This solicitation requests quotes for the installation of building facades at a Military Operations on Urbanized Terrain site. The Air Force seeks to award a single contract to install facades on Buildings 34, 35, and 32, with an option to also install the facade on Building 31. Quotes are due by September 16th, 2022 and the site visit will be held on September 9th. The contract will be awarded as a small business set-aside, with a size standard of 500 employees, using NAICS code 339999. The Air Force will evaluate quotes based on durability, realistic appearance, and price factors, and intends to award without discussions. The contractor must provide all labor, equipment, and materials to complete the work. Payment will be made via invoice through WAWF upon satisfactory performance.

View the file

Other files for this federal contract opportunity

Other files attached to MOUT Site - Military Operations on Urbanized Terrain, newest first.
File Type Posted
Summary Pricing Sheet_Updated.xlsx XLSX spreadsheet
Q and A with Pics from Site Visit 09 Sep 22.pdf PDF
RFQ MOUT Site Q and A_1.pdf PDF
Davis-Monthan AFB MOUT site photos.pdf PDF
RFQ for MOUT Site.pdf PDF
Davis-Monthan AFB MOUT site photos.pdf PDF
Summary Pricing Sheet.xlsx XLSX spreadsheet
PWS MOUT Site_Final.pdf PDF
MOUT TVQs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX F

ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)

MOST SIGNIFICANT ENVIRONMENTAL ASPECTS AWARENESS FORM

Each of the installation's activities and services are reviewed to identify associated environmental aspects. The environmental aspects identified for each activity and service is then summarized for the entire installation. The identified environmental aspects are prioritized using a risk rating matrix to determine which aspects are considered significant. These significant aspects are reviewed and adjusted as needed. Below is a list of the current significant aspects and the installations objectives to minimize the impact of these aspects.

Significant Environmental Aspects Objective

1. Potential release of Oils/Fuel to land Reduce the potential to release Oils/Fuel to the land from the Storage, Use and Transfer of Oils/Fuel

2. Withdrawal and use of water for all processes Reduce water intensity by 2% per year beginning in FY08 using FY07 as a baseline

3. Withdrawal and use of electrical power for all processes

Decrease the amount of electrical power used for domestic and industrial processes

4. Generation/Discharge of wastewater contaminated with oil/grease, solids, cleaning compounds, or metals to sanitary sewer

Reduce the generation/discharge of wastewater contaminated with oil/grease, solids, cleaning compounds, or metals to sanitary sewer

5. Potential particulate emissions from travel and parking in unpaved areas.

Reduce the potential emissions caused from parking and traveling on unimproved area

6. Generation of Hazardous Waste. Reduce Hazardous Waste Generation

7. Environmental Impact and Analysis Process Reduce mission impact through proper EIAP

DEFINITIONS:

Environmental Aspect - an element of an organization's activities, products and services that can interact with the environment (adopted from the ISO 14001 standard)

Environmental Impact - any change to the environment, whether adverse or beneficial, wholly or partially resulting from an organization's activities, products or services (adopted from the ISO 14001 standard)

Significant Environmental Aspect - an environmental aspect that has or can have a significant impact on human health or the environment

I accept full responsibility for the actions of all personnel hired on this project and will ensure they receive a thorough briefing on these procedures and initial EMS Awareness training as applicable.

Contractor’s Email Address

Contract Start/Contract Number

Project Name/Company Name

Contractor’s Printed Name

Contractor’s Signature

Contractor Environmental Guide May 201

Date

APPENDIX F

ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)( )

MOST SIGNIFICANT ENVIRONMENTAL ASPECTS AWARENESS FORM