630

Elev: 1043.392

CP 25

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

OHU OHU

OHU

OHU

OHU OHU

OHU

OHU

OHU

OHU

OHU

OHU

O

H

U

O

H

U

O

H

U

O

H

U

O

H

U

O

H

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

P

I

S

P

R

U

P

I

P

I

P

I

H

O

C

K

S

H

P

I

P

I

P

I

A

P

I x x x x x x x x x x x x x x x x x x x x x x x x x

Pt#: 28

N: 207375.8460

E: 740348.1480

Elev: 1043.647

CP 28

Pt#: 29

N: 207361.9330

E: 740535.1050

Elev: 1040.324

CP 29

P

I

P

I

P

I

PINE 14"TWIN

P

I

PINE 12"

MAPLE 18"

P

I

A

P

I

P

I

PINE 10"

A

P

I

P

I

PINE 12"

A

P

I

P

I

P

I

PINE 8"

M

A

P

P

I

P

I

P

I

P

I

P

I

M

A

P

P

I

PINE 10"

A

P

I

P

I

P

I

P

I

PINE 10"

Existing force main location per as-builts provided by the VA. The approximate top of forcemain is ±1034.40'.

FO

G

A

S

G

A

S

G

A

S

G

A

S

Revisions: Date

CONSULTANTS:

DJK NRS

05/27/2020

BID DOCUMENTS

FULLY SPRINKLERED

656-344

18-063

ACG Project Number

N/A

# © COPYRIGHT Apogee- CEMS JV, LLC

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS COORDINATOR

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BY

BUILDING No

LOCATION

DATE:

DATE:

DRAWING NO.

DRAWN

PROJECT TITLE

PLOT SCALE

PROJECT NO.

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

DATE

DATE:

PROJECT:

1151 Kildaire Farm

Rd.

Suite 120

Raleigh, NC 27511 www.acg-pa.com

(919)858-7420

320-C Midland Pkwy

Summerville, SC 29485 www.cemsengineering.com

(843)875-3637

Project Mgr: Ken Noel (APOGEE)

Joint Venture An Alliance for Success

9025 River Road, Suite 200 | Indianapolis, Indiana 46240

TEL 317.547.5580 | FAX 317.543.0270

www.structurepoint.com

CONSTRUCT PARKING

STRUCTURE FOR PATIENT

ACCESS

ST. CLOUD VA HEALTH CARESYSTEM

ST. CLOUD, MINNESOTA

DWG. OF 18

EXISTING LEGEND

BOLLARD

LIGHT

GAS

WATER

SANITARY SEWER

FIBER OPTIC

ELECTRIC

ELECTRIC METER

GAS METER

SIGN

CONCRETE CURBING

CURB INLET

HANDICAP PARKING

STORM SEWER

DECIDUOUS TREE

BUSH LINE

SANITARY MH

F.E.S.

HAND HOLE

WATER MH

SIGN

MAJOR CONTOUR INTERVAL

MINOR CONTOUR INTERVAL

ELECTRIC HANDHOLE

CONTROL POINT

WATER VALVE

SOIL BORING

CONIFEROUS TREE

FENCE

Initial site control established by MnDOT GNSS CORS Network on

11/08/2018.

Benchmarks:

NGS Cast Iron Monument - APOLLO

Located at the Southwest quadrant of 12th St. North and Highway 15.

BM Elevation.=1038.46.

Datums:

Horizontal: Stearns County Coordinate System, NAD83 (2011 Adj), Lambert Conformal Conic, Minnesota. 5th Principal

Meridian, Ground distances, U.S. Survey Foot.

Vertical: NAVD88

Geoid: Geoid12a

BENCHMARK

GENERAL NOTES:

1. CONTRACTOR SHALL PROTECT AND NOT DESTROY

THE PROPERTY CORNER MONUMENTS DURING

CONSTRUCTION.

2. CONTRACTOR TO VERIFY LOCATION, SIZE AND

DEPTH OF EXISTING UTILITIES PRIOR TO

COMMENCING ANY CONSTRUCTION. CONTACT

ENGINEER IF VARIATION EXISTS.

3. SEE SHEET GI001 GENERAL NOTES FOR MORE

INFORMATION.

CAUTION !!

THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES

SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND

EVIDENCE ( including, but not limited to, manholes, inlets, valves, and marks made upon the ground by others ) AND ARE SPECULATIVE IN

NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND

UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE

OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED.

THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND

UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO

ANY AND ALL CONSTRUCTION.

EXISTING TOPOGRAPHY

VF101

AutoCAD SHX Text No.

AutoCAD SHX Text

STATE OF

AutoCAD SHX Text 11200301

AutoCAD SHX Text 0'

AutoCAD SHX Text 30'

AutoCAD SHX Text 60'

AutoCAD SHX Text

SCALE: 1"=30'

AutoCAD SHX Text

EM

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text H

AutoCAD SHX Text W

WV

P

I

P

IN

E 12"

P

I

PINE 12"

S

P

R

U

P

I

P

I

P I N

E

W

H

E

E

B A

S S

W O

O D

" 16

B A

S S

W O

O D

L

O

C

U

MAPLE 12"

MAPLE 16"

M

A

P

WV

E

E

L

O

C

U

E

C r a b

A p p l e

ELM 10"

M

APLE 4

LOCUST 14"

M

A

P

E

E

L

O

C

U

L

O

C

U

L

O

C

U

MAPLE 36"

M

A

P

S

P

R

U

S P

R U

C E

SPR

U

C E 4

S

P

R

U

D

E

A

D

S

P

R

U

S

P

R

U

P

I

P

I

P

I

P

I

P

I

P

I

P

I

W

M

A

P

P

I

P

I

P

I

P

I

J U

N

IP

E R

M

A

P

E

MAPLE 18"

E

ELM 14"

MAPLE 22"

G

E

E

E

E

E

E

E

E

E

P

I

E

E L M

E

E

W

H

E

BASKETBALL

HOOP

CB

RIM=1047.21

8" PVC INV=1045.71

CB

RIM=1047.07

10" PVC INV E.=1043.82

8" PVC INV N.=1043.87

6" PVC INV NE=1044.07

CB

RIM=1046.98

10" PVC INV W=1044.18

10" PVC INV SE=1043.13

CB

RIM=1046.27

10" PVC INC NW=1044.07

12" RCP INV S=1044.07

CULVERT 12" CMP

INV=1043.87

CULVERT 8" PVC

INV=1045.11

SMH

RIM=1043.24

12" RCP Inv=1035.74

EXISTING BUILDING

FFE=1043.56

GRILLGRILL

OPEN

GRATE

GARBAGE

PLANTERS

PLANTERS

P

LA

N T

E R

S

SMALL ROCK

MEMORIAL

H O

R S

E S

H O

E P

IT

S

GAS

GAS

G

A S

G

A

S

G

A

S

G

A

S

G

A

S

G

A

S

G

AS

G A

S

GAS

G A

S

G A

S

GAS

GAS

GAS

G A

S

G A

S

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

W W

W

W

W

W

W

W

W

W

W

W

L I L A C B U S H E S

59.9

59.9

TRUNCATED

DOMES

TRUNCATED

DOMES

CB

RIM=1046.99

6" PVC INV SE=1044.39

CB

RIM=1046.71

8" PVC INV S.=1044.11

8" PVC INV NE=1044.21

CB

RIM=1047.27

8" PVC INV SW.=1044.67

E

M

A

P

S

P

R

U

P

I

P

I

P

I

P

I

P

I

P

I

P

I

P

I

P

I

E

E L M

E

E

P

I

E

E

E

E

P

I

E

I

N

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

P

I

P

I

P

I

S

P

R

U

P

I

S

P

R

U

P

I

P

I

M

A

P

E

E

E

E

M

A

P

E

E

E

P

I

E

E

P

I

P

IN

E

PIN

E 3

0"

P

I

SAND VOLLEYBALL

SMH

RIM=1042.23

18" RCP Inv=1033.83

SMH

RIM=1040.65

18" RCP Inv=1033.05

S

S

S

S

S

E

E

E

E

E

E

E

E

E

W

W

W

W

W APPROX LOCATION PER VA AS-BUILTS

BASKETBALL

COURT

L I L A C

B U S H E S

4"PVC

S

E

E

E x x x x x x x x x x x x x x x x x x x

GAS

G

AS

GAS

G

AS

G

AS

G

A

S

G

A

S

G R A VE L S U R F A C E

SMH

RIM=1042.86

E. W. 12" RCP=1034.76

NW. 4" PVC=1040.16

H

A

C

K

B

E

R

M

A

P

B

U

C

K

T

H

O

R

N

H

O

N

C

K

L

E

E

L

N

U

T

S

P

R

U

A

M

A

P

H

A

C

K

B

E

R

S

P

R

U

S

P

R

U

S

P

R

U

T

W

I

N

L

N

U

T

L

N

U

T

J

U

N

I

P

H

A

C

K

B

E

R x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

OHU OHU

OHU

OHU

OHU OHU

OHU

OHU

OHU

OHU

OHU

OHU

O

H

U

O

H

U

O

H

U

O

H

U

O

H

U

O

H

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

P

I

S

P

R

U

P

I

P

I

P

I

H

O

C

K

S

H

P

I

P

I

P

I

A

P

I x x x x x x x x x x x x x x x x x x x x x x x x x

P

I

P

I

P

I

PINE 14"TWIN

P

I

PINE 12"

MAPLE 18"

P

I

A

P

I

P

I

PINE 10"

A

P

I

P

I

PINE 12"

A

P

I

P

I

P

I

PINE 8"

M

A

P

P

I

P

I

P

I

P

I

P

I

M

A

P

P

I

PINE 10"

A

P

I

P

I

P

I

P

I

PINE 10"

Existing force main location per as-builts provided by the VA. The approximate top of forcemain is ±1034.40'.

I I I I I I I I I I I I

I I I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I

FO

G

A

S

G

A

S

G

A

S

0' 30' 60'

SCALE: 1"=30'

EXISTING LEGEND

BOLLARD

LIGHT

GAS

WATER

SANITARY SEWER

FIBER OPTIC

ELECTRIC

ELECTRIC METER

GAS METER

SIGN

CONCRETE CURBING

CURB INLET

HANDICAP PARKING

W

STORM SEWER

DECIDUOUS TREE

BUSH LINE

SANITARY MH

F.E.S.

HAND HOLE

WATER MH

SIGN

MAJOR CONTOUR INTERVAL

MINOR CONTOUR INTERVAL

ELECTRIC HANDHOLE

CONTROL POINT

WATER VALVE

SOIL BORING

CONIFEROUS TREE

FENCE

Initial site control established by MnDOT GNSS CORS Network on

11/08/2018.

Benchmarks:

NGS Cast Iron Monument - APOLLO

Located at the Southwest quadrant of 12th St. North and Highway 15.

BM Elevation.=1038.46.

Datums:

Horizontal: Stearns County Coordinate System, NAD83 (2011 Adj), Lambert Conformal Conic, Minnesota. 5th Principal

Meridian, Ground distances, U.S. Survey Foot.

Vertical: NAVD88

Geoid: Geoid12a

BENCHMARK

Revisions: Date

CONSULTANTS:

DJK NRS

05/27/2020

BID DOCUMENTS

FULLY SPRINKLERED

656-344

18-063

ACG Project Number

N/A

# © COPYRIGHT Apogee- CEMS JV, LLC

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS COORDINATOR

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BY

BUILDING No

LOCATION

DATE:

DATE:

DRAWING NO.

DRAWN

PROJECT TITLE

PLOT SCALE

PROJECT NO.

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

DATE

DATE:

PROJECT:

1151 Kildaire Farm

Rd.

Suite 120

Raleigh, NC 27511 www.acg-pa.com

(919)858-7420

320-C Midland Pkwy

Summerville, SC 29485 www.cemsengineering.com

(843)875-3637

Project Mgr: Ken Noel (APOGEE)

Joint Venture An Alliance for Success

9025 River Road, Suite 200 | Indianapolis, Indiana 46240

TEL 317.547.5580 | FAX 317.543.0270

www.structurepoint.com

CONSTRUCT PARKING

STRUCTURE FOR PATIENT

ACCESS

ST. CLOUD VA HEALTH CARESYSTEM

ST. CLOUD, MINNESOTA

DWG. OF 18

CAUTION !!

THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES

SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND

EVIDENCE ( including, but not limited to, manholes, inlets, valves, and marks made upon the ground by others ) AND ARE SPECULATIVE IN

NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND

UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE

OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED.

THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND

UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO

ANY AND ALL CONSTRUCTION.

GENERAL NOTES:

1. CONTRACTOR SHALL PROTECT AND NOT DESTROY

THE PROPERTY CORNER MONUMENTS DURING

CONSTRUCTION.

2. CONTRACTOR TO VERIFY LOCATION, SIZE AND

DEPTH OF EXISTING UTILITIES PRIOR TO

COMMENCING ANY CONSTRUCTION. CONTACT

ENGINEER IF VARIATION EXISTS.

3. SEE SHEET GI001 GENERAL NOTES FOR MORE

INFORMATION.

DEMOLITION KEYNOTES

1. EXISTING ASPHALT PAVEMENT AND BASE MATERIAL

TO BE REMOVED (SAWCUT FOR CLEAN EDGE).

2. EXISTING CONCRETE CURB TO BE REMOVED.

3. EXISTING BUILDING AND ALL ASSOCIATED FOOTINGS

TO BE REMOVED.

4. REMOVE EXISTING CONCRETE BASE, CONCRETE

PADS AND OTHER MISCELLANEOUS CONCRETE

MATERIAL (SAWCUT FOR CLEAN EDGE)

5. EXISTING BUSHES, INCLUDING ROOT SYSTEM, TO BE

REMOVED.

6. EXISTING SIGN AND BASE TO BE REMOVED.

7. EXISTING MISCELLANEOUS SITE ITEMS TO BE

REMOVED (PLANTERS, GRILL, GARBAGE CAN,

BASKETBALL HOOP, ROCK MEMORIAL ETC.) AND

RETURNED TO OWNER IF NECESSARY.

8. EXISTING LIGHT POLE AND BASE TO BE REMOVED.

9. EXISTING POST TO BE REMOVED.

10. EXISTING ELECTRIC HANDHOLE TO BE REMOVED.

11. EXISTING GAS METER TO BE REMOVED.

12. EXISTING GAS LINE TO BE REMOVED. CONTRACTOR

TO HIRE LOCAL UTILITY PROVIDER.

13. EXISTING UNDERGROUND ELECTRIC LINE TO BE

REMOVED.

14. EXISTING FIBER OPTIC LINES TO BE REMOVED.

15. EXISTING WATER LINE TO BE REMOVED.

16. EXISTING SANITARY SEWER TO BE REMOVED.

17. EXISTING SANITARY SEWER MANHOLE TO BE

REMOVED.

18. EXISTING STORM SEWER TO BE REMOVED.

19. EXISTING STORM SEWER STRUCTURE TO BE

REMOVED.

20. EXISTING WATER MANHOLE TO BE REMOVED.

21. EXISTING SIGN TO BE REMOVED AND RELOCATED.

22. EXISTING TREE AND DEDICATION SIGN TO BE

RELOCATED. REFER TO LANDSCAPING PLANS FOR

RELOCATION.

23. EXISTING HORSE SHOE PITS TO BE REMOVED AND

REPLACED.

DEMOLITION LEGEND

EXISTING CONCRETE AND BASE TO

BE REMOVED

PAVEMENT TO BE SAWCUT

EXISTING ASPHALT TO BE REMOVED

I I I I I I I I I I I I I I I

EXISTING CURB TO BE REMOVED

EXISTING BUILDING TO BE REMOVED

EXISTING UTILITY TO BE REMOVED

EXISTING TREES / VEGETATION TO

BE REMOVED

EXISTING TREE TO BE REMOVED

EXISTING GRAVEL PATH TO BE

REMOVED

DEMOLITION PLAN

CD101

NOTE: CONTRACTOR TO REMOVE AND CAP ANY IRRIGATION

LINES FOUND DURING DEMOLITION AND CONSTRUCTION.

CAUTION !!

THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES

SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND

EVIDENCE ( including, but not limited to, manholes, inlets, valves, and marks made upon the ground by others ) AND ARE SPECULATIVE IN

NATURE. THERE MAY ALSO BE OTHER EXISTING UNDERGROUND

UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE

OR FOR WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED.

THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND

UTILITIES SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO

ANY AND ALL CONSTRUCTION.

AutoCAD SHX Text

EM

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text H

AutoCAD SHX Text W

AutoCAD SHX Text

WV

AutoCAD SHX Text No.

AutoCAD SHX Text

STATE OF

11200301

43.21'

P I N

E

P

IN

E

P

I

PINE 12"

P

I

W

H

E

B A

S S

W O

O D

" 16

B A

S S

W O

O D

L

O

C

U

MAPLE 12"

MAPLE 16"

M

A

P

WV

E

L

O

C

U

E

M

A

P

MAPLE 18"

MAPLE 22"

H

E

E L M

E

E

P

I

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

P

I

P

I

M

A

P

E

E

E

E

M

A

P

E

P

I

E

E

P

I

P

IN

E

PIN

E 30"

P

I

S

S

S

S x x x x x x x x x x x x x x x x x x x

H

A

C

K

B

E

R

M

A

P

B

U

C

K

T

H

O

R

N

H

O

N

C

K

L

E

E

L

N

U

T

S

P

R

U

A

M

A

P

H

A

C

K

B

E

R

S

P

R

U

S

P

R

U

S

P

R

U

T

W

I

N

L

N

U

T

L

N

U

T

J

U

N

I

P

H

A

C

K

B

E

R x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

OHU

OHU

OHU

OHU OHU

OHU

OHU

OHU

OHU

OHU

OHU OHU

O

H

U

O

H

U

O

H

U

O

H

U

O

H

U

O

H

U

S

P

R

U

S

P

R

U

S

P

R

U

S

P

R

U

P

I

S

P

R

U x x x x x x x x x x x x x x x x x x x x x x x x x

P

I

P

I

P

I

PINE 14"TWIN

P

I

PINE 12"

MAPLE 18"

P

I

A

P

I

P

I

PINE 10"

A

P

I

P

I

PINE 12"

A

P

I

P

I

P

I

PINE 8"

M

A

P

P

I

P

I

P

I

P

I

P

I

M

A

P

P

I

PINE 10"

A

P

I

P

I

P

I

P

I

PINE 10"

Existing force main location per as-builts provided by the VA. The approximate top of forcemain is ±1034.40'.

PROPOSED PARKING GARAGE

(TWO LEVELS)

FFE MAIN: 1052.33

FFE LOWER: 1039.00

PROPOSED DETENTION /

INFILTRATION BASIN

TOP OF BANK: 1043.50

EMERGENCY OVERFLOW: 1042.97

100-YR ELEV: 1042.97

BOTTOM OF POND: 1039.40

6'

'R

R

M

E

R

355.17'

20'

13.34'

R

24'

R

24'

R

186.67'

25.67'

FUTURE PARKING

GARAGE EXPANSION

R

R

'R

210.17'

R

R

20'

20'

8'

6'

7'

15 10

SIDEWALK TO BE INSTALLED

PRIOR TO CONNECTION

SIDEWALK TO BE INSTALLED

PRIOR TO CONNECTION

NOTE: CONTRACTOR TO RESTORE

ALL OFFSITE AREAS TO ORIGINAL

CONDITION FOR OFFSITE UTILITY

CONNECTIONS

FO

G

A

S

G

A

S

G

A

S

R

Revisions: Date

CONSULTANTS:

DJK NRS

05/27/2020

BID DOCUMENTS

FULLY SPRINKLERED

656-344

18-063

ACG Project Number

N/A

# © COPYRIGHT Apogee- CEMS JV, LLC

DRAWING TITLE

APPROVED: CHIEF OF STAFF

APPROVED: HEALTH CARE SYSTEM DIRECTOR

APPROVED: CHIEF OF POLICE

APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:

APPROVED: GEMS COORDINATOR

APPROVED: PROJECTS SECTION MANAGER

APPROVED: SERVICE LINE DIRECTOR

DATE:

DATE:

DATE: APPROVED: INFECTION CONTROL NURSE

APPROVED: PATIENT SAFETY

DATE:

DATE:

DATE:

CHECKED BY

BUILDING No

LOCATION

DATE:

DATE:

DRAWING NO.

DRAWN

PROJECT TITLE

PLOT SCALE

PROJECT NO.

APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR

DATE

DATE:

PROJECT:

1151 Kildaire Farm

Rd.

Suite 120

Raleigh, NC 27511 www.acg-pa.com

(919)858-7420

320-C Midland Pkwy

Summerville, SC 29485 www.cemsengineering.com

(843)875-3637

Project Mgr: Ken Noel (APOGEE)

Joint Venture An Alliance for Success

9025 River Road, Suite 200 | Indianapolis, Indiana 46240

TEL 317.547.5580 | FAX 317.543.0270

www.structurepoint.com

CONSTRUCT PARKING

STRUCTURE FOR PATIENT

ACCESS

ST. CLOUD VA HEALTH CARESYSTEM

ST. CLOUD, MINNESOTA

DWG. OF 18

EXISTING LEGEND

BOLLARD

LIGHT

GAS

WATER

SANITARY SEWER

FIBER OPTIC

ELECTRIC

ELECTRIC METER

GAS METER

SIGN

CONCRETE CURBING

CURB INLET

HANDICAP PARKING

STORM SEWER

DECIDUOUS TREE

BUSH LINE

SANITARY MH

F.E.S.

This is the start of the file's text. The full file is on GovTribe.