ARFQ DOT2700000013 - ATT A - Pricing Page.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Asphalt Material, Delivery, and Labor by Vendor
Solicitation number
ARFQ 0803 DOT2700000013 1
Issued by
Kanawha County, West Virginia

About this file

This is a pricing page attachment (ATT A) for West Virginia's Department of Transportation (WVDOT) multiple vendor award contract for asphalt materials, delivery, and labor services. The contract encompasses 116 line items covering various asphalt products and services across ten districts in West Virginia, including base courses, superpave wearing courses, shoulder stone placement, material hauling, laydown services, pavement profiling and milling, base and edge failure repairs, pothole repairs, ultra-thin overlays, fine milling, rumble strips, parking lot surfacing, traffic maintenance, plant opening fees, raised pavement markers, and void-reducing asphalt membrane (VRAM) installation. Vendors must identify their sourced asphalt plant location(s) by marking the corresponding counties, with pricing varied by county as necessary. Bidders are required to submit four completed documents with their bid: Attachment A and B pricing pages, and Plant Information Forms C and D; bids lacking any of these components will be disqualified. Estimated quantities are not available at the time of bid submission.

Pricing is submitted on a per-unit basis using various measurements including tons, ton-miles, lump sum fees, square yards, gallons, linear feet, and daily rates. This is structured as a multiple vendor award contract, meaning all vendors meeting contract specifications will be awarded a contract, with the low-bid vendor selected per individual project at the time of need as specified in Section 6.1 of the contract specifications. The pricing structure accommodates tiered rates for certain services based on volume thresholds, such as laydown fees varying by tonnage and milling services varying by square yardage. Mobilization costs for specific services are to be completed on Attachment B.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATT A Pricing Pages Vendor Name:

Vendor's Sourced Asphalt Plant(s):

Vendor Instructions: Vendor shall mark with an "X" the counties that correspond with the Asphalt Plant(s) bid prices on this page. If Vendor has varied pricing per county, Vendor shall complete a separate set of Pricing Pages (ATT A and ATT B if different) for each county pricing set. Vendor must complete TWO (2) Pricing Pages (ATT A and ATT B) as well as TWO (2) Plant Information Forms (ATT C and ATT D) with bid.

Bids submissions that do not include ATT A, ATT B, ATT C and ATT D WILL BE DISQUALIFIED.

This is a multiple vendor award contract. All qualifying vendor meeting the contract specifications will be awarded with a contract. The low bid vendor per project will be determined at the time of need, as per Section 6.1 of the Contract Specifications. Estimated quantities are not available.

District 1District 2District 3District 4District 5District 6District 7District 8District 9District 10
BooneCabellCalhounDoddridgeBerkeleyBrookeBarbourPendletonFayetteMcDowell
ClayLincolnJacksonHarrisonGrantHancockBraxtonPocahontasGreenbrierMercer
KanawhaLoganPleasantsMarionHampshireMarshallGilmerRandolphMonroeRaleigh
MasonMingoRitchieMonongaliaHardyOhioLewisTuckerNicholasWyoming
PutnamWayneRoanePrestonJeffersonTylerUpshurSummers
WirtTaylorMineralWetzelWebster
WoodMorgan
Contract Item #Contract Item DescriptionUnit of MeasureList Price
1Asphalt Section 401 - Base ITON
2Asphalt Section 401 - 25mm SuperpaveTON
3Asphalt Section 401 - Base IITON
4Asphalt Section 401 - Patch and LevelTON
5Asphalt Section 401 - Wearing IVTON
6Asphalt Section 402 - Wearing IVTON
7Asphalt Section 401 - 19mm SuperpaveTON
8Asphalt Section 401 - Scratch CourseTON
9Asphalt Section 402 - 9.5mm SuperpaveTON
10Asphalt Section 401 - Wearing 1TON
11Asphalt Section 402 - Wearing 1TON
12Asphalt Section 401 - 4.75mm SuperpaveTON
13Asphalt Section 402 - 4.75mm SuperpaveTON
14Asphalt Section 401 - Wearing IIITON
15Asphalt Section 402 - Wearing IIITON
16Asphalt Section 401 - 12.5mm SuperpaveTON
17Asphalt Section 402 - 12.5mm SuperpaveTON
18Shoulder Stone Placement for Asphalt Section 307 - Class 10TON
19Shoulder Stone Mobilization - Complete on ATT BLUMP SUM-------
20Haul by Vendor Shoulder Stone Placement - First Ton MileTON MILE
21Haul by Vendor Shoulder Stone Placement - Each Additional Ton MileTON MILE
22Surcharge for PG Binder 58-28STON
23Surcharge for PG Binder 64H minus 22TON
24Surcharge for PG Binder 64E minus 22 ordered in 400 Ton incrementsTON
25Asphalt Haul by Vendor - First Ton MileTON MILE
26Asphalt Haul by Vendor - Each Additional Ton MileTON MILE
27Laydown of Material Items #1-17, Each Site 0-100 TonsTON
28Laydown of Material Items #1-17, Each Site 101 to 200 TonsTON
29Laydown of Material Items #1-17, Each Site 201 to 500 TonsTON
30Laydown of Material Items #1-17, Each Site 501 Tons or GreaterTON
31Daytime Paving Mobilization - Complete on ATT BLUMP SUM--------------
32Nighttime Paving Mobilization - Complete on ATT BLUMP SUM--------------
33Excavation for Shoulder Paving - 0 to 1000 Sq. YardsSY
34Excavation for Shoulder Paving - 1001 to 2000 Sq. YardsSY
35Excavation for Shoulder Paving - 2001 to 3000 Sq. YardsSY
36Excavation for Shoulder Paving - 3001 Sq. Yards or GreaterSY
37Asphalt Base I Shoulder Paving Surcharge - 0 to 100 TonsTON
38Asphalt Base I Shoulder Paving Surcharge - 101 to 200 TonsTON
39Asphalt Base I Shoulder Paving Surcharge - 201 to 500 TonsTON
40Asphalt Base I Shoulder Paving Surcharge - 501 Tons or GreaterTON
41Asphalt Base II Shoulder Paving Surcharge - 0 to 100 TonsTON
42Asphalt Base II Shoulder Paving Surcharge - 101 to 200 TonsTON
43Asphalt Base II Shoulder Paving Surcharge - 201 to 500 TonsTON
44Asphalt Base II Shoulder Paving Surcharge - 501 Tons or GreaterTON
45Asphalt Material for Tack CoatGAL
46Additional Heel-In JointsLF
47Overbanding of Constructed JointLF
48Skip Paving SurchargeTON
49Pavement Profiling/Milling-WVDOT Owns Millings 0 to 250 Sq. YardsSY
50Pavement Profiling/Milling-WVDOT Owns Millings 251 to 500 Sq. YardsSY
51Pavement Profiling/Milling-WVDOT Owns Millings 501 to 1000 Sq. YardsSY
52Pavement Profiling/Milling-WVDOT Owns Millings 1001 to 2500 Sq. YardsSY
53Pavement Profiling/Milling-WVDOT Owns Millings 2501 to 5000 Sq. YardsSY
54Pavement Profiling/Milling-WVDOT Owns Millings 5001 Sq. Yards or GreaterSY
55Pavement Profiling/Milling-Vendor Owns Millings 0 to 250 Sq. YardsSY
56Pavement Profiling/Milling-Vendor Owns Millings 251 to 500 Sq. YardsSY
57Pavement Profiling/Milling-Vendor Owns Millings 501 to 1000 Sq. YardsSY
58Pavement Profiling/Milling-Vendor Owns Millings 1001 to 2500 Sq. YardsSY
59Pavement Profiling/Milling-Vendor Owns Millings 2501 to 5000 Sq. YardsSY
60Pavement Profiling/Milling-Vendor Owns Millings 5001 Sq. Yards or GreaterSY
61Pavement Profiling/Milling Mobilization - Complete on ATT BLUMP SUM--------------
62Haul of Profiled/Milled Cuttings or Fine Millings, First 10 Miles
(Included with #50-61 and #70-81)MILENo Add'l Charge-------
63Haul of Profiled/Milled Cuttings or Fine Millings (each additional Ton Mile
after 10 miles)TON MILE
64Base Failure Repair, Asphalt 0-50 Square Yards per MileSY
65Base Failure Repair, Asphalt 51-250 Square Yards per MileSY
66Base Failure Repair, Asphalt 251-500 Square Yards per MileSY
67Base Failure Repair, Asphalt 501 Square Yards or Greater per MileSY
68Base Failure Repair, Stone 0-50 Square Yards per MileSY
69Base Failure Repair, Stone 51-250 Square Yards per MileSY
70Base Failure Repair, Stone 251-500 Square Yards per MileSY
71Base Failure Repair, Stone 501 Square Yards or Greater per MileSY
72Edge Failure Repair 0-50 Square Yards per MileSY
73Edge Failure Repair 51-250 Square Yards per MileSY
74Edge Failure Repair 251-500 Square Yards per MileSY
75Edge Failure Repair 501 Square Yards or Greater per MileSY
76Pothole Repair 0-50 Square Yards per MileSY
77Pothole Repair 51-250 Square Yards per MileSY
78Pothole Repair 251-500 Square Yards per MileSY
79Pothole Repair 501 Square Yards or Greater per MileSY
80Asphalt HPTO - SP496 - PG 64E-22 (400 Ton increments)TON
81Non-Tracking TackGAL
82Lay Down of Materials - to be used with #81 - 400 Ton or GreaterTON
83Ultra-Thin Asphalt Overlay - SP498TON
84Fine Milling -WVDOT Owns Millings 0 to 250 Sq. YardsSY
85Fine Milling -WVDOT Owns Millings 251 to 500 Sq. YardsSY
86Fine Milling -WVDOT Owns Millings 501 to 1000 Sq. YardsSY
87Fine Milling -WVDOT Owns Millings 1001 to 2500 Sq. YardsSY
88Fine Milling -WVDOT Owns Millings 2501 to 5000 Sq. YardsSY
89Fine Milling -WVDOT Owns Millings 5001 SY or GreaterSY
90Fine Milling- Vendor Owns Millings 0 to 250 Sq. YardsSY
91Fine Milling- Vendor Owns Millings 251 to 500 Sq. YardsSY
92Fine Milling- Vendor Owns Millings 501 to 1000 Sq. YardsSY
93Fine Milling- Vendor Owns Millings 1001 to 2500 Sq. YardsSY
94Fine Milling- Vendor Owns Millings 2501 to 5000 Sq. YardsSY
95Fine Milling- Vendor Owns Millings 5001 SY or GreaterSY
96Milled Rumble StripsLF
97Milled Rumble Strip Mobilization - Complete on ATT BLUMP SUM-------
98Parking Lot and Facility Paving Surcharge - Items #1-17, #81, and #84TON
99Cleaning and SweepingSY
100Traffic Maintenance: Pilot Truck and DriverDAY
101Traffic Maintenance: Traffic Control DevicesUNIT
102Traffic Maintenance: FlaggerHOUR
103Traffic Maintenance: Arrow BoardDAY
104Off-Season Plant Opening - First DayDAY
105Off-Season Plant Opening - Each Additional DayDAY
106Raised Pavement Marker (RPM), Type P-2 with InstallationEACH
107Raised Pavement Marker (RPM), Type R-4 with InstallationEACH
108RPM Installation Mobilization - Complete on ATT BLUMP SUM-------
109Raised Pavement Marker (RPM) RemovalEACH
110RPM Removal Mobilization - Complete on ATT BLUMP SUM-------
111VRAM (Void Reducing Asphalt Membrane) 0-1000 LFLINEAR FOOT
112VRAM (Void Reducing Asphalt Membrane) 1001-2000 LFLINEAR FOOT
113VRAM (Void Reducing Asphalt Membrane) 2001-5,000 LFLINEAR FOOT
114VRAM (Void Reducing Asphalt Membrane) 5,001 LF or greaterLINEAR FOOT
115VRAM Preparation - Removal of Center LineLINEAR FOOT
116VRAM Mobilization - Complete on ATT BLUMP SUM-------

&"-,Bold"&12Asphalt Materials Delivery & Labor by Vendor

ATTACHMENT A PRICING PAGE (ATT A)

Asphalt Laydown - ATT A Page &P of &N AMA 6627C001

File details come from the government source that posted it. Updated .