ATT B STANDARD DRAWINGS.pdf
PDF 1 MB Posted
- Solicitation number
- S-73000-00004847
- Issued by
- Crook County, Oregon
About this file
The document consists of standard drawings and details from the Oregon Department of Transportation (ODOT) related to a state and local contract opportunity for the CARPENTERVILLE HWY255 MP355.49 CULVERT REPLACEMENT project located in Curry County, Oregon. The drawings provide specifications and requirements for trench backfill, bedding, pipe zone, multiple pipe installations, street cuts, riprap pads and protection, sloped ends for concrete pipe, and culvert identification markers. The contract period is from December 1, 2022 to May 31, 2023.
The document does not provide specific pricing terms, set asides, incumbent information, funding requirements, or other salient procurement details. It focuses solely on the technical specifications and standard details that would be applicable to the culvert replacement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35486 ITB Draft.docx | DOCX document | |
| How to attach a file in OregonBuys for a Bid-Quote~7.docx | DOCX document | |
| ATT A SPECIAL PROVISIONS AND SPECIFICATIONS.doc | DOC document | |
| Preliminary Results~23.xlsx | XLSX spreadsheet | |
| ADDENDA 1 HARDIE PLANK PROJECT.doc | DOC document | |
| OregonBuys Vendor Solicitation Response~55.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Effective Date: December 1, 2022 - May 31, 2023
The selection and use of this
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-gineer.
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
SDR DATE
C
"A" note 4)
(See general
Tracer wire
MULTIPLE INSTALLATIONS
DIAMETER MIN. SPACE BETWEEN PIPES
(in)
"A"
(in)
"B"
(in)
"C"
(in)
"D"
TABLE A
r d
.d g n
J U
L
RD300
TRENCH BACKFILL, BEDDING,
PIPE ZONE AND MULTIPLE
INSTALLATIONS
Finish grade
Trench foundation stabilization, as required
"C" Pipe bedding, see Table A
Top of subgrade
Topsoil or as directed
Surfacing-match existing material
Base material
C la s s A
E x c a v a te d n a ti v e m a te r ia l
C la s s B o r c r u s h e d r o c k
C la s s C c le a n s a d
(1 m a x
C la s s D p it o r b a r r u n m a te r ia l m a x
A s d ir e c te d
C la s s E
C L
S M
T re n c h b a c k fi ll a re a P ip e z o n e
D
S e e T a b le
A
Nom."B" "B"
Pipe diameter
24" min.
m in
D ia
Up to 48"
48" to 72"
24"
One half (12) dia. of pipe
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
1. Surfacing of paved areas shall comply with street cut Std. Dwg. RD302.
2. For pipe installation in embankment areas where the trench method will not be used and the pipe is ≥ 36" diameter, increase dimension "B" to nominal pipe diameter.
3. Pipes over 72" diameter are structures, and are not applicable to this drawing.
4. See Std. Dwg. RD336 for tracer wire details (When required).
For pipes over 72" diameter, see general note 3.
14-JUL-2014N/A
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-gineer.
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
SDR DATE
(Actual)
Trench width r d
.d
J U
L
RD302
STREET CUT
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
1. All existing AC or PCC pavement shall be sawcut prior to repaving.
2. Concrete pavement shall be replaced with concrete to a minimum thickness of 8" or to the thickness of removed pavement, whichever is greater.
3. For joining new concrete to existing concrete, see contract plans for sepecific details.
4. Place AC mix minimum thkn. of 6" or the thkn. of the removed pavement, whichever is greater. Compact as specified.
Seal surface over joint with tack material and sand
(AC patch only)
Compacted aggregate base, CLSM or full depth asphalt concrete as specified
Compacted trench backfill as specified
Undisturbed base
(Extg.)
Extg. pvmt.
Pvmt. replacement, see general notes
6" min.
6" min.
Min. width=Roller width plus 2" m in
Tack coat cut edges (AC only)
20-JUL-2020N/A
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-gineer.
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
RD317
r d
.d
R D and RIPRAP PADS
PROTECTION
CULVERT EMBANKMENT
30-June-2022N/A SDR DATE
06-30-22 Riprap backing to riprap geotextile
Effective Date: December 1, 2022 - May 31, 2023
12 3
2B B 2B when directed
Riprap protection
W general note 4
See Std. Drg. RD316, D
T general note 4
See Std. Drg. RD316, D
T on plans or directed
Cutoff wall when shown when directed
Riprap protection
W
B
T = Thickness of riprap blanket, see Table A.
D = Diameter of circular barrel or rise of arch pipe, box, or open-bottom arch.
B = Diameter of circular barrel or span of arch pipe, box, or open-bottom arch.
general note 4
See Std. Drg. RD316, D
T when directed
Riprap protection
BB
W
B listed dimension.
* L is the greater of 4B or the
TABLE A - Embankment Slope Protection
See special details or Standard Drawings as called for on plans.
end sections, or other measures).
treatment (sloped ends, culvert embankment protection, paved end slopes, safety
2. Open ends of pipes normally require a site specific design, and may require special
1. See Std. Drg's. RD300 & RD304 for installation details.
c) Riprap pad, end view
W slope protection.
the width of the embankment pad is the larger of 5B or
3 Top width (W) of the riprap loose riprap.
Class 200 and Class 700
2 Use riprap geotextile under rock in order to place riprap.
1 Do not excavate non-erodible
B
Riprap Class T Distance
36 Inches *
24 Inches *
18 Inches
12 Inches
TABLE B - Riprap Pad Dimensions
Class
Riprap
(ft)
L *
(ft)
T
5.6
4.3
3.3
2.3
4B or 3.3
4B or 2.0
4B or 1.6
4B or 1.3 protection
Embankment
b) Riprap pad with cutoff wall, elevation view
L (See Table B)
L (See Table B)
a) Riprap pad without cutoff wall, elevation view
Cutoff wall
Riprap geotextile culvert invert thickness under
Pad should be full
Riprap geotextile
Channel bottom
T (See Table B)
Embankment protection
Outlet invert
W= Width of top of riprap pad, ft
T = Thickness of riprap pad, ft
L = Length of bottom of riprap pad, ft
B = Diameter or span of conduit, ft
T (See Table B)
A
A
B
B
C
C
B2 11 B2
Riprap pad riprap and embankment
* Riprap geotextile required between on plans or directed
Cutoff wall when shown
Wingwall and headwall
EMBANKMENT PROTECTION
RIPRAP PADS
HEADWALL AND WINGWALLS
SLOPED OR PROJECTING END
SLOPED END WITH SLOPE PAVING
SECTION A-A
SECTION B-B
SECTION C-C
RIPRAP PAD NOTES:
GENERAL NOTES FOR ALL DETAILS:
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-gineer.
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
SDR DATE
49.5
40.5
31.5
22.5
82.5
67.5
52.5
37.5
72 90
DIMENSION IN INCHES
(Min.)
L
(Min.)
L
(Min.)
LX
CASE 1 CASE 2
1:3
X
(Min.)
L
CASE 1CASE 2CASE 2
(Min.)
L
(Min.)
L
CASE 1
X
(Min.)
L
CASE 1
(Diameter)
SIZE CASE 1 CASE 2
(Min.)
L
(Min.)
L XX
(Min.)
L
(Min.)
L
(Min.)
L
(Min.)
L
(Min.)
L
CASE 2 CASE 3 CASE 1 CASE 2 CASE 3
1:61:41:1.5 1:2 1:2.5
SLOPE
(Diameter)
SIZE
X r d
.d
J U
L
RD318
SLOPED ENDS
FOR CONCRETE PIPE
CASE 2
DOUBLE PIPE LENGTH
CASE 1
SINGLE PIPE LENGTH
CASE 3
TRIPLE PIPE LENGTH
TIE BAR DETAIL
TABLE A
TOP VIEWTOP VIEWTOP VIEW
SIDE VIEW END VIEW
(CASE 1)
SIDE VIEW END VIEW
(CASE 2 & 3)
SIDE VIEW
Section to be removed
Section to be removed
Section to be removed
Section to be removed
6" min. (12" thru 24")
9" min. (Over 24")
(Typical)
Section to be removed
See Tie Bar
Detail
Tie bar
(See detail)
Slo pe
Slo pe
L
X
X
L
X
L
Si ze
(D ia
Culvert plan and pay lengthCulvert plan and pay length4
0° nominal
Si ze
(D ia
X
X
X
LLL
Tie bar
(See detail)
Culvert plan and pay length
Section to be removed
0 when used with paved end slope.
NOTES:
1. All bolts, nuts and washers to be galvanized.
2. Tie bar to be galvanized after fabrication.
3. "C" is tongue length.
4. Install 2 tie bars at each joint (See end view, Case 2 & 3).
8" bolt, nut, 2 washers
Bolt length = shell thickness + 1"
4"x2" steel bar1
4"x2" steel bar
Slotted hole
16"x15 16"
2" rad.
(Optional)
3C (Nom.)
C
3C (Nom.)
2"
S h e ll
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
1. For dimensions indicated by letter, see Table A.
2. Open ends of pipes normally require a site specific design, and may require special treament (Slope ends, culvert embankment protection, paved end slopes, safety end sections, or other measures).
See special details or Standard Drawings as called for on plans.
3. See Std. Dwg. RD317 for culvert embankment protection and riprap pads
(When reqd.).
NOTE:
Sloped ends shall be made from minimum Class III concrete pipe.
"X" Values shown are for vertical dimension at bottom of sloped end = 0.
Slop e
N/A 15-JAN-2016
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-gineer.
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
RD398
r d .d
R D
CULVERT ID MARKER
N/A 01-July-2020SDR DATE
Mile point for rivet hole locations
See dwg. no. TM570
12345
ODOT
D panelStyle:working_panelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:1panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0constructPanelMode:0constructPanels:36|24|18panelSizes:panelStandard:1levels:GSCOLORFILL|GSBWFILL|GSOUTLINE
TYPE 2 MARKER
TYPE 2 MARKER INSTALLATION
3.5"
1.33"
.67"
1"
.25"
.5"
.75" Non-reflective green tape band
.5"
1", (typ.)
.25" (typ.)
s e e n o te s a n d o r
B ri d g e s tr u c tu re I
D
D ra in a g e f a c il it y
I D
D
F I) black, (typ. all) non-reflectorized
Type C font paddle non-reflective
White
1"
2" m in
Fo g lin e
Ed ge o f p av em en t
Ed ge o f p av em en t
Fo g lin e
In cr ea se m ile p oi nt
Culvert inlet
Culvert inlet
Culvert inlet
Culvert inlet
In cr ea se m ile p oi nt
Barrel B
Barrel A
Edge of pavem ent
Fog Line typ. rivet holes
Paddle with typ. holes
Paddle with
Headwall
Wingwall
12345
ODOT
D
(See Note 8) rivets and washers aluminum blind
(4) 3/16" dia.
steel post with paddle to type 1U
Fasten Type 2 marker
(See Note 8)
MULTIPLE PIPES
SINGLE DRAINAGE FACILITY
SINGLE PIPE
SINGLE DRAINAGE FACILITY
2" m in .4"
6"-12"Varies
(See Note 8)
MULTIPLE DRAINAGE FACILITY
Varies
4"
6"-12"
INSTALLATION
CONCRETE HEADWALL
edge of pavement and letters facing
Type 2 marker, numbers edge of pavement lane, numbers facing post parallel to travel mounted on steel
Type 2 marker paddle pavement lane, numbers facing edge of on steel post parallel to travel
Type 2 marker paddle mounted facing edge of pavement post parallel to travel lane, numbers
Type 2 marker paddle mounted on steel line
Ground slope
Steep concrete anchors with 4 (3/16" X 2") concrete wall
Fasten to with inlet side of first culvert fused thermoplastic tape. Place in line
Type 1 marker, Type B Green preformed
GUARDRAIL INSTALLATION
(See notes 1, 3 and 9) rivets and washers, aluminum blind
(4) 3/16" dia.
steel post with paddle to type 1U
Fasten Type 2 marker
INSTALLATION
CONCRETE BARRIER
Inlet concrete barrier
Precast median
Type 2 marker concrete anchors wall with 2 (3/16" X 2")
Fasten to concrete side of culverts tape. Place in line with inlet preformed fused thermoplastic
Type 1 marker, Type B Green first culvert (see note 10) in line with inlet side of thermoplastic tape. Place
Green preformed fused
Type 1 marker, Type B
.2
NOTES:
10. Install only a Type 1 marker or a Type 2 marker on concrete barrier.
Type 2 marker on slope side of barrier.
9. Steep slopes where guardrail or concrete barrier are present, install
Engineering Technical Services Branch.
Maintenance Hydraulic Engineer in the Hydraulic Unit of the contact the Senior Culvert Hydraulic Engineer or the Senior Culvert
8. For more information on Single and Multiple Drainage Facilities, marker when a culvert has a span equal to or greater than 6 feet.
7. Bridge Structure ID: Place the assigned ID number on the Type 2 marker when the culvert span is less than 6 feet. (Example D10123).
6. Drainage Facility ID: Place the assigned DFI number on the Type 2
5. On divided highways placing markers on the outlet side is optional.
side of highway.
4. On non-divided highways place markers only at the culvert inlet inconspicuous to traffic.
3. Install Type 2 culvert markers parallel to travel lane and with the inlet.
2. Place Type 1 marker on inlet edge of the pavement directly in line details.
1. See Standard Drawing TM571 for 'Type 1U Steel Post Dimensions'
Two-lane, two-way centerlines.
For projects in place through winter months.
Freeway or multilane shifts and crossovers.
To prohibit lane changes or passing (include appropriate regulatory signs).
TYPICAL APPLICATIONS:
pvmt. markers temp. reflective 4" wide stripes
10' pvmt. markers temp. reflective 4" wide stripe
10'
10 ft. x 4 in. stripe
40'
15' 15'
40' pvmt. markers temp. reflective
(Supplemented double solid lines) (Supplemented solid line)
TYPICAL APPLICATIONS: TYPICAL APPLICATIONS:
For projects in place through winter months.
High ADT 2 lane roads (greater than 10,000).
Freeway and multilane broken lines.
For projects in place through winter months.
To discourage lane changes in multilane sections.
Alignment shifts or crossovers.
(Supplemented broken lines)
TYPICAL APPLICATIONS:
(Simulated broken lines)
30'
40'
Temp. reflective or flexible pvmt. markers
5'
5'
GENERAL NOTES FOR ALL DETAILS:
Pavement marking colors shall conform to the MUTCD.
placed in a pattern to substitute for a painted line.
Simulated lines are Reflective Pavement Markers with Reflective Pavement Markers.
Supplemented lines are painted lines enhanced required for one-way traffic or edge lines.
2. White Mono-Directional Pavement Markers are are required for Two-Way Traffic.
1. Yellow Bi-Directional Pavement Markers
When using Supplemented or Simulated lines:
spacings.
pvmt. markers on 10'
Double temp. reflective
8" wide stripe
(Supplemented solid 8" line)
Alignment splits (bifurcations)
Gore areas
TYPICAL APPLICATIONS:
2 lane, 1 way alignments on freeways or multi-lane highways.
2 lane, 2 way centerlines.
To prohibit lane changes or passing (include appropriate regulatory signs).
TYPICAL APPLICATIONS:
(Supplemented wide double solid lines)
40' pvmt. markers temp. reflective 4" wide stripes
Temp. reflective pvmt. markers
10'
TYPICAL APPLICATIONS:
Edge lines for short durations, less than 14 days.
To discourage lane changes in multilane sections.
Alignment shifts or crossovers.
N/A 01-JUL-2020
LAYOUT "A" LAYOUT "B" LAYOUT "C" LAYOUT "D"
LAYOUT "G"LAYOUT "F" CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
TEMPORARY PAVEMENT MARKINGS
TM810
T M tm .d
JU
L pavement markings cannot be placed within two weeks.
Emulsified asphalt surface treatments (chip seals) where permanent
HMAC intermediate surfaces.
During staging on finished/existing surfaces.
2" space
2" space
SDR DATELAYOUT "E"
(Simulated Solid Lines) gineer.
The selection and use of this
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-
Effective Date: December 1, 2022 – May 31, 2023
File details come from the government source that posted it. Updated .