Attachment 2 - Bill of Quantities.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Renovation of Grazioli Apartments
Solicitation number
191T7025R0003
Issued by

About this file

The file is a Bill of Quantities (BoQ) for the renovation of Grazioli TDY apartments (A15-A17 and B2-B4) for the Department of State in Rome. The renovation scope includes comprehensive upgrades across six apartments, encompassing mobilization, safety procedures, demolition, construction, electrical systems, plumbing systems, and new furniture installations. Specific work details include replacing circuit breakers, distribution panels, power plugs, light switches, electrical cables, and plumbing systems in both Buildings A and B, with PVC pipes of specified diameters.

The renovation involves extensive interior upgrades for each apartment, focusing on bathrooms, kitchens, and common areas. Each apartment will receive new floor and wall tiles, furniture, vanity cabinets, lighting fixtures, false ceilings, refinishing, painting, and radiators. The project includes detailed work on kitchen fixtures, cabinets, hoods, drawers, tables, and doors. Safety costs are budgeted at EUR 18,000.00, in compliance with safety regulations. The solicitation (Number 191T7025R0003) is issued by the Department of State for renovation work on six government apartments in Rome.

View the file

Other files

File Type Posted
Conference Meeting Minutes.pdf PDF
Questions and Answers.docx DOCX document
191T7025R0003.docx DOCX document
Attachment 1 - Specs - SOW.docx DOCX document
SF-1442.doc DOC document
Attachment 3 - Drawings.pdf PDF
Prospective Offerors Cover Letter.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BoQ

GRAZIOLI TDY APT A15-A16-A17-B2-B3-B4
1. Mobilization and Safety procedures
Preparation of the site, Submit a Safety Plan, set-up construction area and protect, load, transport and dispose all waste material the authorized dump, releasing disposal certificates
2. Demolition and Construction
Demolition and removal
Preparation base
Construction
3. Electrical Systems for all apartments
Building B: New circuit breakers and distribution panels, power plugs, light switches and electrical switches, power cables and conduits, lights fixture
Building A: New circuit breakers and distribution panels, power plugs, light switches and electrical switches, power cables and conduits, lights fixture
4. Plumbing Systems
Building B: New plumbing and drainage systems in grey PVC and diameter no less than 40 mm for faucets and no less than 90 mm for water closet, new water distribution manifold pre-assembled in boxes with individual shut-off valves.
Building A: New plumbing and drainage systems in grey PVC and diameter no less than 40 mm for faucets and no less than 90 mm for water closet, new water distribution manifold pre-assembled in boxes with individual shut-off valves.
5. New furniture
B02: Two Bathrooms (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator)
B02: Kitchen (Fixture, cabinets, hood, colums, drawers, table, stools, backsplash, floor tiles and baseboard, masonry works such as false ceiling, refinishing and painting, radiator)
B02: Doors and furnishing accessories
B03: Two Bathrooms (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator)
B03: Kitchen (Fixture, cabinets, hood, colums, drawers, table, stools, backsplash, floor tiles and baseboard, masonry works such as false ceiling, refinishing and painting, radiator)
B03: Doors and furnishing accessories
B04: Two Bathrooms (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator)
B04: Kitchen (Fixture, cabinets, hood, colums, drawers, table, stools, backsplash, floor tiles and baseboard, masonry works such as false ceiling, refinishing and painting, radiator)
B04: Doors and furnishing accessories
A15: Bathroom (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator)
A15: Kitchen (Fixture, cabinets, hood, colums, drawers, table, stools, backsplash, floor tiles and baseboard, masonry works such as false ceiling, refinishing and painting, radiator)
A15: Doors and furnishing accessories
A16: Bathroom (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator)
A16: Kitchenette
A16: Doors and furnishing accessories
A17: Bathroom (floor and wall tiles, furniture, vanity cabinets, lights, masonry works such as false ceiling, refinishing and painting, radiator)
A17: Kitchen (Fixture, cabinets, hood, colums, drawers, table, stools, backsplash, floor tiles and baseboard, masonry works such as false ceiling, refinishing and painting, radiator)
A17: Doors and furnishing accessories
6. Safety Costs
Safety measures as per D.Lgs. 81/08€ 18,000.00

TOTAL € 18,000.00