Attachment 2 - Bill of Quantities.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Renovation of Grazioli Apartments
- Solicitation number
- 191T7025R0003
- Issued by
-
Department of State
About this file
The file is a Bill of Quantities (BoQ) for the renovation of Grazioli TDY apartments (A15-A17 and B2-B4) for the Department of State in Rome. The renovation scope includes comprehensive upgrades across six apartments, encompassing mobilization, safety procedures, demolition, construction, electrical systems, plumbing systems, and new furniture installations. Specific work details include replacing circuit breakers, distribution panels, power plugs, light switches, electrical cables, and plumbing systems in both Buildings A and B, with PVC pipes of specified diameters.
The renovation involves extensive interior upgrades for each apartment, focusing on bathrooms, kitchens, and common areas. Each apartment will receive new floor and wall tiles, furniture, vanity cabinets, lighting fixtures, false ceilings, refinishing, painting, and radiators. The project includes detailed work on kitchen fixtures, cabinets, hoods, drawers, tables, and doors. Safety costs are budgeted at EUR 18,000.00, in compliance with safety regulations. The solicitation (Number 191T7025R0003) is issued by the Department of State for renovation work on six government apartments in Rome.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Conference Meeting Minutes.pdf | ||
| Questions and Answers.docx | DOCX document | |
| 191T7025R0003.docx | DOCX document | |
| Attachment 1 - Specs - SOW.docx | DOCX document | |
| SF-1442.doc | DOC document | |
| Attachment 3 - Drawings.pdf | ||
| Prospective Offerors Cover Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BoQ
| GRAZIOLI TDY APT A15-A16-A17-B2-B3-B4 | |
| 1. Mobilization and Safety procedures | |
| Preparation of the site, Submit a Safety Plan, set-up construction area and protect, load, transport and dispose all waste material the authorized dump, releasing disposal certificates | |
| 2. Demolition and Construction | |
| Demolition and removal | |
| Preparation base | |
| Construction | |
| 3. Electrical Systems for all apartments | |
| Building B: New circuit breakers and distribution panels, power plugs, light switches and electrical switches, power cables and conduits, lights fixture | |
| Building A: New circuit breakers and distribution panels, power plugs, light switches and electrical switches, power cables and conduits, lights fixture | |
| 4. Plumbing Systems | |
| Building B: New plumbing and drainage systems in grey PVC and diameter no less than 40 mm for faucets and no less than 90 mm for water closet, new water distribution manifold pre-assembled in boxes with individual shut-off valves. | |
| Building A: New plumbing and drainage systems in grey PVC and diameter no less than 40 mm for faucets and no less than 90 mm for water closet, new water distribution manifold pre-assembled in boxes with individual shut-off valves. | |
| 5. New furniture | |
| B02: Two Bathrooms (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator) | |
| B02: Kitchen (Fixture, cabinets, hood, colums, drawers, table, stools, backsplash, floor tiles and baseboard, masonry works such as false ceiling, refinishing and painting, radiator) | |
| B02: Doors and furnishing accessories | |
| B03: Two Bathrooms (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator) | |
| B03: Kitchen (Fixture, cabinets, hood, colums, drawers, table, stools, backsplash, floor tiles and baseboard, masonry works such as false ceiling, refinishing and painting, radiator) | |
| B03: Doors and furnishing accessories | |
| B04: Two Bathrooms (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator) | |
| B04: Kitchen (Fixture, cabinets, hood, colums, drawers, table, stools, backsplash, floor tiles and baseboard, masonry works such as false ceiling, refinishing and painting, radiator) | |
| B04: Doors and furnishing accessories | |
| A15: Bathroom (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator) | |
| A15: Kitchen (Fixture, cabinets, hood, colums, drawers, table, stools, backsplash, floor tiles and baseboard, masonry works such as false ceiling, refinishing and painting, radiator) | |
| A15: Doors and furnishing accessories | |
| A16: Bathroom (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator) | |
| A16: Kitchenette | |
| A16: Doors and furnishing accessories | |
| A17: Bathroom (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator) | |
| A17: Kitchen (Fixture, cabinets, hood, colums, drawers, table, stools, backsplash, floor tiles and baseboard, masonry works such as false ceiling, refinishing and painting, radiator) | |
| A17: Doors and furnishing accessories | |
| 6. Safety Costs | |
| Safety measures as per D.Lgs. 81/08 | € 18,000.00 |
TOTAL € 18,000.00