ALTERNATE BID 3 Page 46.pdf
PDF 150 KB Posted
- Attached to
- Request for Asbestos Abatement Services
- Solicitation number
- RFP-CLPS-250000001388-1
- Issued by
- Macomb County, Westland City, Michigan
About this file
This is an Alternate Bid 3 unit cost form for CLPS (likely a school district) Buildings that details pricing requirements for various asbestos containing material (ACM) and PCB removal services. The form outlines specific line items for contractor pricing including mobilization charges, worker hourly rates, and various removal services for ACM materials such as pipe insulation, fire doors, window caulking, floor tiles, and transite panels.
The pricing structure requires contractors to provide unit costs for over 20 different service categories, split between ACM removal and PCB/Non-Asbestos removal work. Specific pricing units vary by service type, including per linear foot, per square foot, per unit, per fixture, and hourly rates. The form indicates that all material pricing must include hourly rates, notifications, materials and disposal costs. The contractor must certify compliance with all specifications and include all charges for wages, overtime, materials, supplies, equipment, disposal costs, hazardous material removal, supervision, taxes, insurance, overhead, profit and incidental expenses in their quoted prices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Advertisement replacement pages.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALTERNATE BID 3 – UNIT COSTS Applies to All Buildings and other CLPS Buildings
The Contractor hereby agrees and certifies to comply with all requirements within this Specification and further agrees to accept in payment of List Itemized Costs Below dollars ($ N/A ) for all work regarding this quote as described in the above detailed Special Conditions, Scope-of-Work and Time Schedule. The Submitter proposes the above stated cost to include all charge for all wages, overtime, materials, supplies, equipment, disposal costs, hazardous material removal/disposal costs, general conditions, supervision, taxes, insurance, overhead, profit and incidental expenses.
The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the Owner or the School District Maintenance Supervisor in verification of the recitals comprising the Submitter's Qualification Form.
COMPANY NAME
PRINT NAME
TITLE
SIGNATURE
• Mobilization charge(if not already mobilized to CLPS, 1 time cost per new project )$ /Mobe
• Abatement Worker Hourly Rate (per worker) ............................................................. $ /hour
• Glove bag removal of ACM pipe fitting insulation. ................................................... $ /Ln Ft
• Glove bag removal of ACM straight pipe insulation.................................................. $ /Ln Ft
• Mini-enclosure removal of ACM pipe fitting insulation. ........................................... $ /Ln Ft
• Non-friable removal of ACM fire doors/frames ........................................... $ /door & frame
• Non-friable removal of ACM window or door frame caulking................................. $ /Ln Ft
• Non-Friable Removal of light fixtures containing round light heat fixture pads........ $ / light
• Non-Friable Removal of Transite ............................................................. $ /SF
• Non-Friable Removal of Transite Heat Panel Unit ................................................. $ /UNIT
• Friable removal of ACM floor tile by Machine ......................................................... $ /Sq Ft
• Friable removal of ACM floor mastic by Grinding .................................................... $ /Sq Ft
• HEPA Vac Debris Cleanup ............................................................. $ /Sq Ft
• ACM Removal of Roof sump Mud Fitting ............................................................... $ /each
• ACM Removal of standard classroom sink .............................................................. $ /sink
PCB and NON-Asbestos Removal Costs
• Removal of PCB Caulk with Disposal ............................................................. $ /LF
• Removal of a Stone Panel system approx. 6’x10’ x 2” thick with PCB Adhesive ...... $ /Unit
• friable removal of NON ACM floor tile. ............................................................. $ /Sq Ft
• friable removal of NON ACM floor mastic by Grinding ........................................... $ /Sq Ft
• Removal of NON ACM ceiling panels/Ceiling tile /grid ........................................... $ /Sq Ft
• Removal of Light Fixture with 2 bulb with ballast to be recycled ........................... $ /fixture
• Removal of Light Fixture with 4 bulb with ballast to be recycled ........................... $ /fixture
Note: Material Pricing for material removal to include stated hourly rate, notification, materials and disposal
PCB and NON-Asbestos Removal Costs