About this file
This document provides details of a pre-proposal conference for a federal solicitation seeking landscaping services at Minute Man National Historical Park. The solicitation is for Phase II of a multi-phase landscaping project with an estimated value between $5-10 million. Services include construction of a new trail bypass, boardwalk repairs, and design and repairs for other trails. The period of performance is 650 calendar days. The procurement is set aside for small businesses under NAICS code 238910 with a size standard of $16.5 million. Proposals are due by December 5, 2022 and evaluations will consider technical approach, qualifications, schedule, key personnel, past performance, and price. The National Park Service is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-proposal Conference/Site Visit November 17th, 2022
Landscaping (Phase 2)
MIMA 317529
Solicitation Number 140P2023R0006
Request for Proposals No.1443N5010070901
AGENDA
• Introductions
– Make sure to sign in. Sign-in sheet will be incorporated into an Amendment.
• Today’s Goal
• Project Background
• Project Scope
• Solicitation Review
• Proposal Instructions – Section L
• Proposal Evaluation – Section M
• Site Walk
INTRODUCTIONS
• Tony Jasper, Contracting Officer, NPS Denver Service Center
• Michael Moffett, Contract Specialist, NPS Denver Service Center
• Stephen Spaulding, NPS Historic Architecture Conservation & Engineering Center
• Michelle Surber, NPS, Project Specialist
TODAY’S GOAL
• Provide potential Offerors an opportunity for thorough site investigation
(FAR 52.236-3)
• Provide Offerors an opportunity to gain a better understanding, ask questions, interface, and receive clarity from the entire MIMA 317529 team; Park, Technical, and Contracting.
• Encourage questions and clarifications at any time. Questions shall be asked in the open for the entire group to hear. No side-bar conversations.
• You must submit questions in writing for Q and A’s to be incorporated into the contract via a solicitation amendment. It is the Offeror’s responsibility to take notes and submit questions by the deadline.
• Questions are due to the CO/CS by minimum 10 days prior to proposal due date to:
– Michael_Moffett@nps.gov and Tony_Jasper@nps.gov
PROJECT BACKGROUND
• This project will rehabilitate several miles of the Battle Road Trail at MIMA in Lexington and Concord, MA
• This project is partially funded through the Great American Outdoors Act (aka Legacy Restoration Fund).
• Includes three sets of drawings/specs (Battle Road Trail Reroute, Boardwalk Repairs, and Trail Repairs)
• This project is Phase 2 of a larger 3 Phase effort that will be conducted over the next few years.
• Project is in preparation for the 250th Anniversary of the Revolutionary War, April 19, 2025
PROJECT SCOPE
1. Construction - Battle Road Bypass
2. Construction - Boardwalk Repairs
3. Design - Trail Repairs
4. Construction - North Bridge Trail Repairs
5. Construction - Hartwell Tavern Trail
Repairs
6. Construction - Priority Trail Repairs
7. Construction - All Other Trail Repairs
Completion by
October 2024
BATTLE ROAD BYPASS
• Approx. 700 lineal feet of new trail
• Abandonment of existing trail and return to natural state
• Pedestrian crossing on Shadyside Lane
BOARDWALK REPAIRS
• Approx. 1600 lineal feet boardwalk
• Replacement of pier foundation with pin system
• Replacement of decking, railings, reuse of materials where possible
• Wetland protections – Order of Conditions from Concord and Lexington
TRAIL REPAIRS
• Repair or replacement of trail segments at North Bridge (0.5 miles) and along the Battle Road Trail (5.5 miles)
• Mitigation of drainage issues - North Bridge and Hartwell
• Completion of design for trail
• Permitting/approvals from Conservation Commissions, drawings stamped by Engineer as necessary
SOLICITATION OVERVIEW
• Estimated price is between $5M and $10M
• Period of Performance is 650 calendar days after NTP
• Total Small Business Set Aside
• One Firm-Fixed-Price Contract will be awarded
• Source selection will be made using FAR 15 - Best
Value/Tradeoffs
• Offer guarantee for 90 days
• NAICS code: 238910, the small business size standard is
$16.5M
CLIN STRUCTURE
Key Solicitation Clauses
• Special Clause 1: Key Personnel
– Lead Designer, PM, Superintendent, QC Manager and Safety
Manager – no substitutions for 120 days)
• Special Clause 2: Key Trades
- Paving
• Special Clause 6: Options (90 Days after award)
• Liquidated Damages ($1,482/day)
• FAR 52.236-6 – Superintendence by the Contractor
PROPOSAL INSTRUCTIONS
• Please read Section L thoroughly
• Email submissions to CO/CS on or before 17:00 ED, December 5th,
– Tony_Jasper@nps.gov, Michael_Moffett@nps.gov, and
CS_DSC_Proposal_Submission@nps.gov
• Create two volumes – Technical and Price
• Make sure you verify receipt
• Pay attention to detailed page limitation requirements mailto:Tony_Jasper@nps.gov mailto:Michael_Moffett@nps.gov mailto:CS_DSC_Proposal_Submission@nps.gov
PROPOSAL EVALUATION
Basis of Award
• Evaluation process is explained in Section M
• Source Selection using FAR 15.1, Best Value Tradeoff
• Government intends to award without discussions, but reserves the right to conduct discussions if deemed necessary
• The Government may accept other than the lowest priced proposal when the perceived benefits of a higher priced proposal merit the price differential
Factors
• Importance
– Factors 1-5 are in descending order of importance
– Overall: all evaluation Factors other than price, when combined are significantly more importance than price.
– All non-price factors will be assigned adjectival ratings
Volume 1 – Non-Price Proposal
• Factor 1 – Technical Approach
• Factor 2 – Technical Qualifications – Experience of the GC and AE
• Factor 3 – Schedule
• Factor 4 – Key Personnel
• Factor 5 – Past Performance
Volume 2 – Business and Price Proposal
• SF1442
• Amendment Acknowledgement
• Price Schedule
• SF24 Bid Bond
• Section K: Reps & Certs
• General References
REMINDER
• Questions are currently due to the CO/CS by November 25th, 2022.
• Email proposals to CO/CS on or before December 5th,
• Solicitation and project documents are only changed with a formal amendment.
• Direct all inquiries to contracting until contract award. All inquiries will be redirected to contracting.
QUESTIONS?
Thank you for your time and interest in this project!
| Landscaping (Phase 2)�MIMA 317529�Solicitation Number 140P2023R0006 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Request for Proposals No.1443N5010070901 |
| Slide Number 19 |