Attachment 10 - Tipsaw Campgrounds Exhibit A Road Repairs.xls
XLS spreadsheet 47 KB Posted
- Attached to
- Tipsaw Recreation Area Roads Federal contract opportunity
- Solicitation number
- 12445521B0009
- Issued by
- Department of Agriculture Forest Service
About this file
This document contains an exhibit detailing asphalt road repair work for several campground roads within the Tipsaw Recreation Area. The exhibit provides location-specific details on repairs needed such as pavement cracking, distress, and overlays. It includes tables outlining work locations, dimensions of repairs, and total square footage of milling, paving fabric, and overlay work required. The related federal contract opportunity is seeking bids to provide all labor, materials, equipment and other items necessary to remove existing road materials and complete the repairs as specified in the exhibit and project plans for several sections of roads and campgrounds within the Tipsaw Recreation Area located in Perry County, Indiana. The soliciting agency is the Department of Agriculture Forest Service.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items
| Exhibit A - Campground Road Repairs | |||||||||||
| Asphalt Road Repairs | |||||||||||
| Tipsaw Campground Road 1122.020 | |||||||||||
| Station | Left | Right | Both | Description | Length | Width | Milling Area Sq.Ft. | Method 2 Area Sq.Ft. | Paving Fabric Area Sq.Ft. | Paving overlay Area Sq.Ft. | Remarks |
| 0.0 | x | Begin Paving | 41 | 75 | 1145 | Variable entrance | |||||
| 0+41 | x | pavement cracking | 63 | 10 | 630 | ||||||
| 1+04 | x | pavement cracking | 59 | 20 | 1,180 | ||||||
| 1+63 | x | pavement cracking | 92 | 6 | 552 | ||||||
| 2+55 | x | pavement cracking | 35 | 20 | 700 | ||||||
| 2+90 | pavement cracking | ||||||||||
| 3+32 | x | pavement distress | 42 | 5 | 210 | ||||||
| 3+74 | x | pavement cracking | 539 | 20 | 10,350 | ||||||
| 4+99 | x | pavement distress | 35 | 5 | 175 | ||||||
| 5+34 | pavement cracking | 20 | |||||||||
| 5+64 | x | pavement distress | 51 | 5 | 255 | ||||||
| 6+15 | x | pavement cracking | |||||||||
| 9+13 | x | pavement cracking | 20 | ||||||||
| 11+08 | x | pavement cracking | 53 | 20 | 1,060 | ||||||
| 11+61 | x | pavement cracking | 111 | 10 | 1,110 | ||||||
| 12+72 | x | pavement cracking | |||||||||
| 15+20 | x | pavement cracking | 32 | 5 | 160 | ||||||
| 15+52 | pavement cracking | ||||||||||
| 16+84 | x | pavement cracking | 106 | 5 | 530 | ||||||
| 17+90 | pavement cracking | ||||||||||
| 19+45 | x | pavement cracking | 177 | 20 | 3,540 | ||||||
| 20+67 | x | x | pavement distress | 55 | 5 | 275 | |||||
| 21+22 | x | pavement cracking | 67 | 20 | 1,340 | ||||||
| 21+89 | x | pavement cracking | 80 | 10 | 800 | ||||||
| 22+69 | x | pavement cracking | 19 | 20 | 380 | ||||||
| 22+88 | x | pavement cracking | 98 | 10 | 980 | ||||||
| 23+86 | x | pavement cracking | 146 | 20 | 2,140 | ||||||
| 24+00 | x | pavement distress | 78 | 10 | 780 | ||||||
| 24+78 | pavement distress | ||||||||||
| 25+32 | x | pavement cracking | 52 | 10 | 520 | ||||||
| 25+84 | x | x | pavement cracking | 86 | 10 | 860 | 860 | ||||
| 26+70 | x | pavement distress | 70 | 10 | 700 | ||||||
| 27+40 | x | pavement cracking | 79 | 20 | 1,580 | ||||||
| 28+19 | x | pavement cracking | 74 | 20 | 1,480 | ||||||
| 28+93 | x | pavement cracking | 2203 | 20 | 44,060 | ||||||
| 50+96 | x | End Paving | 20 | ||||||||
| 28+34 | x | pavement cracking | 44 | 32.27 | 1,420 | Primerose tie in | |||||
| 28+78 | pavement cracking | Side road transition | |||||||||
| Total Asphalt Milling | 76,517 | ||||||||||
| Total Digouts | 3,255 | ||||||||||
| Primerose Road (1122.021) and tapers | 1,745 | Small overlay section | |||||||||
| Main Road Campground Road | 5096 | 20 | 101,920 | Overlay section | |||||||
| Total Overlay | 103,665 | ||||||||||
| Dogwood Campground Loop 1122.028 | |||||||||||
| Station | Left | Right | Both | Description | Length | Width | Milling Area Sq.Ft. | Method 2 Area Sq.Ft. | Paving Fabric Area Sq.Ft. | Paving overlay Area Sq.Ft. | Remarks |
| 0+00 | x | Begin Paving | 103 | 20 | 2060 | ||||||
| 1+03 | x | pavement cracking | 1117 | 12 | 13,404 | ||||||
| 12+20 | End Paving | ||||||||||
| Total Digouts | |||||||||||
| Total Paving Fabric | |||||||||||
| Main Road | 15,464 | 15,464 | Overlay section | ||||||||
| Additional for taper, extra lane and parking areas | 3,200 | Taper and var. width | |||||||||
| Total Overlay | 18,664 | ||||||||||
| Pay Station 1122.025 | |||||||||||
| Station | Left | Right | Both | Description | Length | Width | Method 2B Area Sq.Ft. | Method 2 Area Sq.Ft. | Paving Fabric Area Sq.Ft. | Paving overlay Area Sq.Ft. | Remarks |
| 0+00 | Begin Paving | Variable entrance | |||||||||
| pavement cracking | |||||||||||
| 1+95 | End Paving | Variable Tie in | |||||||||
| Total Digouts | |||||||||||
| Main Road | 2,855 | overlay section | |||||||||
| Parking area | Parking area | ||||||||||
| Total Overlay | 2,855 | ||||||||||
| Golden Rod 1122.023 | |||||||||||
| Station | Left | Right | Both | Description | Length | Width | Milling Area Sq.Ft. | Method 2 Area Sq.Ft. | Paving Fabric Area Sq.Ft. | Paving overlay Area Sq.Ft. | Remarks |
| 0+00 | x | Begin Paving | 57 | Variable entrance | |||||||
| 0+45 | x | End Taper | 20 | ||||||||
| 4+17 | X | pavement cracking | 45 | 20 | |||||||
| 6+82 | End Paving | ||||||||||
| Total Asphalt Milling | 10,049 | ||||||||||
| Main Road | 682 | 12 | 8,184 | overlay section | |||||||
| 0+92 | Parking area | 25 | 29 | 725 | Parking area | ||||||
| 2+63 | Parking area | 29 | 26 | 754 | Parking area | ||||||
| Additional area | 1,865 | extra area width | |||||||||
| Total Overlay | 11,528 | ||||||||||
| Weather Station Road 1122.024 | |||||||||||
| Station | Left | Right | Both | Description | Length | Width | Method 2B Area Sq.Ft. | Method 2 Area Sq.Ft. | Paving Fabric Area Sq.Ft. | Paving overlay Area Sq.Ft. | Remarks |
| 0+00 | Begin Paving | 25 | 12 | Variable entrance | |||||||
| 0+25 | end apron | ||||||||||
| 2+97 | Begin Paving | 25 | 12 | ||||||||
| 3+22 | end apron | ||||||||||
| Total Digouts | |||||||||||
| Total Paving Fabric | |||||||||||
| Main Road | 50 | 12 | 600 | overlay section | |||||||
| Additional for taper and extra lane | 600 | Taper and var. width | |||||||||
| Total Overlay | 1,200 | ||||||||||
| Total Asphalt Milling | 102,030 | ||||||||||
| Total Method 2 Digouts | 3,255 | ||||||||||
| Pavement Fabric | 0 | ||||||||||
| Total Project Overlay | 137,912 |