ATTACHMENT 1 - Schedule of Pricing.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
CGC ALEX HALEY DOCKSIDE REPAIR FY24
Solicitation number
70Z08524QLREP0008
Issued by

About this file

This document contains a pricing schedule and solicitation for repair work on the USCGC ALEX HALEY. The pricing schedule lists 18 line items for work such as piping renewal, bridge wing repair and preservation, tank cleaning and inspection, generator and boiler exhaust cleaning, circuit breaker inspection and testing, steering system maintenance, and davit and sewage tank overhaul. Labor rates and markup percentages for subcontractors and materials are also included.

The related solicitation from the Department of Homeland Security Coast Guard seeks quotes for dockside repair of the CGC ALEX HALEY in fiscal year 2024. The requirement will be procured according to Section 8220 of the Vessel Conversion, Alteration, and Repair Projects and is a full and open opportunity for Alaskan businesses. The solicitation includes this pricing schedule and additional unspecified attachments.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC ALEX HALEY (WMEC-39) DOCKSIDE AVAILABILITY FY2024
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Piping, RenewJOB1
D-002Bridge Wing, Repair and PreservationJOB1
D-003Tanks (MP Fuel Storage and Overflow, Clean and InspectJOB1
D-004Boiler Exhaust Stack Uptakes, Commercial CleanJOB1
D-005Ship Service Diesel Generator Exhuast Piping, Commercial CleanJOB1
D-006MDE Exhaust Piping, Commercial CleanJOB1
D-007Circuit Breakers (400Hz), Inspect and TestJOB1
D-008Circuit Breakers (60Hz), Inspect and TestJOB1
D-009Steering System, GroomJOB1
D-010Single Point Davit, Level 3 OverhaulJOB1
D-011Sewage Holding Tank(s), Clean and InspectJOB1
D-012Temporary Services, ProvideJOB1
D-013MDE Exhaust Hanger RenewalJOB1
D-014Plate Inspection and RenewalJOB1
D-015Deck Drain, OverhaulJOB1
D-016Watertight Trunk, 100% PreserveJOB1
D-017Vaneaxial Fan and Motor Assembly, OverhaulJOB1
D-018Fire Prevention, ProvideJOB1
O-00AComposite Labor RateHour1911
O-00BMarkup for Subcontractors and Materials (% of $100,000)%$ 100,000.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00