XLSX spreadsheet 34 KB Posted
- Attached to
- FRAZIER FALLS TRAIL REHABILITATION
- Solicitation number
- AG-9JGP-S-15-0087
About this file
Davis Bacon wage rates
View the file
Other files
| File | Type | Posted |
|---|---|---|
| sf30July2.JPG | JPG image | |
| ScheduleOfItemsJuly2.docx | DOCX document | |
| Sheet7_Frazier_Falls_Typical_Trail_Sections.pdf | ||
| Sheet5_Frazier_Falls_Plan_and_Profile_3.pdf | ||
| Sheet4_Frazier_Falls_Plan_and_Profile_2.pdf | ||
| ScheduleOfItems.docx | DOCX document | |
| SF30.doc | DOC document | |
| Sheet3_Frazier_Falls_Plan_and_Profile_1.pdf | ||
| Sheet2_Frazier_Falls_Overall_Plan_View.pdf | ||
| QuestionsandAnswers.docx | DOCX document | |
| Special_Specificatons.docx | DOCX document | |
| Fire_Plan.doc | DOC document | |
| drawings.pdf | ||
| AG9JGPS150087.doc | DOC document | |
| Special_Specificatons.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Decision No. CA15009 | ||||||
| updated as of 03/24/2015 | East Plumas County in Plumas National Forest | |||||
| APPLICABILITY OF COMPLETE WAGE RATE DECISION: In addition to the wage rates in this solicitation, the complete decision of the Secretary of Labor contains wage rates for other classes of laborers and mechanics. Because it does not appear that the work called for by this solicitation will require the use of such other classes, the wage rates applicable to them have not been reprinted herein. However, if any such classes of laborers or mechanics actually are employed to perform work under the contract resulting from this solicitation, payment will be required as specified in this clause entitled "Davis-Bacon Act" at wage rates contained in the complete decision of the Secretary of Labor. Offerors desiring the complete decision may request it from the Contracting Officer. | ||||||
| PLUMAS COUNTY - SKILLED LABOR / TRADES | BASIC HOURLY RATES | FRINGE BENEFITS | TOTAL WAGES & BENEFITS | |||
| Bricklayer (Area 1) | 36.48 | 19.59 | 56.07 | x | ||
| Tile Layer (Area 1) | 38.13 | 11.98 | 50.11 | x | ||
| Drywall Installer/Lather (Area 4) | 16.81 | 16.30 | 33.11 | x | ||
| Carpenter (Area 4) | 40.35 | 27.53 | 67.88 | x | ||
| - Bridge Builder | 40.35 | 27.53 | 67.88 | x | ||
| - Shingler, Scaffold & Shoring Erector | 40.35 | 27.53 | 67.88 | x | ||
| - Millwright | 40.45 | 29.12 | 69.57 | x | ||
| Electrician: | 45.31 | 20.13 | 65.44 | x | ||
| Ironworker, Fence Erector | 27.08 | 18.24 | 45.32 | x | ||
| Ironworker, Ornamental, Reinforcing, Structural | 33.50 | 28.20 | 61.70 | x | ||
| Asbestos Removal, Laborer (Area B) | 31.13 | 6.95 | 38.08 | x | ||
| Lead Removal, Laborer (Area B) | 28.02 | 19.42 | 47.44 | |||
| Plasterer Tender | 30.00 | 16.36 | 46.36 | x | ||
| Mason Tender (Brick) | 31.11 | 17.34 | 48.45 | x | ||
| Drywall Finisher/Taper | 36.24 | 19.88 | 56.12 | x | ||
| Painter | 30.85 | 16.85 | 47.70 | x | ||
| - Spray /Sandblast ($0.50 additional/hr.) | 31.35 | 17.35 | 48.70 | x | ||
| - High Time 50' - 100' | 30.85 | 16.85 | 47.70 | x | ||
| Glazier | 33.79 | 22.49 | 56.28 | x | ||
| Plasterer (Area 295) | 31.79 | 14.93 | 46.72 | x | ||
| Cement Mason, Concrete Finisher: | 28.65 | 18.56 | 47.21 | x | ||
| Plumber : | 37.50 | 26.39 | 63.89 | x | ||
| Underground Utility Worker / Landscape Fitter | 28.55 | 9.25 | 37.80 | x | ||
| Roofer : | 33.23 | 13.79 | 47.02 | x | ||
| Sprinkler Fitter | 34.19 | 19.37 | 53.56 | x | ||
| Sheet Metal Worker, Decking and siding only | 33.86 | 31.83 | 65.69 | x | ||
| - Mechanical jobs ($200,000 and under) | 29.88 | 28.75 | 58.63 | x | ||
| - Mechanical jobs (over $200,000) | 39.05 | 31.24 | 70.29 | x | ||
| HIGHWAY IMPROVEMENT | BASIC HOURLY RATES | FRINGE BENEFITS | TOTAL WAGES & BENEFITS | |||
| Parking Lot Striping / Highway Marking | ||||||
| GROUP 1: STRIPER: Layout & application of traffic stripes & marking: | 34.26 | 11.65 | 45.91 | x | ||
| GROUP 2: Game court and Playground Installer: | 29.12 | 11.65 | 40.77 | x | ||
| GROUP 3: Protective Coatings and Pavement Sealing: | 29.46 | 11.65 | 41.11 | x | ||
| Traffic Control / Lane Closure | ||||||
| Escort Driver, Flag Person, Area B) | 28.14 | 19.03 | 47.17 | x | ||
| Traffic Control Person I, | ||||||
| Layout of traffic control, construction area & roadside signage | 28.44 | 19.03 | 47.47 | x | Could not find | |
| Traffic Control Person II, | ||||||
| Installation & removal of signs, markers, delineators & crash cushions. | 25.94 | 19.03 | 44.97 | x | ||
| CONSTRUCTION CRAFT LABORERS (AREA B) | BASIC HOURLY RATES | FRINGE BENEFITS | TOTAL WAGES & BENEFITS | |||
| Construction Specialist Group: Asphalt Ironer and Raker / Chainsaw, Blaster, Diamond Driller | 28.14 | 18.66 | 46.80 | x | ||
| GROUP 1: Faller, Log Loader, Bucker / Jack Hammer, Compactors, Hydro Seeder, Pipe Layer, Post Hole Digger, Form Raiser, Asphalt Spreader Boxes, Kettle Tender | 28.14 | 18.66 | 46.80 | x | ||
| GROUP 1(a): Rock Drillers (All Types), Mech. Pipe Layer, All working/placing/and blasting of all powder and explosives | 28.61 | 18.66 | 47.27 | x | ||
| GROUP 1(b): Sewer Cleaner | ||||||
| ($5.00 per day above GROUP 1 wages) | 32.39 | 19.82 | 52.21 | x | ||
| GROUP 1(c): Burning and Welding | 28.44 | 18.66 | 47.10 | x | ||
| x | GROUP 1(e): Work on bell hole footings and shafts, and work on deep footings (15 ft. or more in depth) | 28.94 | 18.66 | 47.60 | x | |
| GROUP 1(f): Wire winding machine in connection with guniting or shot crete | 28.97 | 18.66 | 47.63 | x | ||
| GROUP 2: Asphalt Shoveler,Cement Laborer, Chipper Feeder, Choker Setter & Rigger (clearing work), all pneumatic, air, gas, and eletric tools not in GROUPS 1 - 1(f) | 28.24 | 18.66 | 46.90 | x | ||
| GROUP 3: Construction Laborers, including, Dump Load Spotter, Flagman, Fire Watcher, Fence/Guardrail Erector, Brush Loader/Plier, | 28.14 | 18.66 | 46.80 | x | ||
| GROUP 4: Cleanup Work of debris, grounds, and buildings | 21.83 | 18.66 | 40.49 | x | ||
| POWER EQUIPMENT OPERATORS | BASIC HOURLY RATES | FRINGE BENEFITS | TOTAL WAGES & BENEFITS | |||
| GROUP 1: Power Shovel, Excavator (> 7 CY), Helicopter Oper.erection work | 39.85 | 27.44 | 67.29 | x | ||
| GROUP 2: Power Blade Operator (finish), Power Shovels (1-7 CY), Hydralic Excavator (3 1/2 - 7 CY), Highline Cableway | 38.32 | 27.44 | 65.76 | x | ||
| GROUP 3: Excavator (up to 3 ½ CY), Loader (4 CY+), Combo Backhoe -Loader (> 3/4CY), Dozer / Multi. Engine Scraper (push-pull), Power Shovels (up to and incl.14CY), Asphalt Milling Machine, Wheel Excavator (up to 750 CY/hr.) | 36.84 | 27.44 | 64.28 | x | ||
| GROUP 4: Asphalt Plant Engineer, Combo. Backhoe-Loader (up to 3/4 CY), Concrete Batch Plant (wet/dry), Dozer and/or Push Cat, Timber Skidder, Loader (< 4 CY), Roller Operator (AC), Scraper, Track Loader (up to 4 CY), Welder, Lube & Service Engineer, Grade Setter & Grade Checker | 35.46 | 27.44 | 62.90 | x | ||
| GROUP 5: Cast-in-place Pipe Laying Machine, Drilling Equipment, Trenching Mach.(max.>5' in depth), Concrete Mixer/Finisher, Portable Crusher | 34.19 | 27.44 | 61.63 | x | ||
| GROUP 6: Self Loading Chipper/Chip Spreading Machine, Assist. Plant & Bridge Deck Engineer, Soils & Materials Tester | 32.87 | 27.44 | 60.31 | x | ||
| GROUP 7: Roller (except AC) Chip Seal Automatic Curing Machine, Self-Propelled Compactor (w/o Dozer), Boom Truck (under 15 Ton) | 31.73 | 27.44 | 59.17 | x | ||
| GROUP 8: Compressor Oper., Deckhand, Forklift Oper., Self-Propelled Power Sweeper, Tar Pot Firetender | 30.59 | 27.44 | 58.03 | x | ||
| GROUP 8-A: Mini-Excavator (backhoe, trencher (< 25 h.p.), Skidster Loader/Bobcat 743 series or smaller (w/o attachments), Tub Grinder, Wood Chipper | 28.38 | 27.44 | 55.82 | x | ||
| Crane Opperator, Group 3, Under 45 tons, Hydraulic and Boom Trucks | 38.40 | 26.27 | 64.67 | x | ||
| - Oiler | 34.43 | 26.27 | 60.70 | x | ||
| TRUCK DRIVERS | BASIC HOURLY RATES | FRINGE BENEFITS | TOTAL WAGES & BENEFITS | |||
| GROUP 1: Dump Truck (< 6 CY), Forklift, Comcrete Pump Truck, Fuel & Greese truck, Single Unit Flat Rack (2-Axle), Bus or Person-Haul Driver | 27.96 | 24.28 | 52.24 | x | ||
| GROUP 2: Dump Truck (6 CY & under 8 CY), Transit mixer (thru 10 CY), Water Trucksa < 7000 Gal.), Single Unit Flat Rack (3-axle), Highbed Heavy Duty Transit, Road Oil Truck or Bootman | 28.26 | 24.28 | 52.54 | x | ||
| GROUP 3: Dump truck (8-35 CY), Water Truck (> 7000 gal.), Lowbed Heavy Duty Transport, Self Loading truck, Boom Truck, Snow Plow | 28.56 | 24.28 | 52.84 | x | ||
| GROUP 4: Dump Truck (over 35-65 CY), Helicopter Pilot (when transporting men/materials), Lowboy Heavy Duty Transport | 28.91 | 24.28 | 53.19 | x | ||
| GROUP 5: Dump Truck (65CY and over), Lowbed Trqnsport (> 7-axles) | 29.26 | 24.28 | 53.54 | x |
&"Times New Roman,Bold"&11COMMONLY USED DAVIS-BACON WAGES &"Times New Roman,Regular"Plumas National Forest Page&P