ScheduleOfItemsJuly2.docx
DOCX document 20 KB Posted
- Attached to
- FRAZIER FALLS TRAIL REHABILITATION
- Solicitation number
- AG-9JGP-S-15-0087
About this file
Amended Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| sf30July2.JPG | JPG image | |
| Sheet5_Frazier_Falls_Plan_and_Profile_3.pdf | ||
| Sheet4_Frazier_Falls_Plan_and_Profile_2.pdf | ||
| Sheet7_Frazier_Falls_Typical_Trail_Sections.pdf | ||
| ScheduleOfItems.docx | DOCX document | |
| SF30.doc | DOC document | |
| Sheet3_Frazier_Falls_Plan_and_Profile_1.pdf | ||
| Sheet2_Frazier_Falls_Overall_Plan_View.pdf | ||
| QuestionsandAnswers.docx | DOCX document | |
| Special_Specificatons.docx | DOCX document | |
| drawings.pdf | ||
| Fire_Plan.doc | DOC document | |
| AG9JGPS150087.doc | DOC document | |
| Special_Specificatons.docx | DOCX document | |
| EPCo_Decis_03-24-15.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 1, SCHEDULE OF ITEMS
SECTION B
SUPPLIES OR SERVICES, AND PRICES/COSTS
| PROJECT |
| Frazier Falls Trail Rehabilitation |
| UNIT |
| Beckwourth R.D., Plumas N.F. |
| SOL. # |
| AG-9JGP-S-15-0087 |
METHOD OF
| ITEM NO. |
| DESCRIPTION |
| MEASURE |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL PRICE |
15101
Mobilization
CQ
LS
1.
| 15201 |
| Construction Survey and Staking, method 1, tolerance D |
CQ
LF
3,021.
20102
Clearing and Grubbing
CQ
LS
1.
20401
Excavation and Embankment
AQ
CY
110.
32202 Aggregate Base, Grading E, 4 Inch Depth, Compaction Method D
AQ
CY
110.
40401 Warm Asphalt Concrete, Nominal Maximum 1/2" Aggregate, Compaction Method B or better
AQ
TON
350.
41202
Tack Coat CRS-1
AQ
GAL
145.
55602a
Bridge Railing (HEART B)
CQ
FT
183.
55602b
Bridge Railing (HEART B)
CQ
FT
100.
55602c
Bridge Curb (CONSTRUCTION HEART)
CQ
FT
70.
55703
Treated Structural Timber and Lumber (6x6 #1 DF)
CQ
FT
130.
15101a
Alternate Creek Crossing
AQ
LS
1.
TOTAL $
| NOTES: |
| 1) Respondent must price each item to be considered for award. |
2) Responses for quantities less than those listed may be rejected.
3) If award is made in excess of $30,000, bonds will be required. (See Section I.)
4) If response is greater than $150,000, include bid bond =20% of the total price.
(5) Following are abbreviation definitions from FP-03, Section 109 that may appear in the "Unit" column of the Schedule of Items; AC=Acre, CQ=Contract Quanitity, CY= Cubic Yard, EA=Each, GAL=Gallon, HR=Hour, LF=Linear Foot, LS=Lump Sum, MI=Mile, LB=Pound, SF=Square Foot, SY=Square yard, ST=Station, TON=Ton. CQ and LS will be measured and paid as stated in FP-03, Section 109-02. All other Units will be paid according to FAR clause 52.211-18, Variation in Estimated Quanitity.
PRICE SUBMITTED BY:
Signature
Phone
Vendor Name
FAX
Address
File details come from the government source that posted it. Updated .