Attachment_0004__Price_Schedule_.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 140P5123R0001
About this file
This document contains a price schedule template and details of a related federal contract opportunity for replacement of the cooling tower and condenser water pumps at Tuskegee Airman National Historic Site in Tuskegee, Alabama.
The price schedule template includes a base contract line item for replacement of the cooling tower and condenser water pumps with a lump sum price. It also includes three option items that can be awarded with the base contract: option A for a gift shop slatwall, option B for gift shop track light heads, and option C with an unspecified title. Offerors are required to submit pricing for all base and option line items. The solicitation number for the related federal contract opportunity is 140P5123R0001 and is being issued by the National Park Service Southeast Region within the Department of the Interior for the replacement work at the historic site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | 140P5123R0001 | ||||
| PARK - PMIS: | TUAI 235151 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Tuskegee Airmen National Historic Site | ||||
| Project Title: | Replace Cooling Tower and Condenser Water Pumps | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Replacement Cooling Tower and Condenser Water Pumps | 1 | Lump Sum | $0.00 | |
| 2 | (CLI Title) | - 0 | |||
| TOTAL BASE PRICE (Contract Line Item Number 1 through 1) --------------------------------------------------------------------------------- | $0.00 | ||||
| 2 | OPTION A, Gift Shop Slatwall | 1 | Lump Sum | $0.00 | |
| 3 | OPTION B, Gift Shop track light heads | 1 | Lump Sum | - 0 | |
| 5 | OPTION C, (CLI Title) | - 0 | |||
| 6 | OPTION D, (CLI Title) | - 0 | |||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 2 through 3) ----------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 1) -------------------------- | $0.00 |
File details come from the government source that posted it. Updated .