SCOPE OF WORK

Southside Parking Lot Bureau of Land Management – Southeastern States District Jupiter Inlet Lighthouse Outstanding Natural Area Jupiter, FL

11/1/2022

Description of Project Area This project occurs within the Bureau of Land Management’s (BLM) 120-acre Jupiter Inlet Lighthouse Outstanding Natural Area (ONA) in northern Palm Beach County, Florida. The project site consists of the approximately 0.5-acre south parking lot to the south of S. Beach Road. The gated parking lot will consist of 19 angled parking stalls, including 2 ADA parking stalls. Traffic will be directed in a one-way path by new landscaping, signage, and rope fencing. The parking lot will be surfaced with a coquina base (per FOT Section 911).

Scope of Work The project consists of construction of the improved parking area in accordance with the attached drawings and specifications, including:

1. Clearing and grubbing of parking area of vegetation and existing parking barricades.

2. Placement and compaction of the new parking surface in accordance with drawings and specifications, including.

a. Installation of concrete wheel stops and signage.

3. Placement of sod and seeding in accordance with drawings and specifications and to restore any areas disturbed during construction.

4. Installation of post and foundation for rope fence per the drawings and specifications.

The contractor shall develop a program of work and schedule to complete the tasks for BLM review and approval consistent with drawings and specifications provided by BLM, and furnish all labor, materials, equipment, supervision, transportation necessary to cleanup and dispose of construction debris.

Location The South Parking Lot is located along Coast Guard Way within the Jupiter Inlet Lighthouse, adjacent to S. Beach Road. The site is accessed from I-95 (Exit 87A) or the Florida Turnpike (Exit 116) via Indian Town Road proceeding east, then north/right on Alt. A1A and across US.1/Federal Highway. This Jupiter Inlet Lighthouse Compound is accessed via Coast Guard Way, the second right on Beach Road (also known as Country Road/State Road 707) after crossing US.1/Federal Highway.

Access to the South Parking Lot is publicly accessible; however, the south trail and parking area will be closed to the public during construction activities. The contractor will be responsible for restricting access to work area during construction activities (the access gate in the plans should be installed first to achieve this). All work must occur with BLM staff onsite during regular business hours (Monday-Friday 7:30am – 3:30pm).

Time of Performance Period of Performance for this project is the 60-days following the Contract award.

Government Furnished Property There are no other government furnished items.

Parking, Storage and Security The Contractor shall coordinate parking of Contractor’s vehicles and temporary storage of equipment and hazardous materials with the Contracting Officer. Security for the Contractor's equipment and supplies shall be the sole responsibility of the Contractor.

Public Access Prevention Contractor shall post signs at an appropriate perimeter to the work site informing the public of construction work and temporary access restrictions.