Att 01_Schedule of Items (20320).docx
DOCX document 19 KB Posted
- Attached to
- Little Rough Run and Cold Run Culvert Replacement Federal contract opportunity
- Solicitation number
- 12445525R0007
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Schedule of Items for a culvert replacement project in the Monongahela National Forest, Webster County, West Virginia. The solicitation (No. 12445525R0007) is issued by the Department of Agriculture Forest Service and requires replacing box culverts on FR-76 for two specific locations: Little Rough Run and Cold Run. The project will involve comprehensive civil engineering work including mobilization, excavation, dewatering, structure excavation, rip rap installation, aggregate surface course placement, backfilling, and installing 4x14 concrete box culverts.
The project has a defined performance period from May 27, 2025, to November 14, 2025, with all in-water work restricted to low flow conditions (70 cubic feet per second) between July and October. The solicitation anticipates a single Firm Fixed Price (FFP) contract, requiring contractors to provide unit and total pricing for all line items. Key requirements include an active System for Award Management (SAM) registration, submission of a technical proposal, and understanding that payment will only be made for items listed in the schedule, with incidental work considered included in the listed items. The total contract price will include performance and payment bonds, with no modifications allowed for bond premium miscalculations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_12445525R0007.pdf | ||
| Att 03_Plans (240916).pdf | ||
| Att 02_SOW (240916).pdf | ||
| Att 04_Wage Rates (250214).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Little Rough Run and Cold Run Culvert Replacement Monongahela National Forest Webster County, WV Performance Period: 05/27/2025-11/14/2025
Schedule of Items Item Number
| Description |
| QTY |
| Pay |
Units Unit Price Amount
Little Rough Run
| 0001 |
| (151-01-001) Mobilization |
| 1 |
| LS |
| $ |
| $ |
| 0002 |
| (204-01-002) Excavation |
| 27 |
| CY |
| $ |
| $ |
| 0003 |
| (209-01(A)-003) Dewatering |
| 1 |
| LS |
| $ |
| $ |
| 0004 |
| (209-01(B)-004) Structure Excavation |
| 175 |
| CY |
| $ |
| $ |
| 0005 |
| (251-01-005) Rip Rap, Class VII |
| 13 |
| CY |
| $ |
| $ |
| 0006 |
| (301-01-006) Aggregate Surface Course |
| 50 |
| TN |
| $ |
| $ |
| 0007 |
| (302-01(A)-007) backfill Aggregate 1 1/2" CR |
| 83 |
| CY |
| $ |
| $ |
| 0008 |
| (302-01(B)-008) Bedding Material (AASHTO #8) |
| 9 |
| CY |
| $ |
| $ |
| 0009 |
| (602-04-009) Box Culvert, Concrete, 4x14 |
| 28 |
| LF |
| $ |
| $ |
Little Rough Run Subtotal
Cold Run
| 0010 |
| (151-01-010) Mobilization |
| 1 |
| LS |
| $ |
| $ |
| 0011 |
| (204-01-011) Excavation |
| 63 |
| CY |
| $ |
| $ |
| 0012 |
| (208-07-012) Dewatering |
| 1 |
| LS |
| $ |
| $ |
| 0013 |
| (209-01-013) Structure Excavation |
| 196 |
| CY |
| $ |
| $ |
| 0014 |
| (301-01-014) Aggregate Surface Course |
| 50 |
| TN |
| $ |
| $ |
| 0015 |
| (302-01(A)-015) Backfill Aggregate |
| 104 |
| CY |
| $ |
| $ |
| 0016 |
| (302-01(B)-016) Bedding Material (AASHTO #8) |
| 9 |
| CY |
| $ |
| $ |
| 0017 |
| ( 602-04-017) Box Culvert, Concrete, 4x14 |
| 28 |
| LF |
| $ |
| $ |
Cold Run Subtotal
Project Total
By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows: _____________________________________________________________________________
| Signature:______________________________________________ | Date:_____________ |
| Company Name:_________________________________________ | UEI:______________ |
Schedule Notes
1) CY = Cubic Yard, LF = Linear Foot, LS = Lump Sum, TN = Ton.
2) One Firm Fixed Price (FFP) contract is anticipated from this solicitation. Contractors must provide pricing [both unit price, and total item amount] for all line items. Type prices directly into the schedule provided, to speed up the review process.
3) All in water work will occur under low flow conditions (70 cubic feet per second), between July and October.
4) Contractor must have an active registration with the System for Award Management (SAM) to be eligible for award. A status of "ID Assigned" does not qualify as an active registration.
5) This Request For Proposals (RFP) also contains a requirement for a technical proposal (refer to Sections L and M for details).
6) Payment will only be made for the items listed in the schedule. Any work necessary to complete this project that is not listed in the schedule of items is considered incidental to the items shown.
7) The total contract price is inclusive of any applicable performance and payment bonds. The award price of any contract resulting from this solicitation will not be modified to accommodate failure of the contractor to account for bond premiums in their offer.
8) Site visits may be scheduled by contacting Chad Arbogast: refer to provision FAR 52.236-27 (Pg 33) for details.
File details come from the government source that posted it. Updated .