Attachment_02_MIMA_Boardwalks_CD_rev_set_2022-0727.pdf
PDF 5 MB Posted
- Attached to
- MIMA 317529 - Phase II - Landscaping Federal contract opportunity
- Solicitation number
- 140P2023R0006
About this file
This solicitation package is for a landscaping project at Minute Man National Historical Park. The project has an estimated value between $5 million and $10 million and is set aside for total small businesses under NAICS code 238910 for landscaping services. An on-site pre-solicitation conference will be scheduled to provide additional details. The work involves site preparation, demolition, boardwalk reconstruction, landscaping, and historic resource protection at the park located in Concord, Lincoln, and Lexington, Massachusetts. Offerors must comply with various regulations for accessibility, environmental protection, cultural resources preservation, and construction sequencing. The contracting agency is the National Park Service National Office within the Department of the Interior.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MINUTE MAN NATIONAL HISTORICAL PARK
PROJECT INFORMATION:
1. PROJECT LOCATION: MINUTE MAN NATIONAL HISTORICAL PARK, CONCORD,
LINCOLN, AND LEXINGTON, MIDDLESEX COUNTY, MASSACHUSETTS
2. SITE WORK GENERALLY CONSISTS OF THE FOLLOWING:
· DEMOLITION AND SELECTIVE DEMOLITION OF BOARDWALKS
· RE-CONSTRUCTION OF BOARDWALKS
· RESOURCE PROTECTION
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS, HORIZONTAL AND
VERTICAL CONTROLS, AND PROPOSED DIMENSIONS PRIOR TO
CONSTRUCTION. NOTIFY THE CONTRACTING OFFICER OF ANY
DISCREPANCIES PRIOR TO CONSTRUCTION.
2. ALL UTILITIES SHOWN HAVE BEEN LOCATED BASED ON BEST INFORMATION
AVAILABLE. UTILITIES MAY NOT BE IN EXACT LOCATION SHOWN, AND
CONTRACTOR SHALL EXERCISE CARE IN EXCAVATION. CONTACT THE LOCAL
UTILITY SERVICE PROVIDER OR LOCATOR, ETC. SERVICE.
3. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES PRIOR TO
DISCONNECTION, REMOVAL AND RELOCATION OF ALL SERVICE LINES.
4. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER IMMEDIATELY IN THE
EVENT THAT ANY UTILITY IS DAMAGED DURING DEMOLITION OR
CONSTRUCTION.
5. REPAIR OF DAMAGED UTILITIES SHALL BE AT THE CONTRACTORS EXPENSE,
INCLUDING BUT NOT LIMITED TO UNKNOWN UNDERGROUND UTILITIES.
6. CONTRACTOR TO CONFORM TO ALL FEDERAL, STATE AND LOCAL HEALTH
AND SAFETY RULES AND REGULATIONS.
7. CONTRACTOR RESPONSIBLE FOR HAVING REQUIRED DOCUMENTATION AT
THE JOB SITE AT ALL TIMES FOR ALL AGENCY REVIEWS.
8. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITTING REQUIREMENTS
INCLUDING, BUT NOT LIMITED TO; COORDINATING, INITIATING PERMIT
ACQUISITION SERVICES, SCHEDULING, FURNISHING APPLICATIONS, PERMIT
STATUS, AND FINAL PERMITS.
9. ALL WALKWAYS, TRAILS, RAMPS, HANDRAILS, SIGNAGE, AND SITE
FURNISHINGS PROVIDED AS PART OF THIS CONTRACT SHALL BE IN
COMPLIANCE, AS AMENDED, WITH ARCHITECTURAL BARRIERS ACT-ABA
ACCESSIBILITY STANDARDS; DESIGN; OUTDOOR DEVELOPED AREAS -
ABAAS CHAPTER 10, AND ALL OTHER APPLICABLE FEDERAL, STATE AND
LOCAL REQUIREMENTS REGARDING ACCESSIBLE FACILITIES.
10. COMPLY WITH APPLICABLE CODES, AS SUPPLEMENTED, AMENDED, OR
OTHERWISE MODIFIED, SUCH AS INTERNATIONAL BUILDING CODE, EXISTING
BUILDING CODE, NFPA 101 LIFE SAFETY CODE, AND OTHER RELATED CODES.
11. REFER TO ORDERS OF CONDITIONS PREPARED BY LOCAL AUTHORITIES
HAVING JURISDICTION APPENDED TO PROJECT MANUAL FOR ADDITIONAL
PROTECTIONS REGARDING WETLANDS.
PRESERVATION OF CULTURAL RESOURCES:
1. ALL WORK MUST BE IN KEEPING WITH THE SECRETARY OF THE INTERIOR'S
STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES WITH
GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING &
RECONSTRUCTING HISTORIC BUILDINGS (2017) AND THE SECRETARY OF
INTERIOR'S GUIDELINES FOR THE TREATMENT OF CULTURAL LANDSCAPES
(1996).
2. LANDSCAPES AND MANY COMPONENT STRUCTURES ARE DESIGNATED AS
NATIONAL LANDMARKS. THIS PROPERTY IS MANAGED IN ACCORDANCE WITH
DOI AND NPS STANDARDS TO PROTECT RESOURCES FROM DAMAGE OR
LOSS OF HISTORIC INTEGRITY.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FOLLOW BEST
PRESERVATION PRINCIPLES AND PRACTICES, NOT ONLY IN IMPLEMENTING
WORK IN ACCORDANCE WITH THE HISTORIC PRESERVATION TREATMENT
PLAN REQUIRED, BUT IN OCCUPYING THE SITE AND PERFORMING TASKS
RELATED TO THE WORK ON THE SITE OR WITHIN THE BUILDING.
4. CONTRACTOR SHALL COORDINATE WITH CONTRACTING OFFICER
DESIGNATED ARCHEOLOGIST TO IDENTIFY PROTECTION NECESSARY FOR
SENSITIVE AREAS.
STAGING AND ACCESS:
1. CONTRACTOR TO PROVIDE A CULTURAL LANDSCAPE COORDINATION PLAN
FOR CONTRACTING OFFICER APPROVAL PRIOR TO NOTICE TO PROCEED
PER THE CULTURAL LANDSCAPE PROCEDURES SPECIFICATION PROVIDED IN
THE PROJECT MANUAL.
2. PARKING, STAGING, AND LAYDOWN FACILITIES MAY BE PROVIDED IN
NEARBY DESIGNATED PARKING LOT AT PARK'S DISCRETION. ACCESS TO
PARKING IN PUBLIC LOTS SHALL BE COORDINATED WITH CONTRACTING
OFFICER.
3. CONTRACTOR SHALL COORDINATE NECESSARY INTERMEDIATE LAYDOWN
AREAS WITH CONTRACTING OFFICER AND PARK REPRESENTATIVE.
LAYDOWN AREAS SHOULD BE OUTSIDE OF 100' WETLAND BUFFER.
CONTRACTOR SHALL PROVIDE PROTECTIVE MEASURES TO PREVENT ANY
CONTAMINATION OF SOIL, WATER, OR WETLAND.
4. CONTRACTOR RESPONSIBLE FOR KEEPING CONSTRUCTION AREA, STAGING
AREA, AND PARKING AREAS FREE OF DEBRIS AND GARBAGE.
5. STAGING AREAS ON SOFT SOILS SHALL BE PROTECTED FROM VEHICULAR
DAMAGE THROUGH THE USE OF APPROPRIATE PROTECTIVE MATS AS
SPECIFIED. IN PERIODS OF MUDDY CONDITIONS, CONTRACTOR SHALL USE
ALTERNATE AREA FOR PARKING AND STORAGE OF HEAVY EQUIPMENT
AND/OR MATERIALS. ALTERNATE AREAS SHALL BE COORDINATED AND
APPROVED BY CONTRACTING OFFICER.
6. CHEMICALS SHALL ONLY BE STORED IN STAGING AREAS UNLESS
OTHERWISE APPROVED BY CONTRACTING OFFICER. BEST PRACTICES FOR
STORAGE OF MATERIALS, INCLUDING MEASURES TO CONTROL POSSIBLE
SPILLS AND PREVENT CONTAMINATION OF SURROUNDING LANDSCAPE,
SHALL BE TAKEN BY CONTRACTOR. NO CHEMICALS MAY BE STORED WITHIN
100' WETLAND BUFFER.
7. FUELING OF EQUIPMENT SHALL TAKE PLACE IN AREA OUTSIDE OF THE 100'
WETLAND BUFFER. REFUELING AREA SHALL BE PROTECTED TO ENSURE NO
CONTAMINATION OF SOIL, WATER, OR WETLAND.
8. PROTECTIVE MATS SHALL BE CLEANED PER SPECIFICATION BEFORE AND
AFTER PLACEMENT IN WETLANDS, AND WHEN TRANSFERRED BETWEEN
WETLAND LOCATIONS.
9. CONFLICTS WITH ACTIVELY USED TRAILS SHALL BE CLEARLY MARKED,
FENCED, AND SIGNAGE SHALL BE PROVIDED WHICH INSTRUCTS PARK
VISITORS AND CONSTRUCTION CREW REGARDING CONFLICT.
10. INSTALL CONSTRUCTION SIGNAGE ON TEMPORARY POSTS PRIOR TO ANY
CONSTRUCTION OPERATIONS AT THE SITE(S). TEMPORARY POSTS SHOULD
BE ANCHORED USING WEIGHTS AND/OR STANDS WHERE PRACTICAL TO
MINIMIZE SUB-SURFACE DISRUPTION. REMOVE AFTER ALL CONSTRUCTION
OPERATIONS ARE COMPLETE. THE INSTALLATION OF THE SIGNS ARE
SUBSIDIARY TO INSTALLING FENCE.
11. SAFETY AND PROTECTIVE FENCING FENCING SHALL BE CONTINUOUSLY
MONITORED THROUGHOUT THE DURATION OF CONSTRUCTION PER
FEDERAL, STATE, LOCAL REQUIREMENTS AND AS DIRECTED BY THE
CONTRACTING OFFICER.
12. PROVIDE TEMPORARY SIGNAGE PLAN FOR CONTRACTING OFFICER
APPROVAL BEFORE COMMENCEMENT OF WORK.
13. INSTALL MOVABLE 6 FOOT CHAIN LINK FENCE & TEMPORARY TRAFFIC
CONTROL AT THE SITE(S) PRIOR TO ANY CONSTRUCTION OPERATIONS.
REMOVE AFTER ALL CONSTRUCTION OPERATIONS ARE COMPLETE.
RESTORE LANDSCAPE GRADE TO PRE-CONSTRUCTION OR IMPROVED
CONDITION.
14. IN LOCATIONS WHERE SITE ACCESS REQUIRED CROSSING OF ACTIVE
PUBLIC TRAIL FACILITIES, A FLAG PERSON MAY BE REQUIRED TO ESCORT
VEHICLES OR FACILITATE ACTIVITY OF LARGE MACHINERY. THIS
REQUIREMENT MAY BE COORDINATED WITH THE CONTRACTING OFFICER
DURING PHASING AND SCHEDULING OR WORK.
15. TEMPORARY FACILITIES SHALL BE REMOVED FOLLOWING PROJECT
COMPLETION. STAGING AND CONSTRUCTION AREAS WILL REQUIRE
RESTORATION AS SPECIFIED AT END OF CONSTRUCTION ACTIVITY.
MANAGEMENT OF SITE
1. UNLESS OTHERWISE MARKED, KEEP DRIVEWAYS AND ENTRANCES SERVING
PREMISES CLEAR AND AVAILABLE TO GOVERNMENT, GOVERNMENT'S
EMPLOYEES, AND EMERGENCY VEHICLES AT ALL TIMES.
2. SCHEDULE DELIVERIES TO MINIMIZE USE OF DRIVEWAYS AND ENTRANCES.
3. SCHEDULE DELIVERIES TO MINIMIZE SPACE AND TIME REQUIREMENTS FOR
STORAGE OF MATERIALS AND EQUIPMENT ON-SITE.
4. HAULING RESTRICTIONS: COMPLY WITH ALL LEGAL LOAD RESTRICTIONS IN
THE HAULING OF MATERIALS. LOAD RESTRICTIONS ON PARK ROADS ARE
IDENTICAL TO THE STATE LOAD RESTRICTIONS WITH SUCH ADDITIONAL
REGULATIONS AS MAY BE IMPOSED BY THE CONTRACTING OFFICER. A
SPECIAL PERMIT WILL NOT RELIEVE CONTRACTOR OF LIABILITY FOR
DAMAGE WHICH MAY RESULT FROM MOVING OF EQUIPMENT.
CONSTRUCTION SEQUENCE:
1. INSTALL SEDIMENT CONTROL DEVICES (EROSION WATTLE) AS REQUIRED.
2. STAKE LIMITS OF DISTURBANCE.
3. INSTALL PROTECTIVE FENCING AND SITE BARRIERS.
4. REMOVE TREES AND VEGETATION AS DESIGNATED ON THE DRAWINGS.
TRANSPORT OFFSITE TO AN APPROVED DISPOSAL SITE.
5. REMOVE ALL MATERIALS DESIGNATED FOR DEMOLITION. TRANSPORT
OFFSITE TO AN APPROVED DISPOSAL SITE.
6. COMPLETION OF BOARDWALK CONSTRUCTION WORK AS NOTED IN PLANS.
SEQUENCING TO BE COORDINATED WITH CONTRACTING OFFICER AND PARK
REPRESENTATIVE.
7. COMPLETE SITE RESTORATION AS REQUIRED BY PLANS OR
SPECIFICATIONS.
8. REMOVE STAKING, BARRIERS, AND ANY OTHER CONSTRUCTION RELATED
EQUIPMENT FROM SITE.
DEMOLITION AND SITE PREPARATION:
1. NPS TO PROVIDE ARCHEOLOGICAL MONITORING PLAN & SCHEDULE PRIOR
TO ANY MOBILIZATION & DEMOLITION. CONTRACTOR TO COORDINATE WITH
NPS ARCHAEOLOGIST PRIOR TO ANY EARTH DISTURBANCES.
2. CONTRACTOR SHALL ABIDE BY ALL FEDERAL, STATE, AND LOCAL CODES
FOR THE DEMOLITION AND DISPOSAL OF ALL MATERIALS.
3. ALL QUANTITIES ARE APPROXIMATE. CONTRACTOR SHALL VERIFY.
4. EXCAVATE ONLY AS NECESSARY TO PERFORM THE WORK.
5. CONTRACTOR TO STAKE EXTENT OF DISTURBANCE FOR NPS APPROVAL
PRIOR TO IMPLEMENTATION.
6. TEMPORARY DISTURBANCE AREAS ARE TO BE APPROVED BY THE
CONTRACTING OFFICER.
7. IF TEMPORARY DISTURBANCE TO UTILITIES IS DEEMED NECESSARY, THE
CONTRACTOR SHALL FIELD COORDINATE AND PROVIDE STAMPED
DRAWINGS BY A PROFESSIONAL WITH THE APPROPRIATE LICENSES AND
CERTIFICATIONS FOR THE STATE OF MASSACHUSETTS FOR GOVERNMENT
REVIEW.
8. CONTRACTOR TO PROVIDE ALL NECESSARY MEANS TO PROTECT EXISTING
STRUCTURES, PAVING, SITE FEATURES, SITE FURNISHINGS, AND
VEGETATION TO REMAIN.
9. CONTRACTOR SHALL MAINTAIN ALL LAWNS, SIDEWALKS, AND PARKING
AREAS NOT DESIGNATED AS STAGING AREA FROM CONSTRUCTION
EQUIPMENT AND DEBRIS.
10. ANY TREATMENT OF PLASTIC LUMBER WHICH MAY RESULT IN SHAVINGS,
CUTTINGS, OR DEBRIS SHALL BE ACCOMPLISHED IN A MANNER WHICH
CONTROLS WASTE AND PREVENTS CONTAMINATION OF SITE.
11. ENSURE POSITIVE DRAINAGE AT ALL TIMES.
TREE AND PLANT PROTECTION:
1. NO PRUNING OF LIMBS OR ROOTS ON ANY PART OF THE TREE SHALL BE
PERFORMED EXCEPT UNDER GUIDANCE OF CERTIFIED ARBORIST OR AN
APPROVED PARK REPRESENTATIVE.
2. INSTALL PROTECTION FENCING, SIGNAGE, AND ANY NECESSARY
ACCESSORIES AS INDICATED IN DRAWINGS AND SPECIFICATIONS.
3. REMOVE TREES AND OTHER VEGETATION ONLY AS INDICATED ON THE
DRAWINGS AND AS PER SPECIFICATIONS. REMOVAL SHALL BE COMPLETED
USING INDUSTRY BEST PRACTICES. TRANSPORT OFFSITE TO AN APPROVED
DISPOSAL SITE.
4. TREES MARKED ALONG TRAIL FOR PROTECTION ARE VERY CLOSE TO TRAIL
AND IN THE PATH OF CONSTRUCTION. TREES REQUIRE TRUNK PROTECTION
DURING CONSTRUCTION. IF TREE REQUIRES REMOVAL, THIS TREE SHOULD
BE REPLACED IN KEEPING WITH OTHER TREES, IN APPROPRIATE,
APPROVED SPECIES FOR LOCATION.
5. ALL TREES AND NATURAL AREAS NOTED IN TREE PROTECTION PLAN SHALL
BE PROTECTED DURING CONSTRUCTION WITH TEMPORARY FENCING AT
THE START OF ANY SITE PREPARATION WORK THROUGH THE ENTIRETY OF
CONSTRUCTION.
6. PROTECTIVE FENCING SHALL EXPAND TO INCLUDE TREES WHOSE TRUNKS
ARE WITHIN FIVE FEET OF CONSTRUCTION ZONE. EXTRA CARE SHOULD BE
TAKEN TO AVOID DAMAGE BY CONSTRUCTION ACTIVITY.
7. IF AN EXISTING IRRIGATION SYSTEM IS RENDERED INOPERABLE DURING
CONSTRUCTION, CONTRACTOR SHALL PROVIDE ADEQUATE WATER FOR
PLANT MATERIALS AS SPECIFIED.
8. EROSION AND SEDIMENTATION CONTROL BARRIERS SHALL BE MAINTAINED
TO PREVENT SOIL BUILDUP IN PROTECTED AREA.
9. REMOVAL OF SUB-GRADE MATERIALS WITHIN CRITICAL ROOT ZONE SHALL
BE DONE BY HAND UTILIZING HAND TOOLS AND/OR AN AIR SPADE WHEN
LARGE (2" DIAMETER OR GREATER) ROOTS ARE UNCOVERED. EXPOSED
ROOTS WITHIN THE EXCAVATED AREA SHALL BE PRUNED AND KEPT MOIST
UNTIL SUBGRADE MATERIALS HAVE BEEN LIFTED INTO SITE AND
COMPACTED. ROOT PRUNING SHALL BE OVERSEEN BY CERTIFIED ARBORIST
OR AN APPROVED PARK REPRESENTATIVE.
10. PRUNING TO PROVIDE CLEARANCE FOR STRUCTURES, VEHICULAR TRAFFIC,
AND EQUIPMENT SHALL TAKE PLACE BEFORE CONSTRUCTION BEGINS
THROUGH COORDINATION WITH CONTRACTING OFFICER.
11. IN THE EVENT OF DAMAGE TO TREES OR LANDSCAPE, CONTRACTOR SHALL
CONTACT PARK REPRESENTATIVE IMMEDIATELY.
12. REFER TO SPECIFICATIONS FOR ADDITIONAL TREE PROTECTION
REQUIREMENTS.
STORM CONTROL:
1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY AND ALL
REQUIRED PERMITS AND IMPLEMENTING AND MAINTAINING EROSION AND
SEDIMENT CONTROL MEASURES AT ALL TIMES DURING CONSTRUCTION.
CONTROL SYSTEMS SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF
WORK.
2. NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED AS NOTED ON
DRAWINGS. EXPOSURE OF SOIL TO EROSION BY REMOVAL OR
DISTURBANCE OF VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED
FOR IMMEDIATE CONSTRUCTION OPERATION AND FOR THE SHORTEST
PRACTICAL PERIOD OF TIME.
3. TOPSOIL SHALL BE STOCKPILED TO THE EXTENT PRACTICABLE ON THE SITE
FOR USE ON AREAS TO BE GRADED OR TOP-DRESSED. NY AND ALL
STOCKPILES SHALL BE LOCATED AND PROTECTED FROM EROSIVE
ELEMENTS. PILE MAY BE COVERED FOR SHORT TERM STORAGE, OR SEEDED
WITH ANNUAL RYE FOR LONGER TERM STORAGE.
4. IF PROJECT REQUIRED EARTHWORK, THE PROPERTY SHALL BE MAINTAINED
AND/OR WATERED TO PREVENT WIND-CAUSED EROSION AT ALL TIMES.
EARTHWORK OPERATIONS SHALL BE DISCONTINUED WHEN FUGITIVE DUST
SIGNIFICANTLY IMPACTS ADJACENT PROPERTY. IF EARTHWORK IS
COMPLETE OR DISCONTINUED AND DUST FROM THE SITE CONTINUES TO
CREATE PROBLEMS, THE CONTRACTOR SHALL IMMEDIATELY INSTITUTE
MITIGATIVE MEASURES AND SHALL CORRECT DAMAGE TO ADJACENT
PROPERTY.
5. THE CONTRACTOR SHALL PREVENT SEDIMENT, DEBRIS AND ALL OTHER
POLLUTANTS FROM ENTERING WETLANDS AND/OR WATERWAYS DURING
ALL DEMOLITION, EXCAVATION, GRADING OR OTHER CONSTRUCTION
OPERATIONS THAT ARE PART OF THIS PROJECT. THE CONTRACTOR SHALL
BE HELD RESPONSIBLE FOR REMEDIATION OF ANY ADVERSE IMPACTS TO
ADJACENT WATERWAYS, ROADWAYS, WETLANDS, ETC., RESULTING FROM
WORK DONE AS PART OF THIS PROJECT.
6. THE CONTRACTOR AND/OR THEIR AUTHORIZED AGENTS SHALL REMOVE ALL
SEDIMENT, MUD, CONSTRUCTION DEBRIS, OR OTHER POTENTIAL
POLLUTANTS THAT MAY HAVE BEEN INADVERTENTLY DISCHARGED TO, OR
ACCUMULATED IN, THE FLOW LINES AND PUBLIC RIGHT-OF-WAY AS A
RESULT OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS
CONSTRUCTION PROJECT.
7. THERE SHALL BE NO CUT SOIL OR EXCAVATED STONE TRANSPORTED FROM
THE SITE WITHOUT PRIOR APPROVAL OF CONTRACT OFFICER.
8. APPROVED EROSION AND SEDIMENT CONTROL "BEST MANAGEMENT
PRACTICES" [BMP] SHALL BE MAINTAINED AND KEPT IN GOOD REPAIR FOR
THE DURATION OF THIS PROJECT. AT A MINIMUM, THE CONTRACTOR OR HIS
AGENT SHALL INSPECT ALL BMPS WEEKLY AND AFTER SIGNIFICANT
PRECIPITATION EVENTS. ALL NECESSARY MAINTENANCE AND REPAIR SHALL
BE COMPLETED IN A TIMELY MANNER. ACCUMULATED SEDIMENT AND
DEBRIS SHALL BE REMOVED FROM A BMP WHEN THE SEDIMENT LEVEL
REACHES ONE HALF THE HEIGHT OF THE BMP OR, AT ANY TIME THAT
SEDIMENT OR DEBRIS ADVERSELY IMPACTS THE FUNCTIONING OF THE BMP.
LAYOUT & GRADING:
1. CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS & GRADES PRIOR TO
CONSTRUCTION.
2. BACKFILL PER FEDERAL, STATE AND LOCAL REQUIREMENTS. STAKE ALL
IMPROVEMENTS FOR GOVERNMENT REVIEW PRIOR TO INSTALLATION.
CONTRACTOR TO RE-STAKE IMPROVEMENTS AND MAKE ADJUSTMENTS AT
THE DIRECTION OF THE GOVERNMENT.
MINUTE MAN NATIONAL HISTORICAL PARK
NOTES:
1. LAWN AND MEADOW SEEDING SHOULD BE WITHIN THE LIMITS ACCEPTABLE
FOR SPECIES OR MIX TYPE. DO NOT SEED OR PLANT MEADOW OUTSIDE OF
RECOMMENDATIONS FOR TYPE.
2. REFER TO MEADOW SEEDING SPECIFICATION. RATES FOR SEEDING
SHOULD BE INCREASED BY 25% DURING CERTAIN SUMMER MONTHS.
3. USE A STRING TRIMMER OR MOWER TO CUT BACK COOL SEASON GRASSES
IN SELECT AREAS.
4. IN SOME AREAS, ARCHEOLOGICAL OVERSIGHT MAY BE NEEDED FOR
EXCAVATION/DIGGING. COORDINATE WITH PARK REPRESENTATIVES OR
CONTRACTING OFFICER IF DIGGING IS REQUIRED FOR PERENNIAL, SHRUB,
OR TREE PLANTINGS.
5. WETLAND CONSTRUCTION ALLOWED JUNE 1 THROUGH OCTOBER 15.
VERNAL POOL AND VERNAL POOL OVERLOOK CONSTRUCTION CAN OCCUR
FROM AUGUST 15 TO OCTOBER 15.
WETLAND SCHEDULING CONSIDERATIONS
ACTION JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC
VERNAL POOL CONSTRUCTION
WETLAND CONSTRUCTION
.0
.0
.0
| nps mima boardwalks_sheets.pdf |
| Sheets and Views |
| 4 SITE PREPARATION PLANS - L2 |
| 5 SITE PREPARATION PLANS - L3 |
| 6 LAYOUT AND MATERIAL PLANS - L4 |
| 7 LAYOUT AND MATERIAL PLANS - L5 |
| 8 DETAILS-A - L6 |
| 9 DETAILS-B1 - L7 |
| 10 DETAILS-B - L8 |
| 11 DETAILS-C - L9 |
| 12 DETAILS-D - L10 |
| 13 DETAILS-E - L11 |
| 14 DETAILS-F - L12 |
| 15 DETAILS-G - L13 |
| 16 DETAILS-H - L14 |
| 17 DETAILS-I - L15 |
File details come from the government source that posted it. Updated .