This document is a Performance Work Statement (PWS) for a 5-year single award Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide Apache AH-64 Transition Training Support (ATTS) to the U.S. Government (USG) and Foreign Military Sales (FMS) customers. The scope includes qualifying and training operators, maintainers, Maintenance Test Pilots, support personnel, and other authorized individuals to effectively transition operations from previous Apache versions to the AH-64E V6 and any subsequent versions. The PWS details the required training courses, training aids and simulators, programs of instruction, instructor services, deliverables, and data items. The PWS supports a larger solicitation under Solicitation Number W900KK-25-R-0002 with a proposal due date and questions submission deadline provided in the solicitation details.

View the file

Other files for this federal contract opportunity

Other files attached to Apache AH-64 Transition Training Support (ATTS)-Amd 01 Cancelation, newest first.
File Type Posted
Attachment 09_Past Performance Questionnaire Apache TT W900KK-25-R-0002.docx DOCX document
Attachment 10_Industry Question-Comment Form_Apache TT _W900KK25R0002.docx DOCX document
Attachment 10_Industry Question-Comment Form.docx DOCX document
Attachment 07.1_TO 001_Apache Transition Training IDIQ Program Management_PWS 13Aug24.pdf PDF
Attachment 05_Data Item Transmittal-Acceptance-Rejection Form.pdf PDF
Attachment 02_Apache Base IDIQ Price Workbook 11Nov24.xlsx XLSX spreadsheet
W900KK-25-R-0002.pdf PDF
Attachment 11_SF1408a.pdf PDF
Attachment 07.0_TO 001_Apache TT_Program_Management_Sec B-J CMS_08NOV24.pdf PDF
Draft RFP QAs Apache Transition Training IDIQ 12Nov24.xlsx XLSX spreadsheet
Attachment 07.2 Task Order 001 Cost-Price Workbook.xlsx XLSX spreadsheet
Attachment 04_Apache Transition Training_IDIQ_QASP_11.7.24.pdf PDF
Attachment 03 DD Form 254 FMS Apache Transition Training Support 20241022.pdf PDF
Attachment 12_DCAA required Preaward_Survey_of_Prospective_Contractor_Accounting_System_Checklist.pdf PDF
Attachment 09_Past Performance Questionnaire Apache TT W900KK-25-R-0002.docx DOCX document
Attachment 06_Task Order Procedures-Work Request Procedures.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS-2023-018

12 November 2024

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

Performance Work Statement for the FMS Apache Transition Training Support

Single Award (SA) Indefinite Delivery Indefinite Quantity (IDIQ)

PROJECT MANAGEMENT

X_______________

Concurrence: Rick Denny Product Lead, International Aviation, IPO PEO STRI

U.S. Army Program Executive Office for Simulation, Training, and Instrumentation (PEO STRI)

12211 Science Drive Orlando, FL 32826-3276

DISTRIBUTION STATEMENT D. Distribution authorized to U.S. Government agencies and U.S. DOD contractors only, Administrative or Operational, 30 September 2023. Other requests for this document shall be referred to The Program Executive Office for Simulation, Training and Instrumentation (PEO STRI), SFAE-STRI-IPO, 12211 Science Drive, Orlando, FL 32826-3276.

Controlled by: PEO STRI Controlled by: SFAE-STRI-IPO

CUI Category: CTI Distribution: D

POC: Tanya Caceres, 407.669.8177

DENNY.RICKY.LEE.1081529759X_______________Digitally signed by

DENNY.RICKY.LEE.1081529759

Date: 2024.10.30 12:59:09 -04'00'

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

TABLE OF CONTENTS

1.0 OVERVIEW

1.1 Scope

1.2 Background

2.0 APPLICABLE DOCUMENTS

2.1 Government Documents

2.2 Non-Government Standards and Other Publications

2.3 Availability of Government Documents and Non-Government Documents

3.0 DEFINITIONS

4.0 PROGRAM REQUIREMENTS

4.1 General

4.2 Program Management

4.2.1 Integrated Master Schedule (IMS)

4.2.2 Meetings and Reviews

4.2.2.1 Post Award Conference (PAC)

4.2.2.2 Program Management Review (PMR)

4.2.2.3 Integrated Product Team (IPT) Meetings

4.2.3 Financial Management

4.2.4 DD Forms 254

4.2.5 Non-Personal Services

4.2.6 USG Directed Travel/ Temporary Duty

4.2.7 Use of Illegal Substances

4.2.8 Military Extraterritorial Jurisdiction Act (MEJA) Compliance

4.2.9 Synchronized Pre-deployment and Operational Tracker (SPOT)

4.2.10 Passports

4.2.11 Licenses

4.2.12 Organizational Conflict of Interest

4.2.13 Safeguarding

4.2.14 Access and General Protection Policy and Procedures for Contractor Requiring Common Access Card (CAC)

4.2.15 Hazardous Duty

4.2.16 Arming

4.2.17 Law of Armed Conflict (LOAC)/Rules for the Use of Force (RUF)

4.2.18 Foreign Disclosure and Visits

4.3 Army Training Certification Tracking System (ATCTS)

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

4.3.1 Information Assurance (IA)/Information Technology Training

4.3.2 AT Awareness Training for US based Contractor Personnel Traveling Overseas 17

4.3.3 iWATCH Training

4.3.4 Antiterrorism (AT) Level I Training

4.3.5 Requirement for OPSEC Training

4.3.6 Performance or Delivery in a Foreign Country

4.3.7 Handling or Access to Classified Information

4.3.8 Threat Awareness Reporting Program (TARP) Training

4.3.8.1 Cybersecurity/Information Technology Certification

4.3.9 Controlled Unclassified Information (CUI) Training

4.4 Site Survey

4.5 Incident Reporting

4.6 Training Devices and Related Hardware and Software Systems

4.6.1 System Safety

4.6.2 Quality Assurance (QA)

4.6.3 Configuration Management (CM)

4.6.4 Logistics and Supportability

4.6.4.1 Commercial Off-The-Shelf (COTS) Manuals and Associated Supplemental Data22

4.6.4.2 Operator User Manuals (OUM)

4.6.4.3 System Maintenance Manuals (SMM)

4.6.4.4 Packaging, Handling, Storage and Transportation (PHS&T)

4.7 Training Programs of Instruction and Training Course Conduct

5.0 DETAILED REQUIREMENTS

5.1 General

5.2 Training Aids, Devices, Simulators, and Simulations (TADSS)

5.3 Programs of Instruction (POIs), Training Classes, and Instructor Services

5.4 Training Courses

5.4.1 Other Courses

6.0 DELIVERABLES

7.0 DATA ITEMS (DI)

8.0 ACRONYMS LIST

APPENDIX A: CLASSROOM EQUIPMENT AND TADSS REQUIREMENTS

APPENDIX B: TRAINING COURSES

APPENDIX C: New Equipment Training Team (NETT) Requirements

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

1.0 OVERVIEW

1.1 Scope

This Performance Work Statement (PWS) defines the work effort for the Contractor to train and qualify operators, maintainers, Maintenance Test Pilots (MTPs), support personnel, and other authorized personnel as necessary in the transition of operations necessary to effectively employ the AH-64E V6 (and any successor AH-64 version) configuration.

1.2 Background

On 8 September 2022, a Program Level Agreement (PLA) was signed between Product Manager Apache Production and Fielding, PM Apache, and Product Lead International Aviation, PEO STRI International Program Office. The background statement of that PLA states, “Based on direction received from PM Apache and Project Lead, PEO STRI, International Program Office, PM Apache NETT (New Equipment Training Team) will no longer provide Foreign Military Sales (FMS) New Equipment Training (NET).

Therefore, PEO STRI IPO will contract for and develop the AH-64E V6 Aircraft Series Transition Course (ASTC) Training and any unique NET specific AH-64E training “not covered by the Ft Rucker” transition course. This training will be Ft Rucker recognized Foreign Military Sales (FMS), Apache Aircraft Qualification Course (AQC) – (Unique NET Training).” The PLA further defined “the operational and support relationship between the Program Manager, Apache NETT and the Product Lead International Program, PdL, AVN Office for working relationships, roles, responsibilities, specific support requirements, information sharing, and points of contact for future actions and matters of coordination that supports FMS NETT only.”

In accordance with the PLA, this Performance Work Statement (PWS) has been issued to address the demands of New Equipment training for the AH-64E V6 aircraft and any successor sub-versions (e.g. V6.5 is a subversion but V7 is not), to include training of the operators, maintainers, maintenance test pilots, support personnel, and other personnel as necessary to enable effective operations. The task involves a variety of specialties, requirements, and deliverables consisting of hardware, software, information, programs of instruction, and training activities, which will vary across the operating environments, controlling nation militaries, and the evolution of capabilities from a pre-Apache aircraft basis to a transition from the most recent prior versions to the newest versions. This PWS is designed therefore to support multiple operating environments, transition and collective, specific country mission/tactical training, multiple nations, multiple device and service deliveries, and multiple AH-64 variants.

This PWS has also been established by following the formats and guidance of MIL-STD- 961E, Department of Defense Standard Practice, Defense and Program-Unique Specifications Format and Content, 2 April 2008, following the template and format beginning on page 1. This template has been chosen due to the potential for this PWS and its resulting contract to be used by multiple US Government (USG) and potentially foreign Government entities, and thus satisfies the need to apply broadly understood format and content bases throughout this contract.

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

This PWS has also been designed to provide a menu-based approach to the delivery of the needed items and services, such that each using entity, foreign or domestic, can rapidly understand the options available and secure rapid and accurate pricing, requirements, and deliveries through this menu.

AH-64E V6 identifies the Operational Flight Program (OFP) software build for the aircraft.

The AH-64E V6 consists of sub-versions ranging from AH-64E V6 through AH64E V6.9 and AH-64E V6.X, V6.X being the projected OFP software build for FMS customers. AH- 64E V6.5, a sub-version of AH-64E V6, is expected to be released during the performance of this contract and difference classes to V6.5 are included as part of this requirement.

2.0 APPLICABLE DOCUMENTS

Requests for these documents can be directed to PEO STRI, SFAE-STRI-IPO-IA, 12211 Science Drive, Orlando, FL 32826-3276.

2.1 Government Documents

Doc Number Title and Location Date

AR 12-1 Security Assistance, Training, and Export Policy 29 FEB 24

AR 25-2 Army Cybersecurity 16 FEB 23

AR 95-1 Flight Regulations 22 MAR 22

DCMA INST 8210-1D Contactor’s Flight and Ground Operations 06 FEB 23

AR 380-5 Army Information Security Program 25 MAR 22

AR 380-10

Foreign Disclosure and Contacts with Foreign Representatives

14 JUL 15

AR 381-12 Threat Awareness and Reporting Program 01 JUN 16

AR 385-10 The Army Safety and Occupational Health Program 24 JUL 23

AR 525-13 Antiterrorism 29 MAR 19

AR 530-1 Operations Security (OPSEC) 26 SEP 14

DFARS Part 252 Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.239-7001

30 MAY 24

DoDD 8140.01 Cyberspace Workforce Management 05 OCT 20

DoDM 5200.01, Volume 3 DoD Information Security Program: Protection of

Classified Information

24 FEB 12

DoDI 3020.41 Operational Contract Support (OCS) 31 AUG 18

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

Doc Number Title and Location Date

DoDI 5200.48 Controlled Unclassified Information (CUI) 06 MAR 20

DoDM 8140.03 Cyberspace Workforce Qualification and Management Program

15 FEB 23

DoDI 8500.01, CH-1 Cybersecurity 07 OCT 19

32 CFR, part 117 National Industrial Security Program Operating Manual

(NISPOM)

24 FEB 21

INST 8210-1D Contractor’s Flight and Ground Operations 6 FEB 2023

MIL-STD-961E, CH-4

Defense and Program-Unique Specifications Format and Content https://quicksearch.dla.mil/Transient/771D15D0B0BE4 2C5A432855D4569CC70.pdf

16 JUL 20

MIL-STD-810H, CH-1

Environmental Engineering Considerations and Laboratory Tests

18 MAY 22

MIL-STD-130N, CH-1 Identification Marking of U.S. Military Property 16 NOV 12

MIL-STD-31000B

Technical Data Packages https://quicksearch.dla.mil/qsDocDetails.aspx?ident_nu mber=276980

31 OCT 18

MIL-STD-40051-2D (1),

CH-1

Preparation of Digital Technical Information for Page- Based Technical Manuals (TMs) https://quicksearch.dla.mil/Transient/2E2B1FDC7EDA4 231BC4FDC2953437661.pdf

22 NOV 21

TRADOC Pamphlet 350- 70-13

System Training Integration https://adminpubs.tradoc.army.mil/pamphlets/TP350- 70-13.pdf

27 OCT 14

TRADOC Pamphlet 525-8-

Army Learning Concept for Training and Education https://adminpubs.tradoc.army.mil/pamphlets/TP525-8- 2.pdf

12 FEB 24

2.2 Non-Government Standards and Other Publications

Doc Number Title Date

SAE-GEIA-STD-0007C

Logistics Products https://www.sae.org/standards/content/geiastd0007c/

06 NOV 19

2.3 Availability of Government Documents and Non-Government Documents

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

• Army Regulations (AR), Field Manuals (FM) and Technical Manuals (TM) are available at: https://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

• Department of Defense (DoD) publications are available at:

https://www.esd.whs.mil/DD/DoD-Issuances

• Military Standards are available at: https://quicksearch.dla.mil/ https://armypubs.army.mil/ProductMaps/PubForm/AR.aspx https://www.esd.whs.mil/DD/ https://quicksearch.dla.mil/

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

3.0 DEFINITIONS

a. Acquisition Streamlining and Standardization Information System (ASSIST). The official database containing information about standardization documents used in the DoD. ASSIST also provides electronic access to government documents included in the database over the Internet. ASSIST can be accessed at http://assist.daps.dla.mil.

b. Aircraft Qualification Course (AQC). The aircraft training course for rated rotary wing aviators needing qualification in the AH-64 current version.

c. Aircraft Series Transition Course (ASTC). The aircraft training course for aviators previously qualified on AH-64D versions who require transition training for customer’s delivered E series. Other previous AH-64D version qualifications establish a unique training starting point and would require a customized ASTC.

d. Analysis. An element of verification that uses established technical or mathematical models or simulations, algorithms, charts, graphs, circuit diagrams, or other scientific principles and procedures to provide evidence that stated requirements were met.

e. Collective Training. Training conducted by more than one aircraft intended to train tasks outlined in the Aircrew Training Manual (ATM), the Aircrew Training Program (ATP), or other approved tactics, techniques and procedures including combined arms integration training.

f. Continuation Training. Aviator training identified in the ATM and ATP as 3000 series tasks and evaluations.

g. Current Version (CV). The customer’s existing delivered AH-64 software version. CV establishes a baseline starting point from which other training course requirements can be established.

h. Data. Recorded information, regardless of form or method of recording.

i. Data Item Description (DID). A standardization document that defines the data content, preparation instructions, format, and intended use of data required of a contractor. DIDs are prepared in accordance with MIL-STD-963.

j. Differences Course (DIFF). The aircraft training course for AH-64E version 4 qualified aviators who require transition training for customer’s delivered AH-64E version 6.

Other previous AH-64E version qualifications or unique customer delivered version 6 features establish a unique training starting point and would require a customized training class.

k. Duty Day. The hours available in a customer’s schedule that are useable for classroom, simulation and/or flight training. Duty day determinations account for cultural, organizational, and regional requirements and limitations. A standard customer duty day may be less than 8 hours and establishes the base line for a standard training for each customer.

l. Entity. General term to denote the system, item, software, process, or material that is the subject of a specification.

m. Government Flight Representative (GFR). The GFR performs the contract administration services function – to maintain surveillance of flight operations and

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

must evaluate contractor responsibility and liability for property loss. The GFR is responsible for review and approval of all flight schedules.

n. Graduate Qualification Courses. Flight and maintainer courses that deliver advanced training qualifications to students with prior undergraduate/initial qualification in that specialty.

o. Inspection. The examination and testing of supplies and services to determine whether they conform to specified requirements.

p. Instructor Pilot Course (IPC). For qualified AH-64 aviators needing the IPC specific to current aircraft configuration and version.

q. Instrument Examiner Course (IE). For qualified AH-64 aviators needing the IE course specific to current aircraft configuration and version.

r. Maintenance Examiner Course (ME). For AH-64 qualified aviators needing the ME specific to current aircraft configuration and version. Requires MTPC and IPC qualifications. Additional Skill Identifier (ASI).

s. Maintenance Test Pilot Course (MTPC). For AH-64 qualified aviators (any version) needing the MTPC specific to current aircraft configuration and version. Additional Skill Identifier (ASI).

t. Maintenance Test Pilot Course (MTPC) ASTC. For AH-64D qualified MTPs needing a transition to the E series. Other starting points would require adjustments and customization to the course.

u. Maintenance Test Pilot Course (MTPC) DIFF. For AH-64E qualified MTPs needing the latest software version training. Other previous AH-64E version qualifications or unique customer delivered features may establish a unique training starting point and would require a customized training class.

v. Mission Equipment Package (MEP). Federated or Integrated navigation, communication, data management, weapons management or other customer-unique system that requires unique and customer-specific training courses.

w. New Equipment Training (NET). Foreign countries with US Army approved FMS cases to purchase newly built weapons systems are eligible to contract for qualification training on their equipment as outlined in AR12-1. The material developer (PEO Aviation and PEO STRI, in the case of aviation systems) is authorized by AR12-1 and instructed by DA PAM12-1 to manage the FMS NET program.

x. Packaging. The processes and procedures used to protect material from deterioration, damage, or both. It includes cleaning, drying, preserving, packing, marking, and unitization.

y. Program-unique specification. A specification that describes a system, item, software program, process, or material developed and produced (including repetitive production and spares purchases) for use within a specific program, or as a part of a single system and for which there is judged to be little potential for use by other systems.

z. Qualification. A process in advance of and independent of an acquisition by which a

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

manufacturer's capabilities, or a manufacturer’s or distributor's products are examined, tested, and approved to be in conformance with specification requirements, and subsequent approval for or listing of products on a qualified products list (QPL) or manufacturers on a qualified manufacturers list (QML).

aa. Specification. A document prepared to support acquisition that describes essential technical requirements for materiel and the criteria for determining whether those requirements are met.

bb. Style. A term used to denote differences in design or appearance.

cc. Supplement. A listing of specification sheets or Materiel Safety Data Sheet associated with a general specification.

dd. Test. An element of verification in which scientific principles and procedures are applied to determine the properties or functional capabilities of items.

ee. Training Day. A customer’s day that can accommodate a specific amount of training based on duty day requirements and limitations. Training days are used to determine total days available for customer training and will be used to develop a customized customer master training calendar.

ff. Type. A term that implies differences in like items or processes as to design model, shape, or other configuration, which is usually designated by Roman numerals, such as “type I” or “type II.”

gg. Undergraduate Qualification Courses. Flight and maintainer courses that deliver initial qualification training to students who meet basic entry criteria.

hh. Verification. Confirmation through the provision of objective evidence that specified requirements have been fulfilled. Objective evidence may be obtained through observation, measurement, test, or other means.

4.0 PROGRAM REQUIREMENTS

4.1 General

This section covers general aspects of style, format, and requirements that are applicable to all specifications covered by this document.

The requirements defined herein form the basis for work to be performed as part of the Task Orders (TOs) the Government will issue under this PWS. Management of the SA IDIQ and TOs shall be in accordance with the requirements of this PWS and each individual TO. In the event of a conflict between this PWS and the individual TO PWS, the tailored individual TO PWS takes precedence. Each TO PWS shall identify the requirements to be executed by the Contractor to provide a total, comprehensive, and integrated capability to address the scope and requirements of that TO PWS for the identified customer.

As specified in each TO, the Contractor shall develop and deliver training through the integration of the specified packages cited in Section 5 Detailed Requirements and its

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

subsections and shall acquire and support the required packages (of hardware, software, programs of instruction, and training conduct) to enable the customer to safely operate, maintain, and support the AH-64 and its related mission systems. The customer’s AH-64 configuration specific packages cited in Section 5, Government Furnished Equipment (GFE), Government Furnished Information (GFI), training location(s), travel, and other administrative requirements will be identified in each TO PWS.

Unless otherwise specified in a TO PWS, the Contractor shall use the most current approved courses/training approved for release to the specific TO customer. When established courses are not available or when the Contractor is required to train customer-specific mission equipment, the contractor shall develop the courses or training using best training development practices in accordance with Analysis, Design, Development, Implementation and Evaluation (ADDIE) process. In addition, for current courses and future training development the contractor shall make use of relevant and effective training methods, resources, and techniques to maximize efficiency and effectiveness.

4.2 Program Management

The Contractor shall provide overall program management and administrative support at the Base IDIQ and TO levels to ensure the requirements of the contract are satisfied. The prime contractor is responsible for the conduct and management of all subcontractors.

The Contractor shall deliver the Contractors Progress and Status Report (CPSR) Contract

Data Requirements List (CDRL) monthly. The CPSR shall document program (IDIQ) status and accomplishments such as upcoming activities, issues and their resolution, and deliverables status. The CPSR shall provide the status and accomplishments report at the IDIQ level. The CPSR shall be inclusive of detailing individual active TO (project) level status and accomplishment reporting. A project/TO is considered active from the date of award to the date that the period of performance for the TO ends, the contract is closed out, or upon written direction by the Contracting Officer, whichever occurs first.

The Contractor shall deliver a Contract Change Proposal CDRL to request a change to the contract.

DI-MGMT-81928 Contractor’s Progress and Status Report (DI A001) DI-ADMN-81401C Contract Change Proposal (DI A002)

4.2.1 Integrated Master Schedule (IMS)

For each TO, the Contractor shall design, develop, implement, manage, update, and maintain the Base level IMS inclusive of the TO level IMS elements. All contract schedule information delivered or presented at program reviews shall originate from the IMS and shall contain all critical events, entry and exit criteria, accomplishment predecessor and successor events, and their dependencies. The IMS shall address all project and program activities including activities performed by subcontractors. The Contractor shall conduct a critical path analysis of the tasks and identify problem areas and corrective actions required to eliminate or reduce schedule impacts IAW the IMS.

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

DI-MGMT-81861C Integrated Data and Analysis Report (IPMDAR) (DI A003)

4.2.2 Meetings and Reviews

The Contractor shall support Continental United States (CONUS) and Outside Continental United States (OCONUS) meetings and/or reviews. The location of the reviews shall be at Huntsville, AL or Orlando, FL unless otherwise mutually agreed to by the Contractor and the USG. These meetings and/or reviews may be conducted biweekly in person, by conference call or by Video Teleconference (VTC) between the Contractor’s In-Country Manager and the USG PdL, APM, or designated representative. The Contractor shall be required to plan and/or attend meetings and reviews as required.

Locations and times shall be determined by the Contractor subject to prior approval by the USG. The Contractor shall be prepared to explain the reasoning, assumptions and methods used to arrive at any conclusion, recommendation, or alternative in the accomplishment of tasks required by the contract. When necessary, the Contractor shall provide status updates and illustrative examples (photos, drawings, statistics, status diagrams, sample text, etc.) of progress being made about any training, operations, maintenance, or other activity based on program details being reviewed during the meeting(s). The Contractor shall prepare presentation materials, as required. The Contractor shall have key personnel, subject matter expert, and sub-contractor support as appropriate, attend the meetings as necessary to support the meeting agenda.

Additional Meetings and Reviews may be scheduled by the Contractor or the USG as necessary.

4.2.2.1 Post Award Conference (PAC)

The Contractor shall support the PAC and provide at least one in-person attendee. The Contractor is encouraged to include representatives of teaming sub-contractors (if applicable), although limits may be placed on the number of representatives as driven by facility accommodations. The purpose of the PAC is to ensure that the Contractor is prepared to execute the work required in the PWS and to establish the framework of the Contractor and USG interaction during the performance of the contract. The USG Procuring Contracting Officer (PCO) will notify the awardee of the specific date, location (in the Orlando, FL area), and agenda of the PAC. The conference will be used to ensure that the USG and Contractor achieve a clear and mutual understanding of all contract requirements and identify and resolve potential issues. The PAC shall take place within 30 calendar days after contract award and be immediately followed by a Program Management Review. The TO PACs will take place if necessary.

4.2.2.2 Program Management Review (PMR)

The Contractor shall conduct PMRs approximately once every six (6) months in accordance with the IMS. The location of the reviews shall be at Huntsville, AL or at the Contractor’s site, unless otherwise mutually agreed to by the Contractor and the USG.

The locations may alternate between PM Apache and Contractor site, at the discretion of the USG. Each PMR shall provide a program (IDIQ-level) overview and a detailed discussion of program status, schedules, production/integration issues, risks, and mitigation plan at the program and the project level for each active TO. Additionally, the Contractor shall identify and report to the USG all identified risks, their statuses, and how

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

they are being managed to reduce and/or mitigate them.

The Contractor shall coordinate and obtain USG concurrence of Program Management Review (PMR) topics and read-ahead materials at least two weeks prior to each PMR.

Status and information at the review shall reflect currency since the previous PMR. The Contractor shall create and update as necessary briefing slides for the PMRs. The slides shall contain an action item log to capture programmatic actions and assign a POC that shall report to the Contracting Officer’s Representative (COR) or designated USG representative. The Contractor shall ensure that key stakeholders, including support and subcontractors are available and participate to the extent necessary to achieve a successful meeting and outcome. Additionally, Customer-site Program Meetings and Reviews may be scheduled by the USG as necessary.

The Contractor shall document the PMR support in the Contractor’s Progress and Status CDRL. The Contractor shall document the results of the review, including any resulting action items IAW the Report, Record of Meeting/Minutes CDRL.

DI-MGMT-81928 Contractor’s Progress and Status (DI A001) DI-MGMT-81809 Risk Mitigation Status Report (DI A004) DI-ADMN-81505 Report, Record of Meeting Minutes (DI A005)

4.2.2.3 Integrated Product Team (IPT) Meetings

The Contractor shall host and participate in biweekly IPT meetings and address the full spectrum of the program (IDIQ) and TO statuses including systems engineering, schedule, financial, integrated logistics support, and testing. The USG and Contractor may cancel a scheduled IPT meeting with mutual one-day notice. Telephone conferences and video teleconferencing may be utilized for IPT meetings. IPT meetings may be held in conjunction with other reviews, conferences, and meetings.

4.2.3 Financial Management

The Contractor shall provide overall program management and administrative support to ensure that the TO requirements are accomplished. The status of all funds associated with the TO to include payments, cancellations, and invoices against each Contract Line Item Number (CLIN) and Sub Line Item Number (SLIN) shall be documented and tracked IAW the Contractor Invoicing and Payment Report CDRL.

DI-MGMT-81651 Contract Invoicing and Payment Report (DI A006)

4.2.4 DD Forms 254

Overarching security requirements and Contractor access to classified information shall be as specified in the DD Form 254 for this PWS. Individual TOs may add additional DD254 information to designate specific security clearance and security requirements.

4.2.5 Non-Personal Services

The Government will neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances will the Government assign tasks to, or prepare work schedules for, individual Contractor

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

employees. It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the Contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor's responsibility to notify the PCO immediately.

4.2.6 USG Directed Travel/ Temporary Duty

All Contractor travel shall be in accordance with Federal Acquisition Regulation (FAR) 31.205-46, Travel Costs. The Joint Travel Regulations (JTR), and Department of State Standardized Regulations (DSSR) shall provide the basis for the determination as to the reasonableness and allowance of all travel costs. Costs incurred for lodging, meals, and incidental expenses shall be reasonable and allowable only to the extent that they do not exceed daily the maximum per diem rates, authorized for Federal civilian personnel, in effect at the time of travel. Airfare costs shall be the lowest priced airfare available to the contractor during normal business hours. Airfare costs more than the above standard airfare are unallowable except as authorized under Federal Acquisition Regulation (FAR) 31.205-46(b). All travel requirements shall be pre-approved by the COR. The Contractor shall be responsible for coordinating all travel arrangements to, from, and in-and-about all CONUS and OCONUS Points of Destination.

Additionally, the following applies:

a. Non-program management office travel shall be conducted and invoiced IAW with

FAR 31.205-46 Travel Costs and the JTR.

b. All travel not specifically required by the USG will be funded by the Contractor as part of their program management pricing via indirect rates or within the Contractor’s competitive pricing. Routine program management travel shall not be funded by any travel CLIN.

4.2.7 Use of Illegal Substances

All Contractor and subcontractor personnel shall be subject to both U.S. and local laws when it comes to illegal or unauthorized substances or items. Accordingly, the Contractor shall establish a zero-tolerance policy with respect to substance abuse.

4.2.8 Military Extraterritorial Jurisdiction Act (MEJA) Compliance The Contractor shall comply with Department of Defense Instruction (DoDI) 5525.11 - Criminal Jurisdiction over Civilians Employed by or Accompanying the Armed Forces outside the United States, Certain Service Members, and Former Service Members. The Contractor shall maintain a copy of each employee's written acknowledgement of receipt of the notification prior to travel/deployment and have this available for the COR upon request.

IAW DoDI 5525-11, Paragraph 6.1.5, it is DoD policy that the requirement for order and discipline of the Armed Forces OCONUS extends to civilians employed by or accompanying the Armed Forces, and that such persons who engage in conduct constituting criminal offenses shall be held accountable for their actions, as appropriate.

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

4.2.9 Synchronized Pre-deployment and Operational Tracker (SPOT) Travel requirements shall correspond to the Aircraft and Personnel Automated Clearance System (APACS) foreign travel guidance and applicable host customer requirements. If When required by APACS or the individual Task Order, the Contractor shall ensure SPOT applicability with respect to visiting countries, in accordance with the DoD Foreign Clearance Guide, at https://www.fcg.pentagon.mil/fcg.cfm .SPOT has been designated as the Joint Enterprise contractor management and accountability system to provide a central source of contingency Contractor information and a summary of contract services in accordance with DoDI 3020.41 Operational Contract Support (OCS). Government representatives are required to maintain, by-name, Contractor accountability within SPOT. Contractor administrators shall register for a SPOT account at https://spot.dmdc.mil and provide the necessary information for all deploying contractor personnel. All Contractor data shall be entered into the SPOT database for all Contractor employees traveling to any OCONUS location. The Contractor shall coordinate this with the Army Contracting Command (ACC) PCO, PEO STRI COR, and respective Combatant Command (COCOM).

Contractor personnel must have an approved SPOT generated Letter of Authorization signed by the cognizant Government PCO to travel to, from, or within the designated operational area. The Letter of Authorization also will identify any additional authorizations, privileges, or Government support that contractor personnel are entitled to under this contract.

4.2.10 Passports

Contractor personnel traveling abroad shall possess a valid U.S. passport and all appropriate visas and clearances required to conduct the assigned overseas missions, (See - https://www.fcg.pentagon.mil/fcg.cfm).

4.2.11 Licenses

Contractor personnel shall possess valid U.S. (State) and international driver's licenses as required. The Contractor shall ensure licenses remain valid during the entire performance period.

4.2.12 Organizational Conflict of Interest

Contractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interest (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer (CO) immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the CO and in the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the CO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent https://www.fcg.pentagon.mil/fcg.cfm https://www.fcg.pentagon.mil/fcg.cfm

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

contracted requirements which may be affected by the OCI.

4.2.13 Safeguarding

The Contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

4.2.14 Access and General Protection Policy and Procedures for Contractor

Requiring Common Access Card (CAC) For Contractors requiring Common Access Cards (CAC). Before CAC issuance, the Contractor employee requires, at a minimum, a favorably adjudicated Tier 1 (T1) or an equivalent or higher investigation in accordance with Army Directive 2014-05, Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Un-cleared Contractors. The Contractor shall be responsible for submitting T1 requests. The Contractor employee shall be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the Federal Bureau of Investigation (FBI) fingerprint check and a successfully scheduled T1 at the Office of Personnel Management (OPM).

Additionally, Contractor support personnel may need to be badged by the individual customer’s Department of Defense, Ministry of Defence (MOD), or similar office which they will be supporting during PWS execution. The Contractor support personnel may require a passport sized photo (usually x2), a copy of their passport page, and a short information sheet (provided by the MOD Office to be filled out by everyone), to be processed by the appropriate MOD or equivalent office supported.

4.2.15 Hazardous Duty

Contractor personnel may be eligible for allowances typically available for DoD civilians deploying into difficult or hazardous conditions. The level of compensation allowable will be commensurate with U.S. State Department and OPM prevailing compensation rates for DoD civilian personnel.

Under this PWS, Hazardous Duty Pay is permissible only up to the level authorized by the Department of State Standardized Regulation (DSSR).

4.2.16 Arming

Contractor personnel may be authorized to possess firearms in accordance with the Security and Defense Cooperation Agreement (SDCA) between the Government and the partner nation, and per all applicable U.S., partner nation, and theater laws and regulations. The Contractor shall comply with the provisions of the Lautenberg Amendment, which prohibits any person convicted of a crime involving domestic violence

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

from possessing firearms. The Contractor is responsible to conduct the appropriate criminal and financial background checks to ensure all employees meet the legal requirements to carry firearms under this contract and qualify in accordance with applicable qualification standards. The Contractor shall submit qualification requirements for prior approval to the Government PCO and COR. Unsatisfactory employee qualification results shall be reported to the COR. The Contractor shall review this process and make needed process improvements with PCO approval. When required, the Contractor shall comply with the applicable U.S. partner nation agreement(s) and applicable partner nation laws when using or operating in a live firing range.

Person(s) requesting arming shall have a SPOT-generated Letter of Authorization (LOA) with the authorized weapon service, selected and approved by the Contracting Officer. In addition, the individual’s weapon type and serial number, shall be registered in SPOT per DoDI 3020.50; this registration is the responsibility of the prime contractor for its employees and subcontractors. Weapon authorizing activities should check individual records in SPOT to ensure the Contractor’s LOA is valid prior to issuing the weapons card.

4.2.17 Law of Armed Conflict (LOAC)/Rules for the Use of Force (RUF) The Contractor shall require all employees to be trained on LOAC and RUF and shall obtain a signed written acknowledgement from each employee authorized to bear weapons that they have been briefed on and understand LOAC, RUF, and the differences between rules of engagement (ROE) and RUF. The Contractor shall provide a copy of the Geneva Convention Relative to the Treatment of Prisoners of War, August 12, 1949, to all employees (in their native language) authorized to carry weapons.

The Acknowledgement shall read (in everyone’s native language):

"I have been briefed on the Law of Armed Conflict (LOAC) and Rules for the Use of Force (RUF) and understand the RUF, the difference between the RUF and the Rules of Engagement (ROE), of the LOAC, and that the use of a firearm creates a potential for criminal and civil liability under U.S./Host nation laws."

The Contractor shall provide refresher LOAC training to all applicable employees (to include its subcontractors) every three months. In particular, LOAC training shall include:

a. Restrictions on firing on persons who have surrendered or are out of combat due to wounds/injuries,

b. Requirements to render first aid to the best of the Contractor's ability and contact medical response units to obtain medical care for wounded, safety permitting,

c. Requirements to report to the PCO and PEO STRI COR all escalation of force incidents within two hours of time of incident,

d. Requirements to comply with provisions of the Geneva Convention Relative to the

Treatment of Prisoners of War.

4.2.18 Foreign Disclosure and Visits

The Contractor shall ensure that disclosure of Classified Military Information (CMI) or

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

Controlled Unclassified Information (CUI) to any foreign national or foreign representative has been approved in writing by the cognizant government PCO, COR, Program Director and U.S. Government foreign disclosure officer per CFR Title 32, Part 117National Industrial Security Program Operating Manual (NISPOM), AR 380-10 Foreign Disclosure and Contacts with Foreign Representatives and AR 12-1 Security Assistance, Training and Export Policy.

The Contractor shall ensure foreign disclosure approvals are coordinated prior to implementation of policy and programs associated with the Army’s Security Cooperation activities (FMS), foreign military training, exercises, and allocation of excess defense articles to foreign countries, armaments cooperation, technology transfer, direct commercial sale, and munitions case processing in accordance with AR 12-1 Security Assistance, Training and Export Policy.

Visits by foreign nationals or foreign representatives performing under this contract (whether on or off-site) that require access to CMI or controlled unclassified information (CUI) shall be processed through the Foreign Visits System in accordance with CFR Title 32, Part 117 NISPOM, AR 380-10 Foreign Disclosure and Contacts with Foreign Representatives, and AR 12-1 Security Assistance, Training and Export Policy. Approved visits will include disclosure authorization through the installation or servicing Army or DoD foreign disclosure officer. Visits that are non-sponsored visits may take place, but disclosure will be limited to information in the public domain only or information covered by a valid export license issued by the Department of State IAW the Arms Export Control Act (AECA). In all cases foreign disclosure approval must be coordinated and approved prior to all visits.

4.3 Army Training Certification Tracking System (ATCTS)

All Contractor employees with access to a government Information Systems (IS) must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of service and must successfully complete the DoD Information Assurance Awareness Training prior to access to the IS and then annually thereafter.

4.3.1 Information Assurance (IA)/Information Technology Training The Contractor shall ensure that all personnel and associated subcontractor personnel complete the annual DoD IA Awareness Training prior to accessing DoD networks or commercial networks that contain DoD data. DoD IA Awareness Training is available at the following website: https://cs.signal.army.mil.

4.3.2 AT Awareness Training for US based Contractor Personnel Traveling

Overseas All US based Contractor personnel and associated Subcontractor personnel who travel overseas must take USG provided Area of Responsibility specific AT Awareness Training as required by AR 525-13. Specific Area of Responsibility training content is required by the combatant commander with the unit AT Office being the local point of contact.

https://cs.signal.army.mil/

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

4.3.3 iWATCH Training The Contractor and all associated subcontractors shall brief all personnel on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform personnel of the types of behavior to watch for and instruct personnel to report suspicious activity to the COR. This training shall be completed within thirty (30) calendar days of contract award and within thirty (30) calendar days of new personnel commencing performance with the results reported upon request to the COR/ Contracting Officer no later than sixty (60) calendar days after contract award.

4.3.4 Antiterrorism (AT) Level I Training

All Contractor personnel, to include subcontractor personnel, requiring access to installations, facilities, and controlled access areas shall complete AT Level I Awareness Training in accordance with AR 381-12. This will be completed within thirty calendar days after contract start date, effective date, upon thirty (30) days of new personnel commencing performance, or incorporation of this requirement into the contract, whichever is applicable. The contractor shall report completion of training for each affected contractor personnel and subcontractor personnel to the COR or to the contracting officer if a COR is not assigned, within thirty (30) calendar days after completion of training by all personnel and subcontractor personnel. AT Level I Awareness Training is available at the following website: https://jko.jten.mil/courses/AT-level1/launch.html.

4.3.5 Requirement for OPSEC Training

Per AR 530-1, Operations Security (OPSEC), Contractor personnel shall complete Level I OPSEC training within thirty (30) calendar days of reporting for duty. All Contractor personnel shall complete annual OPSEC awareness training. The Contractor shall ensure all applicable personnel have completed OPSEC initial training and annual refresher training and shall certify that their work force has completed the training through the submission of completion certificates(s) upon request to the COR/ Contracting Officer within thirty (30) days of arrival on the installation.

OPSEC training can be accomplished at the Defense Security Services website at:

https://securityawareness.usalearning.gov/opsec/index.htm

4.3.6 Performance or Delivery in a Foreign Country

The Contractor shall comply with DFARS clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US. Non-local national contractor personnel must comply with theater clearance requirements. Detailed guidance for all contractor travel requirements will be directed in TOs.

4.3.7 Handling or Access to Classified Information

The Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified “Confidential,” “Secret,” or “Top Secret”. The contractor shall comply with (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (NISPOM) CFR Title 32 Part 117 and (2) any revisions to CFR Title 32 Part 117.

https://jko.jten.mil/courses/AT-level1/launch.html https://jko.jten.mil/courses/AT-level1/launch.html https://securityawareness.usalearning.gov/opsec/index.htm

CUI//SP-PROCURE//FEDCON

CUI//SP-PROCURE//FEDCON

The Contractor shall be required to have a SECRET facility clearance with NO storage requirements.

All employees of the contractor who will have access to U.S. Government systems and technical information must undergo a security investigation, although certain positions/duties may not require a security clearance. The appropriate clearance level will range from HSPD-12 (Tier-1) to Secret (Tier-3), depending on the sensitivity of the information being accessed. The Contractor shall ensure that all employees performing under this contract have the appropriate clearance level for the specific requirements they are supporting. This will help maintain the integrity of sensitive information and ensure compliance with all relevant security regulations.

4.3.8 Threat Awareness Reporting Program (TARP) Training

For all Contractors with security clearances, per AR 381-12 Threat Awareness and Reporting Program (TARP), Contractor personnel shall receive annual TARP training by counterintelligence agents who have successfully completed the TARP T3 program and are certified to conduct the training as specified in AR 381-12 paragraph 2-4b.

4.3.8.1 Cybersecurity/Information Technology Certification

If applicable, Per DoDD 8140.01, Defense Federal Acquisition Regulation Supplement (DFARS) Part 252 subpart 252.239-7001, DoDM 8140.03and AR 25-2, if required, the Contractor employees supporting cybersecurity/IT functions shall be appropriately certified (within the last calendar year) or shall obtain the certification within thirty calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The baseline certification as stipulated in DoDD

8140.01 must be completed upon contract award.

4.3.9 Controlled Unclassified Information (CUI) Training

Pursuant to DoDI 5200.48, Section 3, Programmatic, every individual at every level, including DoD civilian and military personnel as well as contractors providing support to the DoD, shall comply with the requirements for initial and annual refresher CUI training.

DoD Mandatory CUI training is available at the following website:

https://securityawareness.usalearning.gov/cui/index.html.

4.4 Site Survey

The Contractor shall perform a site survey visit to each training site within 45 calendar days after TO award. A USG representative(s) shall be present with the Contractor during the performance of the site survey. The site survey shall be accomplished, once scheduled, within five calendar days not to include travel to and from the Customer.