Attachment 1 QASP.pdf

PDF 230 KB Posted

Attached to
Boiler and Cooling Tower Chemicals
Solicitation number
W911KF-20-Q-0089
Issued by

View the file

Other files

File Type Posted
Amendment 005-RELEASED.pdf PDF
Amendment 004-RELEASED.pdf PDF
Amendment 003-Released.pdf PDF
20-Q-0089.pdf PDF
Amendment 002-RELEASED.pdf PDF
Amendment 001-RELEASED.pdf PDF
Attachment 3 Past_Performance_Questionnaire-1.pdf PDF
Attachment 2 Wage Determination.pdf PDF
SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Contract Number:PANWRN-20-P 0000 000491

7/1/2020, DRAFT

1.0 INTRODUCTION

1.1. Purpose. The role of the Government in quality assurance is to ensure contract standards are achieved. The purpose of the Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to evaluate contractor actions while performing the requirements in the Statement of Work (SOW). It is designed to provide an effective surveillance method by monitoring contractor performance for each listed performance objective in the Performance Requirements Summary (PRS) (Section 7 of this document).

1.1.1. The QASP provides a systematic method to evaluate the services the contractor is required to perform as specified in the Statement of Work (SOW) and the Contract.

1.1.2. The QASP has been developed by the requiring activity. It is designed to provide direction to personnel performing contract surveillance activities. Personnel surveying the contract terms and conditions and SOW requirements will periodically review the QASP throughout the life of the contract.

2.0. ROLES AND RESPONSIBILITIES.

2.1. Contracting Officer Representative. The Contracting Officer Representative (COR) is responsible for quality assurance guidance and to ensure that contract quality requirements, provisions, standards, and thresholds are defined, practical, enforceable, necessary, and verifiable.

2.1.1. The COR evaluates and documents contractor performance in accordance with the QASP and SOW.

2.1.2. The COR shall notify the Contracting Officer of any significant performance deficiencies using a Contractor Discrepancy Report with supporting documentation.

2.1.3. The COR will upload copies of ALL surveillance documentation to the VCE COR Tool, unless otherwise directed by the contracting officer.

2.1.4. The COR will submit a monthly report to the contracting officer concerning performance of services rendered under this contract.

2.1.5. The COR recommends improvements to the QASP and SOW throughout the life of the contract.

2.2. Contracting Officer. The Contracting Officer is responsible for safeguarding the interests of the United States Government in contractual relationships. Only the Contracting Officer is authorized to bind the Government and then, only to the extent of the authority delegated to them through the issuance of a warrant.

2.2.1. The Contracting Officer delegates authority for inspection and/or acceptance in accordance with the terms of the contract.

2.2.2. The Contracting Officer informs the contractor of the names, duties, and limitations of authority for all quality assurance personnel assigned to the contract.

3.0. DESCRIPTION OF SERVICES

3.1. Scope of Work. The scope of this contract is to supply treatment chemicals and services for boilers and cooling towers.

4.0. QUALITY REQUIREMENTS

4.1. Quality Control Program. The contractor, not the Government, is responsible for management and quality control actions to meet the terms of the contract.

5.0 SURVEILLANCE. The COR will perform monthly surveillance based on the quality and effectiveness of the services provided and contractor’s data deliverables.

5.1 Unacceptable Performance. If the number of complaints/defects exceeds the performance threshold for any objective, the COR will determine the possible cause of this unacceptable performance. Government-caused complaints/defects will not be counted against the contractor. The same applies to any other requirement of the contract when Government-caused complaints/defects are the cause of unacceptable contractor performance. If the contractor’s performance is judged unacceptable for any requirement by the COR, the COR will inform the contracting officer for resolution. Significant performance deficiencies must be submitted to the Contracting Officer using a Contractor Discrepancy Report and include supporting documentation.

6.0 CONTRACTOR DOCUMENTATION REQUIREMENTS

a. Contractor shall complete all requirements listed in the SOW.

b. Contractor shall work with the COR to coordinate all on-site work, including personnel and vehicle access.

6.1 Progress Reports

6.2 Final Report

7.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS)

7.1 Overview. This PRS identifies the services required by the SOW over which the Government will exercise surveillance.

7.2 Performance Evaluation. Performance of a service will be evaluated to determine whether or not it meets the performance threshold. The contractor shall provide the Government a written response as to why the performance threshold was not met, how performance will be returned to acceptable levels, and how recurrence of the cause will be prevented in the future. When documentation does not meet performance thresholds, revising and resubmitting the documentation at no cost to the Government is the preferred method for correcting unacceptable performance.

7.3 Performance Objectives, Indicators, Thresholds, and Surveillance Methods. The services required by the contractor are summarized into performance objectives and indicators, along with the minimum standards that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

PERFORMANCE REQUIREMENTS SUMMARY (PRS)

Performance Objective

Performance Indicator

Performance Threshold

Method of Surveillance

PRS # 1. Check boilers and coolinmg towers for scale

Scale free boilers and cooling tower water

100% Of cooling towers and boilers

Physical inspection of all cooling towers and boilers

PRS # 2 Test reports

Verifify test reports are current

100% of reports are current

Physical inspection

The evaluation ratings are as follows:

Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal - Performance does not meet some contractual requirements. The contractual performance of the task and sub-task being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

8.0 APPROVAL

COR will report any human trafficking activity to the proper authority.

PRINTED NAME: Jarrod Smith TITLE: Facilities Specialist

PHONE: 256-235-6819

File details come from the government source that posted it. Updated .