FRAZIER FALLS TRAIL REHABILITATION
Solicitation number
AG-9JGP-S-15-0087
Issued by

About this file

Amended Schedule of Items

View the file

Other files

File Type Posted
sf30July2.JPG JPG image
Sheet5_Frazier_Falls_Plan_and_Profile_3.pdf PDF
Sheet4_Frazier_Falls_Plan_and_Profile_2.pdf PDF
Sheet7_Frazier_Falls_Typical_Trail_Sections.pdf PDF
ScheduleOfItems.docx DOCX document
SF30.doc DOC document
Sheet3_Frazier_Falls_Plan_and_Profile_1.pdf PDF
Sheet2_Frazier_Falls_Overall_Plan_View.pdf PDF
QuestionsandAnswers.docx DOCX document
Special_Specificatons.docx DOCX document
drawings.pdf PDF
Fire_Plan.doc DOC document
AG9JGPS150087.doc DOC document
Special_Specificatons.docx DOCX document
EPCo_Decis_03-24-15.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 1, SCHEDULE OF ITEMS

SECTION B

SUPPLIES OR SERVICES, AND PRICES/COSTS

PROJECT
Frazier Falls Trail Rehabilitation
UNIT
Beckwourth R.D., Plumas N.F.
SOL. #
AG-9JGP-S-15-0087

METHOD OF

ITEM NO.
DESCRIPTION
MEASURE
UNIT
QUANTITY
UNIT PRICE
TOTAL PRICE

15101

Mobilization

CQ

LS

1.

15201
Construction Survey and Staking, method 1, tolerance D

CQ

LF

3,021.

20102

Clearing and Grubbing

CQ

LS

1.

20401

Excavation and Embankment

AQ

CY

110.

32202 Aggregate Base, Grading E, 4 Inch Depth, Compaction Method D

AQ

CY

110.

40401 Warm Asphalt Concrete, Nominal Maximum 1/2" Aggregate, Compaction Method B or better

AQ

TON

350.

41202

Tack Coat CRS-1

AQ

GAL

145.

55602a

Bridge Railing (HEART B)

CQ

FT

183.

55602b

Bridge Railing (HEART B)

CQ

FT

100.

55602c

Bridge Curb (CONSTRUCTION HEART)

CQ

FT

70.

55703

Treated Structural Timber and Lumber (6x6 #1 DF)

CQ

FT

130.

15101a

Alternate Creek Crossing

AQ

LS

1.

TOTAL $

NOTES:
1) Respondent must price each item to be considered for award.

2) Responses for quantities less than those listed may be rejected.

3) If award is made in excess of $30,000, bonds will be required. (See Section I.)

4) If response is greater than $150,000, include bid bond =20% of the total price.

(5) Following are abbreviation definitions from FP-03, Section 109 that may appear in the "Unit" column of the Schedule of Items; AC=Acre, CQ=Contract Quanitity, CY= Cubic Yard, EA=Each, GAL=Gallon, HR=Hour, LF=Linear Foot, LS=Lump Sum, MI=Mile, LB=Pound, SF=Square Foot, SY=Square yard, ST=Station, TON=Ton. CQ and LS will be measured and paid as stated in FP-03, Section 109-02. All other Units will be paid according to FAR clause 52.211-18, Variation in Estimated Quanitity.