Attachment_1_Udall_Kitchen_Preventative_Maintenance_PWS.pdf
PDF 3 MB Posted
- Attached to
- Udall Kitchen Preventative Maintenance Federal contract opportunity
- Solicitation number
- 140D0426Q0740
About this file
This is a Performance Work Statement (PWS) for Commercial Cafeteria and Executive Kitchen Equipment Maintenance Services at the Stewart Lee Udall Building, Department of the Interior Headquarters in Washington, DC.
The PWS requires the contractor to provide recurring preventive maintenance, equipment-related cleaning, inspection, sanitation, reporting, baseline condition documentation, limited repair-proposal support, and emergency stabilization for designated cafeteria and executive kitchen equipment across two service areas: the Bison Bistro/main cafeteria (basement) and the 5100 executive kitchen (5th floor). Covered services include scheduled maintenance, grease trap cleanout, commercial kitchen exhaust hood cleaning and inspection, ice machine cleaning/sanitization/filter management, dishwasher deliming/descaling, seal/gasket/latch inspections, post-service operational verification, deficiency reporting, and event-readiness support. The contract structure anticipates one base period of 12 months with up to four 12-month option periods, exercisable at Government discretion. The Contractor must complete a post-award baseline inventory and condition assessment within 30 days, submit a Preventive Maintenance Plan within 30 days, and provide recurring service utilizing a hybrid model: monthly targeted Bison Bistro inspections, quarterly comprehensive PM for both areas, monthly grease trap cleanout, quarterly hood cleaning/ice machine cleaning, and on-demand executive event readiness checks. Emergency response capabilities must be maintained with Priority 1 (immediate safety hazards) acknowledged within 1 hour and onsite within 4 hours, Priority 2 (urgent operational issues) within 4 hours onsite, and Priority 3/4 routine repairs proposed within 5-10 business days. The Contractor must be a firm with at least 5 years of documented commercial kitchen equipment maintenance experience, with personnel qualified per NFPA 96 standards for hood work and applicable licenses/certifications for specialized trades. Deliverables include baseline reports, PM plans, quality control plans, scheduled service notices, recurring service reports with area-specific documentation, hood cleaning/inspection reports with photographs, ice machine sanitization records, dishwasher deliming records, temperature verification records, executive event readiness summaries, emergency response reports, deficiency/repair proposals, critical spare parts lists, and waste disposal documentation, all due per specified timeframes with acceptance standards defined in Section 10.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140D0426Q0740_Amd_0001.pdf | ||
| Attachment_1_PWS_Amendment_One_0001.pdf | ||
| Attachment_2_Price_Template_Amendment_One_0001.xlsx | XLSX spreadsheet | |
| Attachment_3_QuestionAndAnswer_0001.pdf | ||
| Sol_140D0426Q0740.pdf | ||
| Attachment_2_Price_Template.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Commercial Cafeteria and Executive Kitchen Equipment Maintenance Services
Performance Work Statement (PWS)
Stewart Lee Udall Building | Department of the Interior Headquarters
1849 C Street NW, Washington, DC 20240
1. Purpose / Intent The intent of this requirement is to procure recurring preventive maintenance, equipment-related cleaning, inspection, sanitation, reporting, baseline condition documentation, limited repair-proposal support, emergency stabilization support, and executive/special-event readiness support for designated cafeteria and executive kitchen equipment at the Stewart Lee Udall Building.
The work includes, but is not limited to, scheduled maintenance of covered equipment; grease trap cleanout;
commercial kitchen exhaust hood cleaning and inspection; ice machine cleaning, sanitization, and filter management;
dishwasher deliming/descaling; inspection of seals, gaskets, latches, hinges, safety interlocks, and related components; post-service operational verification; deficiency reporting; repair proposal support; shutdown/startup support; special-event equipment readiness checks; and emergency response or stabilization when equipment failures affect safety, sanitation, food-service operations, Government property, executive support requirements, planned national/holiday events, or mission requirements.
This PWS does not transfer routine food-service operator responsibilities, general custodial cleaning, general kitchen deep cleaning, fire-suppression certification, HVAC air balancing, or building-system correction to the Contractor unless those services are separately authorized by the Contracting Officer.
2. Background The Stewart Lee Udall Building serves as the Department of the Interior Headquarters. The building was originally constructed in 1936 and concluded a multi-year, multi-phased modernization project in 2017. The building contains two food preparation/service areas covered by this PWS: the Bison Bistro/main cafeteria located in the basement and the 5100 executive kitchen located on the 5th floor.
The requirement supports safe, sanitary, code-conscious, and operationally reliable food-service equipment as building population, tenant expectations, executive support functions, and food-service operations continue to increase. The executive kitchen and/or cafeteria equipment may support high-level, VIP, Cabinet-level, short-notice, holiday, national celebration, emergency, or mission-support functions; therefore, equipment readiness, response time, and clear documentation are mission-support considerations.
3. Acquisition Objective The Government requires a contractor capable of providing planned recurring maintenance, specialty cleaning, equipment sanitation, documented inspection, limited calibration/verification support, and emergency response/stabilization services in a federal headquarters facility with minimal disruption to operations.
The objective is to maintain covered equipment in a safe, sanitary, reliable, manufacturer-consistent, and inspection-ready condition; reduce preventable equipment failure; establish a documented equipment baseline; support regulatory and inspection readiness; support executive, holiday, national celebration, and special-event readiness when needed; and provide written documentation sufficient for COR surveillance, invoice validation, repair planning, emergency decision-making, performance evaluation, and future acquisition planning.
Loading dock operating hours are 7:30 AM to 4:30 PM, Monday through Friday, excluding federal holidays and building closures.
• Parking is not provided. The Contractor is responsible for parking, staging, transportation, tools, supplies, equipment, and all logistical costs necessary to perform the work.
• The Contractor shall coordinate work that may affect tenants, food-service operations, security, loading dock access, elevators, corridors, utilities, fire/life safety systems, or building systems through the COR before performance.
7. Scope of Work The Contractor shall furnish all management, supervision, labor, materials, tools, equipment, transportation, safety equipment, cleaning supplies, consumables, replacement filters when included, reports, checklists, photographs, and deficiency documentation necessary to perform the services described in this PWS. Work shall maintain food-service equipment sanitation, protect Government property, minimize operational disruption, and comply with applicable requirements.
7.1 Covered Service Areas and Area-Specific Structure
This PWS covers two separate food-service equipment areas inside one contract requirement: (1) the Bison Bistro/main cafeteria located in the basement and (2) the 5100 executive kitchen located on the 5th floor. The two areas shall be treated as separate service areas for baseline inventory, PM planning, reporting, deficiency tracking, readiness assessment, and invoice-support documentation. Unless a requirement is specifically limited to one space, all requirements in this PWS apply to both areas.
The Government intent is to maintain one coordinated PWS while avoiding confusion between the high-volume cafeteria operation and the lower-volume, higher-visibility executive kitchen. The Contractor may coordinate service visits for both areas when practical, but documentation shall clearly distinguish which work, deficiency, photo, part, filter, response action, and recommendation applies to each location.
7.1.1 Service Area 1 - Bison Bistro / Main Cafeteria Kitchen
The Bison Bistro/main cafeteria kitchen is the primary high-use food-service area. It includes heavier production equipment, grease-generating equipment, commercial hood/exhaust components, grease trap requirements, dishwashing and warewashing equipment, steamers, fryers, ovens, warmers, disposals, ice machine equipment, and listed small appliances. The Contractor shall treat this area as the primary daily-operation risk area for sanitation, grease accumulation, equipment uptime, food-service continuity, waste handling, and routine PM performance.
• Baseline inventory, PM checklist, recurring service reports, photos, deficiencies, parts recommendations, and repair proposals shall identify the Bison Bistro/main cafeteria as the applicable service area.
• The Contractor shall identify cafeteria equipment conditions that may affect food-service operations, grease management, dishwashing/warewashing, hood/exhaust performance, sanitation, leaks, equipment safety, or tenant-facing service continuity.
• Grease trap cleanout, high-volume dishwasher/Power Soak requirements, hood cleaning/inspection, fryer/grill/steamer/kettle/skillet PM, and cafeteria ice machine service shall be reported as Bison Bistro/main cafeteria requirements unless otherwise directed.
• Recurring or worsening deficiencies in this area shall be tracked by equipment ID and location so the Government can evaluate repeat failures, service trends, and repair priorities.
7.1.2 Service Area 2 - 5100 Executive Kitchen / 5th Floor Executive Kitchen
The 5100 executive kitchen is a separate executive support area with a different operational profile. It may have lower routine usage than the main cafeteria, but it carries higher visibility and mission-support risk when used for senior leadership, VIP, Cabinet-level, holiday, national celebration, USA 250-related, Fourth of July, Thanksgiving, Christmas, emergency, or short-notice events. The Contractor shall treat this area as a readiness-sensitive service area and shall document it separately from the Bison Bistro/main cafeteria.
• Baseline inventory, PM checklist, recurring service reports, photos, deficiencies, parts recommendations, and repair proposals shall identify the 5100 executive kitchen as the applicable service area.
• The Contractor shall identify conditions that may affect executive event support, including equipment startup reliability, shutdown/idle condition, sanitation-sensitive readiness, leaks, temperature display concerns, dishwasher function, ice machine readiness, coffee equipment condition, oven/range readiness, and warming cabinet availability.
• When requested by the COR, the Contractor shall perform executive, holiday, national celebration, or special-event readiness checks for covered equipment and provide same-day written status, restrictions, and recommended next steps.
• Because some executive kitchen equipment may sit idle for extended periods, the Contractor shall include startup, shutdown, extended-idle, and return-to-service considerations in the PM Plan and applicable service reports.
7.2 Covered Equipment
Covered equipment is listed in Attachment A. The equipment inventory is provided for pricing and performance planning. The Contractor shall verify existing conditions during the required site walk-through and during the required post-award baseline inventory. The Contractor shall notify the Government of any discrepancies between the PWS inventory and actual field conditions.
7.3 Small Appliances and Report-Only Items
Small appliances, coffee equipment, toasters, warming lamps, microwaves, panini presses, and similar items are covered only when specifically listed in Attachment A or later added by written contract action. When the Contractor observes an unsafe condition, sanitation concern, abnormal operation, damaged cord, overheating, broken component, or other risk involving a non-covered item, the Contractor shall report the condition to the COR, but shall not repair, alter, or service the item unless authorized in writing.
7.4 Scope Boundary for Cleaning, Sanitation, and Deep Cleaning For purposes of this PWS, cleaning and sanitation are limited to equipment-related preventive maintenance, cleaning, sanitizing, degreasing, descaling, deliming, flushing, filter/access panel cleaning, and restoration of work areas directly affected by Contractor performance. This PWS is not intended to duplicate, replace, or assume responsibilities assigned to the Government's separate custodial, cafeteria operator, pest control, or other building service contracts.
General custodial cleaning, routine cafeteria operator cleaning, floor care, dining area cleaning, wall cleaning, counter cleaning, broad kitchen deep cleaning, pest control, and cleaning unrelated to covered equipment are excluded unless specifically authorized in writing by the Contracting Officer.
The Contractor shall leave affected work areas clean, sanitary, safe, and ready for use after performing work. This restoration requirement applies only to areas affected by the Contractor's work and does not make the Contractor responsible for the cafeteria operator's daily cleaning program, the building custodial program, or other separately contracted services.
If the Contractor identifies conditions that appear to fall under another Government contract or building service program, the Contractor shall document the condition and notify the COR. The Contractor shall not perform out-of-scope cleaning or corrective work unless authorized in writing by the Contracting Officer.
7.5 Replacement, Added, Removed, or Deactivated Equipment
The Government may add, remove, replace, deactivate, or return equipment to service during the contract period.
When equipment changes affect scope, frequency, cost, access, response risk, filter requirements, calibration requirements, or performance risk, the Government may request a written quote from the Contractor to adjust the contract. No adjustment shall be effective unless authorized in writing by the Contracting Officer.
7.6 Post-Award Equipment Inventory and Baseline Condition Assessment Within 30 calendar days after contract award, and prior to beginning recurring preventive maintenance services unless otherwise directed by the COR, the Contractor shall perform a complete onsite inventory and baseline condition assessment of all equipment covered under this PWS.
The baseline assessment shall verify, at a minimum:
• Equipment manufacturer, model number, serial number, asset tag number if present, location, equipment description, and whether the item is listed in Attachment A.
• Operational status of each item, including whether the equipment is fully operational, partially operational, inoperable, unavailable for inspection, deactivated, or not found.
• Visible condition of major components, including doors, seals, hinges, latches, controls, panels, burners, heating elements, motors, fans, drains, hoses, filters, electrical connections, temperature displays, safety interlocks where visible/testable, and other observable components applicable to the equipment type.
• Evidence of leaks, corrosion, grease accumulation, scale, unusual noise, vibration, overheating, damaged cords, missing parts, unsafe conditions, sanitation concerns, poor hood capture, odor/smoke concerns, or other deficiencies.
• Manufacturer-recommended preventive maintenance requirements, where available.
• Known or suspected repair needs, recommended priority level for corrective action, and whether an item should be shut down, monitored, repaired, or returned to service.
• Photographic documentation of each piece of covered equipment and any observed deficiency, grouped by equipment location and equipment ID.
The Contractor shall provide the COR with a written Baseline Equipment Inventory and Condition Assessment Report in Adobe PDF and editable Microsoft Excel format within 10 business days after completing the assessment.
The report shall identify discrepancies between the equipment listed in this PWS and the equipment found onsite.
The Contractor shall not remove, add, substitute, repair, alter, or exclude equipment from the covered inventory without written direction from the Contracting Officer or COR.
The baseline assessment shall establish the initial documented condition of covered equipment, support development of the Preventive Maintenance Plan, identify pre-existing deficiencies, establish critical parts and filter needs, and provide the Government with a starting point for evaluating future repairs, emergency response, and contractor performance. The Contractor shall not claim that a deficiency was pre-existing unless the deficiency was identified in the accepted Baseline Equipment Inventory and Condition Assessment Report or otherwise documented in writing by the Government.
7.7 Equipment Shutdown, Startup, and Return-to-Service Procedures The Contractor shall include equipment shutdown, startup, extended idle, and return-to-service procedures in the Preventive Maintenance Plan for covered equipment where applicable. The procedures shall be consistent with manufacturer instructions, facility requirements, safety controls, sanitation requirements, and Government direction.
• The Contractor shall not shut down, isolate, disconnect, energize, restart, or return equipment to service without required Government coordination and authorization.
• For planned shutdowns or startup activities, the Contractor shall notify the COR at least 10 business days in advance unless an emergency condition requires faster action.
• For extended idle periods, seasonal usage changes, or executive kitchen equipment that is not used regularly, the Contractor shall recommend protective steps, inspection frequency, sanitation precautions, and return-to-service checks.
• Before leaving the site after shutdown, startup, PM, repair, or emergency stabilization, the Contractor shall document operational status, restrictions, and follow-on recommendations.
7.8 Area-Specific Reporting, Surveillance, and Optional Pricing Structure The Contractor shall organize baseline data, PM schedules, service reports, photos, deficiencies, repair proposals, and readiness summaries by service area. Each report shall include a separate section or table for the Bison Bistro/main cafeteria and the 5100 executive kitchen, even when work for both areas occurs during the same visit.
The Government may structure pricing as one contract with separate Contract Line Item Numbers (CLINs), sub- CLINs, or internal price breakouts for each service area and specialty service. Final pricing structure shall be established by the Contracting Officer. Suggested breakout areas include: Bison Bistro/main cafeteria recurring PM;
5100 executive kitchen recurring PM; hood cleaning/inspection; grease trap cleanout; emergency service/stabilization; and separately authorized repairs.
Separate area tracking does not authorize duplicate billing for the same mobilization, labor, service visit, report, or task unless the contract pricing structure specifically allows it. The Contractor shall avoid charging the Government twice for coordinated work performed during the same visit.
7.9 Contract Administration Controls Added From Final Senior-Level Review The following contract-administration controls are added to strengthen pricing transparency, start-up coordination, Government direction, inspection, invoice support, and contractor accountability. These controls do not expand the Contractor authority to perform unauthorized work or change the contract without Contracting Officer action.
7.9.1 Post-Award Kickoff Meeting
Within 10 calendar days after award, the Contractor shall attend a kickoff meeting with the COR and other Government representatives as required. The meeting shall review security/access requirements, work hours, loading dock limitations, service areas, covered equipment, baseline inventory expectations, reporting format, photo naming standards, emergency contact procedures, invoice documentation, communication protocols, site-specific constraints, and Contracting Officer/COR authority limitations.
7.9.3 COR Technical Direction and Contracting Officer Authority The COR may provide technical direction related to scheduling, access, reporting, surveillance, safety coordination, work-area coordination, and Government acceptance review. The COR shall not authorize changes to contract scope, price, period of performance, labor category, frequency, terms, or conditions. Only the Contracting Officer may authorize contract modifications or binding changes to the contract.
7.9.4 No Implied Approval or Unauthorized Scope Growth
Identification of a deficiency, submission of a repair recommendation, Government receipt of a repair proposal, Government review of a report, or operational urgency does not authorize the Contractor to proceed with repair work, replacement work, construction work, fire-suppression work, HVAC/TAB work, refrigerant work, or any other work outside the awarded scope. Work outside the recurring base scope shall not begin until written authorization is provided by the Contracting Officer or another authorized Government official consistent with the contract.
7.9.5 Government Review Does Not Waive Contractor Responsibility Government review, comment, acceptance, or payment related to a report, plan, schedule, service record, invoice package, photo log, or proposal does not relieve the Contractor of responsibility for safe, complete, code-compliant, sanitary, manufacturer-consistent, and contract-compliant performance. Government review shall not be interpreted as acceptance of unsafe work, incomplete work, defective service, or work performed outside contract authority.
7.9.6 Repeat Deficiencies and Corrective Action
If the same deficiency, missed task, incomplete report, housekeeping issue, late deliverable, recurring service-quality issue, or repeat equipment concern occurs more than once, the Contractor shall identify the apparent root cause and submit a corrective action plan when requested by the COR. The corrective action plan shall describe the issue, affected service area/equipment, cause, corrective steps, responsible party, target completion date, and method for preventing recurrence.
8. Applicable Standards and Order of Precedence The Contractor shall comply with all applicable federal, District of Columbia, building, safety, food service, environmental, fire protection, electrical, manufacturer, and facility requirements. If a conflict is identified among requirements, the Contractor shall notify the COR and Contracting Officer in writing before proceeding. The Contractor shall not use uncertainty, lack of prior notice, or incomplete site information as a basis for unsafe, unsanitary, incomplete, or non-compliant work.
• District of Columbia Department of Health food-service and food-operation requirements, including applicable provisions of Title 25-A DCMR.
• Applicable OSHA requirements, including hazard communication, PPE, electrical safety, walking/working surfaces, and control of hazardous energy when applicable.
• NFPA 96 requirements for commercial cooking operations, exhaust systems, inspection, cleaning, access panels, and documentation, as adopted or required by the applicable AHJ.
• National Electrical Code (NEC) requirements when work involves electrical connections, equipment safety, or electrical components.
• GSA PBS Core Building Standards, current applicable edition, including requirements incorporated by reference.
• Manufacturer operation, maintenance, cleaning, sanitizing, calibration, filter, parts, shutdown, startup, and return-to-service requirements for each piece of covered equipment.
• GSA Green Procurement Compilation guidance and applicable federal sustainable acquisition requirements for cleaning products, supplies, and materials, where applicable.
• All applicable local, state, and federal waste handling, transportation, and disposal requirements.
• Facility security, access, loading dock, escort, fire/life-safety, and building operations requirements communicated by the COR or authorized Government officials.
9. Required Services
9.1 Preventive Maintenance Plan
Within 30 calendar days after award, the Contractor shall submit a written Preventive Maintenance Plan to the COR for review. The plan shall use the post-award baseline inventory as a foundation and shall cover all equipment and services under this PWS, with separate subsections for the Bison Bistro/main cafeteria and the 5100 executive kitchen. The plan shall be updated whenever equipment, manufacturer recommendations, work methods, service frequencies, filter requirements, shutdown/startup procedures, calibration needs, or observed conditions change.
At a minimum, the Preventive Maintenance Plan shall include:
• Equipment-specific preventive maintenance tasks, frequency, estimated duration, applicable manufacturer reference, and responsible trade/technician type.
• Minimum PM checklists by equipment type, including required tasks in Section 9.3 and Attachment E.
• Safety interlock observation or testing methods where such checks can be performed safely and without bypassing protective devices.
• OEM-required or manufacturer-compatible descaling, deliming, lubrication, cleaning, sanitizing, flushing, filter replacement, and operational verification tasks.
• List of anticipated parts, materials, lubricants, filters, cleaning products, sanitizers, and chemicals to be used.
• Safety Data Sheets (SDS) for chemicals and products used onsite.
• Job Hazard Analysis (JHA) or Activity Hazard Analysis (AHA) addressing tools, chemicals, hot surfaces, electrical hazards, sharp edges, slip/trip hazards, limited-access areas, mezzanine access, roof/fan access, and lockout/tagout needs.
service operational verification, deficiency documentation, photographs where required or useful, filter/temperature notes, and cleanup/restoration.
9.2.2 Monthly Targeted Bison Bistro / Main Cafeteria Inspection The Bison Bistro/main cafeteria shall receive a monthly targeted inspection and sanitation-sensitive service visit focused on high-use or high-risk equipment and conditions, including visible leaks, seals/gaskets/latches, grease or sanitation concerns, disposal/drainage concerns, dishwasher/Power Soak visible condition, ice machine/filter condition, obvious temperature-display concerns, unusual noise/odor/overheating, and urgent deficiency reporting.
The monthly targeted visit is not intended to replace the quarterly comprehensive PM cycle.
9.2.3 5100 Executive Kitchen Routine Frequency The 5100 executive kitchen shall receive quarterly comprehensive PM rather than monthly routine PM, unless observed conditions, manufacturer recommendations, executive/special-event needs, or Contracting Officer direction require more frequent service. Because the executive kitchen may sit idle between events, the Contractor shall emphasize startup, shutdown, idle-condition, sanitation-readiness, ice-machine readiness, warming/holding equipment readiness, and return-to-service checks.
9.2.4 Specialty Service Frequencies and Emergency Response
Specialty service frequencies shall remain controlled by the PWS, manufacturer requirements, observed conditions, and AHJ requirements. Hood cleaning shall occur at least every 90 calendar days, hood inspection at least every 6 months, ice machine cleaning/sanitization at least every 90 calendar days, and grease trap cleanout monthly unless otherwise directed. Emergency, urgent, and event-readiness response requirements remain in effect regardless of the recurring PM frequency.
• The Contractor shall notify the COR by email not less than 10 business days before each scheduled monthly targeted inspection, quarterly comprehensive PM visit, hood/grease/ice specialty service, or other planned service visit and shall include planned tasks, work areas, required access, utility support needs, shutdown/startup needs, lockout/tagout needs, and names of personnel expected onsite.
• During scheduled visits, the Contractor shall inspect the applicable covered equipment for visible damage, excessive wear, sanitation concerns, missing/damaged components, unusual noise, unsafe conditions, leaks, loose parts, excessive grease accumulation, scale buildup, filter concerns, poor temperature performance indicators, or other conditions that may affect safe or reliable operation.
• Where safe and authorized, the Contractor shall remove access panels, filters, covers, or other removable components necessary to perform PM and visual inspection, and shall reinstall them before returning equipment to service.
• The Contractor shall perform post-service operational verification after PM, cleaning, sanitation, repair, or stabilization work. The operational verification shall be documented in the service report.
• The Contractor shall perform only work authorized under the contract. Repairs beyond routine preventive maintenance shall follow Section 15 unless expressly included in the awarded scope.
• The Contractor shall restore all affected areas to a clean, safe, sanitary, and operational condition before leaving the site.
9.3 Minimum Equipment-Specific PM Requirements
The Contractor shall perform the minimum equipment-specific tasks listed below, as applicable to each covered item, unless a manufacturer requirement is more stringent. These tasks shall be incorporated into the Preventive Maintenance Plan and the applicable monthly targeted, quarterly comprehensive, or specialty service reports.
• The Contractor shall clean the hood canopy, hood filters, backsplash/wall surfaces between hood and cooking equipment where impacted by grease, fan blades, interior fan housing, fan roof, and accessible exhaust ductwork.
• The Contractor shall include photographs of accessible duct interior surfaces, hood filters, fan blades, fan housings, fan roof areas, access panels, pre-service conditions, post-service conditions, and deficiencies.
Photographs shall be organized by hood, equipment area, and service date.
• The Contractor shall identify trends such as recurring grease accumulation, repeat deficiencies, access problems, sanitation concerns, damaged filters, repeated fan conditions, or repeated areas not fully accessible.
• Deficiencies shall be coded Red, Yellow, or Green in the report. Red indicates immediate safety, sanitation, fire, property, or operational risk. Yellow indicates repair, monitoring, or follow-up is recommended. Green indicates no deficiency observed for the item reviewed.
• The Contractor shall affix an inspection/service label to each hood showing company name, inspector/service technician name, service date, pass/fail or deficiency status, and next due date.
• The Contractor shall observe and report apparent ventilation, smoke capture, odor, exhaust, grease vapor, or airflow concerns discovered during hood or kitchen equipment service. Formal air balancing, pressure certification, HVAC testing/adjustment, or TAB work is excluded unless separately authorized by the Contracting Officer.
• The Contractor shall not impair, disconnect, obstruct, modify, charge, certify, or repair hood fire-suppression components unless that scope is separately authorized and performed by properly qualified personnel. Apparent deficiencies in fire-suppression nozzles, caps, piping, pull stations, links, cylinders, tags, or obstructions shall be reported immediately to the COR.
• The Contractor shall remove all generated waste from the site during the same visit and shall leave all affected kitchen and mechanical areas clean, sanitary, and ready for use.
9.6 Ice Machine Cleaning, Sanitization, and Filter Management The Contractor shall clean and sanitize all internal wetted surfaces of the ice machines in the cafeteria and executive kitchen at least every 90 calendar days, in accordance with manufacturer instructions and using manufacturer-recommended or manufacturer-compatible products.
• Work shall include required disassembly, cleaning, sanitizing, flushing, reassembly, and operational check of accessible components.
• The Contractor shall inspect ice machine water filters during each PM visit and shall document filter condition, date last changed if known, date next change is due, and whether an expired, clogged, damaged, missing, or unknown filter condition exists.
• Unless the Contracting Officer confirms in writing that another contract is responsible for ice machine water filters, the Contractor shall replace ice machine water filters at least every six months using manufacturer-compatible filters. Each replaced filter shall be labeled or otherwise documented with date of replacement and next due date.
• The Contractor shall maintain a recommended filter inventory list showing filter type, part number, quantity needed per replacement cycle, minimum recommended on-hand level, shelf-life/expiration concerns, and estimated lead time.
9.6.1 Critical Spare Parts and Long-Lead-Time Risk List
Within 45 calendar days after award, the Contractor shall provide a recommended critical spare parts and long-lead-time parts risk list for covered equipment. The list shall identify parts that commonly fail, parts with extended delivery timelines, discontinued or hard-to-source parts, filter and gasket requirements, likely operational impacts if the part fails, and recommended Government planning considerations. The list is informational only and does not authorize purchase, storage, replacement, or repair unless separately approved in writing consistent with the contract.
• The Contractor shall document products used, service date, technician, equipment serviced, observed deficiencies, filter status, and post-service condition.
9.7 Dishwasher Deliming, Descaling, and Sanitation-Sensitive Service The Contractor shall perform dishwasher and power soak system preventive maintenance sufficient to support sanitation-sensitive operation. At a minimum, this shall include deliming/descaling, rinse arm/nozzle inspection and cleaning, screen inspection, drain observation, gasket/door inspection, visual chemical-feed observation where safely accessible, leak checks, and a post-service test cycle. Frequency shall follow manufacturer instructions and observed conditions, but shall not be less than quarterly unless otherwise approved by the COR.
The Contractor shall immediately report dishwasher conditions that may affect sanitation, including failure to heat, failure to drain, abnormal cycle operation, missing/damaged rinse arms, clogged nozzles, chemical-feed concerns, visible contamination, unsafe electrical conditions, or water leakage.
9.8 Temperature Verification and Calibration Support
The Contractor shall perform temperature verification and limited calibration support for covered equipment when applicable and when such work is consistent with manufacturer instructions and technician qualifications. This requirement includes observing and documenting equipment temperature displays, thermostats, thermometers, digital probes, refrigeration/cold holding temperature indicators, and oven/warmer temperature performance indicators during scheduled PM, repair, emergency response, and executive-event readiness checks.
• The Contractor shall document readings, observed variances, abnormal conditions, and recommended corrective action in the service report.
• Where calibration can be performed safely and is within the Contractor qualification and awarded scope, the Contractor shall calibrate or adjust covered equipment in accordance with manufacturer instructions.
• Where calibration, controls repair, parts replacement, or specialized testing is required beyond the awarded scope, the Contractor shall submit a repair proposal or recommendation.
• This PWS does not make the Contractor responsible for routine food temperature logs, cafeteria operator HACCP records, menu operations, or food disposal decisions unless specifically authorized by the Government.
9.9 Oven, Refrigerator, Freezer, and Equipment Seal Inspections During the Bison Bistro/main cafeteria monthly targeted inspection and each quarterly comprehensive PM visit, the Contractor shall inspect the condition of seals, gaskets, latches, hinges, door alignment, and similar accessible components on ovens, freezers, refrigerators, warmers, dishwashers, and other covered equipment where applicable.
For the 5100 executive kitchen, this inspection shall occur at least quarterly and during event-readiness checks when requested.
• Damaged, missing, worn, brittle, loose, or unsanitary seals shall be documented in the applicable service report.
• When replacement is recommended, the Contractor shall submit a repair proposal in accordance with Section 15.
• The Contractor shall report conditions that may affect food safety, energy use, temperature performance, sanitation, or door closure.
9.10 Executive, Holiday, National Celebration, and Special Event Readiness Support The 5100 executive kitchen and, when applicable, Bison Bistro/main cafeteria equipment may be used to support senior leadership, VIP, Cabinet-level, holiday, national celebration, emergency, or mission-support events. Examples include Fourth of July support, USA 250-related activities, Thanksgiving, Christmas, and other Government functions. This PWS authorizes equipment-readiness support only; it does not make the Contractor responsible for food preparation, catering, food service staffing, ice distribution/handling, event setup, food-safety decisions, or cafeteria operator duties unless separately authorized in writing by the Contracting Officer.
For planned events, the Government may request a pre-event readiness check as early as practicable, preferably 5 to 10 business days before the event, to allow time for deficiency identification, repair proposals, parts ordering, and Government decision-making. When a final operational confirmation is needed, the COR may request a 24- to 48-hour pre-event confirmation or day-of readiness status, subject to access, funding, and contract authorization. When time does not permit advance coordination, the Contractor shall respond under the applicable priority level in Section 15.
• Readiness checks may include visual inspection, operational verification, leak checks, temperature verification where applicable, sanitation-sensitive equipment checks, shutdown/startup checks, ice-machine readiness checks, warming/holding equipment readiness checks, and identification of conditions that may affect event support.
• The Contractor shall provide a same-day email summary identifying the event support area, equipment checked, equipment status, deficiencies, operational restrictions, immediate recommendations, repair proposal needs, and whether the affected equipment appears ready for use, ready with limitations, or not recommended for use.
• If the Contractor identifies a condition that may affect a planned executive, holiday, national celebration, or special event, the Contractor shall notify the COR as soon as practicable and identify whether temporary operational restrictions, alternate equipment, emergency stabilization, or a repair proposal may be needed.
• When requested by the COR, readiness support may include a pre-event equipment check, final pre-event confirmation, and post-event observation of covered equipment condition, provided the work is within scope and authorized under the contract.
• Additional visits, after-hours/weekend/federal holiday labor, expedited parts, rental equipment, temporary equipment, or repair work outside the awarded recurring scope shall not proceed unless authorized in accordance with the contract.
• The Contractor shall not provide food, beverages, catering, food handling, ice distribution, cafeteria staffing, event staffing, or operator sanitation logs under this PWS unless separately authorized in writing by the Contracting Officer.
9.11 Housekeeping and Restoration
The Contractor shall maintain housekeeping standards during all phases of work sufficient to prevent hazards to equipment, personnel, tenants, and building operations.
• Work areas shall remain free from unnecessary tools, hoses, grease, water, packaging, debris, waste, and slip/trip hazards.
• Final cleaning shall restore all affected areas to their pre-service condition or better.
• Movable equipment relocated by the Contractor shall be returned to its pre-service layout, position, and operational status.
• The Contractor shall remove all generated waste, used filters, debris, packaging, grease waste, wastewater, and contractor materials from the site unless otherwise directed by the COR.
9.12 Exclusions and Scope Boundaries
• General custodial cleaning, routine cafeteria operator cleaning, dining area cleaning, broad kitchen deep cleaning, pest control, and non-equipment cleaning are excluded unless specifically added by written contract modification.
• Hood fire-suppression inspection, testing, charging, repair, certification, impairment management, and code certification are excluded unless specifically added by written contract modification and performed by properly qualified personnel.
• Formal air balancing, TAB services, negative/positive pressure certification, HVAC correction, air-quality monitoring, or building ventilation repair are excluded unless separately authorized.
• Work involving the handling, recovery, charging, disposal, or management of refrigerants is not included unless specifically added by written contract modification and performed by properly certified personnel.
• Major repairs, equipment replacement, code upgrades, construction work, electrical infrastructure work, plumbing infrastructure work, and building-system alterations are not included unless separately authorized by the Contracting Officer.
• Contractor personnel shall conduct themselves professionally and in a manner that reflects favorably upon the Contractor, OFAS, and the Department of the Interior.
• The Contractor shall submit required personnel information in advance when requested to support security screening and access approval.
13. Contractor Qualifications
• The Contractor shall be a firm specializing in commercial kitchen equipment maintenance, commercial kitchen exhaust hood cleaning/inspection, grease management, or closely related work, with not less than 5 years of documented successful experience.
• Personnel performing hood cleaning/inspection shall be trained and qualified for commercial kitchen exhaust system cleaning and inspection consistent with NFPA 96 and industry practice.
• Personnel performing electrical, mechanical, sanitation, calibration, filter replacement, or specialized equipment work shall possess applicable licenses, certifications, training, or manufacturer qualifications where required by law, code, manufacturer, or the Contracting Officer.
• Personnel performing work involving refrigerants, fire-suppression systems, electrical infrastructure, plumbing infrastructure, or building systems shall not perform such work unless that scope is specifically authorized and personnel possess required qualifications.
• The Contractor shall ensure all subcontractors meet the same qualification, safety, security, and performance standards applicable to the Prime Contractor.
13.1 Contractor Responsibility
The Prime Contractor remains fully responsible for the acts, omissions, safety practices, quality of work, access coordination, reporting, cleanup, and performance of all subcontractor personnel. If applicable, the Government will hold the Prime Contractor accountable for subcontractor performance, including late work, defective work, incomplete reports, security violations, safety issues, damage to Government property, or failure to comply with this
PWS.
The Prime Contractor shall identify proposed subcontractors to the COR and Contracting Officer when required for access, security coordination, specialty qualifications, scheduling, or contract administration. At a minimum, the Prime Contractor shall provide the subcontractor company name, point of contact, work to be performed, expected dates onsite, personnel names when available, and applicable licenses, certifications, or qualifications.
Subcontractor personnel shall comply with all facility access, identification, escort, security, safety, sanitation, environmental, work-hour, and conduct requirements applicable to Contractor personnel. The Prime Contractor shall ensure subcontractors possess the licenses, certifications, training, and experience required for the specific work performed, including hood cleaning, grease management, electrical/mechanical work, ice machine service, dishwasher service, chemical use, waste handling, or other specialty services.
A Prime Contractor employee shall be onsite in a supervisory or lead capacity whenever subcontractor personnel are performing work onsite, unless otherwise approved in writing by the COR. Subcontractors shall not receive direction from Government personnel that changes contract scope, price, period of performance, or terms and conditions. Only the Contracting Officer may authorize binding contract changes.
14. Contractor Quality Control and Government Quality Assurance
14.1 Contractor Quality Control Plan
Within 30 calendar days after award, the Contractor shall submit a Quality Control Plan (QCP) for COR review. The QCP shall describe how the Contractor will ensure, inspect, document, and correct performance under this PWS.
• Quality control organization, responsible personnel, and escalation points.
• Inspection checklist or method used by the Contractor before leaving the site.
• Method for tracking recurring tasks, due dates, filters, deficiencies, temperature concerns, emergency calls, corrective actions, repair proposals, and trend observations by service area and equipment ID.
• Process for preventing recurrence of defective service.
• Process for verifying subcontractor work before submitting reports or invoices.
• Internal review process for accuracy and completeness of deliverables.
• Process for validating that all required photos, R/Y/G coding, post-service operational verification, and cleanup/restoration documentation are included before report submission.
14.2 Government Quality Assurance
The Government may conduct surveillance and inspection to determine whether services conform to the PWS.
Government inspection does not relieve the Contractor of responsibility for quality control, safety, code compliance, complete performance, or correction of defective work.
1. Surveil contractor performance while onsite.
2. Review, accept, reject, or require correction of reports and submittals.
3. Review service records, progress reports, photographs, checklists, R/Y/G deficiency coding, trend notes, and other performance documentation.
4. Assess the Contractor quality control program and require improvement if ineffective or insufficient.
5. Obtain tenant, cafeteria operator, executive kitchen user, or stakeholder feedback where relevant to contract performance.
6. Conduct Government or third-party inspections of facility equipment and systems.
7. Coordinate inspections by District of Columbia officials or other authorities associated with food service, building safety, or permitting.
8. Document performance deficiencies for consideration in invoice review, past performance, and CPARS, as applicable.
14.3 Repeat-Deficiency Escalation and Corrective Action
The Government may require a written corrective action plan when the Contractor repeats the same deficiency, fails to correct an accepted deficiency, submits recurring incomplete reports, misses recurring service tasks, or demonstrates a pattern of poor housekeeping, late response, inadequate documentation, or deficient subcontractor oversight. Corrective action requirements are in addition to any contractual remedies available to the Government.
14.4 Effect of Government Review or Acceptance
Government surveillance, review, comment, acceptance, or payment does not relieve the Contractor of responsibility for quality control, safety, sanitation, code compliance, manufacturer-consistent performance, complete performance, or correction of defective work.
15. Repair Requirements and Emergency Support
Repairs beyond the recurring preventive maintenance, cleaning, inspection, sanitation, filter management, operational verification, event-readiness checks, and reporting requirements of this PWS shall not proceed without written Government authorization. The Contractor shall identify deficiencies discovered during scheduled work, baseline assessment, executive/special-event readiness checks, emergency response, or Government notification and shall provide proposals as described below.
Repair recommendations, cost estimates, emergency communications, or Government receipt of a proposal do not authorize work to proceed. Except for stabilization actions expressly authorized by the Government during an emergency, repair work shall not begin until written authorization is provided consistent with the contract.
15.4 Emergency Repair Authorization and Not-to-Exceed Estimates For Priority 1 emergency conditions, the Contractor may be required to provide an oral or email not-to-exceed estimate sufficient for the Government to authorize immediate stabilization work. A complete written proposal with labor, materials, travel, overhead, profit, and subcontractor costs shall be provided within 2 business days after the emergency response unless otherwise directed by the Contracting Officer. The Government may or may not authorize follow-on repair work at its sole discretion. Written authorization must be provided by the Government before permanent repairs proceed, except for immediate stabilization actions expressly authorized by the Government.
15.5 Repair Quote Requirements
Repair quotes shall include separate line items for labor, materials, travel, profit, overhead, and any subcontractor costs and fees. Any subcontractor cost included in a repair proposal or invoice shall be separately identified and supported by adequate detail, including labor, materials, travel, overhead, profit, fees, schedule impact, and the specific work performed or proposed. Any subcontractor costs shall include a proposal from the proposed subcontractor broken out to the same degree. Quotes shall include an estimated completion schedule, delivery time for materials, recommended priority, operational impact, warranty terms, whether the repair is temporary or permanent, and whether the work affects safety, sanitation, executive-event readiness, filter management, or future PM requirements.
15.6 Warranty, Parts, and Housekeeping for Repairs
All approved repairs shall be completed with supplies, materials, and parts of the highest quality available and appropriate for the equipment or system. Replacement parts shall be comparable to or higher quality than Original Equipment Manufacturer (OEM) parts unless otherwise authorized. Parts and services provided for repairs shall be warrantied for one calendar year from repair completion unless a longer manufacturer or contractor warranty applies.
General housekeeping standards shall be maintained during all repair activities and final cleaning shall restore affected areas to their normal standard at no additional expense to the Government.
16. Safety, Environmental, Sanitation, and Waste Controls
• The Contractor shall provide all required PPE, safety equipment, spill control materials, tools, and protective coverings necessary to perform the work safely and protect Government property.
• The Contractor shall not create slip, trip, electrical, fire, chemical, sanitation, food-contact, microbial, or access hazards. Any hazard created or discovered by the Contractor shall be immediately controlled and reported to the
COR.
• All chemicals, sanitizers, delimers, degreasers, and products used in kitchen environments shall conform with manufacturer recommendations, applicable food-contact or food-service health standards, applicable District of Columbia Department of Health requirements, and applicable sustainable acquisition guidance.
• The Contractor shall use water containment and work-area protection sufficient to prevent damage, contamination, or discharge to areas not intended for cleaning operations.
• The Contractor shall protect hood fire-suppression components from damage or impairment during hood cleaning and shall immediately report any observed suppression-system concern to the COR.
• All waste products shall…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .