Attachment 1.pdf

PDF 396 KB Posted

Attached to
FR 150 Highland Scenic Highway 48" Culvert Replacement Project
Solicitation number
12343420R0003
Issued by

About this file

This document provides specifications for asphalt paving materials and construction methods. It outlines requirements for aggregate, binder and mixture composition, including job mix formula tolerances. Production and placement procedures are defined, covering equipment, testing, quality control, acceptance criteria and methods of measurement. Pavement is to meet density, smoothness and thickness requirements. The contractor must provide a testing facility and qualified technicians. Payment will be made by ton or square yard for asphalt base, wearing and patching/leveling courses constructed according to these specifications.

View the file

Other files

File Type Posted
12343420R0003 Amendment 2.pdf PDF
1 Amendment 1 SF-30.pdf PDF
2 Meeting Notes.pdf PDF
3 Attachment 13.pdf PDF
6 REVISED Attachment 2.pdf PDF
7 Site Visit Attendance Sheet.pdf PDF
5 12343420R0003 AMENDMENT 1.pdf PDF
4 Attachment 14.pdf PDF
Attachment 12 Sustainable.doc DOC document
12343420R0003.pdf PDF
Attachment 3.pdf PDF
Attachment 7.pdf PDF
Attachment 10 Methodology.doc DOC document
Attachment 9 Experience.doc DOC document
Attachment 2.pdf PDF
Attachment 4.pdf PDF
Attachment 5.pdf PDF
Attachment 11 Personnel.doc DOC document
Attachment 8.pdf PDF
Attachment 6.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 401

ASPHALT BASE, WEARING, AND

PATCHING AND LEVELING COURSES

401.1-DESCRIPTION:

This work shall consist of constructing one or more courses of hot-mix asphalt (HMA) or warm-mix asphalt (WMA), mixed mechanically in a plant, composed of aggregate and asphalt material designed in accordance with either the Marshall or Superpave Design System as specified in the contract documents, on a prepared foundation in accordance with these specifications and in reasonable close conformity with the lines, grades, weights or thicknesses, and cross sections shown on the Plans or established by the Engineer.

The unit of measurement for HMA or WMA will be by the ton (megagram), square yard

(square meter) or cubic yard (cubic meter).

The work will be accepted in accordance with these Specifications and the applicable requirements of Sections 105, 106, and 109.

401.2-MATERIALS:

The materials shall conform to the following requirements:

MATERIAL SUBSECTION PG BINDER GRADE

Coarse Aggregate

703.1 thru 703.3 Note 1 and Note 3

(See MP 401.02.28 for exceptions and additions required for Superpave Items.)

PG 70-22 Note 2 shall be used on projects specified with over 20 million ESALs.

Fine Aggregate

702.3

(See MP 401.02.28 for additions required for Superpave Items)

Any deviation from the above criteria will be specified in contract documents. Mineral Filler 702.4

Performance

Graded Binders 705.5

Standard grade shall be a

PG 64-22.

Note 1 The total shale, coal and other lightweight deleterious material and friable particles shall not exceed 3%.

Note 2 PG 64-22 Binder may be used in asphalt placed below the top two lifts. Scratch course and patching-and-leveling are not identified as lifts

Note 3 When slag is specified in the contract, the coarse aggregate shall be slag which meets the requirements of 703.3, except as amended in this subsection

CONSTRUCTION METHODS

401.3-GENERAL:

Construction methods to be used in performing the work shall be submitted to the Engineer for review prior to the start of work. This review may require modification of the proposed methods to provide the desired end product. All equipment, tools, machinery, and plant shall be maintained in a satisfactory working condition.

401.4-COMPOSITION OF MIXTURES:

401.4.1-General: The aggregate for use in the designated mixture shall consist of a mixture of aggregate (coarse, fine, reclaimed asphalt pavement (RAP) if desired, or mixture thereof) and mineral filler if required. It shall be the responsibility of the Contractor to determine the percentage of RAP to be used in the mix. The amount and grade of virgin PG

Binder to be used in the RAP designs shall be determined in accordance with Materials Procedure

(MP) 401.02.24.

401.4.2-Job Mix Formula: Job Mix Formula (JMF) is the specification for a single mix produced at a single plant. This mix may be specific to a single project or be used on multiple projects if the basic design criteria (design compaction level and PG Binder grade) are the same.

The Contractor shall submit a proposed JMF for each combination of aggregate and asphalt material for each type of HMA to be produced. Depending on the design type, the JMF gradations shall be within the tolerances set forth in either Table 401.4.2A or Table 401.4.2B.

Marshall mix designs shall be developed in accordance with MP 401.02.22. Superpave mix designs shall be developed in accordance with MP 401.02.28.

Each proposed JMF must be documented on the Division Form T400 or T400SP and the entire JMF package shall be forwarded for review to the District Materials

Engineer/Supervisor. The T400/T400SP and JMF package shall then be transmitted to the

Materials Control, Soils and Testing Division for final review. If the JMF requires revision, it will be returned to the designer through the District. The T400/T400SP Form shall contain the following information:

i. Identification of the source and type of materials used in the design.

ii. The aggregate blend percentages and the percentage for each sieve fraction of aggregate considered the desirable target for that fraction.

iii. The percentage of asphalt binder representing the optimum asphalt content for the

JMF submitted, which is to be considered the desirable target percentage.

iv. The temperature of the completed mixture at the plant which shall be within ± 25°

F (± 14° C) of the median mix temperature established by the temperature-viscosity chart or as recommended by the asphalt supplier.

v. The ratio (calculated to the nearest one-tenth percent) of the Fines to Asphalt (FA).

For Marshall mixes the ratio is defined as the percentage of aggregate passing the

No. 200 (75 µm) sieve, divided by the percentage of asphalt content calculated at the percentage optimum asphalt content of the design. For Superpave mixes the ratio is defined as the percentage of aggregate passing the 75 µm (No. 200) sieve, divided by the percentage of effective asphalt content calculated at the percentage optimum asphalt content of the design.

TABLE 401.4.2A

Design Aggregate Gradation Requirements for Marshall Mix Designs

Type of

Mix Base-I

Base-II

(Patch

& Level)

Wearing

IV

Wearing-I

(Scratch-I)

Wearing-III

(Scratch-III)

Sieve

Size

Nominal Maximum Size

1 ½ in

(37.5 mm)

¾ in

(19 mm)

¾ in

(19 mm)

3/8 in

(9.5 mm)

No. 4

(4.75 mm)

2 in (50 mm) 100 – – – –

1 ½ in (37.5 mm) 90-100 – – – –

1 in (25 mm) 90 max 100 100 – –

¾ in (19 mm) – 90-100 90-100 – –

½ in (12.5 mm) – 90 max 90 max 100 –

3/8 in (9.5 mm) – – – 85-100 100

No. 4 (4.75 mm) – – 47 min 80 max 90-100

No. 8 (2.36 mm) 15-36 20-50 20-50 30-55 90 max

No. 16 (1.18 mm) – – – – 40-65

No. 30 (600 µm) – – – – –

No. 50 (300 µm) – – – – –

No. 200 (75 µm) 1-6 2-8 2-8 2-9 3-11

TABLE 401.4.2B

Design Aggregate Gradation Requirements for Superpave Mix Designs

Type of Mix 37.5 25

19 Note 1

(Patch &

Level)

12.5 9.5

(Scratch)

4.75

(Scratch)

Standard

Sieve Size

Nominal Maximum Size

37.5 mm

(1 ½ inch)

25 mm

(1 inch)

19 mm

(3/4 inch)

12.5 mm

(1/2 inch)

9.5 mm

(3/8 inch)

4.75

(No. 4)

50 mm (2”) 100 – – – – –

37.5 mm (1½”) 90-100 100 – – – –

25 mm (1”) 90 max 90-100 100 – – –

19 mm (3/4”) – 90 max 90-100 100 – –

12.5 mm (1/2”) – – 90 max 90-100 100 100

9.5 mm (3/8”) – – – 90 max 90-100 95-100

4.75 mm (No.4) – – – – 90 max 90-100

2.36 mm (No.8) 15-41 19-45 23- 49 28-58 32-67

1.18 mm (No.16) – – – – – 30-60

600 µm (No.30) – – – – – –

300 µm (No. 50) – – – – – –

75 µm (No.200) 0-6 1-7 2-8 2-10 2-10 6-12

Note 1 When a 19 mm mix is specified for use as a heavy duty surface mix, it shall be designed as a fine graded mix with the additional requirement of a minimum of 47% passing the 4.75 mm (No.4) screen.

If it becomes necessary to change aggregate sources, a new mix design shall be developed and submitted for approval. When using neat (unmodified) PG Binders, the binder source may be changed without requiring a new mix design, but the binder grade must always remain the same for each design. If a source change results in the use of an additive- enhanced modified binder of the same grade, a new mix design will be required.

If a modified binder source is changed or if the modification process is changed, a new mix design shall be developed and submitted for approval. A source change to a new location with the original manufacturer/supplier and the original modification process will not require a new mix design.

At no time shall different grades of PG Binders be mixed together in the same storage tank.

When it is necessary to switch to a new binder grade the tank shall be drawn down as far as possible, normally to the top of heating coils, before refilling with the new binder. The new binder shall be circulated thoroughly before restarting production.

401.4.2.1-Warm Mix Asphalt: When the Division allows an approved HMA design to be produced as warm-mix asphalt (WMA) using the water injection system, the temperature of the completed mixture at the plant may be lowered to an established range that has previously been determined through trial production. The allowable temperature range specified on the approved T400 mix design form shall be adjusted accordingly when producing WMA. In addition, all references to the minimum compaction temperatures in

Sections 401.10.3 and 401.10.4 of this specification and in MP 401.05.20, Compaction

Testing of HMA Pavements, may be waived if it can be established that additional density can be obtained at lower temperatures without damaging the pavement. Intermingling of

WMA and HMA on the same course should be avoided. If circumstances result in the need for intermingling, it must be approved by the Engineer. Upon approval, the location where intermingling occurs on the project shall be clearly defined and documented by the Contractor and submitted to the Engineer. Also, if the intermingling occurs on a project where the density of the pavement is being controlled by the rollerpass compaction method, then a new test section shall be established on the new material beginning at the point where the WMA and

HMA meet. All testing requirements established for HMA mix designs and quality assurance/quality control testing shall also apply to WMA.

401.5-TESTING:

401.5.1-Test Methods:

MP 700.00.06 Aggregate Sampling Procedures

AASHTO T168 Sampling Hot-Mix Asphalt

AASHTO T11 Materials Finer than No. 200 (75 µm) Sieve in Mineral

Aggregates by Washing

AASHTO T27 Sieve Analysis of Fine and Coarse Aggregates

AASHTO T30 Mechanical Analysis of Extracted Aggregate

AASHTO T164 Quantitative Extraction of Bitumen from Bituminous

Paving Mixtures

AASHTO T308 Asphalt Content of HMA by the Ignition Method (Test

Method A)

AASHTO T245 Resistance to Plastic Flow of Bituminous Mixtures Using

Marshall Apparatus

ASTM D5581 Resistance to Plastic Flow of Bituminous Mixtures Using

Marshall Apparatus (For Base-I Marshall designs only)

AASHTO T166 Bulk Specific Gravity of Compacted Bituminous Mixtures

AASHTO T209 Maximum Specific Gravity of Bituminous Paving Mixtures

AASHTO T312 Determining the Density of HMA Specimens by Means of the Superpave Gyratory Compactor

401.6-CONTRACTORS QUALITY CONTROL:

401.6.1-Quality Control Testing: Quality control of bituminous asphalt is the responsibility of the Contractor. The Contractor shall maintain equipment and qualified personnel including at least one certified Asphalt Plant Technician at each plant. The technician shall be in charge of all plant quality control activities such as mix proportioning and adjustment and all sampling and testing activities necessary to maintain the various properties of asphalt within the limits of the specification.

The Contractor shall maintain necessary equipment and qualified personnel including at least one certified Asphalt Field and Compaction Technician at each project during paving operations. Additionally, a certified Asphalt Field and Compaction Technician with certification to perform nuclear density testing of asphalt pavements shall perform all testing necessary to assure compaction of the asphalt meets specification requirements. Compaction

Technicians may serve as Asphalt Field and Compaction Technicians for asphalt compaction testing until December 31, 2017.

The Contractor, shall design a workable Quality Control Plan, detailing the type and frequency of sampling and testing deemed necessary to measure and control the magnitude of the various properties of the asphalt governed by these specifications. This plan, prepared in accordance with MP 401.03.50 shall be submitted to the Engineer for review prior to production of material under this specification.

401.6.2-Job Mix Formula (JMF) Field Verification: For each JMF, a mix design field verification shall be conducted during the first days of plant production. For Marshall designs, the verification shall be in accordance with the guidelines established in MP 401.02.27. For

Superpave, designs it shall be in accordance with MP 401.02.29. The field verification is for the purpose of demonstrating that the JMF can be produced within the specified tolerances set forth in the MP. If the mix cannot be produce within these requirements, a new mix design will be required.

401.6.3-Quality Control Testing Requirements: After the JMF design field verification has been successfully completed, sampling frequency and test requirements for quality control shall be as set forth in MP 401.02.27 for Marshall designs and MP 401.02.29 for Superpave designs. If the Division determines that a mix cannot be consistently produced within the tolerance limits of the specified design properties, approval of the mix may be revoked and the contractor will be required to provide a new mix design.

401.7-ACCEPTANCE TESTING:

401.7.1-Acceptance Testing of HMA: Acceptance testing of asphalt is the responsibility of the Division. For Superpave mixes, the acceptance sampling and testing requirements for the mixture shall be as set forth in MP 401.02.29.

401.7.2-Surface Tolerance: It is the intent of these specifications that projects with a total new pavement thickness of 3 inches (75 mm) or more and minimum length of two lots (1100

ft. (340 m)) shall be constructed to provide a smooth riding surface. The smoothness of the riding surface will be determined by the Engineer using an inertial profilometer or Mays Ride

Meter. The smoothness testing shall be accomplished within 30 days after the project is substantially complete. On urban projects with numerous side streets where traffic must cross through the paving operation, the Engineer shall determine if it is practical to evaluate the pavement for smoothness.

The pavement will be divided into sampling Lots of one-tenth (0.1) lane-mile (0.16 km) each. Each Lot shall exhibit a smoothness measurement, expressed in inches per mile

(millimeters per kilometer) equal to or less than that shown in the appropriate Table 401.7.2E or 401.7.2M. When a Lot is represented by a smoothness number greater than that shown in

Tables 401.7.2E or 401.7.2M, the unit price shall be adjusted as in 401.13.2.

TABLE 401.7.2E

Total New Pavement Thickness Smoothness

3 inches to 4 inches 81 inches per mile or less

4 inches or greater 65 inches per mile or less

TABLE 401.7.2M

Total New Pavement Thickness Smoothness

75 mm to 100 mm 1 250 mm/km or less

100 mm or greater 1 000 mm/km or less

When compaction is completed on the course, it shall present a uniform surface, true line and grade, conforming to the cross section shown on the Plans. When tested with a straightedge of approximately 10 feet (3 meters) in length and a template of the specified dimensions, the finished base course shall not show a deviation greater than ¼ inch (6 mm) and the finished wearing course shall not show a deviation from the required surface greater than 3/16 inch (5 mm).

The Contractor shall provide the straightedge and template for checking the surfaces and an employee to use them under the direction of the Engineer. Any irregularity of the surface exceeding the limits specified shall be corrected. Depressions which develop after the initial rolling shall be corrected by loosening the mixture and adding new material. High places shall be corrected by removing excess material.

Areas of completed courses found to be defective shall be removed and replaced with approved mixtures laid in accordance with these specifications, and no additional compensation will be allowed for materials used or work involved in replacing defective areas.

401.7.3-Compaction: Acceptance testing for compaction shall be performed in accordance with either the Lot-by-Lot method described in Section 401.7.3.1 or the rollerpass procedure described in MP 401.05.20, based the following criteria:

Roadway Type Compaction Method

Interstate and Expressways Lot By Lot

APD Routes Lot By Lot

NHS Routes Lot By Lot

All other routes and roadways Determined by Table 401.7.3.A

Patching-and-leveling and scratch courses shall not be included in determining the total new pavement thickness. When asphalt is placed in areas that require a non-uniform thickness or is tapered to a thin edge, the method of acceptance testing shall be determined by the

Engineer. Acceptance testing is not required on areas in which a full-size roller is restricted from properly compacting the mat. These areas shall be compacted to the satisfaction of the

Engineer.

TABLE 401.7.3A

Mainline Compaction Methods

Traffic

Type

Total New

Pavement

Thickness

Marshall

Lift Thickness

Superpave

Lift Thickness

Compaction

Method Note 1, Note 2

Heavy

≥ 3 million

ESALs

≥ 2.5 inches

(63 mm)

≥ 1.5 inch

(37.5 mm)

≥ 1.5 inch

(37.5 mm) Lot-by-Lot

< 1.5 inch

(37.5 mm)

< 1.5 inch

(37.5 mm) Rollerpass

< 2.5 inches

(63 mm)

> 1.5 inch

(37.5 mm)

> 1.5 inch

(37.5 mm) Lot-by-Lot

≤ 1.5 inch

(37.5 mm)

≤ 1.5 inch

(37.5 mm) Rollerpass

Medium

< 3 million

ESALs

≥ 3.0 inches

(75 mm)

> 1.5 inch

(37.5 mm)

> 1.5 inch

(37.5 mm) Lot-by-Lot

≤ 1.5 inch

(37.5 mm)

≤ 1.5 inch

(37.5 mm) Rollerpass

< 3.0 inches

(75 mm) All lifts All lifts Rollerpass

Note 1 Any lift that is placed at a thickness of less than two times the nominal maximum aggregate size, as specified in either Table 401.4.2A or Table 401.4.2B, shall be compacted using the rollerpass method.

Note 2 Any asphalt that has been specified with a higher than standard grade PG Binder (i.e.

PG 70-22, PG 76-22, etc.) shall be compacted using the Lot by Lot method in accordance with Section 10.0 of MP 401.05.20.

TABLE 401.7.3B

Other Compaction Situations

Procedure Construction Situation Compaction Method

Shoulders New Construction Lot-by-Lot

Overlay Projects Rollerpass

Shoulders with Rolled-In

Rumble Strips Surface Course Only See Section 401.7.3.2

Trench Paving All Rollerpass or Satisfaction of the Engineer

Pavement Widening All Rollerpass or Satisfaction of the Engineer

Pavement Repairs All Rollerpass or Satisfaction of the Engineer

401.7.3.1-Lot-by-Lot Testing: Randomly located nuclear density tests will be performed in accordance with the Lot-by-Lot test procedure described in MP 401.05.20.

The pavement shall be divided into Lots not exceeding 1000 feet (300 meters) of paving lane. A randomly located density test shall be conducted in each Lot. The density shall be within the range of 92 to 96% of the maximum density of the approved mix design or the maximum density established under Section 401.6.2, Job Mix Formula Verification. If the density is outside the range, an additional five tests shall be conducted for the Lot and the average of these five tests used to judge acceptance of the Lot in accordance with Table

401.13.3.

401.7.3.2-Shoulders with Rolled-In Rumble Strips: On both new construction and overlay projects, the compaction requirement for the surface course of the shoulder shall be in accordance with the rollerpass procedure described in MP 401.05.20. However, the number of roller passes may be reduced in the area of the rolled-in rumble strip to allow for the proper placement of the rumble strip.

401.7.4-Thickness: When a uniform thickness of three inches (75 mm) or more is specified, excluding resurfacing, cores shall be taken to verify the thickness of the compacted pavement.

Cores will be taken by the Division at random locations. The sampling frequency shall be approximately five cores per 2,000 feet (600 meters) of two-lane construction, except that the sampling frequency shall normally be limited to a minimum of five and a maximum of 50 cores per project. The Division may elect to waive coring for short projects of less than 1,000 feet (300 meters) in length or for projects where a paving mat of uniform thickness cannot be expected (for example: tapered paving mats or pavement widening projects). The Division may also elect to take additional cores when needed to resolve problems related to pavement thickness.

The thickness shall be considered acceptable if one or both of the following criteria are met:

(a) The average thickness equals or exceeds the specified thickness.

(b) The average thickness is less than the specified thickness, but the difference is not statistically significant at the 95% confidence level. (Standard one tail “t” test at 0.05 significance).

The calculated ‘t’ value shall be less than or equal to the standard ‘t’ value at the 95% confidence level. The method for calculating Criteria ‘B’, shall be as follows:

95tt

Where:

95t = value from standard “t” table for 95% confidence level t x x s n s xs = specified thickness

= average thickness n = number of samples s x x x = individual core thickness

If the average thickness is less than specified and is determined to be significant as determined by criteria ‘B’, the Division shall decide on a course of action as described in

Section 401.13.4.

401.8-WEATHER RESTRICTIONS:

Bituminous asphalt shall only be placed when the surface is dry and when weather conditions are such that proper handling, finishing, and compaction can be accomplished. In no case however, shall asphalt be placed when the surface temperature is below the minimum established in Table 401.8.

TABLE 401.8

Course Thickness Minimum Surface Temperature

3 inches (75 mm) and over 35 °F (2 °C) Note 1

1.5 to 2.9 inches (38 to 74 mm) 40 °F (4 °C)

Less than 1.5 inches (38 mm) 50 °F (10 °C)

Note 1 In lieu of 35 °F (2 °C), a minimum air temperature of 40 °F (4 °C) shall be used when paving directly on an aggregate base, subbase, or subgrade.

In addition to the above surface temperature requirements, no wearing courses shall be placed when the air temperature is less than 40° F (4° C).

401.8.1-Cold Weather Paving: When the air temperature falls below 50° F (10° C) or the surface temperature falls below 60° F (15° C) the provisions for cold weather paving shall apply.

Paving shall be performed so that the transverse joints in adjacent lanes shall be no more than 50 feet (15 meters) apart at the end of each day's paving operations.

The surface temperature shall be taken a minimum of once every hour and shall be taken in all shaded areas. The temperature requirements as listed in Table 401.8 shall apply.

It shall be the Contractor's responsibility to monitor the declining surface temperature to insure that material delivery from the plant be terminated so as to allow that all material can be placed prior to the surface temperature falling below the surface temperatures listed in Table

401.8.

The temperature of the delivered material and the mat temperature at the time final density is obtained shall be taken for every truck load. These temperatures shall be in accordance with

Section 401.10.3 for delivered material and 401.10.4 for the mat temperature at the time final density is obtained.

401.9-EQUIPMENT:

401.9.1-Plants: All plants in West Virginia producing asphalt for the Division shall provide documented evidence of compliance with current requirements of the West Virginia

Air Pollution Control Commission.

All plants which are not in West Virginia but producing asphalt for the West Virginia

Division of Highways shall provide documented evidence of compliance with current requirements of the laws and regulations of the State in which they are producing, applicable to air pollution. All plants shall meet the general requirements set forth in AASHTO M156 unless it can be demonstrated to the satisfaction of the Engineer that a consistent quality mix can be produced with modifications to any of these requirements.

401.9.2-Dust Collector: An efficient dust collecting system shall be provided to prevent the loss of fine material. The material collected may be returned to the mixture at a uniform rate or discarded.

401.9.3-Truck Scales: Truck scales shall be provided at each Plant, except that truck scales are not required at properly calibrated automatic batching plant facilities which are equipped with digital printout equipment, and which load the trucks directly from the mixer or the weigh hopper in a surge or storage bin.

A person designated as a weigher shall be provided by the producer. The weigher shall certify that the weight of the asphalt, as determined either by the truck scales or from the digital printout of the batch weights, is correct.

Each truck shall be weighed empty prior to each load, except at automatic batch plants approved to operate without truck scales.

All truck scales shall be mounted on solid foundations which will insure them remaining plumb and level.

Approval and sealing of scales shall be conducted at the frequency determined by the West

Virginia Division of Labor, Bureau of Weights and Measures, and when the plant is moved, or upon the request of the Engineer. The Engineer shall be notified of any scale malfunctions when material is being furnished to Division of Highways projects. The Division may, at its option, accept inspection and sealing by out-of-state agencies when the mixing plant is located outside West Virginia.

A digital recorder shall be required on all truck scales. The digital recorder shall produce a printed record of the gross, tare and net weights, and the time, date, truck identification, and project number. Provision shall be made for constant zero compensation and further provision shall be made so that the scales may not be manually manipulated during the printing process.

The system shall be interlocked so as to allow printing only when the scale has come to rest.

In case of breakdown of the automatic equipment, the Engineer may permit manual operation for a reasonable time, normally not to exceed 48 hours, while the equipment is being repaired.

The scales shall be of sufficient size and capacity to weigh the loaded trucks that are used for delivery of asphalt from the plant.

401.9.4-Test Weights: As part of its standard equipment, each plant which proportions aggregate by weight shall provide a minimum of ten 50-pound (22.68 kg) test weights for the purpose of maintaining the continued accuracy of its weighing equipment.

Plants which proportion asphalt material by weight shall furnish, in addition to the above, one five pound (2.268 kg) test weight.

401.9.5-Surge and Storage Bins: During the normal daily operation of the plant, asphalt may be stored in a surge or storage bin for a maximum of 12 hours, provided the bin has received prior evaluation and acceptance through the District plant inspection. The resulting temperature of the material at time of placement and compaction shall be sufficient to comply with 401.10.3 and 401.10.4

Longer silo storage times, up to 24 hours, may be permitted for dense graded asphalt if the storage silo is insulated and/or heated to assure that the proper mix temperature is maintained.

The gates at the bottom of the storage silo shall be adequately heated and sealed when the asphalt is held for the extended period of time. An inert gas system may be used to purge the silo of oxygen to prevent oxidation of the asphalt. The asphalt delivered from the storage silo shall meet all of the specification requirements.

When asphalt is stored for the extended time period, it shall not be used until the temperature has been checked and the asphalt has been visually inspected for hardening of the mix and stripping of the asphalt from the aggregate. Approval of the extended storage time may be revoked if it is determined through inspection and/or testing that the extended storage is having a detrimental effect on the asphalt.

Loading of trucks through the storage bin will only be permitted when a minimum 25-ton

(23-Mg) buffer of material is being maintained or an amount as recommended by the bin manufacturer, means shall be provided for loading the trucks directly from the mixer when the storage bin is not in operation.

401.9.6-Inspection of Equipment and Plant Operations: The Engineer shall have access to the plant to assure the adequacy of the equipment in use, to inspect the conditions and operation of the plant, to verify weights, to verify the proportion and character of materials, and to determine if specified temperatures are being maintained in the preparation of the mixture.

401.9.7-Trucks for Transporting Mixture: The inside surfaces of trucks shall be thinly coated with a soapy water or a mixture with not more than ten percent lubricating oil. The use of diesel fuel, kerosene, or similar solvent-based products which can dissolve the asphalt film from the aggregate particles will not be permitted. Any commercial release agent which can be certified as harmless to the mix may be used; however, the Division reserves the right to restrict any release agent that is shown to cause problems during placement of the mix. In the case of mixtures composed of PG Binders which contain polymer modification, truck surfaces should be coated with a release agent recommended by the binder supplier. All excess coating material shall be removed from the truck bed prior to loading the asphalt.

All truck beds shall be insulated with approved material. No trucks shall be used which cause segregation of the materials, which show large oil leaks, or which cause undue delays in delivery of material. All trucks shall be provided with a waterproof cover and a hole in the body for the purpose of conveniently checking the temperature of the load. Covers shall be suspended slightly above the mixture, shall extend over the sides of the truck, and shall be securely fastened to eliminate air infiltration and to prevent water from coming in contact with the mixture.

401.9.8-Laboratory: A testing facility or laboratory, as described below, shall be provided within reasonable proximity of the asphalt plant. Plant operations must be visible from within the laboratory.

The laboratory shall be of sufficient size to hold all laboratory test equipment and supplies with adequate floor space to allow the technicians to test samples in an efficient manner. The laboratory shall be furnished and maintained with adequate ventilation, heat, light, water, sink and drainage, electrical or gas outlets, or both, work table, shelves, and supply cabinets.

The laboratory shall be supplied with the equipment and materials listed below and these shall be maintained to meet the applicable requirements of AASHTO or ASTM:

i. Hot plate, gas or electric.

ii. Large ovens (as needed for heating and drying samples), gas or electric.

iii. Unit weight container, ½ cubic foot (0.014 cubic meter). Required for slag only.

iv. Balances of sufficient capacity and accuracy for conducting specified tests and plant calibration.

v. Thermometers: dial type, liquid-in-glass, and digital as required for conducting standard test procedures and monitoring mix temperatures. Digital thermometers shall be equipped with an appropriate sturdy probe that can be pushed into a sample of hot asphalt to check the temperature of the mix.

vi. Standard Gilson shaker or equivalent, with screens.

vii. Ro-Tap shaker or equivalent, with 8 and/or 12 inch (200 and/or 300 mm) diameter screens.

viii. Sample splitters for fine and coarse aggregates.

ix. Miscellaneous items (including sample splitting trowels, scoops, square point shovel, aggregate sample pans, heat resistant gloves, measuring rules, brushes, flashlight, timing devices, and glassware as needed).

x. Expendable supplies necessary for performance of tests.

xi Equipment for determining the maximum specific gravity of asphalt mixtures as specified in AASHTO T209.

xii. Equipment for determining the in-place density of asphalt mixtures meeting the requirements of MP 401.05.20.

xiii. Non-contact infrared thermometer accurate to ± 2° F (± 1° C).

xiv. Equipment for determining the bulk specific gravity of HMA using saturated surface dry specimens complying with AASHTO T166.

xv. Marshall equipment necessary to comply with AASHTO T245 and ASTM D5581, including a calibrated automatic testing apparatus having recording capabilities and compaction hammers. (Marshall designs only)

xvi. Asphalt content ignition oven with built-in scale and printer meeting the requirements of

AASHTO T308, Test Method A. (Optional for Marshall designs – Mandatory for Superpave designs)

xvii. Calibrated Gyratory compactor meeting requirement of AASHTO T312 with computer

(including software for data acquisition and test calculations) and primer. Compactor must be calibrated to the internal angle in accordance with AASHTO TP71 with annual verification (Superpave designs only).

401.9.9-Asphalt Paving Equipment: Asphalt paving equipment shall be self-contained and of sufficient size, power and stability to receive, distribute and strike-off the asphalt mixture at rates and widths commensurate with the typical sections and other details shown on the plans. The paver shall be provided with an activated screed or strike-off assembly equipped to be heated. Approval of the paver by the Engineer will be based on the demonstrated capability of the equipment to place the mixture to the required cross-section, profile and alignment in an acceptable, finished condition ready for compaction.

The paver shall be equipped with means of preventing the segregation of the coarse aggregate particles when moving the mixture from the paver hopper to the paver augers. It shall also be capable of pushing a sufficient amount of the mixture under the auger gearbox to prevent streaking or tearing of the mat. Some paver models may require the installation of a manufacturer retrofit kit or equipment modification to accomplish this.

Specialized equipment or hand methods approved by the Engineer may be employed to spread the asphalt mixture where the use of standard full scale paver is impractical due to the size or irregularity of the area to be paved.

Pavers shall be equipped with mechanical or automatic grade and slope controls. The use of automatic grade and slope controls with a traveling straight edge shall be required only when specified on the Plans or in the Proposal. Both the grade and slope controls shall be in working order at all times. In the event of failure of the automatic controls, the Contractor will be permitted to finish the day's work using manual controls but will not be allowed to resume work the following day until the grade and slope controls are in proper working order.

401.9.10-Compaction Equipment: Compaction may be performed by self-propelled steel-wheeled, pneumatic-tired and/or vibratory rollers. Hand-held rollers or vibrating plates may be used in small inaccessible areas if approved by the Engineer. Prior to use on any project, the roller shall be inspected to see that it is in good mechanical condition. The total weight, weight per inch of width (steel-wheeled), and average ground contact pressure

(pneumatic-tired) shall be documented.

401.10-PAVING OPERATIONS:

401.10.1-Cleaning and Sweeping: Immediately prior to the arrival of the paving mixture, the existing base or surface shall be thoroughly cleaned by the use of tools and equipment as may be required to remove all mud, dirt, dust, and other caked or loose material foreign to the type of treatment or surface being placed. The cleaning shall be done to a minimum width of one foot on each side beyond the width of the surface being placed.

401.10.2-Patching and Leveling and Scratch Courses:

401.10.2.1-Patching and Leveling: A tack coat shall be applied to the existing pavement prior to placing patching and leveling.

Patching and leveling shall be placed at various locations throughout the project to remove irregularities in the existing pavement such as dips, or to raise the outside edge of the existing pavement to provide a uniform template prior to placing a base or wearing course. Patching and leveling shall not be placed as a continuous layer or course over the full width and length of the project.

Compaction of patching and leveling shall be performed with three-wheel (steel) or pneumatic-tire rollers.

401.10.2.2-Scratch Course: A tack coat shall be applied to the existing pavement prior to placing a scratch course.

The scratch course shall be placed to the limits designated on the plans. Scratch course shall be placed with a paving machine. The paving machine screed shall be set to drag on the high areas of the existing pavement, only depositing material in ruts and other depressions.

The wearing course, or at least one lift of base course, should be placed over the scratch course prior to maintaining traffic in the lane where the scratch course has been placed. All repairs to a scratch course due to traffic damage shall be at the contractor’s expense.

Compaction of a scratch course shall be performed with a three-wheel (steel) or pneumatic-tire roller.

401.10.3-Spreading and Finishing: Before spreading any material, the contact surfaces of curbs, gutters, manholes, and of adjacent Portland cement concrete pavement edges shall be painted or sealed with asphalt material. Exact edge of pavement, except on concrete, shall be established by a string or chalk line for a distance of not less than 500 feet ahead of the spreading operation.

For mixes produced with neat (non-modified) asphalts (which may include PG 70-22, PG

64-22, PG 64-28, and PG 58-28) the temperature of the mixture at the time of placement shall be within the temperature requirements of the JMF. The JMF temperature range shall be within the master temperature range of 250° and 338° F (121° and 170° C) unless otherwise specified by the asphalt supplier. The mix temperature shall be monitored by inserting a dial type thermometer into the mix through the hole in the truck bed.

The temperature of the completed mix, when measured at the plant, shall be within the tolerance as established by the JMF. The first load which demonstrates temperatures outside of that range shall be accepted, provided that the temperature is still within the master temperature range. No additional loads of material shall be run out until necessary steps are taken to reestablish the temperature of the mix within the plant tolerance. When measured at the project site, the temperature of the mix shall be within the tolerance established by the JMF.

The first truck load of material which demonstrates temperatures outside of that range or any trucks in transit at that time shall be accepted provided temperatures are within the master temperature range. Any truckload of material which exceeds the master temperature range may be rejected by the Engineer. However, the plant shall immediately be notified that no additional loads of material are to be dispatched until necessary action is taken to reestablish temperature within JMF specification limits.

When the surface temperature falls to within 10° F (6° C) of the weather restrictions of

Table 401.8, the mix temperature may be increased up to a maximum of 338° F (170° C) unless otherwise specified by the asphalt supplier. The temperature of each truckload of material shall be monitored for compliance. Any truckload of material which exceeds this maximum temperature may be rejected by the Engineer.

Mixes produced with asphalts that contain modifiers for high or low temperature performance enhancement shall meet the temperature requirements recommended by the asphalt supplier, which will be referenced on the JMF.

401.10.4-Rolling Procedure: Shoulders, ramps, and similar areas shall be compacted in the same method as the mainline.

During rolling, roller wheels shall be kept moist with only enough water to avoid picking up material. Fuel oil on roller wheels or pneumatic tires is not allowed. Rollers shall move at a slow but uniform speed with the drive roll or wheels nearest the paver.

If rolling causes material displacement, the affected area shall be loosened at once with lutes or rakes and restored to its original grade with loose material before being re-rolled.

Heavy equipment, including rollers, should not be permitted to stand on the finished surface before it has thoroughly cooled or set.

Mat temperature shall be measured using a non-contact infrared thermometer. The required density shall be obtained prior to the mat temperature reaching 175° F (80° C). The

Contractor shall be allowed to lower this temperature to 165° F (74° C) if they can demonstrate during the first day of placement of each lift on each project that additional densification can be achieved without causing any pavement distress.

401.10.5-Joints: The longitudinal joint in any layer shall offset that in the layer immediately below by approximately six inches; however, the joint in the top layer shall be at the centerline of the pavement if the roadway comprises two lanes of the width, or at lane lines if the roadway is more than two lanes in width. The transverse joint in any layer shall offset that in the layer immediately below by approximately six feet.

All transverse joints between existing and new pavement shall be “heeled-in” to the existing surface at the beginning and at the end of the project and at all other locations where the new pavement terminates against an existing pavement. Transverse joints between one day's production and the next shall be carefully constructed and shall be formed by cutting back into the existing section to expose the full depth of the course. All joints shall be squared up to the full vertical depth of the course to be placed, and a tack coat of asphalt material shall be applied. Joints adjacent to curbs, gutters, or adjoining pavement shall be formed by transporting back sufficient hot material to fill any space left uncovered by the paver.

The longitudinal joint between adjacent mats shall be set up to a sufficient height to receive the full compactive effort from the rollers and shall be tacked prior to placing adjacent material.

Transverse joints shall be checked for smoothness with a ten foot straight edge provided by the Contractor. All surface irregularities shall be corrected prior to proceeding with paving operations.

401.11-PROTECTION OF PAVEMENT AND TRAFFIC CONTROL:

The Contractor shall be responsible for the protection of asphalt surfaces from damage by their equipment and personnel. When the construction of asphalt surfaces is undertaken on projects under public traffic and the road surface is 16 feet wide or greater and the ADT is 400 or greater, the Contractor shall place no passing signs, Interim pavement markings, and Temporary pavement markings to delineate the edge line, centerline, and/or lane line of the roadway as required herein and in the project plans. The provision of Section 636: Maintaining Traffic shall apply.

401.12-METHOD OF MEASUREMENT:

Asphalt concrete will be measured by the ton (Mg), or square yard (square meter). For projects paid by the ton, the quantity will be determined by the Contractor from the total weigh slips for each vehicle load weighed upon an approved standard scale or from digital printout slips from an automatic batching plant, and certified by the Contractor as correct. For projects paid by the square yard, the quantity will be determined by the Plan Quantity as provided for in the proposal unless otherwise directed by the Engineer.

Any patching or leveling mixture placed on a subbase or base course constructed in the same Contract with the asphalt items shall be at the expense of the Contractor. No additional compensation will be allowed for the material or any work incidental to its placement.

401.13-BASIS OF PAYMENT:

The quantities determine as provided above, will be paid for at the contract unit price for the items listed below, which prices and payment shall be full compensation for furnishing all the materials and doing all the work herein prescribed in a workmanlike and acceptable manner, including all labor, tools, equipment, field laboratory, supplies, and incidentals necessary to complete the work.

The conditioning, cleaning, and sweeping of the existing base or underlying surface shall be considered as part of the construction of the appropriate items listed in 401.14, and no additional compensation will be allowed for "Cleaning and Sweeping".

There will be no additional compensation for tack coat material used for minor (spot) areas to be patched and leveled; the cost of this tack coat material will be included in the unit bid price for the “patching and leveling” Item.

There will be no additional compensation for Interim Pavement Markings.

401.13.1-When a Lot of Superpave asphalt material is found not in compliance with the tolerance requirements of MP 401.02.29, it shall be subject to a price adjustment in accordance with the criteria established in this MP.

401.13.2-When a Lot of asphalt pavement is represented by a smoothness value larger than that shown in Tables 401.7.2E or 401.7.2M, the unit price of the Lot (surface course only) shall be determined as follows:

ENGLISH VERSION:

Reduced Unit Price = Unit Bid Price X [(127.86 – As)/100]

Where A = 0.429 when specified smoothness is 65 in/mi

Where A = 0.341 when specified smoothness is 81 in/mi

Where s = Smoothness value measured as per 401.7.2

METRIC VERSION:

Reduced Unit Price = Unit Bid Price X [(127 – As)/100]

Where A = 0.0274 when specified smoothness is 1 000mm/km

Where A = 0.0218 when specified smoothness is 1 250 mm/km

Where s = smoothness value measured as per 401.7.2

When the measured smoothness value exceeds the specified value by 50% or more, the Lot so measured shall be corrected, at the Contractor’s expense, to comply with Tables 401.7.2E or Table 401.7.2M.

401.13.3-When a Lot of asphalt pavement does not meet the density requirements of

401.7.3, the Price shall be adjusted as follows:

FORMULA-1: Projects requiring only mat density testing:

Lot Price Adjustment (Mat only) = (unit price) X (Lot quantity)

X ( mat density price adjustment % from

Table 401.13.3A)

TABLE 401.13.3A

Adjustment of Contract Price for

Pavement Density not Within Tolerance of Density

Percent of Density Percent of Contract Price to be Paid

Greater than 96 % Note 1

95% to 96% 102

92% to 94% 100

91% 98

90% 96

89% 92

88% 88

Less than 88% Note 2

Note 1 Mat density slightly above 96% is normally only a problem if it leads to asphalt flushing on the surface of the mat or rutting due to an unstable mix. The Division will make a special evaluation of the material and determine the appropriate action

Note 2 When the density is less than 92%, the mat will be more susceptible to accelerated deterioration and a decrease in the expected service life of the pavement. For price adjustments on mat densities less than 88%, the percent of Contract Bid Price will be decreased by 10% per percentage of mat density less than 88%, unless a Special evaluation performed by the Division determines a more appropriate action.

401.13.4-When a Lot of asphalt pavement is determined to be statistically non-conforming in accordance with criteria ‘B’ of Section 401.7.4, the Division will review the plans and project records to determine if there is an acceptable explanation for this deficiency. If it is determined that a deficiency does exist, one of the following adjustments may be used. If the deficiency is less than ¾ inch (19 mm), the Division may choose to accept the material at a price equal to the bid price times the ratio of the average thickness divided by the specified thickness. If the deficiency is ¾ inch (19 mm) or greater, the Division may require that an additional lift of material [specified to the nearest ¼ inch (6 mm) of the deficiency] be placed at the Contractor’s expense. Retesting of the overlay will be at the expense of the Contractor in accordance with MP 109.00.20.

401.14-PAY ITEMS:

ITEM DESCRIPTION UNIT

401001-* “design method” Asphalt Base Course, “aggregate type”, Type “mix type”

Ton

(Megagram)

401002-* “design method” Asphalt Wearing Course, “aggregate type”, Type “mix type”

Ton

(Megagram)

401003-* “design method” Asphalt Patching And Leveling

Course, “aggregate type

Ton

(Megagram)

401007-* “design method” Asphalt Scratch Course, “aggregate type”, Type ‘mixed type”

Ton

(Megagram)

* Sequence number

“design method” shall be either Marshall or Superpave

“aggregate type” shall be either stone and gravel or slag

“mix type” from Table 401.4.2A or 401.4.2B