ANL-70 Request for Quotation.doc

DOC document 2 MB Posted

Attached to
20-ID Detector Installation Piece Parts
Solicitation number
4-B170-Q-00779-00
Issued by

About this file

This document is a Request for Quotation (RFQ) from Argonne National Laboratory for the fabrication of machined piece parts to support the installation of instrumentation assemblies for the Advanced Photon Source Upgrade Project.

The RFQ includes a list of 21 line items for various components such as goniometer heads, clamp bases, cameras, frames, brackets, and other parts. Interested vendors are required to submit quotes by October 7, 2024. The contract will be awarded to the lowest priced, technically acceptable offer. Key terms include F.O.B. destination, Net 30 days payment, and a 12-month warranty period. The procurement is being conducted by the Department of Energy Office of Science. Supporting documentation includes a Statement of Work, technical drawings, quality requirements, and other terms and conditions.

View the file

Other files

File Type Posted
Appendix B - Statement of Work.docx DOCX document
LPTA Criteria.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANL-70 (February 22, 2013)

UCHICAGO ARGONNE, LLC

OPERATOR OF

ARGONNE NATIONAL LABORATORY

BLDG. 201 OCF, 9700 S. Cass Ave., Lemont, IL 60439

(CONTRACT NO. DE-AC02-06CH11357)

REQUEST FOR QUOTATION

TO ALL PROSPECTIVE OFFERORS
THIS IS NOT AN ORDER

NOTICE:

1. The right is reserved to accept or reject quotations on each item separately unless your quotation states otherwise.

2. The right is reserved to accept minor deviations from specifications herein listed or referenced.

3. Firm prices are requested. If other than firm prices are quoted, conditions of escalation are to be stated.

4. If material is packaged in returnable containers the amount of deposit, if any, is to be stated together with instructions for returning.

5. Terms and Conditions referenced below will apply to any resulting Purchase Order.

Address Reply To:
Kelly L. West
PHONE:
630-252-6553
Date
09/23/2024
Inquiry No.
4-B170-Q-00779-00
Quotation must be received by:
10/07/2024

DESCRIPTION

THE ENCLOSED BOOKLET OF Argonne Representations and Certifications FORMDROPDOWN is included as part of this request and must be completed, signed and returned with your quotation.

Please furnish quotation to supply the materials and/or services indicated on page two(2) in support of the APS-Upgrade.

*****THIS PROCUREMENT IS LOWEST PRICED*****

*****TECHNICALLY ACCEPTALBE*****

Any resulting Purchase Order will be subject to the Argonne Terms and Conditions attached hereto and made part of hereof and will be exempt from Illinois Occupation and Use Taxes and from Manufacturers and Retailers Excise Taxes.

We quote you F.O.B. Destination. Shipment can be made in days from receipt of order.

Cash Terms
Net 30 days
Will Ship Via*

Date

*If Shipment will not be made via FedEX, UPS, or USPS, Please provide estimate of weight and volume _________________________________________ cft

COMPLETE AND RETURN ONE COPY

PLEASE MARK “NO BID” IF YOU CANNOT QUOTE

AUTHORIZED SIGNATURE

ITEM
NAME
MODEL/

PART#

QTY
UNIT
UNIT PRICE
EXTENDED PRICE
DESCRIPTION
DELIVERY

DUE DATE

0001
Goniometer Head Extension
A320-BS0108
2
Each
$
$
Goniometer Head Extension (COTS parts required. APS will send Huber parts to vendor post award)
0002
Clamp Base Assembly
A320-DT0111
2
Each
$
$
Clamp Base Assembly (COTS parts required)
0003
Camera
A320-DT0140
2
Each
$
$
Camera (Insert COTS pins in plates)
0004
Frame B
A320-DT1102
1
Each
$
$
Frame (COTS parts required)
0005
Frame A
A320-DT1202
1
Each
$
$
Frame A (COTS parts required)
0006
Spacer
A306-BS0107
2
Each
$
$
Spacer
0007
L Bracket
A320-BS0101
2
Each
$
$
L Bracket
0008
Base Mount Plate
A320-BS0102
2
Each
$
$
Base Mount Plate
0009
Base
A320-DT0116
2
Each
$
$
Base
0010
Inner Ring
A320-DT0117
2
Each
$
$
Inner Ring
0011
Outer Ring
A320-DT0118
2
Each
$
$
Outer Ring
0012
Motor L-Bracket
A320-DT0119
2
Each
$
$
Motor L-Bracket
0013
Motor Bracket
A320-DT0120
2
Each
$
$
Motor Bracket
0014
Push Plate
A320-DT0121
2
Each
$
$
Push Plate
0015
Brass Ball Pusher
A320-DT0122
4
Each
$
$
Brass Ball Pusher (COTS part required)
0016
Limit Switch Bracket - Front
A320-DT0123
2
Each
$
$
Limit Switch Bracket - Front
0017
Bracket
A320-DT0125
2
Each
$
$
Bracket
0018
Detector Arm
A320-DT0128
3
Each
$
$
Detector Arm
0019
30MM X 2MM Tungsten Disc
A320-DT0134
2
Each
$
$
30MM X 2MM Tungsten Disc
0020
Alignment Plate
A320-DT1204
2
Each
$
$
Alignment Plate
0021
Scintillator Mounting Plate
A431-000031
2
Each
$
$
Scintillator Mounting Plate
TOTAL
$

APPLICABLE DOCUMENTATION:

The following documents are attached hereto and made a part hereof:

A) PROPOSAL INSTRUCTIONS:

PLEASE CAREFULLY READ EACH SECTION BELOW TO ENSURE THAT YOUR QUOTE AND SUBMISSION ADDRESSES ALL REQUIREMENTS TO SUBMIT A COMPLETE AND THOROUGH RESPONSE TO THIS RFQ.

IMPORTANT DATES & REQUIREMENTS

1) QUOTES DUE – Monday, October 7, 2024

a. ANL-740 Request for Quote – Complete and return along with noted Warranty Period

b. Reps & Certs (ANL-70A – Complete and Return

c. LPTA Form – Complete and Return

B) TERMS AND CONDITIONS/SPECIAL CLAUSES

1) Appendix A-71COM, Argonne Terms and Conditions for Commercial Items – February 13, 2023

2) Payment by Electronic Funds Transfer – October 20, 2023

3) Appendix D-8C – Intellectual Property Provision – December 12, 2023

4) Inconsistency Between English Version and Translation – February 1, 2000

5) Property Acquisition – ANL-6 Government Property Acquisition Record – August 31, 2023

6) Property Questionnaire – Property Management Self Evaluation Questionnaire – September 8, 2023

7) Property Requirements – Control of Government Property – Contractor Requirements – August 31, 2023

C) TECHNICAL DOCUMENTS

1) Appendix “B” - Statement of Work – 20-ID-E Detector Installation Piece Parts – October 9, 2024

2) LPTA Form – TO BE COMPLETED AND RETURNED WITH QUOTE

3) Drawings:

a. A306-BS0107

b. A320-BS0108

c. A320-BS0109

d. A320-BS0101

e. A320-BS0102

f. A320-DT0111

g. A320-DT0112

h. A320-DT0113

i. A320-DT0116

j. A320-DT0117

k. A320-DT0118

l. A320-DT0119

m. A320-DT0120

n. A320-DT0121

o. A320-DT0122

p. A320-DT0123

q. A320-DT0125

r. A320-DT0128

s. A320-DT0134

t. A320-DT1102

u. A320-DT1103

v. A320-DT1104

w. A320-DT1105

x. A320-DT1106

y. A320-DT1107

z. A320-DT0140

aa. A320-DT0141

ab. A320-DT1202

ac. A320-DT1203

ad. A320-DT1204

ae. A431-000031

4) STP Files

D) QUALITY DOCUMENTS

1) ANL-266 Acceptance Criteria Listing

2) ANL-407 Argonne Advanced Photon Source Upgrade Project Procurement Quality Requirements

E) WARRANTY

Warranty is required for a minimum of 12 months after acceptance

*****THIS PAGE LEFT INTENTIONALLY BLANK*****

PAGE

File details come from the government source that posted it. Updated .