Attachment_05_MIMA-RFP_TrailsInferreraBoardwalks_DSC.pdf

PDF 1 MB Posted

Attached to
MIMA 317529 - Phase II - Landscaping Federal contract opportunity
Solicitation number
140P2023R0006
Issued by
Department of the Interior National Park Service National Office

About this file

This solicitation package is for a landscaping project at Minute Man National Historical Park with an estimated value between $5-10 million. The work will be conducted as a total small business set-aside under NAICS code 238910 for construction support activities. An on-site pre-solicitation conference will be scheduled to provide additional details to interested parties. Responses are due based on the timeline outlined in the solicitation. The National Park Service is the contracting agency overseeing this procurement.

View the file

Other files for this federal contract opportunity

Other files attached to MIMA 317529 - Phase II - Landscaping, newest first.
File Type Posted
B09_AM_006_L28_DETAILS_TRLS_L28_DETAILS_(2)_0006.pdf PDF
B09_AM_006_L27_DETAILS_TRLS_L27_DETAILS_(2)_0006.pdf PDF
Sol_140P2023R0006_Amd_0006.pdf PDF
B09_AM_005_MIMA_317529_Q_and_A_0005.pdf PDF
Sol_140P2023R0006_Amd_0005.pdf PDF
B09_AM_005_Attachment_11_WD_MA20210001_0005.pdf PDF
Sol_140P2023R0006_Amd_0004.pdf PDF
B09_AM_004_MIMA-RFP_TrailsInferreraBoardwalks_DSC_Rev1_0004.pdf PDF
B09_AM_004_MIMA_317529_Revised_CPS_0004.pdf PDF
B09_AM_004_Q_and_A_0004.pdf PDF
B09_AM_004_Attachment_10_Proposal_Submission_Package_(2)_0004.docx DOCX document
B09_AM_004_L8_NORTHBRIDGE_REPRINT_20221129_(1)_0004.pdf PDF
B09_AM_003_MIMA_PreProposal_Conf_0003.pdf PDF
Sol_140P2023R0006_Amd_0003.pdf PDF
Sol_140P2023R0006_Amd_0002.pdf PDF
Sol_140P2023R0006_Amd_0001.pdf PDF
B09_AM_001_Attachment_05_MIMA_TrailsInferreraBoardwalks_DSC_0001.pdf PDF
Attachment_08_MIMA_Lease_and_Ancillary_Staging_Plans.pdf PDF
Attachment_07_MIMA_APP-F_Wetland_Delineations.pdf PDF
Attachment_04_MIMA-inferrera_CD_kzla_2022-0328.pdf PDF
Attachment_03_MIMA_INFERRERA100__Specs_KZLA_TOWN_2022-0328.pdf PDF
Attachment_11_DB_Wage_Determination_MA20220001.pdf PDF
Attachment_09_MIMA_APP-H_Cultural_Landscape_Treatment_Procedures.docx DOCX document
Attachment_02_MIMA_Boardwalks_CD_rev_set_2022-0727.pdf PDF
Attachment_06_MIMA_APP-A_TRAILS_RFP.pdf PDF
Attachment_10_Proposal_Submission_Package.docx DOCX document
Attachment_01_MIMA_Boardwalks_100__Specs_KZLA_TOWN_2022-0527.pdf PDF
B08_140P2023R0006.pdf PDF
Sol_140P2023R0006.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MINUTE MAN NATIONAL HISTORICAL PARK

CONCORD, LINCOLN, AND LEXINGTON,

MASSACHUSETTS

SOLICITATION 140P2023R0006

REHABILITATE AND REPAIR STRUCTURES AND LANDSCAPES

PMIS 317529 – TRAIL REPAIRS,

PMIS 170863 – REROUTE BATTLE ROAD TRAIL,

PMIS 322882 – BOARDWALK REPAIRS

DESIGN-BID-BUILD (DBB) PROJECT SCOPE

(DBB Request for Proposal (RFP))

NATIONAL PARK SERVICE (NPS)

DENVER SERVICE CENTER (DSC)

3170529 RFP-TRAILS 09/09/2022 | Page 2 of 96

TABLE OF CONTENTS

1.0 PROJECT INTRODUCTION

1.1 PROJECT OVERVIEW

1.2 LOCATION

1.3 BACKGROUND

1.4 DESCRIPTION

1.5 SCHEDULE

1.5.1 DB DESIGN DEVELOPMENT DOCUMENTS (DD):

1.5.2 50% DRAFT DB CONSTRUCTION DOCUMENTS (CD):

1.5.3 100% COMPLETE DB CONSTRUCTION DOCUMENTS (CD):

1.5.4 FINAL STAMPED AND SIGNED DB CONSTRUCTION DOCUMENTS (CD)

WITH APPROVED CONSERVATION COMMISSION AGREEMENTS:

1.5.5 CONSTRUCTION:

1.5.6 AS-CONSTRUCTED DRAWINGS:

1.6 NPS CONTACTS & ADDRESS:

2.0 PROJECT REQUIREMENTS

2.1 INTRODUCTION

2.2 GENERAL REQUIREMENTS

2.2.1 SCOPE OF WORK AND PROJECT SUMMARY/REQUIREMENTS

2.2.2 DEFINITION OF CONTRACT LINE ITEMS

2.2.3 PROGRESS PAYMENTS

2.2.4 PROJECT MEETINGS

2.2.5 PROJECT SCHEDULE

2.3 DESIGN REQUIREMENTS

2.3.1 DB DESIGN DEVELOPMENT (DD) DOCUMENTS AND DB CONSTRUCTION

DOCUMENTS (CD)

2.3.2 DESIGN SUBMITTALS

2.3.3 FORMATTING

2.4 CONSTRUCTION REQUIREMENTS

2.4.1 ENVIRONMENTAL AND SUSTAINABILITY REQUIREMENTS

2.4.2 SCHEDULE OF VALUES

2.4.3 CONSTRUCTION SUPPORT

2.4.4 SUBMITTALS DURING CONSTRUCTION

2.4.5 CONSTRUCTION COORDINATION

2.4.6 DIGITAL IMAGES

2.4.7 QUALITY CONTROL

2.4.8 WORKING HOUR RESTRICTIONS

2.4.9 TEMPORARY SERVICES

2.4.10 ACCESS

3170529 RFP-TRAILS 09/09/2022 | Page 3 of 96

2.4.11 PRESERVATION OF ADJACENT FEATURES

2.4.12 EXISTING UTILITIES

2.4.13 HAULING RESTRICTIONS

2.4.14 ACCIDENT PREVENTION

2.4.15 TEMPORARY CONTROLS

2.4.16 FIELD ENGINEERING

2.4.17 PROJECT CLOSE-OUT

2.4.18 SUBSTANTIAL COMPLETION AND FINAL INSPECTION

2.5 SAMPLE & TEMPLATE

3.0 ELEMENT 1: TRAIL REPAIRS

3.1 LOCATION

3.2 BACKGROUND

3.3 DESCRIPTION

3.4 SUB-ELEMENT 1A – NORTH BRIDGE TRAIL REPAIRS

3.4.1 OVERVIEW

3.4.2 SUB-ELEMENT 1A SCOPE

3.4.3 DESIGN STANDARDS

3.4.4 CULTURAL AND ARCHEOLOGICAL RESOURCES

3.4.5 TRAIL SURFACING AND DRAINAGE

3.4.6 WETLAND PROTECTIONS

3.4.7 VEGETATION MANAGEMENT

3.4.8 EROSION CONTROL

3.4.9 ACCESS AND TRAFFIC CONTROL DURING CONSTRUCTION

3.4.10 ABAAS REQUIREMENTS

3.5 SUB-ELEMENT 1B – BATTLE ROAD TRAIL REPAIRS

3.5.1 OVERVIEW

3.5.2 SUB-ELEMENT 1B SCOPE

3.5.3 DESIGN STANDARDS

3.5.4 CULTURAL AND ARCHEOLOGICAL RESOURCES

3.5.5 TRAIL SURFACING AND DRAINAGE

3.5.6 WETLAND PROTECTIONS

3.5.7 VEGETATION MANAGEMENT

3.5.8 EROSION CONTROL

3.5.9 ACCESS AND TRAFFIC CONTROL DURING CONSTRUCTION

3.5.10 ABAAS REQUIREMENTS

4.0 ELEMENT 2: REROUTE BATTLE ROAD TRAIL TO IMPROVE SAFETY AND VISITOR

EXPERIENCE

4.1 LOCATION

4.2 BACKGROUND

4.3 DESCRIPTION

3170529 RFP-TRAILS 09/09/2022 | Page 4 of 96

5.0 ELEMENT 3: BOARDWALK REPAIRS

5.1 LOCATION

5.2 BACKGROUND

5.3 DESCRIPTION

6.0 GENERAL DESIGN CRITERIA AND CONSIDERATIONS

6.1 CULTURAL RESOURCES

6.2 ARCHEOLOGY

6.5 WETLAND PROTECTIONS

6.6 VEGETATION MANAGEMENT

6.7 ACCESS AND TRAFFIC CONTROL DURING CONSTRUCTION

6.8 PHASING

6.9 ABAAS REQUIREMENTS

6.10 GIS REQUIREMENTS

7.0 PERFORMANCE REQUIREMENTS

7.1 ELEMENTS AND PRODUCTS

8.0 TECHNICAL REQUIREMENTS

G10 – SITE PREPARATION CRITERIA

G20 – SITE IMPROVEMENTS CRITERIA

APPENDIX A – SCHEMATIC DESIGN DRAWINGS – TRAIL REPAIRS

APPENDIX B – BATTLE ROAD REROUTE CONSTRUCTION DOCUMENTS

APPENDIX C – BOARDWALK REPAIR CONSTRUCTION DOCUMENTS

APPENDIX D – WETLAND DELINEATION REPORTS

APPENDIX E – STAGING AREAS PER ANCILLARY AND LEASE STRUCTURE DESIGN

PACKAGE

APPENDIX F – CULTURAL LANDSCAPE TREATMENT PROCEDURES SAMPLE

SPECIFICATION

3170529 RFP-TRAILS 09/09/2022 | Page 5 of 96

1.0 PROJECT INTRODUCTION

MIMA PMIS 317529 – TRAIL REPAIRS,

MIMA PMIS 170863 – REROUTE BATTLE ROAD TRAIL,

MIMA PMIS 322882 – BOARDWALK REPAIRS

Project Title: REHABILITATE AND REPAIR STRUCTURES AND LANDSCAPES

Project Drawing Number: 406 – 184184 Trail Repairs

406 – 178327 Reroute Battle Road Trail

406 – 178326 Boardwalk Repairs

1.1 PROJECT OVERVIEW

This document provides the Program of Requirements (POR) to repair, replace, and rehabilitate historic and non-historic elements within the Cultural Landscapes at Minute Man National Historical Park (MIMA).

This project requires completion of Contract Documentation, negotiation of required permits, and completion of construction. Architect-Engineer (A/E) Services shall be performed by licensed Architects and Engineers registered in good standing in the Commonwealth of Massachusetts.

The work of this task order shall be performed in accordance with the Denver Service Center (DSC) Design-Build (DB) Workflows website.

The DB homepage includes links to design phases describing required workflow process from Predesign (PD) through Construction Documents (CD). Each design phase webpage contains links to definitions, forms, templates, samples, and guidelines.

The DB homepage also includes links to the Design Standards and Design Deliverables sections which provide design requirements and criteria that shall be used for completing the work of this contract:

Design Standards are arranged by discipline and/or specialty.

DB Design Deliverables - Content and Format Requirements:

o Design phase submission requirements for:

o Technical content o Submission format

In addition, the Information section has links directly to:

3170529 RFP-TRAILS 09/09/2022 | Page 6 of 96

Definitions: A list of terms relevant to design and construction in National Parks.

Forms/Templates/Samples/Guidelines: A list of forms, templates, samples, and guidelines used for a typical project.

Law/Regulations/Polices/Guidance: A list of sources for retrieving laws, regulations, policies, and guidance applicable to NPS projects.

Quality Assurance (QA) Guideline & Review Checklists: Overview of the DSC

QA Process for reviewing Design Documents.

In case of conflict between this task order and the DSC DB Workflows website, this task order shall take precedence and shall be used in lieu of conflicting portions.

The A/E remains fully responsible for determining if the standards or provisions cited on the DSC DB Workflows website have been revised or updated. Any such conflicts between the website and the identified standard or provisions shall be brought to the attention of the Contracting Officer (CO).

The goal of this project is to return the cultural landscapes and trail system to good condition while addressing chronic drainage issues. All elements of this project shall be completed by October 15, 2024.

1.2 LOCATION

This project is located at Minute Man National Historical Park (MIMA).

A seven-mile linear park with four distinct units, the Minute Man NHP spans three towns -- Concord, Lincoln, and Lexington, Massachusetts -- and attracts more than one million visitors a year. The park’s mission is to preserve the historic sites, structures, properties, and landscapes associated with the opening battles of the American Revolution. The park also preserves resources related to America’s literary tradition, including The Wayside, 3170529 RFP-TRAILS 09/09/2022 | Page 7 of 96 home of three nineteenth century American authors. The park maintains some 200 assets, including about 1,000 acres of maintained landscape and twelve witness structures that were present at the time of the Battles of Lexington and Concord on April 19, 1775.

Work included in this project lies within two of the four units which make up the park: the Battle Road and North Bridge.

1.3 BACKGROUND

In 2025, MIMA will commemorate the 250th anniversary of the opening battle of the Revolutionary War with numerous special events. To prepare for these commemorations, the National Park Service has prioritized work which will improve the condition of park amenities and assets and create a safer environment for park visitors and staff.

The Great American Outdoors Act (GAOA) has provided funds necessary to complete several projects within the park. These projects will address deferred maintenance issues in park environs and bring several residential properties into a condition which will allow rental and collection of needed funds for future park maintenance.

Concurrent with this RFP, the park has solicited work which will repair 18 structures over 15 sites for leasing and park ancillary use. The park will also address wayfinding and interpretive signage along the trail and conservation of the park’s monuments and statues through separate projects. The work within this RFP will require coordination with contractors or crews during construction at various structures as well as during the repair or installation of signage along the trail.

Due to the work’s proximity to designated wetlands and a complicated pattern of ownership and control, the work within this project will require oversight by local conservation commissions and coordination with various municipalities. The sensitive archeological nature of the park will require coordination with NPS archeological staff, and all work will be completed through consultation and agreement with state and local preservation organizations.

3170529 RFP-TRAILS 09/09/2022 | Page 8 of 96

1.4 DESCRIPTION

This project contains three elements:

Element 1: Trail Repairs Involves trail repair, replacement, and mitigation of drainage issues at the North Bridge Trail and along the Battle Road Trail.

Element 2: Reroute Battle Road Trail to Improve Safety and Visitor Experience Involves construction of trail bypass at the Inferrera farm and abandonment of current trail facilities.

Element 3: Boardwalk Repairs Involves repair and construction of boardwalk facilities along the Battle Road Trail.

Details of each Element are described within this document. Documents for each element can be found in the Appendices of this document:

Element 1 – Appendix A

Element 2 – Appendix B

Element 3 – Appendix C

Supporting documentation which will aid in project completion can be found in Appendix D, E, and F.

All elements are to be planned and constructed concurrently. Project construction phasing shall be completed as part of this RFP to allow the most efficient construction possible while maximizing public access to park amenities.

1.5 SCHEDULE

Work within this RFP shall be completed by October 15, 2024.

In order to reach these goals, the following schedule for completion of work is anticipated.

Notice to Proceed – 30 days after award or following approval of division 1 documentation, whichever comes first

Design Development – 45 days after Notice to Proceed

50% Draft DB Construction Documentation – 60 Days after DD Documents

100% Complete DB Construction Documentation – 60 days after 50% CD document submission

Final DB Construction Documentation – 14 days after receipt of review comments from Contracting Officer following 100% CD document submission

Construction Mobilization – Following Notice to Proceed for two design packages which are ready to build; following completion of Final Construction Documentation and approvals for permitting for work to be designed as part of this RFP.

3170529 RFP-TRAILS 09/09/2022 | Page 9 of 96

Construction Completion – October 15, 2024

Consultation with the respective Conservation Commissions should begin by March of 2023 to determine applicability of local regulations, character and complexity of review process, and possible barriers to acceptance by local authorities. Each Conservation Commission responds to applicants on a unique set schedule. Application information may be found at the following web locations:

Concord Natural Resources Commission Lincoln Conservation Commission Lexington Conservation Commission

For further information regarding wetland considerations, Conservation Commissions, and other related requirements, refer to Section 6.2 of this document.

Some elements of this package may move at an accelerated rate due to the nature of design and implementation. Contractor may begin construction on elements which are ready to build at discretion of Contracting Officer.

1.5.1 DB DESIGN DEVELOPMENT DOCUMENTS (DD):

Submit DB Design Development Documents no later than 45 calendar days after Notice to Proceed.

Complete NPS Review no later than 14 calendar days after submitting DB Design Development Documents

1.5.2 50% DRAFT DB CONSTRUCTION DOCUMENTS (CD):

Continue work on non-compliance tasks associated with construction and design on 50% Draft DB Construction Documents and deliverable during DB Design Development Documents review. After receiving review comments, address and incorporate comments in 50% Draft DB Construction Documents.

Submit 50% Draft DB Construction Documents and responses to NPS Review form with responses to DB Design Development Documents no later than 60 calendar days after submitting DB Design Development Documents.

Complete NPS Review and Compliance Review with local, state, and tribal preservation officials no later than 35 calendar days after receiving 50% Draft DB Construction Documents.

1.5.3 100% COMPLETE DB CONSTRUCTION DOCUMENTS (CD):

Continue work on non-compliance tasks associated with construction and design on 100% Complete DB Construction Documents and deliverable during 50% Draft DB Construction Document review. After receiving review comments, address and incorporate comments in 100% Complete DB Construction Documents.

3170529 RFP-TRAILS 09/09/2022 | Page 10 of 96

Submit 100% Complete DB Construction Documents and NPS Review form with responses to 100% Draft DB Construction Documents review comments no later than 60 calendar days after submitting 100% Draft DB Construction Documents.

Complete NPS review no later than 14 calendar days after receiving 100% Complete DB Construction Documents.

1.5.4 FINAL STAMPED AND SIGNED DB CONSTRUCTION DOCUMENTS (CD) WITH

APPROVED CONSERVATION COMMISSION AGREEMENTS:

After receiving review comments, address and incorporate comments in Final DB Construction Documents.

Submit Complete Stamped and Signed DB Construction Documents and NPS Review form with responses to 100% Complete DB Construction Documents review comments no later than 14 calendar days after receiving NPS review comments.

1.5.5 CONSTRUCTION:

Construction begins when Contracting Officer issues DB Start Work Notice.

Complete construction no later than 650 calendar days after award of contract.

1.5.6 AS-CONSTRUCTED DRAWINGS:

Complete As-Constructed Drawings no later than 21 calendar days after Substantial Completion.

Submit DB Design Development (DD) Documents, DB Construction Documents (CD), and As-Constructed Drawings to NPS Project Manager (PM).

1.6 NPS CONTACTS & ADDRESS:

Contractual:

Contracting Officer (CO): Tony Jasper, 303-969-2789, tony_jasper@nps.gov

Contract Specialist (CS): Michael Moffett, 720-701-0281, michael_moffett@nps.gov

Technical:

Project Manager (PM): Stephen Spaulding, 978-970-5127, stephen_spaulding@nps.gov

Project Specialist (PS): Michelle Surber, 339-215-4133, michelle_surber@nps.gov

Contracting Officer’s Representative (COR): Michelle Surber, 339-215-4133, michelle_surber@nps.gov

Alternate Contracting Officer’s Representative (COR): TBD

3170529 RFP-TRAILS 09/09/2022 | Page 11 of 96

Address:

National Park Service - Denver Service Center

12795 West Alameda Parkway

Post Office Box 25287

Denver, Colorado 80225

3170529 RFP-TRAILS 09/09/2022 | Page 12 of 96

2.0 PROJECT REQUIREMENTS

2.1 INTRODUCTION

This project encompasses three elements:

Element 1 – Trail Repairs

Element 2 – Reroute Battle Road Trail to Improve Safety and Visitor Experience

Element 3 – Boardwalk Repairs

Details of each element are covered in their respective document sections; supplemental documents are found in the appendices. Special requirements for each element are covered in their respective Sections, as well as Section 6.0: General Design Criteria and Considerations.

2.2 GENERAL REQUIREMENTS

2.2.1 SCOPE OF WORK AND PROJECT SUMMARY/REQUIREMENTS

The project will include, but not be limited to:

Determine and provide schedule for design of work, including major benchmarks for review and approval

Review Schematic Design documents provided in the RFP package Complete field data collection and physical survey Review data provided by NPS Perform geotechnical analysis Review Conservation Commission requirements and initiate coordination with local jurisdictions Perform additional wetland delineation, if required Review archeological restrictions and coordinate appropriate reviews with archeologist provided by park Review environmental restrictions and prepare appropriate reports Determine permitting requirements and acquire necessary permits Submit project documents for review and approval, as required Submit list of necessary permits, reports, and other processes necessary to complete construction Develop schedule of construction work, including necessary phasing, in collaboration with the Contracting Officer and Park administration Secure work area and provide for either closure of or continued access to the trail facility through coordination with Contracting Officer Construct project Provide as-built drawings, operations and maintenance manuals, and other closeout documents as required by project

3170529 RFP-TRAILS 09/09/2022 | Page 13 of 96

2.2.2 DEFINITION OF CONTRACT LINE ITEMS

CONTRACT LINE ITEM 1 – PMIS 170863 – REROUTE BATTLE ROAD TRAIL TO

IMPROVE SAFETY AND VISIOR EXPERIENCE (CONSTRUCTION)

Includes all work indicated in the Construction Documents provided in Appendix B of this document

CONTRACT LINE ITEM 2 – PMIS 322882 – BOARDWALK REPAIRS

(CONSTRUCTION)

Includes all work indicated in the Construction Documents provided in Appendix C of this document

CONTRACT LINE ITEM 3 – PMIS 317529 – TRAIL REPAIRS (DESIGN)

Includes fees associated with design and approval of work necessary to complete work associated with the Trail Repairs project included in:

Contract Line Item 4 Contract Line Item 5 Contract Line Item 6 Contract Line Item 7

CONTRACT LINE ITEM 4 – PMIS 317529 – TRAIL REPAIRS: NORTH BRIDGE

(CONSTRUCTION)

Includes repairs shown on sheet L8 of attached Trail Repairs plan per standards represented on plans, within this document, and as determined appropriate through best practices and industry standards.

CONTRACT LINE ITEM 5 – PMIS 317529 – TRAIL REPAIRS: HARTWELL

(CONSTRUCTION)

Includes repairs shown on sheets L17A and L17B of attached Trail Repairs plan per standards represented on plans, within this document, and as determined appropriate through best practices and industry standards.

CONTRACT LINE ITEM 6 – PMIS 317529 – OPTION 1 TRAIL REPAIRS: PRIORITY

REPAIRS (CONSTRUCTION)

Includes all work indicated in project drawings provided in Appendix A of this document as specified in the following list. Repairs within these Areas, including any work necessary to connect those sections correctly to adjacent trail and roadways per standards represented on plans, within this document, and as determined appropriate through best practices and industry standards.

Includes any auxiliary work, such as wayside areas, bench pads, etc.

Area 1 through Area 5 – Station 0+00.00 to 17+50.00 o Includes paving and leveling at wayside locations o Includes all plaza repairs outside the comfort station at Meriam

3170529 RFP-TRAILS 09/09/2022 | Page 14 of 96 o Exclusive of pavement at driveways and within parking lots that is not included in contract

Area 9 through Area 11 – Station 35+00.00 to 61+20.00 Area 12 through Area 14 – Station 69+19.00 to 87+32.00 o Includes all of Area 13, which is stationed separately Area 18 – Station 113+37.00 to 127+95.00 o Includes all of “Triangle Side Leg”, which is stationed separately Area 19 through Area 21 – Station 137+50.00 to 152+75.00 Area 22 – Station 156+45.00 to 165+18.00 Area 25 through Area 26 – Station 176+55.00 to 177+82.00 o Includes all of Area 26, which is stationed separately Area 28 through Area 29 – Station 186+50.00 to 207+33.00 Area 31 – Station 212+75.00 to 218+12.00 Area 32 through Area 33 – Station 221+25.00 to 242+90.00

CONTRACT LINE ITEM 7 – PMIS 317529 – OPTION 2 TRAIL REPAIRS: PRIORITY

REPAIRS (CONSTRUCTION)

Includes all work indicated in project drawings provided in Appendix A of this document not included in the list for CLIN 6. Repairs shall be completed per standards represented on plans, within this document, and as determined appropriate through best practices and industry standards.

2.2.3 PROGRESS PAYMENTS

Design Phase - Progress payments will be based on submission, review, and acceptance of design deliverables.

DD

50% CD

100% CD

Final

Construction Phase - Progress payments will be based on percentage of work completed on items listed in approved schedule of values. Actual construction completed and in place will form basis for payment. DB Contractor shall verify percent complete under direction of the Contracting Officer Representative unless Contracting Officer waives this requirement in a specific instance. DB Contractor shall make computations for payment based on Government’s verification of work completed and in place for periods which progress payments are requested.

DB Contractor shall furnish to Contracting Officer originals of field notes and other records relating to basis for payment. Contracting Officer shall use as necessary to determine final amount of progress payments. DB Contractor shall retain copies of material furnished to Contracting Officer.

3170529 RFP-TRAILS 09/09/2022 | Page 15 of 96

2.2.4 PROJECT MEETINGS

Meetings may be held in person or via Teams, to be agreed upon when scheduling and depending on the reason and needs of the conference.

Design Meeting

After award of contract and acceptance of Performance and Payment bonds, Contracting Officer will arrange a design meeting with DB Contractor. Meeting agenda shall include the following as a minimum:

Areas available for use by DB Contractor Access requirements of the Park Design schedule Environmental and sustainability requirements Natural and Cultural Resource Protection Payments to DB Contractor Review and emphasize Park needs and design objectives Modifications during design Schedule of Values Submittals during design

Meeting with DB Contractor may be requested at various stages of design process.

Preconstruction Meeting

Submit following Part 2 Project Requirement deliverables a minimum of one week prior to Preconstruction Meeting.

Accident Prevention Program (APP) DB Contractor’s Commissioning Plan (CCxP) Evidence of liability insurance coverage and workman’s compensation for DB

Contractor and Subcontractors Cultural Landscape Coordination Report Letter designating your Project Superintendent List of required permits List of Subcontractors for project (same as proposal) Project Schedule with construction portion fully developed o Includes dates and duration of work o Include proposed closures of park facilities o Include anticipated re-opening of park facilities

Quality Control Plan Schedule of Values Storm Water Pollution Prevention Plan (SWPPP) Submittal process Waste Management Plan Written statements from Subcontractors certifying compliance with applicable labor standard clauses

3170529 RFP-TRAILS 09/09/2022 | Page 16 of 96

After 100% Complete DB Construction Documents are approved (or completed portions of DB Construction Documents necessary for fast tracking the project), and before start of construction, Contracting Officer will arrange on-site Preconstruction meeting with DB Contractor. Meeting agenda will include the following as a minimum:

Accident reporting Construction schedule Correspondence procedures Jobsite safety Labor standards Lines of Authority Modifications NPS/DSC SharePoint Project website Park Rules and Regulations Payroll reports Progress Payments Resolution to comments provided by NPS on the Part 2 Project Requirements Roles and responsibilities Schedule of Values Submittal process Bridge, access road and site constraints Medical emergency processes, availability, emergency numbers, and contacts Park permits, burning construction waste, rules of the road, alcohol use, housekeeping, firearms, pets, natural and cultural resource concerns Visitation and public relations Archeological Resources Protection Requirements Environmental and sustainability requirements for the Project, required tracking for sustainability (related submittals), and use of NPS Project Sustainability Checklist Saturdays, Sundays, holidays and night work Traffic control, generally and as regards pedestrian trails

Progress Meetings

DB Contractor shall participate in weekly telephone conference calls with Contracting Officer and other project team members with updates to following meeting agenda items:

Approval of minutes of previous meetings Modifications Review of off-site fabrication and delivery Requests for Information (RFI) and issues Schedule update. (Provide updated CPM (Critical Path Method) schedule) Status of Project Record Drawings and O&M (Operation & Maintenance) Manuals Submittal status Work in progress and projected Other business relating to work

3170529 RFP-TRAILS 09/09/2022 | Page 17 of 96

2.2.5 PROJECT SCHEDULE

DB Contractor shall deliver digital copy of schedule after award and before design meeting. Schedule shall include detailed design phase with design deliverable submission dates, review periods, and summary construction schedule with important milestones included for both phases.

Fully develop construction portion of project schedule and submit to Contracting Officer on NPS/DSC SharePoint Project website before Preconstruction meeting or construction begins. Update project schedule monthly throughout contract period until project substantial completion. Status date of each schedule update shall be 10 days before progress payment request date.

Construction work cannot begin until Government approval is obtained for either:

Entire set of 100% Complete DB Construction Documents.

Fast track construction: 100% Complete DB Construction Documents affecting work to be constructed.

Currently, both the Reroute of Battle Road (PMIS 170863) and Boardwalk Repairs (PMIS 322882) are approved and ready to begin construction. Construction may begin as soon as possible for these parts of the project.

Purpose: Project schedule ensures adequate planning, coordinating, scheduling, and reporting of DB Contractor’s design and construction activities. Project schedule will assist DB Contractor and Contracting Officer to monitor work progress, evaluate proposed changes, and process DB Contractor's monthly progress payment requests.

Schedule Development: Project schedule shall cover entire contract period. Late finish date is same as contract’s established completion date.

DB Contractor shall use Critical Path Method (CPM) with limited use of lead or lag durations between schedule activities. DB Contractor's project schedule shall consist of procurement activities (including mobilization, submittal, and fabrication and delivery of key and long-lead procurement items) and construction activities.

DB Contractor's project schedule shall consist of, but not be limited to, the following for each activity:

Identify activities and numbers numerically (maximum 5-digit). Number activities in increments of 10.

Concisely describe work represented by activity (maximum 48 characters). Avoid using non-standard abbreviations. Limit work related to each activity to one work trade.

Activity duration shall be in whole working days with maximum duration 15 work days each, unless otherwise approved by Contracting Officer, except for non-construction activities including mobilization, shop drawing and sample submittals, fabrication of materials, delivery of materials and equipment, and concrete curing.

DB Contractor shall ensure project schedule includes own work and Subcontractor work.

3170529 RFP-TRAILS 09/09/2022 | Page 18 of 96

Project schedule shall show sequence and interdependence of activities required for complete performance of work and shall be cost and resource loaded. DB Contractor shall ensure work sequences are logical and project schedule shows a coordinated work plan. Proposed durations assigned to each activity shall be DB Contractor's best estimate of time required to complete activity, considering scope and resources planned. Resource loading of each activity shall list personnel by labor category and equipment type, and capacity proposed to complete activity in duration shown. Include permit requirements and constraints. Schedule shall include possible suspension of activity or closures related to Park events, as well as closures necessary for construction. Consider and include seasonal weather conditions in planning and scheduling of work influenced by high or low ambient temperatures and wind and/or precipitation, to ensure completion of work within contract time.

Project Schedule Updates

Monthly updates: Monthly updates of project schedule shall be an integral part and basic element of estimate upon which progress payments shall be made under this contract. If, in judgment of Contracting Officer, DB Contractor fails or refuses to provide schedule of values and complete schedule update or revision as specified hereinafter, DB Contractor shall be deemed to have not provided required information upon which progress payment may be made and shall be subject to retainage of a portion of the payment.

Narrative

Include in report:

Brief description actual progress made during update period Actual and potential delaying activities Impediments to progress Issues related to inclement weather Progress toward established milestones.

Upcoming partial or full closures of park facilities Anticipated timing of reopening of park facilities Project float Brief description of work anticipated to be performed in next month Identify minor revisions to schedule for evaluation and accepted or rejected

As work progresses, indicate Actual Completion percentage for each activity. If schedule update shows late finish date after contract completion date, at a minimum, include the following in narrative with submission:

Known delays Actions taken to get back on schedule Pending modifications Impediments or constraints affecting progress

3170529 RFP-TRAILS 09/09/2022 | Page 19 of 96

Progress Payments: Update currently accepted construction schedule monthly. If DB Contractor fails to provide monthly updates or revisions to currently accepted construction schedule, a portion of monthly payment may be retained until updates/revisions made.

Time Impact Analysis for Contract Modifications, Changes, Delays, and Contractor Requests Requirements: When contract modifications or changes are initiated, delays are experienced, or DB Contractor revises project schedule, DB Contractor shall submit to Contracting Officer a written time impact analysis illustrating influence of each modification, change, delay, or DB Contractor’s request on the contract time.

Time Extensions: Activity delays shall not automatically mean an extension of contract time is warranted or due to DB Contractor. It is possible that modification, change, or delay will not affect existing critical activities or cause non-critical activities to become critical. A modification, change, or delay may result in only absorbing a part of available total float that may exist within an activity chain of the project schedule, thereby not effecting the contract time. Time extensions will be granted according with terms of contract.

Float: Float is not for exclusive use or benefit for NPS or DB Contractor. Extension of contract time is granted only to extent the equitable time adjustments to activity or activities affected by modification, change, or delay exceeds total (positive or zero) float available on a particular activity.

2.3 DESIGN REQUIREMENTS

2.3.1 DB DESIGN DEVELOPMENT (DD) DOCUMENTS AND DB CONSTRUCTION

DOCUMENTS (CD)

Prepare DB Design Development Documents and DB Construction Documents using English System of Weights and Measurements and according to DSC Design Standards and DSC Design Deliverables - Content and Format Requirements for DB Design Development Documents and DB Construction Documents.

List salient characteristics for products and materials specified. Refer to Guide for Specifiers.

2.3.2 DESIGN SUBMITTALS

The following deliverables are required (refer to Section 1.6 for schedule):

Submit DB Design Development (DD) Documents for Review o Draft DB Design Development Drawings o Divisions 2 through 49 Outline Specifications o Product File o Statement of Structural Tests and Special Inspections o Design Calculations o Class B Construction Cost Estimate

3170529 RFP-TRAILS 09/09/2022 | Page 20 of 96

Submit 50% Draft DB Construction Documents (CD) for Review o 50% Draft DB Construction Drawings o Divisions 2 through 49 Construction Specifications (Construction

Specifications Institute (CSI) MasterFormat 04 Edition). A/E shall utilize and modify their own Divisions 2 through 49 Construction Specifications templates.

o Product File o Statement of Structural Tests and Special Inspections o Design Calculations o Draft Class A Cost Estimate o Checklists for internal review of drawings, specifications, calculations, and cost estimates Required documents for each submission are included and complete per contract requirements.

Required documents have been through a Quality Control (QC) review. NPS requires documentation and submittal of QC work performed.

o NPS Review form with responses to DB Design Development Documents review comments

Submit 100% Complete DB Construction Documents (CD) for Final Approval o 100% Complete DB Construction Drawings o Divisions 2 through 49 Construction Specifications o Product File o Statement of Structural Tests and Special Inspections o Design Calculations o Class A Construction Estimate o Checklists for internal review of drawings, specifications, calculations, and cost estimates Required documents for each submission are included and complete per contract requirements.

Required documents have been through a Quality Control (QC) review. NPS requires documentation and submittal of QC work performed.

o NPS Review form with responses to 100% Draft DB Construction Documents review comments

Submit Complete Stamped and Signed DB Construction Documents (CD) o Upon final approval of 100% Complete DB Construction Documents, submit

Complete Stamped and Signed DB Construction Documents per following table for NPS archiving and general use.

o The recipient of the files is TIC (Technical Information Center).

o Final Construction Drawings shall be printed from native CAD (Computer

Aided Design)/BIM (Building Information Modeling) equivalent software (e.g.

AutoCAD .dwg). Final Construction Drawings printed from secondary

3170529 RFP-TRAILS 09/09/2022 | Page 21 of 96 software (e.g. Adobe .pdf) are not acceptable as they often result in off-scale product.

o A/E team to stamp and sign cover and all plan sheets relevant to their respective professions.

COMPLETE STAMPED AND SIGNED

DB CONSTRUCTION DOCUMENTS (CD)

FILE FORMATS

DB Construction Drawings PDF & CAD

Divisions 2 through 49 Construction Specifications PDF & Microsoft Word

Product File PDF

Statement of Structural Tests and Special Inspections PDF & Microsoft Word

Supplemental Design Reports (if applicable) PDF

Design Calculations PDF

Checklists for internal review of drawings, specifications, calculations, and cost estimates

PDF & Microsoft Excel

NPS Review form with responses to 100% Complete DB CD review comments

PDF & Microsoft Excel

2.3.3 FORMATTING

Submit documents in native and PDF (Portable Document Format) file formats.

PDF files shall be unlocked to allow printing and saving.

See DB Submittal Requirements, Design Deliverables.

2.4 CONSTRUCTION REQUIREMENTS

2.4.1 ENVIRONMENTAL AND SUSTAINABILITY REQUIREMENTS

Specific sustainability requirements generated in design will dictate more stringent environmental requirements for this project. Refer to Part 3 Performance Requirements and NPS Project Sustainability Checklist. General requirements:

Site Disturbance: Minimize construction limits of project to reduce impact on site.

Toxic Chemicals: Avoid materials that can leach toxic chemicals into ground water. Do not allow toxic chemicals to enter sewers or storm drains or contaminate land or any body of water. Refer to NPS Project Sustainability Checklist for additional requirements.

Soil Erosion: Protect against erosion and topsoil depletion according to Stormwater Pollution Prevention Plan (SWPPP).

3170529 RFP-TRAILS 09/09/2022 | Page 22 of 96

Habitats: Protect natural habitats and ecological systems on facility site in accordance with Conservation Commission approvals.

Noise: Minimize noise during construction. Operate power equipment according to local noise restrictions.

Waste Management: Employ processes ensuring minimal waste output and in landfills. Recycling is a requirement of this project. Specific recycling goals were established in NPS Project Sustainability Checklist. Legally dispose materials unsuitable for recycling at public or private dumping areas outside the Park.

DB Contractor shall designate an on-site party (or parties) responsible for instructing workers and overseeing environmental and sustainability requirements of this project.

Distribute copies of environmental and sustainability requirements to Job Site Foreman and each Subcontractor.

Waste Management Plan: Prior to scheduled Preconstruction meeting, DB Contractor shall submit draft Waste Management Plan to Contracting Officer for approval. Develop and implement according to ASTM E1609 and as required in contract documents. Plan shall include, but not be limited to:

List of recycling facilities, reuse facilities, municipal solid waste landfills, and other disposal area(s) to be used. Include name, location, and phone number.

List of proposed materials to be reused or recycled.

List of materials that cannot be recycled or reused with explanation or justification.

Storage and collection methods of waste and recyclables, handling procedures, and means of keeping recyclables free of contamination.

Describe means of transporting recyclable materials and estimate frequency of emptying bins.

Identity person or persons responsible for ensuring project recycling goals are achieved.

Revise and resubmit Plan per Contracting Officer. Approval of DB Contractor’s

Plan does not relieve DB Contractor of complying with applicable environmental regulations.

Progress Documentation: Supplemental to Waste Management Plan, document solid waste disposal, diversion, and cost/revenue analysis, and submit completed worksheet monthly. See Project Waste Management Plan Worksheet Sample, included with Division 1 Specifications, and report totals to date for column headings.

Prior to commencement of work, schedule and conduct meeting with Contracting Officer.

Discuss proposed Waste Management Plan and develop mutual understanding of details of environmental protection.

Minimize Construction Impacts

Implement following mitigation measures to minimize impacts of construction activities:

Soil Erosion: Protect against erosion and topsoil depletion. SWPPP is required.

3170529 RFP-TRAILS 09/09/2022 | Page 23 of 96

Exotic Vegetation and Noxious Weeds: Prevent introduction and minimize spread of exotic vegetation and noxious weeds. Incorporate following procedures:

Obtain fill, rock, or additional topsoil needed from a Government approved source.

Use approved native seed and/or plants and revegetate areas disturbed by construction.

Special Status Species: To protect unknown or undiscovered threatened, endangered, or special status species, construction contract will include provisions for these discoveries. DB Contractor should contact Park for direction to evaluate special species at the site.

Visitor Experience: Incorporate following mitigation measures into action alternatives to minimize impacts of construction activities on visitor experience:

Signage to inform visitors of temporary closures of trails and/or parking lots Avoid use of orange safety fencing and screen staging areas when in view of park users when possible

Air and Water Pollution Control: Air quality impacts are expected to be temporary and localized. To minimize these impacts, take following actions:

To reduce tailpipe emissions, do not leave construction equipment idling longer than necessary for safety and mechanical reasons.

To reduce construction dust, apply water to problem areas. Limit equipment to fenced project area to minimize soil disturbance and dust generation.

Take necessary reasonable measures to reduce air and water pollution with material or equipment used during construction. Keep volatile wastes in covered containers.

Storm Water Pollution Prevention Plan (SWPPP): Submit a SWPPP, according to applicable State Water Resources Control Board's (SWRCB) requirements, to Contracting Officer for approval. (See Technical Requirements.) Before starting construction, DB Contractor shall implement approved SWPPP.

Cultural Resources: An Archeological Monitor will be present at work site. If archeological resources are discovered at project site while Archeological Monitor is absent, immediately stop work in vicinity of discovery and report discovery to Contracting Officer. Refer to Section 6.0: General Design Criteria and Considerations for specific guidance regarding cultural resources and archeological considerations.

2.4.2 SCHEDULE OF VALUES

After contract award and before Design Meeting, submit schedule of dollar value based on Contract Price Schedule. Breakdown each lump-sum item into component parts of design deliverables or construction work for which progress payments may be requested.

Total costs for component parts of work shall equal contract line-item amount for that lump-sum item. Contracting Officer may request data to verify accuracy of dollar values.

Include mobilization, general condition costs, overhead, and profit in total dollar value of unit price item and in component parts of work for each lump-sum item, as described

3170529 RFP-TRAILS 09/09/2022 | Page 24 of 96 below. Do not include mobilization, general condition costs, overhead, or profit as separate items.

Do not break down unit price items. Only use contract line-item amount for unit price items.

Total cost of items shall equal contract sum. Schedule of Values will form basis for progress payments.

Before first progress payment is processed, DB Contractor and Contracting Officer shall agree on an acceptable Schedule of Values. A cost loaded project schedule is an acceptable substitute for a schedule of values in some cases.

2.4.3 CONSTRUCTION SUPPORT

Work included in this RFP will be accomplished concurrently with other projects ongoing within the park. Support facilities shall be coordinated with the Contracting Officer to ensure facility use does not conflict with other work. Examples of approved staging locations are included in Appendix E, though these locations may be subject to change depending on site conditions during construction.

Locations of all support facilities must be approved by the Contracting Officer.

Cultural Landscape Coordination Procedures

Contractor shall be required to develop a Cultural Landscape Coordination Plan before construction may commence. Report requires detail of planned staging and laydown facilities, tree protection, protection for surrounding structures and landscape features, and planned paths for movement of equipment through Cultural Landscapes.

Details for Cultural Landscape Coordination Plans are located in Section 6.0 of this document. A sample of the specification for Cultural Landscapes Treatment Procedures is located in Appendix F.

Staging Areas

Limit construction sites to smallest feasible area. Carefully control ground disturbance and site management to prevent undue damage to vegetation, soils, and archeological resources, and to minimize air, water, soil, and noise pollution.

Staging is limited in or near construction area for a construction office or trailer. Locate construction equipment and material storage in previously disturbed areas near construction site. Protect paving, landscape, and lawn utilizing protective matting and/or temporary gravel pads.

Obtain Contracting Officer’s approval for staging area location for construction equipment.

Once construction is complete, return staging areas to pre-construction conditions.

Consult with Contracting Officer and develop standards and methods for determining standards.

3170529 RFP-TRAILS 09/09/2022 | Page 25 of 96

Staging areas may be allowed in parking areas with the approval of the Contracting Officer.

Location of staging or laydown facilities may be governed by wetland protection regulations requested by local authorities having jurisdiction.

Locations of approved staging area for structural repair work within the park are included in Appendix E. Use of these facilities will require coordination with work occurring concurrently on site.

Structures: Trailers, Storage, Field Offices, Staging Area, Laydown Area, and Sheds:

Contracting Officer to approve location.

DB Contractor's Field Office: Structurally sound construction and weather tight.

Location determined by NPS before issuing Start Work Notice.

Storage Sheds: If used, provide weather tight sheds or other covered facilities for materials subject to weather damage and remove temporary water, sewer, sanitary facilities and electric utilities upon project completion. Remove temporary utility connections.

Construction Camp

Establishment of a construction camp will not be permitted.

Construction Zones

Before construction activity, use construction barrier, plastic, or portable fencing, approved by Contracting Officer, to define construction zone, minimum area required for construction. Clearly state protection measures in construction specifications and instruct workers to avoid conducting activities beyond construction zone.

Protection of Public

Use fence, barricade, or other means to block immediate work area and prevent unauthorized entry. Erect and maintain fencing, barricades, lights, signals, and warning signs according to current version of Manual on Uniform Traffic Control Devices

(MUTCD).

DB Contractor shall protect tree trunks and root systems of trees in, or adjacent to, work areas.

Special Construction Requirements

The following requirements are specific to MIMA construction:

Construction fencing must be green or black to minimize visual intrusion in park environs. Metal fencing should have a green scrim to reduce visibility of construction activity. Orange safety fencing is not allowed.

No night work is allowed.

3170529 RFP-TRAILS 09/09/2022 | Page 26 of 96

Weekend work may be considered with Contracting Officer approval.

Closures must be coordinated with planned park events, including bu t not limited to Patriot’s Day week.

Parking of Construction Vehicles

Limit to existing roads in legally designated areas and within approved staging area(s).

2.4.4 SUBMITTALS DURING CONSTRUCTION

Construction Submittals

Construction Submittal Types:

Action Submittals: Written, graphic information, and physical samples that require Government’s responsive action.

o Product Data: Collect information in single submittal for each element of construction and type of product or equipment.

o Shop Drawings: Prepare project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of Contract Documents or standard printed data.

o Samples: Submit Samples of kind, color, pattern, and texture for reviewing characteristics with other elements and comparing between submittal and actual component as delivered and installed.

o Construction Materials: DB Contractor is encouraged to submit, for approval, products made of recycled or environmentally responsible material. NPS will make every effort to approve these materials.

Informational Submittals: Written information not requiring Government’s responsive action. Submittals may be rejected for not complying with requirements.

o Prepare and submit Informational Submittals required by individual Specification Sections.

o Informational submittals include, but are not limited to, Coordination Drawings LEED™ Submittals Product Data, Certificates, Test reports, Manufacturer’s instructions, Division 01 Management Plans, etc.

Contractors Review

Review each submittal for coordination with other work of contract and compliance Contract Documents. Note corrections and field dimensions.

General Submittal Procedures

Prepare and submit submittals shown in Section 8.0: Technical Requirements. See individual technical sections for details on requirements for each.

Contracting Officer reserves the right to require submittals in addition to those identified in individual sections.

3170529 RFP-TRAILS 09/09/2022 | Page 27 of 96

Coordination: Coordinate submittal preparation and processing with construction activity performance. Review for legibility, accuracy, completeness, and compliance with Contract Documents.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities requiring sequential activity.

2. Partial submittals are not acceptable, will be considered non-responsive, and will be returned without review.

Processing Time: Allow enough time for submittal review and re-submittals. Start review when Contracting Officer, or designee, receives email indicating submittal has been posted on the NPS/DSC SharePoint project website. After Contracting Officer completes review, an email is sent to the DB Contractor indicating submittal has been processed.

Contract time extensions will not be authorized if submittals are not transmitted with enough time to permit processing, including re-submittals.

1. Action Submittals: Allow 30 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.

2. Informational Submittals: Allow 10 days for review of each submittal.

Electronic Submittals: Identify and incorporate information in each electronic submittal file as follows:

1. Electronic Submittal Review Form (CM-SPE): Use NPS/DSC SharePoint Project website to access and complete this form and to transmit submittals. For actions taken on submittal items, this form must accompany.

a. Complete general information at the top.

b. Provide required information based on submittal type.

c. Attach related documents.

d. Sign Electronic…