Atch 8 SOW Supplemental Requirements.pdf

PDF 212 KB Posted

Attached to
Pioneering Aerospace Capabilities, Engineering and Research Federal contract opportunity
Solicitation number
FA2391-23-S-2403
Issued by
Department of the Air Force Materiel Command Research Laboratory

View the file

Other files for this federal contract opportunity

Other files attached to Pioneering Aerospace Capabilities, Engineering and Research, newest first.
File Type Posted
Atch 1 Supplemental Instructions for Assistance Instruments.docx DOCX document
Atch 4 R-DFAR252.215-7993 Proposal Adequacy Checklist.pdf PDF
Atch 8 (RFO-based) Research and Related Senior and Key Person Profile Worksheet.pdf PDF
Atch 11 BAA Attachment Security Program Questionnaire.pdf PDF
Atch 2 AFRL Addendum and Award DoD Articles.docx DOCX document
Atch 3 Section K_Reps and Certs.docx DOCX document
Atch 5 Contract Data Requirements List.pdf PDF
Atch 7 SOW Supplemental Requirements.docx DOCX document
Atch 12 AFRLI 61-113.pdf PDF
Call for HAMWC dated 16 March 2026.pdf PDF
HiTEMP Call Pacer Broad Agency Announcement.pdf PDF
Atch 2 Model Contract FA2391-24-C-B044.pdf PDF
Atch 7 DD Form 254.pdf PDF
Atch 9 (non-FAR) SF 424 Research and Related Key Persons V4.0.pdf PDF
Atch 12 Privacy Act Statement for Covered Individuals.pdf PDF
FA2391-23-S-2403_Revised April 2025.pdf PDF
Atch 9 (FAR-based) Research and Related Senior and Key Person Profile Worksheet.pdf PDF
Atch 11 AFRLI 61-113.pdf PDF
Amendment 06 - MASTR Call-23 APR 2025.pdf PDF
Amendment 05 - MASTR Call-11 APR 2025.pdf PDF
Amendment 04 -MASTR Call-07 APR 2025.pdf PDF
Amendment PACER White Paper Call - FC EMA Complete Package 1.pdf PDF
Amendment 03-MASTR Call-19 Mar 2025.pdf PDF
Amendment 02-MASTR Call-13 MAR 2025.pdf PDF
Amendment 01-MASTR Call-07 MAR 2025.pdf PDF
PACER White Paper Call - FC EMA Complete Package.pdf PDF
Call for MASTR 27 Jan 25.pdf PDF
Call for MSIPPT Amend 1.pdf PDF
Call for MSIPPT.pdf PDF
Call for AEPO Amendment 1 26 Nov 24.pdf PDF
CALL for AEPO 28 Oct 24 .pdf PDF
CALL For SNAPP 04 Sep 24.pdf PDF
FA2391-23-S-2403_June 2024.pdf PDF
Atch 2 Model Contract FA2391-24-C-B044.pdf PDF
Call For CRONUS 20 Mar 24.pdf PDF
Call for OPTIML dated 01 Feb 2024.pdf PDF
CALL for OPTIML dated 27 October 2023 - CANCELLATION of First Step.pdf PDF
CALL for OPTIML and Attachments dated 27 October 2023.pdf PDF
Amendment 4--CC DROIDS Call QandA--31 Aug 2023.pdf PDF
Amendment 3--CC DROIDS Call-QA--24 Aug 2023.pdf PDF
Amendment 2--CC DROIDS Call-QandA--18 Aug 2023.pdf PDF
CALL for INNATE 08 AUG 2023 and Attachments.pdf PDF
Call for CC DROIDS Attachments.pdf PDF
Call for CC DROIDS--27 July 2023.pdf PDF
FA2391-23-S-2403.pdf PDF
Atch 4 Section L - Instructions Conditions and Notices to Offerors.pdf PDF
Atch 9 SF 424 Research and Related_KeyPersonal_4_0-V4.0.pdf PDF
Atch 1 Supplemental Instructions for Assistance Instrument Proposals.pdf PDF
Atch 5 DFARS 252.215-7009 Proposal Adequacy Checklist.pdf PDF
Atch 6 Contract Data Requirements List (CDRLs).pdf PDF
Show all 50

Pioneering Aerospace Capabilities, Engineering and Research has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA2391-23-S-2403

Attachment 8

Statement of Work (SOW) Supplemental Requirements (AFRL/PZL)

04 May 2023

The following paragraphs are also considered be a part of the SOW/PWS requirements and the Contractor is responsible for compliance to the same extent as the rest of the SOW/PWS.

1. Implementation of Disclosure of Information:

In order to comply with DFARS 252.204-7000, Disclosure of Information, the following copies of the information to be released are required at least 50 days prior to the scheduled release date:

a. One (1) copy(ies) to: TBD, Contracting Officer

b. One (1) copy(ies) to: TBD, Program Manager

2. Key Positions and Minimum Qualifications:

a. Contractor personnel holding the position titles and having the qualifications listed below are considered essential to the work being performed under this contract:

Key Positions: Minimum Qualifications:

TBD

b. The Contractor shall notify the Contracting Officer before the departure of any individual in a key position and identify the proposed substitution. Any proposed personnel substitution that does not meet the minimum qualification requirements described above requires the prior written approval of the Contracting Officer.

3. Packaging and Marking:

a. All hardware deliverable contract items shall be packaged in accordance with established commercial practices.

b. When special delivery and/or handling instructions are required, all boxes and/or crates must contain the following statement in plain sight and in bold letters:

INSTRUCTION TO RECEIVING OFFICE – DO NOT OPEN; CONTENTS ARE SENSITIVE TO

DAMAGE WHEN IMPROPERLY OPENED OR HANDLED. CONTACT THE RESPONSIBLE

TECHNICAL PROJECT OFFICER IMMEDIATELY UPON RECEIPT. CONTACT INFORMATION: TBD

4. Program Manager:

The Government Program Manager for this effort is TBD.

5. Program Focal Points:

The individuals listed below are identified as focal points for this contract.

Principal Investigator: TBD Technical Contract Manager: TBD Alternate: TBD

6. Base Support:

Base support may be provided by the Government to the Contractor in accordance with this SOW/PWS.

a. The Contractor will require use of base support on a rent-free, non-interference basis to include Government-controlled working space, material, equipment, services (including automatic data processing), or other support (excluding use of the Defense Switched Network (DSN)) which the

Government determines can be made available at, or through, any Air Force installation where this contract shall be performed.

b. Unless otherwise stipulated in the contract schedule, the Contractor will use base support on a no-charge-for-use basis and the value shall be a part of the Government’s contract consideration.

c. The Contractor will immediately report (with a copy to the cognizant contract administration office (CAO)) inadequacies, defective base support, or nonavailability of support stipulated by the contract schedule, together with a recommended plan for obtaining the required support.

Facilities are not to be purchased under this contract by the Contractor. Additionally, the Contractor (or authorized representative) will not purchase or otherwise furnish any base support requirement provided by the SOW/PWS (or authorize others to do so), without prior written approval of the Contracting Officer regarding the price, terms, and conditions of the proposed purchase, or approval of other arrangements.

d. The following are installations where base support will be provided: TBD

e. The base support to be furnished under this contract is TBD. Because of the nature and location(s) of the work performed, the value of such support is undeterminable. The Contractor is not authorized to incur any costs resulting from nonsupport prior to Contracting Officer direction.

f. In the performance of this contract or any major subcontract, no direct or indirect costs for support will be incurred if the Government determines that support is available at or through any Air Force installation where this contract shall be performed.

7. Contracting Officer’s Representative (COR) for Sensitive Compartmented Information (SCI) Security

Administration:

The Government COR for SCI Security Administration on behalf on the Contracting Officer for this effort is TBD.

8. Implementation of Patent Rights Clause:

a. Interim or Final Invention Reports 1) listing the subject invention(s) and stating that all subject inventions have been disclosed, or 2) stating that there are no such inventions, shall be sent to both the Administrative Contracting Officer TBD and det1.afrl.pk.patents@us.af.mil within the timeframes specified in the Patent Rights clause of this contract.

b. Contractors are highly encouraged to use DD Form 882, Report of Inventions and Subcontracts, to submit these reports. The DD Form 882 may also be used for the notification of an award of any subcontract(s) for experimental, developmental, or research work which contain a “Patent Rights” clause.

c. All other notifications required by the contract shall also be sent to the individuals in paragraph

a. This provision also constitutes the request for the following information for any subject invention for which the Contractor has retained ownership: (1) the filing date, (2) the serial number and title, (3) a copy of the patent application, and (4) the patent number and issue date.

Submittal shall be to det1.afrl.pk.patents@us.af.mil.

9. Implementation of Pollution Prevention and Right-To-Know Information Clause:

To comply with FAR Clause 52.223-5, Pollution Prevention and Right-to-Know Information, with its Alternate I, and Environmental Management System (EMS) requirements, the Contractor is required to complete Initial EMS Awareness-Level training for all personnel working on an Air Force installation.

a. The installation office responsible for providing the EMS training is TBD.

mailto:det1.afrl.pk.patents@us.af.mil mailto:det1.afrl.pk.patents@us.af.mil

b. The training requires TBD.

c. The training shall be accomplished within TBD days of contract (or modification) award. New contract employees shall be trained within TBD days of starting work on the installation.

d. The training is available via TBD, which provides materials that meet the training requirement.

e. Upon completion of the training, the Contractor shall provide TBD a list of the Contractor employees’ names and the date the training was completed.

10. Information Regarding Non-U.S. Citizens Assigned to this Project:

a. Contractor employees requiring access to USAF bases, AFRL facilities, and/or access to U.S.

Government Information Technology (IT) networks in connection with the work on this contract must be U.S. citizens. For the purpose of base and network access, possession of a permanent resident card (“Green Card”) does not equate to U.S. citizenship. This requirement does not apply to foreign nationals approved by the U.S. Department of Defense or U.S. Department of State under international personnel exchange agreements with foreign governments. It also does not apply to dual citizens who possess U.S. citizenship, to include Naturalized citizens. Any waivers to this requirement must be granted in writing by the Contracting Officer prior to providing access. Specific format for a waiver request will be provided upon request to the Contracting Officer. The above requirements are in addition to any other contract requirements related to obtaining a Common Access Card (CAC).

b. For purposes of paragraph a above, if an IT network/system does not require AFRL to endorse a Contractor’s application to said network/system in order to gain access, the organization operating the IT network/system is responsible for controlling access to its system. If an IT network/system requires a U.S. Government sponsor to endorse the application in order for access to the IT network/system, AFRL will only endorse the following types of applications, consistent with the requirements above:

i. Contractor employees who are U.S. citizens performing work under this contract.

ii. Contractor employees who are non-U.S. citizens and who have been granted a waiver.

Any additional access restrictions established by the IT network/system owner apply.

11. Fundamental Research:

Pursuant to DFARS 252.204-7000, Disclosure of Information, the exception in paragraph (a)(3) allowing release of information is applicable to Statement of Work section(s)/task(s) TBD, only as long as the work remains in the public domain or is considered fundamental research and not sensitive or inappropriate for public release. Any time work progresses to the non-public domain, exceeds the scope of fundamental research, or the Contractor has reason to believe the work has become sensitive or inappropriate for release to the public, then this exception no longer applies.

12. Comprehensive Small Business Subcontracting Plan:

The comprehensive small business subcontracting plan dated TBD is hereby incorporated into the contract by reference.

13. Science and Technology (S&T) Protection:

The requirements below are in accordance with Air Force Research Laboratory Instruction (AFRLI) 61- 113, “Science and Technology (S&T) Protection for the Air Force Research Laboratory”.

a. Initial/Annual/New SF 424, Research and Related Senior/Key Person Profile (Expanded)

Form, Requirement: In accordance with CDRL TBD, the Contractor shall provide an SF 424 with the following information: 1) an initial report of all Senior/Key Personnel at the time of award; 2) an annual report of all Senior/Key Personnel providing support; and 3) a report for any new Senior/Key Personnel who join the contract, agreement, grant, or OT. Any updated SF 424s for new Senior/Key Personnel supporting the award require coordination from the Government prior to the Contractor employee receiving access to S&T information.

b. S&T Protection Plan Requirement: The Contractor shall support the USG in the planning, development, and implementation of the S&T Protection Plan as required and adhere to the S&T Protection Plan in the course of executing this requirement, incorporating any previous planning conducted on the baseline system. The Contractor shall adhere to and be compliant with the guidance established in the S&T Protection Plan found at Attachment

TBD.