Attachment 1- Specification # C10-0070UBR.23.docx

DOCX document 34 KB Posted

Attached to
Inspect and Rebuild Under Bridge Inspection Unit
Solicitation number
RFP 591 230000002220 1
Issued by
Grand Traverse County, Lansing City, Michigan

About this file

This is a Request for Proposal specification document issued by the State of Michigan Department of Transportation (MDOT) for the inspection and rebuild of an Under Bridge Inspection Unit mounted on a Peterbilt chassis, specifically MDOT Truck 04-1708, under RFP No. 230000002220 and Specification # C10-0070UBR.23. The project encompasses a comprehensive 12-year inspection and rebuild of the specialized vehicle, requiring bidders to confirm their ability to complete each specified requirement or provide detailed alternate solutions. The scope of work includes extensive structural, mechanical, hydraulic, and electrical restoration across multiple components including axle locks (front and rear), turntables, four boom sections, platform systems, control systems, and hydraulic pumps, along with required non-destructive testing, sandblasting, repainting, and stability testing to current ANSI A92.8 standards.

Bidders are required to complete a detailed response table indicating "Yes" for each included specification or providing comprehensive substitute information if manufacturer specifications are unavailable. The project demands adherence to strict manufacturing standards and includes requirements for final testing of all AC and DC electrical systems, operational testing of all components, protective finishing including new caution and warning decals, and return of all removed components to the State of Michigan. Pricing terms, award dates, contract duration, and other financial details are not specified in this attachment and would appear in accompanying RFP documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 - SPECIFICATION # C10-0070UBR.23

Request for Proposal (RFP) No. 230000002220 Inspect and Rebuild an Under Bridge Inspection Unit

Bidder must complete the below table indicating “Yes” in the Response column for each item that is included in the quoted price.

If any specifications and/or requirements listed are not available from the manufacturer, the Bidder must identify the appropriate substitution in the Response column.

If the Bidder proposes an alternate to any listed specifications, the Bidder must clearly describe all variances from the specifications and the proposal must include descriptive literature that contains complete specifications.

Specifications for a 12-year inspection and rebuild of MDOT Truck 04-1708 – Under Bridge Inspection Unit mounted on Peterbilt chassis.

Specification
Response

(Indicate Yes or provide Alternate information)

1.0
Inspection and Reporting
1.1
Perform visual/operation inspection
1.2
Test control and intercom system to manufacturer’s standards
1.3
Test operational limit system to manufacturer’s standard
1.4
Visually inspect hydraulic cylinders for leaks and damage. Perform boom cylinder drift test to manufacturer's standards
1.5
Inspect chassis lighting components
1.6
Inspect counterweight ball screw, including motor and wear pads
2.0
Chassis and Sub-frame:
2.1
Inspect units sub-frame and chassis frame
2.2
Replace deck side marker and rear lighting wiring
2.3
Torque sub-frame mounting bolts
2.4
Repair/replace access step and grab rails as needed
2.5
Inspect master panel in truck and replace defective lights or switches as needed
2.6
Ensure proper circuit breaker relay protection is installed between truck battery and unit
2.7
Replace front and rear springs if needed
3.0
Axle Locks - Front:
3.1
Remove upper side plates, jaws, and pin rollers, bushings and lower axle lock assemblies
3.2
Make required repairs
3.3
Sand blast, perform magnetic particle test
3.4
Repaint axle lock assemblies
3.5
Install new bolts, nuts and structural fasteners to manufacturer’s standards
3.6
Install new pins and rollers
3.7
Install new limit switches
3.8
Adjust clearance to manufacturer’s standards
4.0
Axle Locks - Rear:
4.1
Remove pins and bushings
4.2
Replace spherical ball bushings as needed
4.3
Replace upper yoke weldment
4.4
Make required repairs as needed
4.5
Sand blast, perform magnetic particle test
4.6
Repaint axle lock assemblies
4.7
Install new bolts, nuts and structural fasteners to manufacturer’s standards
4.8
Install new pins and rollers
4.9
Install new limit switches
4.10
Adjust clearance to manufacturer’s standards
5.0
Sliding Counterweight:
5.1
Remove counterweight and inspect components
5.2
Upgrade rear sliding counterweight to cylinder/chain drive
6.0
Turntables (T-1 and T-2):
6.1
Remove paint to bare metal (white metal) and non-destructive test (NDT)
6.2
Perform structural repairs per NDT test results
6.3
All repairs must be non-destructively tested
6.4
Remove pins and bushings
6.5
Measure the pin bosses with a micrometer
6.6
Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced
6.7
Paint inside and outside of components
6.8
Unit to be reassembled with all new fasteners
6.9
Install new hoses, wires, clamps and protection
6.10
Install new limit switches
6.11
Perform service test on rotational bearings
6.12
Replace both rotation gearboxes and hydraulic motors with current design
6.13
Inspect turret cylinder # 2 and repair as needed
7.0
Boom One:
7.1
Remove pins and bushings
7.2
Measure the pin bosses with a micrometer
7.3
Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced
7.4
Remove paint to bare metal (white metal) and non-destructive test (NDT)
7.5
Perform structural repairs per NDT test results
7.6
All repairs must be non-destructively tested
7.7
Paint inside and outside of components
7.8
Install new pins and bushings
7.9
Unit to be reassembled with all new fasteners
7.10
Install new hoses, wires, clamps and protection
7.11
Install new limit switches
7.12
Inspect boom cylinder #1 and repair as needed
8.0
Boom Two:
8.1
Remove pins and bushings
8.2
Measure the pin bosses with a micrometer
8.3
Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced
8.4
Remove paint to bare metal (white metal) and non-destructive test (NDT)
8.5
Perform structural repairs per NDT test results
8.6
All repairs must be non-destructively tested
8.7
Paint inside and outside of components
8.8
Install new pins and bushings in cylinders
8.9
Unit to be reassembled with all new fasteners
8.10
Install new hoses, wires, clamps and protection
8.11
Install new limit switches and new boom angle switches
8.12
Inspect boom cylinder #2 and repair as needed
9.0
Boom Three and Catrac:
9.1
Install new rollers and bearings on boom three extension structures
9.2
Install extension cylinder mounting system
9.3
Remove pins and bushings
9.4
Measure the pin bosses with a micrometer
9.5
Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced
9.6
Remove paint to bare metal (white metal) and non-destructive test (NDT)
9.7
Perform structural repairs per NDT test results
9.8
All repairs must be non-destructively tested
9.9
Paint inside and outside of components
9.10
Install new pins and bushings
9.11
Unit to be reassembled with all new fasteners
9.12
Install new hoses, wires, clamps and protection
9.13
Install new limit switches and new boom angle switches (non-mercury)
9.14
Replace wear pads
9.15
Inspect Catrac and cover and repair as needed
9.16
Inspect boom cylinder #3 and telescoping cylinders and repair as needed
10.0
Boom Four:
10.1
Remove pins and bushings
10.2
Measure the pin bosses with a micrometer
10.3
Pin bosses found to have a tolerance greater than 0.12" must be removed and replaced
10.4
Remove paint to bare metal (white metal) and non-destructive test (NDT)
10.5
Perform structural repairs per NDT test results
10.6
All repairs must be non-destructively tested
10.7
Paint inside and outside of components
10.8
Install new pins and bushings in cylinders
10.9
Unit to be reassembled with all new fasteners
10.10
Install new hoses, wires, clamps and protection
10.1
Install new limit switches and new boom angle switches
10.1
Inspect Catrac and cover and repair as needed
10.1
Inspect boom cylinder #4 and telescoping cylinders and repair as needed
11.0
Platform:
11.1
Platform will be inspected and refurbished
11.2
Install new 110 and 12-volt outlets and wiring system
11.3
Install new grade 8 mounting bolts
11.4
Install new 3/4 inch fall protection points
11.5
Rebuild or replace Helac rotator
11.6
Inspect leveling cylinder and repair as needed
12.0
Boom Rest:
12.1
Install new stow pads
12.2
Install new platform rest pads and update rest as necessary
13.0
Control and Limit System:
13.1
All wires shall be replaced through booms and turntables
13.2
System wiring is located at the fire wall and boom areas will be relocated in a new LED box, mounted at turntable one
13.3
Unit shall have all new limit switches and foot switches installed
13.4
Install new CAN line cables
13.5
Controls shall be properly adjusted and settings recorded
13.6
New circuit breaker and relay protection shall be installed
14.0
Hydraulic system and pumps:
14.1
Remove and replace hydraulic pumps
14.2
Install new PTO for main unit hydraulic pump
14.3
Install new hydraulic filters and oil
14.4
Main valve replacement or rebuild and reseal as needed
14.5
Set relief valves
14.6
Set all port relief valves
14.7
Set all controls to current factory settings
14.8
Replace hydraulic oil cooler
15.0
Stability Testing:
15.1
Stability test unit to current ANSI A92.8 requirements
15.2
Install counterweight at T-1 or at rear, if needed, to meet ANSI standard for stability
15.3
Operational test run unit on bridge
16.0
Miscellaneous:
16.1
All items removed from the cab, chassis and tower by Contractor (frame ends, fuel tanks mirrors, etc.) remain the property of the State of Michigan and are to be returned with the truck
16.2
All wires passing through holes in metal or non-metal wearing surfaces, which could cause wear of the insulation, shall be adequately protected by rubber or plastic grommets, and/or non-metal conduit.
16.3
Ends of all wires shall be adequately anchored to prevent loosening
16.4
All electrical connections shall be soldered and enclosed in heat shrink or in watertight junction blocks
16.5
Scotch locks and wire nuts are not acceptable
17.0
Painting:
17.1
Repaint boom assemblies to match original color - Dupont 43106X or equivalent
17.2
Repaint deck as needed
17.3
Rust proof as needed
18.0
Final Finish:
18.1
Install protective sleeves over hydraulic hose and electrical wire at pivot points
18.2
Install a complete set of operational caution and warning decals
18.3
Test all AC and DC electrical systems
18.4
Operational test of all systems
18.5
Final adjustments to all system and components