Attach 7_KTR Work Surveillance Checklist_Placement or Removal Empty ROB or Vac Box.pdf

PDF 45 KB Posted

Attached to
Tucson HW Removal & Disposal Amend II Federal contract opportunity
Solicitation number
SP450022R0007
Issued by
Defense Logistics Agency

View the file

Other files for this federal contract opportunity

Other files attached to Tucson HW Removal & Disposal Amend II, newest first.
File Type Posted
Contract Terms and Conditions_Tucson_rv3_12152021.docx DOCX document
Attach 2_Tucson PWS v12082021.docx DOCX document
Contract Terms and Conditions_Tucson_rv2_11042021.docx DOCX document
22R07_Instructions to Offerors _Addenda to 52.212-1_format.pdf PDF
Attach 2_Tucson PWS v083121 final.docx DOCX document
Attach 6_KTR Work Surveillance Checklist_ICS Work.pdf PDF
Attach 1_Tucson PS v071321.xlsx XLSX spreadsheet
Attach 3_Tucson PUPs v071321.docx DOCX document
Attach 5_DOL WD 1996_0223 Rev51_10052021.pdf PDF
22R07 Evaluation _Addenda to 52.212-2_rv1.pdf PDF
Attach 4_Past Performance Information Questionnaire.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Work Surveillance Checklist

Placement or Removal of Empty Rented Rolloff Box (ROB) or Vacuum Box

Date(s) of Work Surveillance: _________________ Start Time: ___________ Stop Time: ___________

Contract Number: SP4500-______-D-___________ TO #: ________________ CLIN: ______________

Name of Designated Government Representative: ___________________________________________

Title of Designated Government Representative: ____________________________________________

Phone Number of Designated Government Representative: (______) _______-___________ Ext.______

Yes No N/A Description of Contractor Work Surveillance: [ROB] or [Vac Box] (Circle one)

Did the Contractor arrive on site at the scheduled time and date?

Did the Contractor arrive on site with all of the requisite equipment, including

- One ROB or Vacuum Box container of the appropriately ordered size, with

- One plastic liner of sufficient size and thickness to adequately contain the waste for which it was intended (ROB only), and

- One watertight tarp cover that was generally free of rips and tears (ROB only)?

Does the Contractor have an approved weight ticket showing the empty (tare) weight of the container?

Was the container inspected by a Designated Government Representative upon arrival at the designated location?

Was the container of acceptable appearance and integrity, with minimal evidence of corrosion, visibly void of waste residue and legible/offensive graffiti upon delivery?

Was the ROB, bows and cover free of any defects or damage, other than those attributable to normal wear and tear, and determined acceptable for Government use? Please document below any noteworthy defects or damage and have driver initial for acknowledgment.

Note: Failure of the driver to acknowledge any existing noteworthy defects or damage will be cause for rejection of the ROB and liner.

Did the equipment operate properly without causing a delay in work?

Was the work performed safely and did the equipment meet the satisfaction of the Designated Government Representative?

Comments:

Signature of Designated Government Representative Date

File details come from the government source that posted it. Updated .