| File | Type | Posted |
|---|---|---|
| Sol_140L0623Q0002_Amd_0001.pdf | ||
| Attach_6_Jupiter_Inlet_Q_A_0001.pdf | ||
| Attach_4_Pricing_Worksheet.xlsx | XLSX spreadsheet | |
| Sol_140L0623Q0002.pdf | ||
| Attach_2_Jupiter_Inlet_ONA_-_Drawings.pdf | ||
| Attach_5__DOL_Wage_Determination_FL20220182_02-25-2022.pdf | ||
| Attach_3__SOW_-_South-Side_Parking_Lot_Nov_2022.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
for
JUPITER INLET PARKING LOT
Released for Construction
Prepared For:
U.S. Bureau of Land Management
Andrew Peng, State Engineer
Prepared By:
Civil Engineer of Record:
D. Patrick Jehle, Jr., P.E.
License #71528
April 1, 2022
U.S. BUREAU OF LAND MANAGENT
00000-1
Jupiter Inlet Parking Lot
April 1, 2022
U.S. Bureau of Land Management
TABLE OF CONTENTS
SITEWORK
02200 – SITE PREPARATION
02300 – EARTHWORK
02700 – COQUINA SHELL BASE
02820 – TEMPORARY CHAIN LINK FENCING AND GATES
02920 – SODDING AND SEEDING
02200-1
SECTION 02200 – SITE PREPARATION
PART 1 – GENERAL
1. RELATED DOCUMENTS:
A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL
AND SUPPLEMENTARY CONDITIONS AND FRONT-END ADMINISTRATIVE
SPECIFICATION SECTIONS, APPLY TO THIS SECTION.
B. FLORIDA DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS FOR
ROAD AND BRIDGE CONSTRUCTION (FDOT SPECS), SECTION 110, LATEST EDITION.
WORK SHALL COMPLY WITH REQUIREMENTS OF FDOT SPECS AS MODIFIED
HEREIN. REFERENCES TO MEASUREMENT AND PAYMENT DO NOT APPLY.
2. SUMMARY:
A. THIS SECTION INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING:
1 PROTECTION OF EXISTING TREES INDICATED TO REMAIN.
2. REMOVAL OF TREES AND OTHER VEGETATION.
3. TOPSOIL STRIPPING.
4. CLEARING AND GRUBBING.
5. REMOVING ABOVE-GRADE IMPROVEMENTS.
6. REMOVING BELOW-GRADE IMPROVEMENTS.
B. EXTENT OF SITE CLEARING SHALL BE AS INDICATED ON DEMOLITION PLAN
UNLESS OTHERWISE NOTED OR INSTRUCTED. REMOVE ALL ITEMS THAT
INTERFERE WITH NEW CONSTRUCTION
C. CONTRACTOR MUST OBTAIN AND PAY FOR ALL DEMOLITION PERMITS THAT ARE
REQUIRED BY ANY AUTHORITY HAVING JURISDICTION.
3. PROJECT CONDITIONS:
A. TRAFFIC: CONDUCT OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH
ROADS, STREETS, WALKS, AND OTHER ADJACENT OCCUPIED OR USED FACILITIES.
DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER OCCUPIED OR USED
FACILITIES WITHOUT PRIOR APPROVAL.
B. PROTECTION OF EXISTING IMPROVEMENTS: PROVIDE PROTECTION NECESSARY
TO PREVENT DAMAGE TO EXISTING IMPROVEMENTS INDICATED TO REMAIN IN
PLACE.
1. PROTECT IMPROVEMENTS ON ADJOINING PROPERTIES, U.S. BUREAU OF
LAND MANAGEMENT PROPERTY, AND ADJOINING RIGHTS-OF-WAY.
2. RESTORE DAMAGED IMPROVEMENTS TO THEIR ORIGINAL CONDITION.
02200-2
C. PROTECTION AND PRUNING OF EXISTING TREES AND VEGETATION: PROTECT
EXISTING TREES AND OTHER VEGETATION INDICATED TO REMAIN IN PLACE
AGAINST UNNECESSARY CUTTING, BREAKING OR SKINNING OF ROOTS, SKINNING
OR BRUISING OF BARK, SMOTHERING OF TREES BY STOCKPILING CONSTRUCTION
MATERIALS OR EXCAVATED MATERIALS WITHIN DRIP LINE, EXCESS FOOT OR
VEHICULAR TRAFFIC, OR PARKING OF VEHICLES WITHIN DRIP LINE. PROVIDE
TEMPORARY GUARDS TO PROTECT TREES AND VEGETATION TO BE LEFT
STANDING. SUBMIT PLANS DETAILING THE TEMPORARY GUARDS TO THE
ENGINEER. FOR ANY TREE DESIGNATED TO BE SAVED PRIOR TO CONSTRUCTION
THAT IS DAMAGED BEYOND SALVAGE BY THE CONTRACTOR'S FORCES, A SUM OF
$150.00 PER INCH DIAMETER WILL BE PAID BY THE CONTRACTOR TO THE OWNER.
1. WATER TREES AND OTHER VEGETATION TO REMAIN WITHIN LIMITS OF
CONTRACT WORK AS REQUIRED TO MAINTAIN THEIR HEALTH DURING
COURSE OF CONSTRUCTION OPERATIONS.
2. PROVIDE PROTECTION FOR ROOTS OVER 1-1/2 INCH IN DIAMETER THAT
ARE CUT DURING CONSTRUCTION OPERATIONS. COAT CUT FACES WITH
AN EMULSIFIED ASPHALT OR OTHER ACCEPTABLE COATING
FORMULATED TO USE ON DAMAGED PLANT TISSUES. TEMPORARILY
COVER EXPOSED ROOTS WITH WET BURLAP TO PREVENT ROOTS FROM
DRYING OUT, COVER WITH EARTH AS SOON AS POSSIBLE.
3. REPAIR OR REPLACE TREES AND VEGETATION INDICATED TO REMAIN
THAT ARE DAMAGED BY CONSTRUCTION OPERATIONS IN A MANNER
ACCEPTABLE TO ENGINEER. EMPLOY A LICENSED ARBORIST, AS NEEDED,
TO REPAIR DAMAGED TREES AND SHRUBS.
4. REPLACE TREES THAT CANNOT BE REPAIRED AND RESTORED TO FULL-
GROWTH STATUS, AS DETERMINED BY ARBORIST.
4. EXISTING UTILITIES AND OTHER SERVICES:
A. LOCATIONS AND ELEVATIONS OF UTILITIES SHOWN ON PLANS ARE TO BE
CONSIDERED APPROXIMATE ONLY. THE CONTRACTOR SHALL EMPLOY THE USE
OF GROUND PENETRATING RADAR (GPR) EQUIPMENT BY A QUALIFIED COMPANY
AND PERSONNEL TO LOCATE, IDENTIFY AND PROTECT EXISTING UNDERGROUND
UTILIZES IN THE AREA OF WORK. ANY UTILITIES SPOTTED SHALL BE DRAWN ON
THE SITE PLAN PROVIDED BY THE ARCHITECT/ENGINEER AND SUBMITTED AS
PART OF THE “AS-BUILT” DRAWINGS. COST OF GPR LOCATES SHALL BE INCLUDED
IN THE CONTRACTOR’S BASE BID. NOTIFY UTILITY AND ARCHITECT/ENGINEER OF
CONFLICTS BETWEEN EXISTING AND PROPOSED FACILITIES.
B. COORDINATE RELOCATION OF EXISTING PUBLIC UTILITIES REQUIRED ON NEW
CONSTRUCTION. UNLESS OTHERWISE NOTED RELOCATION COSTS SHALL BE AT
EXPENSE OF UTILITY.
02200-3
5. MONUMENTS:
A. PROVIDE PROTECTION FOR ALL PUBLIC LAND CORNERS AND MONUMENTS
WITHIN THE LIMITS OF CONSTRUCTION.
B. COORDINATE REFERENCE BY A FLORIDA REGISTERED LAND SURVEYOR OF
CORNERS AND MONUMENTS IN CONFLICT WITH WORK AND IN DANGER OF BEING
COVERED, DAMAGED OR DESTROYED.
C. RESTORE DISTURBED CORNERS AND MONUMENTS TO THEIR ORIGINAL
CONDITION UPON COMPLETION OF THE WORK.
PART 2 – PRODUCTS
NOT APPLICABLE TO THIS SECTION.
PART 3 – EXECUTION
1. SITE CLEARING:
A. GENERAL: REMOVE TREES, SHRUBS, GRASS, AND OTHER VEGETATION,
IMPROVEMENTS, OR OBSTRUCTIONS, AS REQUIRED, TO PERMIT INSTALLATION OF
NEW CONSTRUCTION. REMOVE SIMILAR ITEMS ELSEWHERE ON SITE OR PREMISES
AS SPECIFICALLY INDICATED. REMOVAL INCLUDES DIGGING OUT AND OFF-SITE
DISPOSAL OF STUMPS AND ROOTS.
1. CAREFULLY AND CLEANLY CUT MINOR ROOTS AND BRANCHES OF TREES
INDICATED TO REMAIN IN A CLEAN AND CAREFUL MANNER WHERE SUCH
ROOTS AND BRANCHES OBSTRUCT INSTALLATION OF NEW
CONSTRUCTION.
B. TOPSOIL: TOPSOIL IS DEFINED AS SURFACE SOIL FOUND NORMALLY TO A DEPTH
OF AT LEAST 4 INCHES. SATISFACTORY TOPSOIL IS REASONABLY FREE OF
SUBSOIL, CLAY LUMPS, STONES, AND OTHER OBJECTS OVER 2 INCHES IN
DIAMETER, AND WITHOUT WEEDS, ROOTS, AND OTHER OBJECTIONABLE
MATERIAL.
1. STRIP TOPSOIL TO WHATEVER DEPTHS ENCOUNTERED IN A MANNER TO
PREVENT INTERMINGLING WITH UNDERLYING SUBSOIL OR OTHER
OBJECTIONABLE MATERIAL. REMOVE HEAVY GROWTHS OF GRASS FROM
AREAS BEFORE STRIPPING.
a. WHERE EXISTING TREES ARE INDICATED TO REMAIN, LEAVE
EXISTING TOPSOIL IN PLACE WITHIN DRIP LINES TO PREVENT
DAMAGE TO ROOT SYSTEM.
2. STOCKPILE TOPSOIL AND OTHER REUSABLE SOILS IN STORAGE PILES IN
AREAS INDICATED OR DIRECTED. CONSTRUCT STORAGE PILES TO
PROVIDE FREE DRAINAGE OF SURFACE WATER. COVER STORAGE PILES, IF
REQUIRED, TO PREVENT WIND EROSION.
C. CLEARING AND GRUBBING: CLEAR SITE OF TREES, SHRUBS, AND OTHER
VEGETATION, EXCEPT FOR THOSE INDICATED TO BE LEFT STANDING.
02200-4
1. COMPLETELY REMOVE STUMPS, ROOTS, AND OTHER DEBRIS PROTRUDING
THROUGH GROUND SURFACE.
2. USE ONLY HAND METHODS FOR GRUBBING INSIDE DRIP LINE OF TREES
INDICATED TO REMAIN.
3. FILL DEPRESSIONS CAUSED BY CLEARING AND GRUBBING OPERATIONS
WITH SATISFACTORY SOIL MATERIAL, UNLESS FURTHER EXCAVATION OR
EARTHWORK IS INDICATED.
a. PLACE FILL MATERIAL IN HORIZONTAL LAYERS NOT EXCEEDING 6
INCHES LOOSE DEPTH, AND THOROUGHLY COMPACT EACH LAYER
TO A DENSITY EQUAL TO ADJACENT ORIGINAL GROUND.
D. REMOVAL OF IMPROVEMENTS: REMOVE EXISTING ABOVE-GRADE AND BELOW-
GRADE IMPROVEMENTS AS INDICATED AND AS NECESSARY TO FACILITATE NEW
CONSTRUCTION AND OTHER WORK AS INDICATED.
1. THERE SHALL BE NO STOCKPILING OF CONSTRUCTION DEBRIS EXCEPT IN
A LOCKED, FENCED STORAGE AREA APPROVED BY THE OWNER. DEBRIS IN
STORAGE AREA MUST BE REMOVED ON A WEEKLY BASIS.
2. DISPOSAL OF WASTE MATERIALS:
A. BURNING: BURNING IS PERMITTED ON OWNER'S PROPERTY. ALL NECESSARY
PERMITS AND AUTHORIZATION FOR BURNING OPERATIONS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
B. REMOVAL FROM OWNER’S PROPERTY: REMOVE WASTE MATERIALS AND
UNSUITABLE OR EXCESS TOPSOIL FROM OWNER’S PROPERTY, AND DISPOSE OF
OFF SITE IN A LEGAL MANNER.
END OF SECTION
02300-1
SECTION 02300 – EARTHWORK
PART 1 - GENERAL
1. GENERAL:
A. PERFORM EXCAVATION, FILLING, COMPACTING, GRADING, AND DEWATERING
OPERATIONS AS REQUIRED FOR BELOW-GRADE IMPROVEMENTS AND TO
ACHIEVE CONTOURS AND ELEVATIONS INDICATED.
B. PROVIDE SUITABLE FILL FROM OFFSITE IF ON-SITE QUANTITIES ARE
INSUFFICIENT, AND DISPOSE OF EXCESS FILL OFFSITE.
2. SUBMITTALS:
A. SUBMIT FOR APPROVAL TEST REPORTS.
3. QUALITY ASSURANCE:
A. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF
ACCEPTABLE MANUFACTURERS WHICH HAVE BEEN IN SATISFACTORY USE IN
SIMILAR SERVICE FOR THREE YEARS. USE EXPERIENCED INSTALLERS. DELIVER,
HANDLE, AND STORE MATERIALS IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS.
1. MATERIALS:
A. FILL: MATERIALS SHOULD BE RELATIVELY CLEAN SANDS WITH LESS THAN 12
PERCENT FINES (MATERIAL PASSING THE NO. 200 SIEVE), AND FREE OF NON-SOIL
MATERIALS AND ROCK FRAGMENTS LARGER THAN 3 INCHES IN DIAMETER.
TARGET MAX. DRY DENSITY OF AT LEAST 100 LBS/CU. FT IN STRUTCURAL AREAS.
1. EXCAVATION:
A. LOCATIONS AND ELEVATIONS OF UTILITIES SHOWN ON PLANS ARE TO BE
CONSIDERED APPROXIMATE ONLY. THE CONTRACTOR SHALL EMPLOY THE USE
OF GROUND PENETRATING RADAR (GPR) EQUIPMENT BY A QUALIFIED COMPANY
AND PERSONNEL TO LOCATE, IDENTIFY AND PROTECT EXISTING UNDERGROUND
UTILITIES IN THE AREA OF WORK. ANY UTILITIES SPOTTED SHALL BE DRAWN ON
THE SITE PLAN PROVIDED BY THE ARCHITECT/ENGINEER AND SUBMITTED AS
PART OF THE “AS-BUILT” DRAWINGS. COST OF GPR LOCATES SHALL BE INCLUDED
IN THE CONTRACTORS BASE BID. NOTIFY UTILITY AND ARCHITECT/ENGINEER OF
CONFLICTS BETWEEN EXISTING AND PROPOSED FACILITIES.
B. EXCAVATION IS UNCLASSIFIED AND INCLUDES EXCAVATION TO SUBGRADE
REGARDLESS OF MATERIALS ENCOUNTERED. REPAIR EXCAVATIONS BEYOND
ELEVATIONS AND DIMENSIONS INDICATED.
02300-2
C. MAINTAIN STABILITY OF EXCAVATIONS; PROVIDE SHORING AND BRACING AS
REQUIRED BY AUTHORITIES HAVING JURISDICTION. PREVENT SURFACE AND
SUBSURFACE WATER FROM ACCUMULATING IN EXCAVATIONS. STOCKPILE
SATISFACTORY MATERIALS FOR REUSE, ALLOW FOR PROPER DRAINAGE AND DO
NOT STOCKPILE MATERIALS WITHIN DRIP LINE OF TREES TO REMAIN.
2. EARTHWORK:
A. COMPACT MATERIALS WITHIN 2% OF OPTIMUM MOISTURE CONTENT AS
DETERMINED BY ASTM D1557 BY AERATION OR WETTING TO THE FOLLOWING
PERCENTAGES OF MAXIMUM DRY DENSITY:
1. STABILIZED SUBGRADE: TOP 12” OF EXPOSED SUBGRADE AND EACH
SUBGRADE LAYER TO 98% OF MAXIMUM DRY DENSITY.
B. PLACE ACCEPTABLE FILL MATERIALS IN LAYERS NOT MORE THAN 12" LOOSE
DEPTH FOR MATERIALS COMPACTED BY HEAVY EQUIPMENT AND NOT MORE
THAN 6" LOOSE DEPTH FOR MATERIALS COMPACTED BY HAND EQUIPMENT TO
SUBGRADES INDICATED.
C. GRADE TO WITHIN 1/2" ABOVE OR BELOW REQUIRED SUBGRADE AND WITHIN A
TOLERANCE OF 1/2" IN TEN FEET.
3. TESTING:
A. PAYMENT FOR TESTING WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
B. LABORATORY TESTS SHALL BE PERFORMED BY AN INDEPENDENT TESTING
LABORATORY APPROVED BY THE ENGINEER AND REPORTS OF RESULTS SHALL
BE SENT DIRECTLY TO THE ENGINEER. FOR EACH TEST THAT FAILS TO MEET THE
SPECIFIED DENSITY, ONE ADDITIONAL TEST SHALL BE MADE AFTER ADDITIONAL
COMPACTION WORK IS PERFORMED.
C. LABORATORY TESTS:
1. SIEVE TESTS IN ACCORDANCE WITH STANDARD METHODS ASTM D422
AND ASTM D1140
2. DETERMINE MAXIMUM DENSITIES AT OPTIMUM MOISTURE CONTENT IN
ACCORDANCE WITH STANDARD METHODS ASTM D1557
D. DENSITY OF FILL SHALL BE DETERMINED BY IN-PLACE DENSITY TESTS MADE IN
ACCORDANCE WITH THE THIN-WALL TUBE, NUCLEAR OR SAND CONE TESTING
METHODS (ASTM D2937, D2922, OR D1556 RESPECTIVELY).
E. ONE TEST PER 2,500 SQUARE FEET AND EACH LIFT OF FILL IS REQUIRED, WITH
TEST LOCATIONS WELL DISTRIBUTED THROUGHOUT THE FILL MASS. WHEN
FILLING IN SMALL AREAS, AT LEAST ONE TEST PER DAY PER AREA SHOULD BE
REQUIRED.
02700-1
SECTION 02700 – COQUINA SHELL BASE
1. RELATED DOCUMENTS:
A. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND
SUPPLEMENTARY CONDITIONS AND OTHER SPECIFICATION SECTIONS IN THE
PROJECT MANUAL, APPLY TO WORK OF THIS SECTION.
B. THE STANDARD SPECIFICATIONS REFERENCED IN THIS SECTION REFER TO THE
FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR
ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION.
2. DESCRIPTION OF WORK:
A. EXTENT OF PREPARED SUBGRADE AND BASE IS SHOWN ON DRAWINGS.
3. SUBMITTALS:
A. MATERIAL CERTIFICATES: PROVIDE COPIES OF MATERIALS CERTIFICATES SIGNED
BY MATERIAL PRODUCER AND CONTRACTOR, CERTIFYING THAT EACH MATERIAL
ITEM COMPLIES WITH, OR EXCEEDS, SPECIFIED REQUIREMENTS.
4. QUALITY ASSURANCE:
A. CODES AND STANDARDS: COMPLY WITH FDOT STANDARD SPECIFICATIONS,
LATEST EDITION, AND WITH LOCAL GOVERNING REGULATIONS IF MORE
STRINGENT THAN HEREIN SPECIFIED.
5. GRADE CONTROL: ESTABLISH AND MAINTAIN REQUIRED LINES AND ELEVATIONS.
A. GENERAL: USE LOCALLY AVAILABLE MATERIALS.
B. CEMENTED COQUINA SHELL MEETING THE REQUIREMENTS OF FDOT SECTION 200
AND 911.
C. MATERIALS TO BE USED AS CEMENTED COQUINA BASE OR STABILIZED BASE,
SHALL BE DEFINED AS NATURALLY OCCURRING DEPOSITS FORMED ESSENTIALLY
OF BROKEN MOLLUSK SHELL, CORALS AND THE SKELETAL REMAINS OF OTHER
MARINE INVERTEBRATES, WHICH ARE PRESENTLY FOUND AS “DRY LAND”
DEPOSITS AND WHICH HAVE BEEN CEMENTED TOGETHER BY CARBONATES OR
OTHER NATURAL CEMENTING AGENTS.
02700-2
D. THE CONTRACTOR MAY USE MORE THAN ONE SOURCE OF BASE MATERIAL
PROVIDED THAT A SINGLE SOURCE IS USED THROUGHOUT THE ENTIRE WIDTH
AND DEPTH OF A SECTION OF BASE. OBTAIN APPROVAL FROM THE ENGINEER
BEFORE PLACING MATERIAL FROM MORE THAN ONE SOURCE. PLACE MATERIAL
TO ENSURE TOTAL THICKNESS SINGLE SOURCE INTEGRITY AT ANY STATION
LOCATION OF THE BASE. INTERMITTENT PLACEMENT OR “BLENDING” OF
SOURCES IS NOT PERMITTED.
PART 3 - EXECUTION
1. EQUIPMENT AND INSTALLATION:
A. USE MECHANICAL BASE SPREADERS, EQUIPPED WITH A DEVICE THAT STRIKES
OFF THE BASE UNIFORMLY TO LAYING THICKNESS, CAPABLE OF PRODUCING
EVEN DISTRIBUTION.
B. PROOF ROLL PREPARED BASE SURFACE TO CHECK FOR UNSTABLE AREAS AND
AREAS REQUIRING ADDITIONAL COMPACTION.
C. TRANSPORT THE BASE TO ITS POINT OF USE, OVER BASE PREVIOUSLY PLACED, IF
PRACTICABLE, AND DUMP IT ON THE END OF THE PRECEDING SPREAD. HAULING
AND DUMPING ON THE SUBGRADE WILL BE PERMITTED ONLY WHEN, IN THE
ENGINEER’S OPINION, THESE OPERATIONS WILL NOT BE DETRIMENTAL TO THE
SUBGRADE.
D. SPREAD THE BASE UNIFORMLY. REMOVE ALL SEGREGATED AREAS OF FINE OR
COARSE BASE AND REPLACE THEM WITH PROPERLY GRADED BASE.
2. MATERIALS:
A. LIMEROCK BEARING RATIO (LBR) AVG. RESULTS PER LOT – 100% MIN.
INDIVUDAL RESULTS – 90% MIN.
PERCENTAGES OF CARBONATES MININUM – 50%
GRADATION REQUIREMENTS PASSING 3-1/2 INCH SIEVE - 97%
PASSING NO. 4 SIEVE - 50%, MAX.
PASSING NO. 200 SIEVE – MAX. 7.5%
B. THICKNESS: THE THICKNESS OF THE SURFACE SHALL BE AS SHOWN ON THE
CONSTRUCTION PLANS. WHERE A DEFICIENCY OF MORE THAN 1/2" EXISTS, THE
CONTRACTOR SHALL BE REQUIRED TO CORRECT THE DEFICIENCY TO THE
SATISFACTION OF THE ARCHITECT/ENGINEER.
3. ROLLING:
A. UNIFORMLY COMPACT EACH LAYER, USING EQUIPMENT THAT WILL ACHIEVE
THE REQUIRED DENSITY, AND AS COMPACTION OPERATIONS PROGRESS, SHAPE
AND MANIPULATE EACH LAYER AS NECESSARY TO ENSURE UNIFORM DENSITY
THROUGHOUT THE EMBANKMENT.
02700-3
4. FIELD QUALITY CONTROL:
A. GENERAL:
1. IF, AT ANY TIME, THE SUBGRADE MATERIAL BECOMES MIXED WITH THE
BASE COURSE MATERIAL, DIG OUT AND REMOVE THE MIXTURE, AND
RESHAPE AND COMPACT THE SUBGRADE. THEN REPLACE THE MATERIALS
REMOVED WITH CLEAN BASE MATERIAL, AND SHAPE AND COMPACT.
2. SHOULD ANY WORK OR MATERIALS FAIL TO MEET THE REQUIREMENTS
SET FORTH IN THE PLANS AND SPECIFICATIONS, CONTRACTOR SHALL PAY
FOR RETESTING OF SAME.
B. THICKNESS:
1. IN-PLACE COMPACTED THICKNESS WILL NOT BE ACCEPTABLE IF
EXCEEDING 1/2" ALLOWABLE VARIATION FROM REQUIRED THICKNESS.
02820-1
SECTION 02820 – TEMPORARY CHAIN LINK FENCING AND GATES
1. SUMMARY:
A. PROVIDE TEMPORARY 6’-0” HIGH CHAIN LINK FENCING IN ORDER TO PREVENT
PUBLIC ACCESS TO THE CONSTRUCTION SITE.
2. SUBMITTALS:
A. SUBMIT FOR APPROVAL PRODUCT DATA, SHOP DRAWINGS
3. QUALITY ASSURANCE:
A. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF
ACCEPTABLE MANUFACTURERS WHICH HAVE BEEN IN SATISFACTORY USE IN
SIMILAR SERVICE FOR THREE YEARS. USE EXPERIENCED INSTALLERS. DELIVER,
HANDLE, AND STORE MATERIALS IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS.
A. ALL MATERIALS TO BE HOT DIPPED GALVANIZED.
B. FENCING AND FABRIC: 9 GAGE HOT-DIPPED GALVANIZED STEEL FENCING WITH 2"
MESH, KNUCKLED TOP AND BOTTOM. TIES TO BE 9 GAUGE.
C. STEEL LINE POSTS: 2” O.D. 2.28 LB. PER FT. GALVANIZED. POSTS TO BE SET WITH
MINIMUM 1’-0” EMBED INTO 16” X 8” DIAMETER CONCRETE WHEN SET IN EARTH.
MAXIMUM SPACING IS 10’-0”. POSTS IN SLABS SHALL BE SET IN A MINIMUM 6”
DEEP X 3” DIAMETER ALUMINUM SLEEVE OR CORE DRILLED HOLE AND GROUTED
WITH POURROCK OR SIMILAR APPROVED MATERIAL. GROUT SHALL NOT ALLOW
WATER TO POND AT THE POST.
D. STEEL TOP RAIL: 1 5/8” O.D. .84 LB. PER FT. GALVANIZED. RAILS SHALL BE
CONTINUOUS WITH OUTSIDE SLEEVES. BOTTOM OF FENCING TO HAVE
CONTINUOUS NO. 7 GALVANIZED TENSION WIRE SECURED TO POSTS.
E. STEEL TERMINAL, END, CORNER AND PULL POSTS (TERMINAL POSTS): 2 ½ INCH
O.D. 3.12 LB. PER FT. GALVANIZED. POSTS TO BE SET WITH MINIMUM 3’-0” EMBED
INTO 3’-6” X 8” DIAMETER CONCRETE WHEN SET IN EARTH. MAXIMUM SPACING IS
10’-0”. POSTS IN SLABS SHALL BE SET IN A MINIMUM 6” DEEP X 3 1/2” DIAMETER
ALUMINUM SLEEVE OR CORE DRILLED HOLE AND GROUTED WITH POURROCK OR
SIMILAR APPROVED MATERIAL. GROUT SHALL NOT ALLOW WATER TO POND AT
THE POST.
F. BRACING BETWEEN TERMINAL, END, CORNER, GATE AND PULL POSTS: 1 5/8” O.D.
1.84 LB. PER FT. GALVANIZED. SPACE NO LOWER THAN ½ OF FABRIC WIDTH FROM
TOP OF POST AND TRUSS BACK TO BASE OF ADJOINING POST.
02820-2
G. GATE POSTS
1. GATES TO 6 FOOT WIDE: 2 ½” O.D. 3.12 LB. PER FT. GALVANIZED
2. GATES OVER 6 FOOT WIDE: 3” O.D. 4.64 LB. PER FT. GALVANIZED
H. GATE FRAMES: 1 5/8” O.D. 1.84 LB. PER. FT. GALVANIZED
I. GATE HARDWARE: PROVIDE PADLOCK LATCHES.
J. HARDWARE: PROVIDE NON-REMOVABLE GALVANIZED POST CAPS FOR ALL POSTS
1. INSTALLATION:
A. PROVIDE FENCING AT LOCATIONS AS INDICATED ON PLANS.
B. INSTALL MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS
AND APPROVED SUBMITTALS. INSTALL MATERIALS IN PROPER RELATION WITH
ADJACENT CONSTRUCTION AND WITH UNIFORM APPEARANCE. COORDINATE
WITH WORK OF OTHER SECTIONS.
C. RESTORE OR REPLACE DAMAGED COMPONENTS. CLEAN AND PROTECT WORK
FROM DAMAGE.
02920-1
SECTION 02920 - SODDING AND SEEDING
1. SUMMARY:
A. FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, AND SERVICES FOR ALL
SODDING AND/OR SEEDING WITHIN DISTURBED AREAS, IN ACCORDANCE WITH
THE PROVISIONS OF THE CONTRACT DOCUMENTS.
B. COMPLETELY COORDINATE WITH WORK OF ALL OTHER TRADES.
C. LOCATION OF WORK
1. ESTABLISH LAWNS BY SODDING ON ALL DISTURBED AREAS, AS
INDICATED ON THE CONSTRUCTION PLANS, WHICH ARE NOT OCCUPIED
BY OTHER PLANTING OR CONSTRUCTION.
2. ALL DISTURBED AREAS NOT INDICATED TO BE SODDED ON THE
CONSTRUCTION PLANS SHALL BE SEEDED AND SUBSEQUENTLY COVERED
WITH DISC-ANCHORED MULCH.
3. EXISTING SODDED AREAS WHICH ARE DISTURBED DURING
CONSTRUCTION SHALL BE RE-SODDED TO MATCH EXISTING.
2. QUALITY ASSURANCE:
A. ALL SEED USED SHALL BE LABELED IN ACCORDANCE WITH U.S. DEPARTMENT OF
AGRICULTURE RULES AND REGULATIONS UNDER THE FEDERAL SEED ACT IN
EFFECT ON THE DATE OF INVITATION FOR BIDS. ALL SEED SHALL BE FURNISHED
IN SEALED STANDARD CONTAINERS, UNLESS EXCEPTION IS GRANTED IN WRITING
BY THE OWNER. SEED WHICH HAS BECOME WET, MOLDY, OR OTHERWISE
DAMAGED IN TRANSIT OR IN STORAGE SHALL NOT BE USED.
B. FERTILIZER SHALL BE DELIVERED TO THE SITE IN THE ORIGINAL, UNOPENED
CONTAINERS, EACH BEARING THE MANUFACTURER'S GUARANTEED ANALYSIS.
ANY FERTILIZER WHICH BECOMES CAKE OR OTHERWISE DAMAGED, MAKING IT
UNSUITABLE FOR USE, SHALL NOT BE USED.
C. SOD, SEED, FERTILIZER AND OTHER GRASSING MATERIALS SHALL BE STORED
UNDER COVER AND PROTECTED FROM DAMAGE WHICH WOULD MAKE THEN
UNACCEPTABLE FOR USE.
3. SUBMITTALS:
A. CERTIFICATES FOR SOD AND SEED STATING BOTANICAL AND COMMON NAMES
AND PERCENTAGES OF EACH SPECIES PERCENTAGE OF EACH SPECIES
PERCENTAGE OF PURITY. CERTIFICATE OF QUALITY.
B. GUARANTEE.
02920-2
A. TOPSOIL: IF THE QUANTITY OF EXISTING STORED OR EXCAVATED TOPSOIL IS
INADEQUATE FOR PLANTING, SUFFICIENT ADDITIONAL TOPSOIL SHALL BE
FURNISHED. TOPSOIL FURNISHED SHALL BE A NATURAL, FERTILE, FRIABLE SOIL,
POSSESSING CHARACTERISTICS OF REPRESENTATIVE PRODUCTIVE SOILS IN THE
VICINITY. IT SHALL BE OBTAINED FROM NATURALLY WELL-DRAINED AREAS.
TOPSOIL SHALL BE WITHOUT ADMIXTURE OF SUBSOIL AND FREE FROM JOHNSON
GRASS (SORGHUM HALEPENSE), NUT GRASS (CYPERUS ROTUNDUS) AND
OBJECTIONABLE WEEDS AND TOXIC SUBSTANCES
B. SOIL AMENDMENTS
1. LIME: GROUND LIMESTONE (DOLOMITE) SHALL CONTAIN NOT LESS THAN
85 PERCENT OF TOTAL CARBONATES, AND SHALL BE GROUND TO SUCH A
FINENESS THAT 50 PERCENT WILL PASS A 100-MESH SIEVE AND 90
PERCENT WILL PASS A 20-MESH SIEVE.
2. FERTILIZER: FERTILIZER SHALL BE 16-16-16 FORMULATION. THE
NITROGEN SHALL BE 60% UREA-FORMALDEHYDE FORM. FERTILIZER
SHALL CONFORM TO THE APPLICABLE STATE FERTILIZER LAWS AND
SHALL BE GRANULATED SO THAT 80 PERCENT IS HELD ON A 16-MESH
SCREEN, UNIFORM IN COMPOSITION, DRY AND FREE-FLOWING.
3. MULCH: CLEAN HAY OR FRESH STRAW MULCH.
C. SOD: THE SOD SHALL BE ARGENTINE BAHIA. THE SOD SHALL BE LIVE, FRESH,
AND UNINJURED AT THE TIME OF PLANTING AND SHALL HAVE A THICK MAT OF
ROOTS WITH ENOUGH ADHERING SOIL TO ASSURE GROWTH. APPLY SOD WITHIN
48 HOURS OF CUTTING OR STACK AND KEEP MOIST. DO NOT PLANT DORMANT
SOD OR IF GROUND IS FROZEN. RYE GRASS OF ANY OTHER SEEDS ARE NOT TO BE
USED TO OVERCAST OR REPAIR SOD.
D. GRASS SEED
1. SEED SHALL MEET FEDERAL SPECIFICATIONS JJJ-S-18 AND SHALL SATISFY
THE FOLLOWING REQUIREMENTS:
SEED PURE SEED HARD SEED WEED SEED
ARGENTINE BAHIA 85% 15% 0.25%
(80% MIN. GERMINATION)
2. SEED FAILING TO MEET THE PURITY OR GERMINATION REQUIREMENTS BY
NOT MORE THAN TWENTY-FIVE PERCENT MAY BE USED, BUT THE
QUANTITY SHALL BE INCREASED TO YIELD THE REQUIRED RATE OF PURE
LIVE SEED. SEED FAILING TO MEET THE WEED SEED REQUIREMENTS
SHALL NOT BE USED.
E. WATER: POTABLE, FREE OF SUBSTANCES HARMFUL TO GROWTH.
02920-3
1. JOB CONDITIONS:
A. PERFORM SODDING AND SEEDING DURING CONDITIONS CONDUCIVE TO
SUCCESSFUL RESULTS.
B. PROVIDE PROPER AND ADEQUATE PROTECTION.
C. DO NOT SOD OR SEED WHEN TEMPERATURE IS BELOW 32°F.
D. DO NOT SOD OR SEED ON FROZEN OR DRIED SOIL.
2. SOIL PREPARATION:
A. LIMIT PREPARATION TO AREAS WHICH WILL BE PLANTED OR GRASSED SOON
AFTER PREPARATION.
B. LOOSEN SURFACE TO MINIMUM DEPTH OF 4 INCHES (100 MM).
C. REMOVE STONES AND DEBRIS OVER 1 INCH (25 MM) IN ANY DIMENSION.
D. SPREAD LIME UNIFORMLY OVER APPROPRIATE AREAS AT RATE OF 50 LB./1000 SF
(0.23 KG/SM) AND INCORPORATE WITH TOPSOIL.
E. DISTRIBUTE FERTILIZER UNIFORMLY OVER AREAS TO BE SEEDED AT RATE OF 30
LB./1000 SF (0.14 KG/SM).
1. INCORPORATE FERTILIZER INTO SOIL TO DEPTH OF AT LEAST 2 INCHES.
F. CLEAN SURFACE OF SUBSTANCES WHICH WILL INTERFERE WITH TURF
DEVELOPMENT OR SUBSEQUENT MOWING OPERATIONS.
G. GRADE SWALE AREAS TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY
FINE TEXTURE.
1. ROLL AND RAKE, REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED
TO MEET FINISH GRADES.
2. FINE GRADE JUST PRIOR TO PLANTING.
H. RESTORE LAWN AREAS TO SPECIFIED CONDITION IF ERODED OR OTHERWISE
DISTURBED BETWEEN FINE GRADING AND PLANTING.
I. IF FERTILIZER APPLICATION RATE IS DETERMINED (BY INVOICES SUBMITTED) TO
BE LESS THAN REQUIRED, APPLY ADDITIONAL FERTILIZER.
02920-4
3. INSTALLATION:
A. SOD
1. WITHIN 24 HOURS AFTER SOIL PREPARATION HAS BEEN COMPLETED, THE
SOD SHALL BE PLACED FIRMLY AND CAREFULLY BY HAND. EACH PIECE
OF SOD SHALL BE PACKED TIGHTLY AGAINST THE EDGE OF ADJACENT
PIECES SO THAT THE FEWEST POSSIBLE GAPS WILL BE LEFT BETWEEN THE
PIECES. UNAVOIDABLE GAPS SHALL BE CLOSED WITH SMALL PIECES OF
SOD.
2. SOD SHALL BE PLACED BEGINNING AT THE TOE OF THE SLOPE WITH THE
LONG EDGE HORIZONTAL AND WITH STAGGERED VERTICAL JOINTS. THE
EDGE OF THE SOD SHALL BE TURNED SLIGHTLY INTO THE GROUND AT
THE TOP OF A SLOPE AND A LAYER OF EARTH PLACED OVER IT AND
COMPACTED SO AS TO CONDUCT THE SURFACE WATER OVER AND ONTO
THE TOP OF THE SOD.
3. ON ALL SLOPES 4:1 OR STEEPER, IN DRAINAGE CHANNELS, AND ON ANY
AREAS THAT ARE IN SUCH CONDITION THAT THERE IS DANGER OF SOD
SLIPPING, SOD SHALL BE STAKED IN PLACE BY DRIVING STAKES FLUSH
WITH THE SOD. STAKING SHALL BE DONE CONCURRENTLY WITH SOD
PLACEMENT AND PRIOR TO TAMPING BY THE USE OF SOUND WOODEN
STAKES APPROXIMATELY 1 INCH SQUARE OR 1 INCH IN DIAMETER AND
NOT LESS THAN 12 INCHES IN LENGTH. THE NUMBER OF STAKES SHALL BE
SUFFICIENT TO PREVENT SLIPPING OR DISPLACEMENT OF THE SOD.
STAKES SHALL BE DRIVEN PERPENDICULAR TO THE SLOPE. WHERE
BACKFILL IS NECESSARY ON CUT SLOPES TO OBTAIN A UNIFORM
SODDING AREA, STAKES SHALL BE OF SUFFICIENT LENGTH TO REACH A
MINIMUM OF 3 INCHES INTO THE SOLID EARTH UNDERNEATH THE
BACKFILL.
4. AFTER THE SOD HAS BEEN PLACED, AND STAKED WHERE NECESSARY, IT
SHALL THEN BE TAMPED CAREFULLY AND FIRMLY BY COMMONLY
ACCEPTED MEANS. EXTREME CARE SHALL BE TAKEN TO PREVENT THE
INSTALLED SOD FROM BEING TORN OR DISPLACED.
B. SEED
1. SHALL BE APPLIED AT THE RATE OF6 LBS./1000 SQ. FT.
2. SEEDED AREAS SHALL BE MULCHED AT THE RATE OF NOT LESS THAN
1-1/2" LOOSE MEASUREMENT OVER ALL SEEDED AREAS. SPREAD BY
HAND, BLOWER, OR OTHER SUITABLE EQUIPMENT. MULCH SHALL BE CUT
INTO THE SOIL WITH EQUIPMENT CAPABLE OF CUTTING THE MULCH
UNIFORMLY INTO THE SOIL. MULCHING SHALL BE DONE WITHIN 24
HOURS OF THE TIME SEEDING IS COMPLETED.
3. ROLLING: AFTER SEEDING AND MULCHING, A CULTIPACKER, TRAFFIC
ROLLER, OR OTHER SUITABLE EQUIPMENT SHALL BE USED FOR ROLLING
THE GRASSED AREAS. AREAS SHALL THEN BE WATERED WITH A FINE
SPRAY.
02920-5
4. MAINTENANCE:
A. CONTRACTOR MUST PROVIDE TEMPORARY WATERING FOR A MINIMUM OF 14
DAYS, LONGER IF REQUIRED FOR SOD TO ESTABLISH ROOTS AND ACHIEVE
VIABILITY.
B. MAINTAIN LAWNS UNTIL FINAL ACCEPTANCE AFTER PLANTING.
1. WATER, FERTILIZATION, WEED, MOW, EDGE, TRIM, ROLL, RE-GRADE,
REPLANT AS REQUIRED. SOD THAT IS BROWN OR SPARSELY COVERED 10
DAYS AFTER LAYING WILL NOT BE ACCEPTED AND MUST BE REPLACED.
2. ESTABLISH A SMOOTH, HEALTHY, UNIFORM, CLOSE STAND, FREE OF
ERODED OR BARE AREAS, WEEDS, AND SURFACE IRREGULARITIES.
C. MOW LAWNS AS SOON AS THERE IS ENOUGH TOP GROWTH TO CUT WITH MOWER
SET AT RECOMMENDED HEIGHT.
1. REPEAT MOWING AS REQUIRED TO MAINTAIN HEIGHT. BOARD WILL
ASSUME MOWING AT TIME OF SOD ACCEPTANCE.
2. DO NOT MOW WHEN GRASS IS WET.
3. DO NOT MOW LOWER THAN 1 ½".
D. RE-SOD, RE-SEED OR SEED BARE, DEAD, OR DYING AREAS USING SAME
MATERIALS SPECIFIED.
| 00000 - Cover Sheet |
| 00000 - Table of Contents |
| 02200 - Site Preparation |
| 02300 - Earthwork |
| 02700 - Coquina Shell Base |
| 02820 - Temporary Chain Link Fencing and Gates |
| 02920 - Sodding and Seeding |
| 2022-04-11T17:17:14-0500 | |
| Donald P Jehle Jr. |
File details come from the government source that posted it. Updated .