12343420R0003 Amendment 2.pdf
PDF 391 KB Posted
- Solicitation number
- 12343420R0003
About this file
This document contains an amendment to a federal solicitation for culvert replacement work. The amendment provides additional questions and answers to clarify project requirements, such as the need for a restroom facility and details on temporary guardrails and signage. It also incorporates a new attachment with a special project specification for drilling holes and filling voids with flowable fill under a line item measured by the linear foot. Proposals for the FR 150 Highland Scenic Highway 48-inch Culvert Replacement Project are due by 4:00 PM on May 26, 2020 to the Monongahela National Forest. The work is to be performed for the USDA Forest Service Eastern Region and involves replacing an existing culvert.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1 Amendment 1 SF-30.pdf | ||
| 2 Meeting Notes.pdf | ||
| 3 Attachment 13.pdf | ||
| 6 REVISED Attachment 2.pdf | ||
| 7 Site Visit Attendance Sheet.pdf | ||
| 5 12343420R0003 AMENDMENT 1.pdf | ||
| 4 Attachment 14.pdf | ||
| Attachment 12 Sustainable.doc | DOC document | |
| 12343420R0003.pdf | ||
| Attachment 3.pdf | ||
| Attachment 1.pdf | ||
| Attachment 7.pdf | ||
| Attachment 10 Methodology.doc | DOC document | |
| Attachment 9 Experience.doc | DOC document | |
| Attachment 2.pdf | ||
| Attachment 4.pdf | ||
| Attachment 5.pdf | ||
| Attachment 11 Personnel.doc | DOC document | |
| Attachment 8.pdf | ||
| Attachment 6.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A0002
CARRIE L EDWARDS; CONTRACTING OFFICER
THE PURPOSE OF THIS AMENDMENT IS TO INCORPORATE THE FOLLOWING:
1. ADDITIONAL QUESTIONS / CLARIFICATIONS
2. NEW ATTACHMENT: Attachment #15 - Special Project Specification Item 56506-0000
PROPOSALS ARE DUE BY 4:00 PM ON TUESDAY, MAY 26, 2020
USDA FOREST SERVICE
MONONGAHELA NATIONAL FOREST
1079 MAIN STREET EAST
WHITE SULPHUR SPRINGS, WV 24986
994913
12343420R0003
1 1
05/13/2020
04/06/2020
5/13/2020
12343420R0003 – FR 150 Highland Scenic Highway 48” Culvert Replacement Project Additional Questions / Clarifications
May 13, 2020
QUESTIONS AND ANSWERS:
1. What is the specification on 64602-1000, Building, Restroom?
ANSWER= Shall be installed before any work can start and a cleaning and pumping plan shall be in writing and gave to the COR. Please look at 1915.88(d) at https://www.osha.gov/laws-regs/regulations/standardnumber/1915/1915.88 for specification on restrooms.
2. Could a detail be provided for the G-4 W Beam System?
ANSWER= Please see sheets 16A and 16B which were added to the Project Drawings / Plans (Attachment #2) document with Amendment #1 (posted 5/7/2020).
3. What end terminals are to be used? I.e. Buffered End Section?
ANSWER= All guard rails that will be used are government owned and shall be picked up at the Marlinton Ranger Station and removed then delivered back to the Marlinton Ranger Station. The Contractor shall install guard rails with new wood posts. Some are the round type, and some are the square type post.
4. On SH 10/25, the signage details are provided and spec’d as Regulatory and Warning. We are interpreting the Regulatory signs to be permanent but there is only a pay item for temporary traffic control. Could it be clarified if there is permanent signage and if so, under what item will it be paid?
ANSWER= All signs are temporary and shall be removed after project is completed.
5. Can you elaborate on item 56506-0000, Coring/Pressure grouting ? The spec section in the FW14 does not apply. This section is for installing drilled shafts and installing structural concrete.
ANSWER= See Special Project Specification Item 56506-0000. This is being incorporated as a new attachment to the solicitation.
6. There is no way to predict how much concrete the voids will take. Can we make this a CY item or use the flowable fill item?
ANSWER= We are using flowable fill and it’s in CY; reference 20410-0000.
7. The pay item is for 111 LF. There’s no requirements on the sizes of holes to drill. Or, do you plan to pay for the pipe filled by the LF? If so, what about voids where the pipe is failed.
ANSWER= We are looking for a hole that can be filled with pressured flowable fill.
8. None of the drillers want to quote this.
ANSWER= An alternative could be them providing a price per day with operator. The flowable fill or pressure grout will be paid under item 20410-0000.
https://www.osha.gov/laws-regs/regulations/standardnumber/1915/1915.88 https://www.osha.gov/laws-regs/regulations/standardnumber/1915/1915.88
2020-SPS-56506-0000
Approved (05/20) Monongahela N.F.
SPECIAL PROJECT SPECIFICATION
Section 56506 Shaft Drilling
DESCRIPTION
56506-0000 Delete entire section and substitute the following.
Drilling and filling Voids With flowable fill This shall consist of drilling one or more holes that will equals
111 feet in total length overall. The contractor shall drill over top of exsisting pipe failure location with a suitable hole or holes that flowable fill can be pumped in the voids. The contractor shall work from the bottom of the voids and work up to the top insuring that all voids are filled with 700-1200 psi flowable fill.
Use Item 20410-000 Select Borrow (Flowable fill) to fill voids and drill hole or holes.
56506-0000 Under Pay Item 56506-0000- Shall be in Liner Foot (LF) Basis
File details come from the government source that posted it. Updated .