Attachment 12 - CLIN Pricing Chart.xls
XLS spreadsheet 64 KB Posted
- Attached to
- 60ft Dive Support Boat
- Solicitation number
- N6426723Q5017
About this file
This document includes a pricing template and specifications for a federal solicitation seeking a 60-foot dive support boat. The solicitation was issued by the Naval Sea Systems Command and requests offers for an all-or-none contract to supply one 60-foot dive support boat, along with associated equipment and services. Offerors must submit pricing for the boat and various configuration items using the provided template, which includes spaces for unit pricing and totals. Responses are due by the date specified in the solicitation posting. The boat must be delivered to Norfolk, VA, with included crew training. Spare parts and initial engineering and production support services are also to be priced.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6426723Q5017_Amendment1.pdf | ||
| Attachment 14 - Questions and Answers.pdf | ||
| Attachment 13 - Past_Performance and Experience.doc | DOC document | |
| Attachment 10 - Delivery Schedule.xlsx | XLSX spreadsheet | |
| Attachment 2 - Specification Response Matrix.xlsx | XLSX spreadsheet | |
| Attachment 11 - Technical Data Rights Assertion.doc | DOC document | |
| Attachment 6 - Unique Item Identification.pdf | ||
| Attachment 5 - Electrical Load Analysis AC Distribution.xlsx | XLSX spreadsheet | |
| Attachment 9 - Warranty Terms.doc | DOC document | |
| Attachment 7 - DS Boat Spare Parts List.xlsx | XLSX spreadsheet | |
| N6426723Q5017_Combined Synopsis-Solicitation.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Contract
| COLOR CODING KEY | ||||
| To Be Filled in by Contractor | ||||
| Auto-fill calculation | ||||
| CLIN | Extended Description | Estimated Qty. | Unit Price per CLIN | Total Per CLIN |
| CLIN 0001 | 60 Ft Dive Support Boat | 1 | $0.00 | $0.00 |
| CLIN 0002 | Aft Deck Extreme Cold Weather Enclosure | 1 | $0.00 | $0.00 |
| Total Evaluated Contract Price | $0.00 | $0.00 |
&C&"Times New Roman,Regular"N00024-21-R-2295 Attachment 8: CLIN Pricing Chart
Breakdown Boat CLINs
| COLOR CODING KEY | |||
| To Be Filled in by Contractor | |||
| Auto-fill calculation | |||
| Extended Description | Qty. | Unit Price per CLIN | Total Per CLIN |
| CLIN 0001 | |||
| 60 Ft Dive Support Boat* | 1 | $0.00 | |
| Shipping to Norfolk, VA | 1 | $0.00 | |
| Crew Fam and Training | 1 | $0.00 | |
| Onboard Spares | 1 | $0.00 | $0.00 |
| TOTAL CLIN 0001 | $0.00 | ||
| CLIN 0002 | |||
| Cold Weather Enclosure | 1 | $0.00 | |
| TOTAL CLIN 0002 | $0.00 | ||
| *This includes a copy of the TDP and UID requirements. |
Onboard Spares 60' Dive Support Boat
SPARES PARTS LIST
| 1 year / 2000 hours worth | |||||
| OEM Part No. | Qty Per Craft | Name of OEM | Description | Unit Price | Extended Price |
| Cummins Engine Spares | |||||
| 4 | Oil filter | $ - 0 | $ - 0 | ||
| 4 | Fuel Filter | $ - 0 | $ - 0 | ||
| 1 | Air Filter | $ - 0 | $ - 0 | ||
| 2 | Fresh Water Pump Kit | $ - 0 | $ - 0 | ||
| 2 | Raw Water Pump Repair Kit (minor) | $ - 0 | $ - 0 | ||
| 2 | Belts | $ - 0 | $ - 0 | ||
| 2 | Crankcase Breather Element | $ - 0 | $ - 0 | ||
| Kohler Genset Spares | |||||
| 8 | Oil Filter | $ - 0 | $ - 0 | ||
| 4 | Fuel Filters, for one year or 2000 hours | $ - 0 | $ - 0 | ||
| 2 | Crankcase Breather | $ - 0 | $ - 0 | ||
| 2 | Raw water pump Impeller | $ - 0 | $ - 0 | ||
| 2 | Fresh water Pump Impeller | $ - 0 | $ - 0 | ||
| 2 | Set 24V Glow Plugs | $ - 0 | $ - 0 | ||
| 2 | Zinc Pencil | $ - 0 | $ - 0 | ||
| 2 | V-Belt | $ - 0 | $ - 0 | ||
| 4 | Air Filter | $ - 0 | $ - 0 | ||
| HP Bauer Dive Compressor | |||||
| 1 | Oil Filter | $ - 0 | $ - 0 | ||
| 1 | Intake Air Filter | $ - 0 | $ - 0 | ||
| 1 | Purification Cartridge | $ - 0 | $ - 0 | ||
| 1 | Dryer Cartridge | $ - 0 | $ - 0 | ||
| 2 | Belt | $ - 0 | $ - 0 | ||
| Misc Spares | |||||
| 4 | Fuel Filter Primary Racor 1000 or equal | $ - 0 | $ - 0 | ||
| 4 | Fuel Filter Primary Racor 500 or equal | $ - 0 | $ - 0 | ||
| 1 | LP Intake Air Filter | $ - 0 | $ - 0 | ||
| 1 | Hydraulic Filter High Pressure | $ - 0 | $ - 0 | ||
| 1 | Hydraulic Filter Low Pressure | $ - 0 | $ - 0 | ||
| 8 | Set, Zincs - All Hull Structure | $ - 0 | $ - 0 | ||
| 2 | Set, Zincs - Propellor Shafts | $ - 0 | $ - 0 | ||
| 2 | Set, Zincs - Rudder 6.5" dia | $ - 0 | $ - 0 | ||
| 2 | Propellers | $ - 0 | $ - 0 | ||
| 4 | Set, Propeller Shaft Bearings | $ - 0 | $ - 0 | ||
| 3 | Set, Windshield Wiper Blades | $ - 0 | $ - 0 | ||
| 1 | Manual Bilge Pump Hoses | $ - 0 | $ - 0 | ||
| 1 | Filter Wrench | $ - 0 | $ - 0 | ||
| 1 | Potable Water Pump | $ - 0 | $ - 0 | ||
| 1 | Black water Pump | $ - 0 | $ - 0 | ||
| 1 | Raw Water Deck Washdown Pump | $ - 0 | $ - 0 | ||
| 1 | Seawater Eductor Pump | $ - 0 | $ - 0 | ||
| 3 | Overhead lights | $ - 0 | $ - 0 | ||
| TOTAL | $ - 0 | ||||
| COLOR CODING KEY | |||||
| To Be Filled in by Contractor | |||||
| Auto-fill calculation | |||||
| Machinery Spaces, (Labeled for Service) Inc. | |||||
| 26 1 TMG-RSC-SP-026 Set, Propeller Shaft Bearings Inc. | |||||
| 27 1 TMG-RSC-SP-027 Set, Windshield Wiper Blades Inc. | |||||
| 28 5 TMG-RSC-SP-028 Sets, Fuses (Labeled for Service) Inc. | |||||
| 29 2 TMG-RSC-SP-029 Bilge Pump Seal Kits Inc. |
CLIN 0003 Engin Indust Serv
| COLOR CODING KEY | ||||||
| To Be Filled in by Contractor | ||||||
| Auto-fill calculation | ||||||
| Engineering | Production | |||||
| Estimated Labor Hours Per Year | 240 | 300 | ||||
| Estimated Material Per Year | $8,400 | |||||
| OFFEROR PROPOSED RATES CLIN 0003 (incld. profit) | ||||||
| Fully Loaded Engineering Rate (per hour) | Fully Loaded Production Rate | |||||
| (per hour) | **Material Handling Rate (percentage) | |||||
| Year 1 | ||||||
| Year 2 | ||||||
| *Material Handling Rate MUST be a percentage (i.e. 5%, 10%, 15%) | ||||||
| Note: The table above will be used to complete the table in Section B | ||||||
| TOTAL EVALUATED PRICE FOR CLIN 0003 | ||||||
| Ordering | ||||||
| Period | Engineering | Production | Materials | Total | ||
| Year 1 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Year 2 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total CLIN 0003 | $0.00 |
File details come from the government source that posted it. Updated .