Geotech_Report_Final.pdf
PDF 4 MB Posted
- Attached to
- Camp Richardson CGS retrofit and BMP
- Solicitation number
- AG-9JGP-S-15-0071
About this file
Geotech Report
View the file
Other files
| File | Type | Posted |
|---|---|---|
| site_visit_4_29.pdf | ||
| 2014PitInspections.pdf | ||
| CR_Badger_Roads-Sewer.pdf | ||
| Eagle_Roads2-2-2Way_West1.pdf | ||
| AMEND_003_CRR_CGS_Options.doc | DOC document | |
| AMEND_002_CRR_CGS_Options.doc | DOC document | |
| amend001_camp_rich.pdf | ||
| CRR_CGS_BMP_Solicitation.doc | DOC document | |
| CRR_Drawings_4-7-2015.pdf | ||
| SectionJ_wages_CA150009.docx | DOCX document | |
| CR_Entrance_Builiding_Specs.pdf | ||
| CR_SWPPP_Feb2015.pdf | ||
| CR_Electric_Specs.pdf | ||
| SectionJ_Fire_Plan.doc | DOC document | |
| FP-03_Supplemental_Specs.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GGEEOOTTEECCHHNNIICCAALL IINNVVEESSTTIIGGAATTIIOONN
BBAADDGGEERR’’SS DDEENN CCAAMMPPGGRROOUUNNDD
CCAAMMPP RRIICCHHAARRDDSSOONN RREESSOORRTT
SSOOUUTTHH LLAAKKEE TTAAHHOOEE,, CCAALLIIFFOORRNNIIAA
PREPARED FOR:
UU.. SS.. FFOORREESSTT SSEERRVVIICCEE
MARCH 2015
FILE: 1710
6980 Sierra Center Parkway, Suite 90 Reno, NV 89511
Office 775-851-8205 fax 775-851-8593 www.cme-corp.com
March 9, 2014 Project No: 1710
Mr. Michael Alexander P.E.
35 College Drive South Lake Tahoe, CA 96150
RE: Geotechnical Investigation Badger's Den Campground Camp Richardson Resort Campground South Lake Tahoe, California
Dear Mr. Alexander:
Construction Materials Engineers Inc. (CME) is pleased to submit the results of our geotechnical investigation report for the Badger's Den Campground at the Camp Richardson Resort Campground in South lake Tahoe, California.
The following report includes the results of our field and laboratory investigations and presents our recommendations for the design and construction of the project. We wish to thank you for the opportunity to provide our services and look forward to working on future endeavors together.
Please feel free to call us should you have any questions or require additional information.
Sincerely, CONSTRUCTION MATERIALS ENGINEERS, INC.
Randal A. Reynolds, PE Senior Geotechnical Engineer rreynolds@cme-corp.com Direct: 775-737-7576 Cell: 775-527-3264 RAR:rar:jwl V:\Active\1710\Badgers Den\geo Inv\c'vr ltr. 3-9-15.doc mailto:rreynolds@cme-corp.com
TABLE OF CONTENTS
V:\Active\1710\Badgers Den\geo Inv\Geo Inv Rpt 3-9-15.docx i
1.0 INTRODUCTION
2.0 PROJECT DESCRIPTION
3.0 SITE CONDITIONS
4.0 FIELD EXPLORATION
4.1 Exploratory Test Pits
4.2 Material Classification
5.0 LABORATORY TESTING
5.1 Index Testing
5.2 R-value Testing
6.0 GEOLOGIC AND GENERAL SOIL CONDITIONS
6.1 Soil Moisture and Groundwater Conditions
7.0 SUBGRADE SOIL STRENGTH (RESILIENT MODULUS)
8.0 DISCUSSION AND RECOMMENDATIONS
8.1 General Information
8.2 Traffic analysis and ESAL Count Determination
8.3 Structural Section Design
8.4 Subgrade Soil Frost Heave Potential
9.0 CONSTRUCTION RECOMMENDATIONS
9.1 Subgrade Soil/Site Preparation
9.2 Stabilization Construction Method
9.3 Grading and Filling
9.3.1 Stabilizing Fill
9.3.2 Untreated Aggregate Base Material
9.3.3 Structural Fill
9.3.4 Densification and Moisture Conditioning Recommendations
9.4 Asphaltic Pavement Construction
9.4.1 Asphalt Design Life
9.5 Anticipated Construction Problems
10.0 CONSTRUCTION OBSERVATION AND TESTING SERVICES
11.0 STANDARD LIMITATION CLAUSE
REFERENCES
TABLES
Table 1- Subgrade Soil Strengths Table 2 - Design MR Values Table 3 - Design ESAL Counts (20 years) Table 4 - Recommended Structural Sections Table 2 - Stabilizing Fill Geotextile Table 6 - Stabilizing Fill Gradation Specifications Table 7 - Structural Fill Gradation Specifications
TABLE OF CONTENTS
ii
APPENDICES
Appendix A Plate A-1 –Test Pit Location Map Plate A-2 – Test Pit Logs Plate A-3 – Soil Classification Chart
Appendix B Plate B-1 – Grain Size Analysis and Hydrometer Results TP-1 Plate B-2 – Grain Size Analysis and Hydrometer Results TP-4 Plate B-3 – Grain Size Analysis and Hydrometer Results TP-7 Plate B-4 – R-value
Appendix C Plate C-1 – Pavement Design Entrance Roads Plate C-2 – Pavement Design Connector Road Plate C-3 – Pavement Design Campground Loop Roads
GEOTECHNICAL INVESTIGATION
Badger's Den Campground
Camp Richardson Resort Campground South Lake Tahoe, California
1.0 INTRODUCTION
Presented herein are the results of Construction Materials Engineers, Inc.’s (CME) geotechnical exploration, laboratory testing, and associated geotechnical design recommendations for the proposed Badger's Den Campground at the Camp Richardson Resort Campground in South Lake Tahoe, California.
These recommendations are based on subsurface conditions encountered at the field exploration locations, and on details of the proposed project as described in this report. The objectives of this study were to:
Determine subgrade soils pertaining to design and construction of the proposed improvements;
Provide recommendations for the design and construction of the project.
The area covered by this report is shown on Plate A-1 (Field Exploration Location Map) in Appendix A. Our study included field exploration, laboratory testing and engineering analyses to identify the physical and mechanical properties of the various on-site materials. Results of our field exploration and testing programs are included in this report and form the basis for all conclusions and recommendations.
2.0 PROJECT DESCRIPTION
It is understood that a network of paved roads will be constructed in the Badger's Den Campground including a paved entrance road from Highway 89. The paved roads will provide access to individual campgrounds.
The paved roadway network consists of three separate roadway segments: entrance road, east to west connector road, and four separate campground loops radiating from the connector road. The east to west connector road is located immediately north of the entrance road. The looped campground roads will have a width of about 13 feet, while the east to west connector and entrance roads will have widths of about 25 feet. Cuts and fills are anticipated to be minor at less than 1 foot.
3.0 SITE CONDITIONS
Badger's Den campground is located immediately south of Highway 89 between Pope Beach Road and Jameson Beach Road. The campground extends approximately 750 feet north of Highway 89 and encompasses approximately 20 acres.
Existing improvements consist of developed campgrounds with fire pits, food storage bins, and tables. The campground has several restrooms consisting of wooden structures. Existing driving trails have a gravel surface.
Vegetation consists of scattered pine trees and small bushes. The overall terrain is relatively flat sloping gently to the north toward Lake Tahoe.
Existing utilities consist of overhead power and telephones lines and underground water lines. A STPUD sewer force main is located trending in an east to west direction near the northern boundary of the campground.
4.0 FIELD EXPLORATION
4.1 Exploratory Test Pits
Subsurface field exploration, completed in January 2015, consisted of excavating seven test pits to maximum depths of 4 feet below the existing ground surface (bgs).
Test pits were excavated using a Case 580L rubber-tired backhoe equipped with a 24-inch bucket. Test pits were located in the field by visual sighting and/or measuring from existing features at the site. Approximate test pit locations are presented on Plate A-1 in Appendix A.
Soils encountered within the test pit excavations were visually classified in general accordance with ASTM D 2488 (Description and Identification of Soils). Bulk samples of representative soil strata were collected, placed in sealed plastic bags, and returned to our laboratory.
Exploratory test pit logs are included as Plate A-2 in Appendix A.. The elevations shown on the test pit logs were obtained by interpolation between contour lines shown on the Test Pit Exploration Location Map (Plate A-1). The elevations and locations included in this report should be considered accurate only to the degree implied by the methods used.
4.2 Material Classification
CME personnel visually classified all soils in the field in general accordance with ASTM D 2488. After the completion of laboratory testing, as described in Section
5.0 Laboratory Testing, the test pit logs were reviewed and corrected in accordance with ASTM 2487 (Unified Soil Classification System). A description of the USCS is presented on Plate A-3.
5.0 LABORATORY TESTING
All soils testing performed in CME’s soils laboratory was conducted in general accordance with the standards and methodologies described in Volume 4.08 of the ASTM Standards. Laboratory test results are presented in Appendix B.
5.1 Index Testing
Samples of significant soil types were analyzed to determine their in-situ moisture content (ASTM D 2216), grain size distribution including hydrometer testing (ASTM D 422), and plasticity index (ASTM D 4318). Results of these tests are presented on Plates B-1 to B-3.
Results of these tests were used to classify the soils according to ASTM D 2487 and to check the field logs, which were then updated as appropriate. Index testing allows for correlation between subgrade support soil classifications and R-value testing.
5.2 R-value Testing
R-value tests (ASTM D 2844) were performed on representative samples of subgrade soil. R-value testing is a measure of subgrade strength and expansion potential and is used in design of flexible pavements. Results of the R-value tests are presented on Plate B-4.
6.0 GEOLOGIC AND GENERAL SOIL CONDITIONS
Based on a review of the Lake Tahoe Basin California and Nevada Geologic Map (Saucedo, 2005), the campground is located in alluvium (Holocene and Pleistocene). Alluvium is defined as unconsolidated, moderately to poorly sorted sand, silt and gravel. Locally includes alluvial fan deposits, glacial outwash, and lacustrine deposits.
Soil types encountered consisted of an uppermost silty sand with gravel (SM) grading into several different soil strata with these classifications: silty gravel with sand, cobbles, and boulders (GM), poorly graded gravel with silt and sand and cobbles (GP-GM), or poorly graded sand with silt (SP-SM). The uppermost soil stratum was encountered to a depth ranging from about ½ to 1 foot bgs and contained considerable organics. The bulk of the tree roots were observed in about the uppermost 1½ to 2 feet of the soil profile.
The predominant lowermost soil horizon classified as silty gravel with sand, cobbles, and boulders (GM) and contained mostly gravels with little cobbles and few boulders to 3 feet in diameter, although most boulders encountered had nominal diameters of 16 to 24 inches. A poorly graded sand with silt and gravel (SP-SM) horizon was encountered in Test Pit TP-7 and contained few gravels and cobbles up to about 6 inches in diameter.
6.1 Soil Moisture and Groundwater Conditions
Groundwater was not encountered during our exploration and is anticipated to lie at a depth that will not affect construction. Subsurface soils were encountered in a slightly moist to moist condition. Mottled soils were encountered in Test Pit TP-4 at about 3 feet bgs. The mottled soil horizon may represent a historic ground water level.
7.0 SUBGRADE SOIL STRENGTH (RESILIENT MODULUS)
Subgrade soil resilient modulus (MR) was determined by R-value testing. Resilient modulus is utilized by AASHTO as a measure of subgrade soil strength for structural section design. Resilient modulus was determined based on this equation: MR (psi) = A + B (R-value), where A = 772 and B = 369. A summary of the subgrade soil R-value test results and corresponding resilient modulus are presented on Table 1 (Subgrade Soil Strengths).
Table 1- Subgrade Soil Strengths
Exploration Location
Subgrade Soil Percent Passing
#200 Sieve R-value
Resilient Modulus (MR-psi)
TP-1
Silty gravel with sand, cobbles, and boulders
(GM)
12.6 74 28,000
TP-4
Poorly graded gravel with silt and sand and cobbles
(GP-GM)
10.0 75 28,500
TP-7
Poorly graded sand with silt and gravels (SP-SM)
7.2 74 28,000
In accordance with AASHTO methodology, the design MR value can be based on averaging MR values obtained for the subgrade soils. Design MR values are summarized in Table 2 (Design MR Values).
Table 2 - Design MR Values
Roadway Segment Design MR Value (PSI)
Entrance Road 28,000
East to West Connector Road 28,000
Campground Loops 28,000
The anticipated subgrade soils have a high resilient modulus with uniform results across the project site.
8.0 DISCUSSION AND RECOMMENDATIONS
Site soils encountered consist of coarse-grained, non-plastic granular soils that will provide good support for the proposed roadways. A thick organic layer generally consisting of a concentrated root mass was predominantly encountered in the uppermost 1½ to 2 feet of the soil profile. This organic layer weakens the subgrade soils and roots may cause uplifting of the pavement layer. Construction mitigation measures for this organic layer are discussed in the report.
8.1 General Information
The recommendations provided herein, particularly under Subgrade Soil/Site Preparation, Grading and Filling, and Construction Observation and Testing Services are intended to reduce the risks of structural distress related to consolidation or expansion of native soils and/or structural fills. These recommendations, along with proper design and construction of the roadways and associated improvements, work together as a system to improve overall performance. If any part of this system is ignored or poorly implemented, the performance and quality of the project will be reduced. Sufficient construction observation and testing should be performed to document that the recommendations presented in this report are followed.
Structural areas referred to in this report include all areas of concrete slabs and asphalt pavements. Unless otherwise stated in this report, all related construction should be in accordance with the Standard Specifications (Caltrans, dated 2010).
All compaction requirements presented in this report are relative to ASTM D 15571.
Any evaluation of the site for the presence of surface or subsurface hazardous substances is beyond the scope of this study. When suspected hazardous substances are encountered during routine geotechnical investigations, they are noted in the exploration logs and reported to the client. No such substances were identified during our exploration.
8.2 Traffic analysis and ESAL Count Determination
The USFS provided traffic information. Assumptions for traffic volumes are presented below:
Campgrounds are open from the end of May (Memorial Day) to mid-October with full campgrounds from Memorial Day through Labor Day. Half full campgrounds were assumed from Labor Day to mid-October.
Total vehicle trips per day for a full campground are 158 (campground loops) and 475 (entrance road and east to west connector). Assume half these amounts for half-full campground conditions.
Based on these assumptions, total vehicles per year are as follows:
Entrance Road: 60,000.
East to West Connector Road: 45,000 (Assuming that the maximum traffic volume on any segment of this roadway is ¾ of the entrance road traffic).
Campground Loops: 20,000.
Automobile traffic is typically ignored for ESAL count determination because they are lightly loaded vehicles. ESAL count determination is based on truck traffic and RVs.
Assumptions for ESAL count determination is presented below:
Half of the anticipated roadway vehicles are classified as a Class A
Motorhome, while the remaining vehicles are classified as passenger vehicles. It is assumed that the Class A Motorhome has 2 single axles with a GAWR (Gross Axle Weight Rating) ranging from 10 to 18 kips (rear axle) and
6.5 to 8 kips (front axle).
Garbage truck is assumed at once per week.
1 Relative compaction refers to the ratio of the in-place density of a soil divided by the same soil’s maximum dry density as determined by the ASTM D 1557. Optimum moisture content is the corresponding moisture content measured at the soils maximum dry density.
The truck factor calculated for the Class A Motorhome is 0.4 assuming an average GAWR (14 kips rear axle).
Utilizing the ADT counts and assumed truck volumes, ESAL counts were determined over a 20 year design period. The growth rate is assumed to be zero. ESAL counts are presented in Table 3 (Design ESAL Counts) and are separated by roadway segment.
Table 3 - Design ESAL Counts (20 years)
Roadway Segment Design ESAL Counts
Entrance Road 240,000
East to West Connector Road 180,000
Campground Loops 80,000
8.3 Structural Section Design
Based on measured subgrade soil strengths and ESAL counts, structural section design alternatives were determined using the AASHTO Guide of Pavement Structures (1993). Structural section design alternatives are based on a 20-year design life. Structural section design recommendations are provided for the three different roadway segments including the entrance road, connector road, and campground loop roads and are presented in Table 4 (Recommended Structural Sections). Calculations are included in Appendix C.
Table 4 - Recommended Structural Sections
Roadway Segment Structural Section
Pavement (inches)
Aggregate Base (inches)
Entrance Road 4 4
East to West Connector Road 3 4
Campground Loops 3 4
Based on the ESAL counts and constructability, the structural sections presented in Table 4 represent the minimum structural section thicknesses recommended for these roadways.
The calculations in Appendix C indicate that the base thickness could be reduced.
However, a minimum base thickness of 4 inches is recommended for constructability purposes and to provide a platform for pavement placement. Also, the base course will provide some frost protection for the pavement. Additionally, it is difficult to achieve a reliable density test result on a base course with a thickness less than 4 inches. Generally, verification of density for base course thicknesses less than 4 inches is obtaining by proof-rolling.
8.4 Subgrade Soil Frost Heave Potential
Frost heave below pavements is caused by the accumulation of ice forming ice lenses, layers, or veins in the subgrade soils, which is also known as ice segregation. Ice segregation forms in soils that are frost susceptible. The degree of frost susceptibility in a soil is a function of the percentage of fine particles (silt and clay sized particles) in the soil. The U.S. Corps of Engineers have reported that inorganic soils containing 3 percent (by dry weight) or more grains finer than 0.02 mm in diameter are considered frost susceptible for pavement design purposes (AASHTO, 1993). Based on the hydrometer test results and this definition for frost susceptible soils, the bulk of the subgrade soils are frost susceptible. However, with the exception of anticipated subgrade soils encountered in Test Pit TP-7, which classified as a non-frost susceptible soil, the other test results indicate 5 to 6 percent by dry weight finer than 0.02 mm. Consequently, existing site soils are close to being considered non-frost susceptible.
A water source is required for the development of ice segregation. Sources of water typically include either a shallow groundwater table or a perched water table in poorly drained soils. Water moisture is wicked up from the groundwater table through capillary forces to form ice lenses. The water table was not encountered; however, there is evidence of a historic shallow water table.
Frost action can cause both frost heave and thaw weakening. However, thaw weakening in granular drained soils, as encountered at the site, is not as detrimental as in poorly-drained fine-grained soils (AASHTO, 1993).
To decrease the effects of frost heave, a non-frost susceptible soil thick enough to insulate the roadbed from frost penetration or an effective drainage system could be constructed. Generally, the required thickness of non-frost susceptible soil is based on the frost depth used for building foundations. In the Lake Tahoe area, the building code for frost depth is 18 inches.
The required structural section is less than 18 inches and since the bulk of anticipated subgrade soils classify as frost susceptible soils they would require removal and replacement with non-frost susceptible soils. To import non-frost susceptible soils would be costly. However, anticipated subgrade soils consist of non-plastic, granular soils and would be considered relatively free draining.
Consequently, the thaw weakening strength loss would be reduced. The readily available base aggregate also likely does not meet the definition of a frost free soil;
however, the percent by weight finer than 0.02 mm would likely be close to the required maximum 3 percent. It is recommended that the base material is non-plastic, so it's relatively free draining.
9.0 CONSTRUCTION RECOMMENDATIONS
9.1 Subgrade Soil/Site Preparation
All near surface vegetation, organics, and topsoil should be stripped and grubbed from structural areas and removed from structural areas. A minimum stripping and grubbing depth of 4 inches is recommended. Deeper areas of localized grubbing to remove organic zones may be required and will be determined during construction.
Topsoil may be used in non-structural areas.
The entire root bulb should be removed as part of any tree removal. Large roots (greater than 2 inches in diameter) radiating from the tree bulb area, located within one foot of the final subgrade should be completely removed. Resulting excavations should be backfilled with structural fill.
It is recommended that subgrade soils are removed to a depth of 12 inches below the stripped and grubbed surface for the campground loops and connector roads. An 18 inch removal depth is recommended for the entrance road. The removal area shall extend to at least one foot beyond the edge of the pavement. These soils can be screened to remove roots and other organics and replaced in the removal areas.
Placement and densification construction procedures shall be in accordance with Section 9.3.
All areas to receive structural fill or structural loading should be densified to at least 90 percent relative compaction in accordance with ASTM D 1557 for a minimum depth of 8 inches. It is recommended that soils have moisture contents of plus or minus 3 percent of optimum moisture (ASTM D1557) prior to densification. Moisture contents above 3 percent of optimum moisture will be acceptable if the soil horizon maintains its stability when subjected to construction equipment loads and density can be achieved in subsequent structural fill lifts. Scarification and moisture conditioning may be required to achieve the required soil moisture content recommendations. It is recommended that prior to densification, the moisture content of the soils be determined, to evaluate the need for moisture conditioning.
After the densification process, a firm, stable surface should be produced. Unstable soils, where encountered, should be removed and replaced with either structural fill or stabilizing fill. To determine potential unstable soil areas, subgrade should be proof-rolled with heavy rubber-tired construction equipment such as a fully loaded water truck. Unstable areas, where encountered, should be marked for removal and replacement.
It is anticipated that in most areas, stable soils will be encountered at a relatively shallow depth (less than 18 inches). Consequently, unstable soil areas can be replaced with structural fill (Refer to Section 9.3 - Grading and Filling). However, if a firmer soil surface is not encountered with depth, then the recommendations given in Section 9.2 - Stabilization Construction Method should be followed.
Where less than 70 percent passes the ¾ - inch sieve, soils are too coarse for standard density testing techniques. As a result, density is established by a proof rolling program consisting of at least five single passes with a minimum 10-ton roller in mass grading is recommended. The final surface should be smooth, firm and exhibit no signs of deflection.
9.2 Stabilization Construction Method
This method consists of removing unstable or "pumping" soils and replacing them with a stabilizing fill overlying a geotextile. Stabilizing fill is material placed within unstable soil areas below the untreated aggregate base course.
The actual depth of removal shall be determined during construction. However, unless a firmer surface is encountered at a shallower depth, the recommended minimum depth of removal is 18-inches. It is advised that shallow utilities are present and these utility locations shall be identified prior to excavation.
A geotextile/stabilizing gravel system shall be used for stabilization. A high performance geotextile (HPG) combines strength and permeability and is recommended for this project. The geotextile shall be placed directly below the stabilizing fill to provide separation and stabilization. The geotextile should be woven and meet or exceed the minimum properties presented in Table 5 (Stabilizing Fill Geotextile).
Table 5 - Stabilizing Fill Geotextile
Mechanical Properties
Minimum Average Roll Value
(MARV)
MD (#/ft) CD (#/ft)
Tensile Strength at ultimate (ASTM D 4595) 3600 3200
Tensile Strength at 5% strain (ASTM D 4595) 1400 1400
Minimum permittivity (ASTM D 4491) 0.5 sec -1
Apparent Opening Size (AOS) 0.60 mm maximum
Products such as a Mirafi HP370, Terra Tex HPG-37, or approved equal can be utilized for this project. Stabilizing fill (refer to Table 6) with a minimum densified thickness of 18 inches shall be placed over the geotextile. Additional thicknesses may be required to ensure stabilization.
Prior to placement of the geotextile, the ground surface should be smooth without sharp particles or abrupt edges. The geotextile should be laid in accordance with the manufacturer’s recommendation with a minimum joint overlap of 18 inches.
Construction equipment is prohibited from traveling directly over the geotextile. It is recommended that the initial lift of stabilizing fill be placed from outside the excavation or should be pushed ahead of the construction equipment during placement over the geotextile. Construction equipment should be light weight such as a tired backhoe.
The initial lift of stabilizing fill shall have a minimum loose lift thickness of 15 inches.
Subsequent lifts should be placed in maximum 12-inch lifts. It is recommended that prior to densification, the stabilizing fill be uniformly moisture conditioned to plus or minus 3 percent of optimum moisture. Higher moisture contents are acceptable if the soil lift is stable and required relative compaction can be attained in the soil lift and succeeding soil lifts. Stabilizing fill material should meet the requirements of Table 6 in Section 9.3.1.
A test section is recommended to determine the required thickness of stabilizing fill.
Stabilization is always a trial and error procedure with requirements and effectiveness varying within the same project. Additionally, the contractor should avoid excessive compactive efforts or construction equipment travel on subgrade soils that could cause instability in otherwise stable subgrade, and thus it will be the contractor’s responsibility to not damage otherwise firm site soils.
9.3 Grading and Filling
Fill material should be free of vegetation, organic matter, debris, and other deleterious material. Fill material required for this project is divided into three different fill types: stabilizing fill, untreated aggregate base, and structural fill.
9.3.1 Stabilizing Fill
Stabilizing fill shall meet the specifications presented in Table 6 (Stabilizing Fill Gradation Specifications).
Table 6 - Stabilizing Fill Gradation Specifications
Sieve Size Percent by Dry Weight Passing 4 Inch 100 ¾ Inch 70 - 100 No. 4 20 - 70
No. 200 0 - 8
Maximum Liquid Limit Maximum Plastic Index 35 5
R-value: 70 minimum
9.3.2 Untreated Aggregate Base Material
Base material shall conform to a Class 2 Aggregate Base with a ¾-inch maximum aggregate size (Caltrans, 2010). It is further recommended that the aggregate base is non-plastic.
9.3.3 Structural Fill
Structural fill shall meet the specifications presented in Table 7 (Structural Fill Gradation Specifications).
Table 7 - Structural Fill Gradation Specifications
Sieve Size Percent by Dry Weight Passing 4 Inch 100 ¾ Inch 70 - 100 No. 40 25 - 60
No. 200 5 - 20
Maximum Liquid Limit Maximum Plastic Index 35 10
R-value: 50 minimum
9.3.4 Densification and Moisture Conditioning Recommendations
Aggregate base material should be densified to at least 95 percent relative compaction. All other structural fill including stabilizing fill shall be densified to at least 90 percent relative compaction. Structural fill shall be placed in maximum 8-inch loose lifts prior to densification.
Prior to densification, these materials shall be uniformly moisture conditioned to plus or minus 3 percent of optimum moisture. Higher moisture contents are acceptable if the soil lift is stable and required relative compaction can be attained in the soil lift and succeeding soil lifts.
9.4 Asphaltic Pavement Construction
Plantmix Aggregate is recommended to be ¾-inch HMA Types A & B in accordance with Section 39 (Hot Mix asphalt) of Caltrans Standard Specifications, 2010. Asphalt pavement construction requirements should be in accordance with Section 39 (Hot Mix asphalt) of Caltrans Standard Specifications, 2010. A pavement mix design should be submitted to the owner by the Contractor at least five working days prior to construction for approval. It is recommended that when pavement is placed adjacent to concrete flatwork, the finish compacted grade of the pavement be at least ¼ to ½ of an inch higher than the edge of adjacent concrete surface. This is to allow adequate compaction of the pavement without damaging the concrete.
9.4.1 Asphalt Design Life
Asphalt pavement sections are calculated for a theoretical 20 year design life and assume that the roadway will be totally reconstructed in approximately 20 years. Prior to reconstruction, the roadway will be in a deteriorated condition, likely showing substantial structural distress including but not limited to:
alligator cracking; potholes; possible rutting and depressions; transverse and longitudinal cracking; and surface raveling. Based on pavement design theory, significant roadway structural distress (alligator cracking and rutting) generally begins in about 15 years. Due to the quality of aggregate available and extreme climate conditions in the South Lake Tahoe area, premature deterioration of the pavement, in some cases, can occur prior to 15 years.
However, it has been shown that a proper maintenance program will reduce pavement deterioration and could extend the life of the pavement.
Maintenance is mandatory to long-term pavement performance. Maintenance refers to any activity performed on the pavement that is intended to preserve its original service life or load-carrying capacity. Examples of maintenance activities include patching, crack or joint sealing, and seal coats. If these maintenance activities are ignored or deferred, premature failure of the pavement will occur.
The cost associated with proper maintenance is generally much less than the cost for reconstruction due to premature failure of the pavement. Therefore, since pavement quality is an integral consideration in the formulation of our design recommendations, we strongly recommend the owner/project manager implement a pavement management program.
9.5 Anticipated Construction Problems
Due to the presence of boulders and large cobbles in the subsurface soils, excavation difficulties may occur.
10.0 CONSTRUCTION OBSERVATION AND TESTING SERVICES
The recommendations presented in this report are based on the assumption that the owner/project manager provides sufficient field testing and construction review during all phases of construction. Prior to construction, the owner/project manager should schedule a pre-job conference to include, but not be limited to: owner/project manager, project engineer, general contractor, earthwork and materials subcontractors, and geotechnical engineer. It is the owner's/project manager’s responsibility to set-up this meeting and contact all responsible parties. The conference will allow parties to review the project plans, specifications, and recommendations presented in this report, and discuss applicable material quality and mix design requirements. All quality control reports should be submitted to the owner/project manager for review and distributed to the appropriate parties.
11.0 STANDARD LIMITATION CLAUSE
This report has been prepared in accordance with generally accepted local geotechnical practices. The analyses and recommendations submitted are based upon field exploration performed at the locations shown on Plates A-1 (Test Pit Location Map) of this report. This report does not reflect soils variations that may become evident during the construction period, at which time re-evaluation of the recommendations may be necessary. Sufficient construction observation should be completed in all phases of the project related to geotechnical factors to document compliance with our recommendations.
This report has been prepared to provide information allowing the engineer to design the project. The owner/project manager is responsible for distribution of this report to all designers and contractors whose work is affected by geotechnical recommendations. In the event of changes in the design, location, or ownership of the project after presentation of this report, our recommendations should be reviewed and possibly modified by the geotechnical engineer. If the geotechnical engineer is not accorded the privilege of making this recommended review, he can assume no responsibility for misinterpretation or misapplication of his recommendations or their validity in the event changes have been made in the original design concept without his prior review. The engineer makes no other warranties, either expressed or implied, as to the professional advice provided under the terms of this agreement and included in this report.
This report was prepared by CME for the account of the United States Forest Service. The material in it reflects our best judgment in light of the information available to us at the time of preparation. Any use which a third party makes of this report, or any reliance on or decisions to be made based upon it, are the responsibility of such third parties. CME accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this report.
REFERENCES
American Society for Testing and Materials (ASTM), 2011 Soil and Rock; Dimension
Stone; Geosynthetics, Volume 4.08.
AASHTO, 1993, Design of Pavement Structures, American Association of State Highway Transportation Officials.
Standard Specifications, 2010, Caltrans
Saucedo G.J et al, 2005, Geologic Map of the Lake Tahoe Basin California and
Nevada, California Geologic Survey Department of Conservation, Map No. 4.
APPENDIX A
SM
GM
B 1A
SL. MOIST
SL. MOIST
0-0.75': TOPSOIL-SILTY SAND WITH GRAVEL ,
mostly fine to medium sand, little subangular gravel, non-plastic, dark brown
Note: Concentrated tree root matrix to about 2 feet bgs
0.75'-3': SILTY GRAVEL WITH SAND, COBBLES
AND BOULDERS, mostly fine to coarse subangular gravel, little cobbles and boulders up to 16-inches nominal diameter, some fine to coarse sand, non-plastic, yellowish brown
Note: Coarse gravels greater than 3-inches nominal diameter were not collected for the bulk sampling.
Sample R-value=74
TERMINATED AT 3 FEET, NO FREE WATER
ENCOUNTERED
12.6 NP NV 4.3 A, G
LOG OF TEST PIT NO. TP-1
PROJECT BADGERS DEN-STRUCTURAL SECTION ANALYSIS EQUIPMENT TYPE CASE 580L WITH 24" BUCKET
CLIENT U.S. FOREST SERVICE
LOCATION S. END OF CAMP GROUND N. OF HIGHWAY 89
PROJECT NO. 1710 DATE 01/16/15 LOGGED BY: SAM SURFACE ELEVATION (ft) 6,240' (PLATE A-1)
GROUNDWATER SAMPLE TYPE LABORATORY TESTS PLATE NO.: A-2a B - Bulk Sample
DEPTH HOUR DATE A - Atterberg Limits G - Grain Size
N.E.
C - Consolidation MD - Moisture/Density DS - Direct Shear
D ep th in Fe et
U ni fie d
So il
C la ss ifi ca tio n
G ra ph ic
L og
Sa m pl e
Sa m pl e
Ty pe
Sa m pl e
N o.
C on si st en cy
D en si ty
M oi st ur e Visual Description %-200
Li qu id L im it
Pl as tic ity
In de x
Po ck et P en ts f)
D ry
D en si ty
(p cf
M oi st ur e
C on te nt
La bo ra to ry Te st s
SM
GM
B 2A
MOIST
MOIST
0-1': TOPSOIL- SILTY SAND WITH GRAVEL,
mostly fine to medium sand, little fine subangular gravel, non-plastic, dark brown
Note: Concentrated root zone matrix encountered to a depth of 2.3 feet
1'-4': SILTY GRAVEL WITH SAND AND
COBBLES, mostly fine to coarse gravel and cobbles up to 6-inches nominal diameter, some fine to coarse sand, yellow brown
Note: Coarse gravels greater than 3-inches nominal diameter were not collected for the bulk sampling.
TERMINATED AT 4 FEET, NO FREE WATER
ENCOUNTERED.
LOG OF TEST PIT NO. TP-2
PROJECT BADGERS DEN-STRUCTURAL SECTION ANALYSIS EQUIPMENT TYPE CASE 580L WITH 24" BUCKET
CLIENT U.S. FOREST SERVICE
LOCATION S. END OF CAMP GROUND N. OF HIGHWAY 89, W. SIDE OF CAMP
PROJECT NO. 1710 DATE 01/16/15 LOGGED BY: SAM SURFACE ELEVATION (ft) 6,237.5 (PLATE A-1)
GROUNDWATER SAMPLE TYPE LABORATORY TESTS PLATE NO.: A-2b B - Bulk Sample
DEPTH HOUR DATE A - Atterberg Limits G - Grain Size
N.E.
C - Consolidation MD - Moisture/Density DS - Direct Shear
D ep th in Fe et
U ni fie d
So il
C la ss ifi ca tio n
G ra ph ic
L og
Sa m pl e
Sa m pl e
Ty pe
Sa m pl e
N o.
C on si st en cy
D en si ty
M oi st ur e Visual Description %-200
Li qu id L im it
Pl as tic ity
In de x
Po ck et P en ts f)
D ry
D en si ty
(p cf
M oi st ur e
C on te nt
La bo ra to ry Te
SM
GM
B 3A
MOIST
MOIST
0-½': TOPSOIL-SILTY SAND WITH GRAVEL,
mostly fine to medium sand, little subangular gravel, dark brown
Note: Concentrated root zone matrix encountered to a depth of about
1.6 feet
½-3½': SILTY GRAVEL WITH COBBLES,
BOULDERS, AND SAND, mostly fine to coarse gravel, little cobbles and boulders up to 18 inches nominal diameter, some fine to medium sand, yellow brown
Note: Coarse gravels greater than 3-inches nominal diameter were not collected for the bulk sampling.
TERMINATED AT 3 FEET, NO FREE WATER
ENCOUNTERED
LOG OF TEST PIT NO. TP-3
PROJECT BADGERS DEN-STRUCTURAL SECTION ANALYSIS EQUIPMENT TYPE CASE 580L WITH 24" BUCKET
CLIENT U.S. FOREST SERVICE
LOCATION N. OF HIGHWAY 89, NW. SIDE OF CAMP
PROJECT NO. 1710 DATE 01/16/15 LOGGED BY: SAM SURFACE ELEVATION (ft) 6,234.5 (PLATE A-1)
GROUNDWATER SAMPLE TYPE LABORATORY TESTS PLATE NO.: A-2c B - Bulk Sample
DEPTH HOUR DATE A - Atterberg Limits G - Grain Size
N.E.
C - Consolidation MD - Moisture/Density DS - Direct Shear
D ep th in Fe et
U ni fie d
So il
C la ss ifi ca tio n
G ra ph ic
L og
Sa m pl e
Sa m pl e
Ty pe
Sa m pl e
N o.
C on si st en cy
D en si ty
M oi st ur e Visual Description %-200
Li qu id L im it
Pl as tic ity
In de x
Po ck et P en ts f)
D ry
D en si ty
(p cf
M oi st ur e
C on te nt
La bo ra to ry Te
SM
GP-GM
B 4A
MOIST
MOIST
0-½': TOPSOIL-SILTY SAND, mostly fine to medium sand, dark brown
Note: Concentrated root zone matrix encountered to a depth of 1.6 feet
½'-3½':POORLY GRADED GRAVEL WITH SILT,
SAND, AND COBBLES , mostly fine to coarse subangular gravel, little subangular cobbles, few boulders up to 24-inches nominal diameter, some fine to coarse sand, non-plastic, yellow brown
Note: Redox staining at a depth of 3 feet
Coarse gravels greater than 3-inches nominal diameter were not collected for the bulk sampling.
Sample R-value=75
TERMINATED AT 3½ FEET, NO FREE WATER
ENCOUNTERED
10.0 NP NV 7.7 A. G
LOG OF TEST PIT NO. TP-4
PROJECT BADGERS DEN-STRUCTURAL SECTION ANALYSIS EQUIPMENT TYPE CASE 580L WITH 24" BUCKET
CLIENT U.S. FOREST SERVICE
LOCATION N. OF HIGHWAY 89, N. SIDE OF CAMP
PROJECT NO. 1710 DATE 01/16/15 LOGGED BY: SAM SURFACE ELEVATION (ft) 6,231.5 (PLATE A-1)
GROUNDWATER SAMPLE TYPE LABORATORY TESTS PLATE NO.: A-2d B - Bulk Sample
DEPTH HOUR DATE A - Atterberg Limits G - Grain Size
N.E.
C - Consolidation MD - Moisture/Density DS - Direct Shear
D ep th in Fe et
U ni fie d
So il
C la ss ifi ca tio n
G ra ph ic
L og
Sa m pl e
Sa m pl e
Ty pe
Sa m pl e
N o.
C on si st en cy
D en si ty
M oi st ur e Visual Description %-200
Li qu id L im it
Pl as tic ity
In de x
Po ck et P en ts f)
D ry
D en si ty
(p cf
M oi st ur e
C on te nt
La bo ra to ry Te
SM
GM
B 5A
MOIST
MOIST
0-0.6': TOPSOIL-SILTY SAND WITH GRAVEL,
mostly fine to medium sand, little fine subangular gravel, dark brown
Note: Concentrated root matrix encountered to a depth of 2 feet
0.6'-3½': SILTY GRAVEL WITH SAND, COBBLES
AND BOULDERS, mostly fine to coarse angular to subrounded gravel, little cobbles, few boulders up to 36- inches nominal diameter, little fine to coarse sand, non-plastic
Note: Coarse gravels greater than 3-inches nominal diameter were not collected for the bulk sampling.
TERMINATED AT 3½ FEET, NO FREE WATER
ENCOUNTERED
LOG OF TEST PIT NO. TP-5
PROJECT BADGERS DEN-STRUCTURAL SECTION ANALYSIS EQUIPMENT TYPE CASE 580L WITH 24" BUCKET
CLIENT U.S. FOREST SERVICE
LOCATION N. OF HIGHWAY 89, NEAR CENTER OF CAMP
PROJECT NO. 1710 DATE 01/16/15 LOGGED BY: SAM SURFACE ELEVATION (ft) 6,233.8 (PLATE A-1)
GROUNDWATER SAMPLE TYPE LABORATORY TESTS PLATE NO.: A-2e B - Bulk Sample
DEPTH HOUR DATE A - Atterberg Limits G - Grain Size
N.E.
C - Consolidation MD - Moisture/Density DS - Direct Shear
D ep th in Fe et
U ni fie d
So il
C la ss ifi ca tio n
G ra ph ic
L og
Sa m pl e
Sa m pl e
Ty pe
Sa m pl e
N o.
C on si st en cy
D en si ty
M oi st ur e Visual Description %-200
Li qu id L im it
Pl as tic ity
In de x
Po ck et P en ts f)
D ry
D en si ty
(p cf
M oi st ur e
C on te nt
La bo ra to ry Te
SM
GM
B 6A
MOIST
0-0.33': TOPSOIL-SILTY SAND WITH GRAVEL,
mostly fine to medium sand, some fine angular gravel, dark brown
Note: Concentrated root zone matrix encountered to a depth of 2 feet
0.33'-4': SILTY GRAVEL WITH SAND, COBBLES
AND BOULDERS, mostly fine to coarse subangular gravel, little cobbles, few boulders up to 16-inches nominal diameter, some fine to coarse sand, olive yellow brown
Note: Coarse gravels greater than 3-inches nominal diameter were not collected for the bulk sampling.
TERMINATED AT 4 FEET, NO FREE WATER
ENCOUNTERED
LOG OF TEST PIT NO. TP-6
PROJECT BADGERS DEN-STRUCTURAL SECTION ANALYSIS EQUIPMENT TYPE CASE 580L WITH 24" BUCKET
CLIENT U.S. FOREST SERVICE
LOCATION N. OF HIGHWAY 89, NE. SIDE OF CAMP
PROJECT NO. 1710 DATE 01/16/15 LOGGED BY: SAM SURFACE ELEVATION (ft) 6,229.5 (PLATE A-1)
GROUNDWATER SAMPLE TYPE LABORATORY TESTS PLATE NO.: A-2f B - Bulk Sample
DEPTH HOUR DATE A - Atterberg Limits G - Grain Size
N.E.
C - Consolidation MD - Moisture/Density DS - Direct Shear
D ep th in Fe et
U ni fie d
So il
C la ss ifi ca tio n
G ra ph ic
L og
Sa m pl e
Sa m pl e
Ty pe
Sa m pl e
N o.
C on si st en cy
D en si ty
M oi st ur e Visual Description %-200
Li qu id L im it
Pl as tic ity
In de x
Po ck et P en ts f)
D ry
D en si ty
(p cf
M oi st ur e
C on te nt
La bo ra to ry Te
SM
SP-SM
B 7A
SL. MOIST
SL. MOIST
0-0.33': TOPSOIL-SILTY SAND, mostly fine to medium sand, non-plastic, dark brown
Note: Concentrated root zone matrix encountered to a depth of 18 inches
0.33'-4': POORLY GRADED SAND WITH SILT
AND GRAVELS, mostly fine to medium sand, few fine to coarse gravels and cobbles up to 6 inches nominal diameter,non-plastic, grey brown
Note: Sample R-value=74
TERMINATED AT 4 FEET, NO FREE WATER
ENCOUNTERED
7.2 NP NV 4.4 A, G
LOG OF TEST PIT NO. TP-7
PROJECT BADGERS DEN-STRUCTURAL SECTION ANALYSIS EQUIPMENT TYPE CASE 580L WITH 24" BUCKET
CLIENT U.S. FOREST SERVICE
LOCATION N. OF HIGHWAY 89, SE. SIDE OF CAMP
PROJECT NO. 1710 DATE 01/16/15 LOGGED BY: SAM SURFACE ELEVATION (ft) 6,238 (PLATE A-1)
GROUNDWATER SAMPLE TYPE LABORATORY TESTS PLATE NO.: A-2g B - Bulk Sample
DEPTH HOUR DATE A - Atterberg Limits G - Grain Size
N.E.
C - Consolidation MD - Moisture/Density DS - Direct Shear
D ep th in Fe et
U ni fie d
So il
C la ss ifi ca tio n
G ra ph ic
L og
Sa m pl e
Sa m pl e
Ty pe
Sa m pl e
N o.
C on si st en cy
D en si ty
M oi st ur e Visual Description %-200
Li qu id L im it
Pl as tic ity
In de x
Po ck et P en ts f)
D ry
D en si ty
(p cf
M oi st ur e
C on te nt
La bo ra to ry Te
APPENDIX B
Tested By: T. HAM Checked By: S. VINEIS
Project No. Client: Remarks:
Project:
Source of Sample: TEST PIT 1 Depth: 22"-3.0' Sample Number: 1A
PLATE
LL PL D85 D60 D50 D30 D15 D10 Cc Cu
MATERIAL DESCRIPTION TEST DATE USCS NM
NV NP 23.1491 1.8417 0.9566 0.2913 0.0927 0.0554 0.83 33.27
silty sand with gravel (SM) SM
1710 U.S. FOREST SERVICE
B-1a
P E
R C
E N
T F
IN
E
R
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel Fine Coarse Medium
% Sand Fine Silt
% Fines Clay
0.0 17.8 13.6 7.5 25.5 23.1 10.3 2.2 i n i n i n
½ i n i n
¾ i n
½ i n
/8 i n
Particle Size Distribution Report
BADGERS DEN RECEIVED 1/16/2015
Construction Materials Engineers, Inc.
GRAIN SIZE DISTRIBUTION TEST DATA 2/2/2015
Client: U.S. FOREST SERVICE Project: BADGERS DEN Project Number: 1710 Location: TEST PIT 1 Depth: 22"-3.0' Sample Number: 1A Material Description: silty sand with gravel (SM) Liquid Limit: NV Plastic Limit: NP USCS Classification: SM AASHTO Classification: A-1-b Testing Remarks: RECEIVED 1/16/2015 Tested by: T. HAM Checked by: S. VINEIS
Sieve Test Data
Dry Sample and Tare (grams)
Tare (grams)
Cumulative Pan
Tare Weight (grams)
Sieve Opening
Size
Cumulative Weight
Retained (grams)
Percent Finer
7216.80 0.00 0.00 2" 0.00 100.0 1 1/2" 442.60 93.9
1" 982.70 86.4 3/4" 1282.40 82.2 1/2" 1693.00 76.5 3/8" 1853.90 74.3
#4 2268.80 68.6
662.10 0.00 0.00 #8 50.20 63.4
#10 71.80 61.1 #16 143.70 53.7 #30 264.10 41.2 #40 318.70 35.6 #50 368.60 30.4
#100 459.70 21.0 #200 541.00 12.5
Hydrometer Test Data Hydrometer test uses material passing #10 Percent passing #10 based upon complete sample = 61.1 Weight of hydrometer sample =116.84 Hygroscopic moisture correction:
Moist weight and tare = 64.33 Dry weight and tare = 63.93 Tare weight = 19.76 Hygroscopic moisture = 0.9% Automatic temperature correction Composite correction (fluid density and meniscus height) at 20 deg. C = -3.0 Meniscus correction only = -1.0 Specific gravity of solids = 2.537 Hydrometer type = 152H Hydrometer effective depth equation: L = 16.294964 - 0.164 x Rm smontalvo Typewritten Text PLATE: B-1b
Hydrometer Test Data (continued)
Elapsed Time (min.)
Temp.
(deg. C.)
Actual Reading
Corrected Reading K Rm
Eff.
Depth
Diameter (mm.)
Percent Finer
0.50 20.2 27.0 24.0 0.0141 26.0 12.0 0.0692 13.0
1.00 20.2 20.0 17.0 0.0141 19.0 13.2 0.0512 9.2
2.00 20.2 17.0 14.0 0.0141 16.0 13.7 0.0369 7.6
3.00 20.2 15.0 12.0 0.0141 14.0 14.0 0.0305 6.5
5.00 20.2 14.0 11.0 0.0141 13.0 14.2 0.0237 6.0
10.00 20.2 12.0 9.0 0.0141 11.0 14.5 0.0170 4.9
15.00 20.2 11.0 8.0 0.0141 10.0 14.7 0.0139 4.3
30.00 20.2 9.0 6.0 0.0141 8.0 15.0 0.0100 3.3
60.00 20.2 8.0 5.0 0.0141 7.0 15.1 0.0071 2.7
120.00 20.2 7.0 4.0 0.0141 6.0 15.3 0.0050 2.2
250.00 20.2 6.0 3.0 0.0141 5.0 15.5 0.0035 1.6
480.00 20.2 6.0 3.0 0.0141 5.0 15.5 0.0025 1.6
1400.00 20.2 6.0 3.0 0.0141 5.0 15.5 0.0015 1.6
Fractional Components
Cobbles
0.0
Gravel Coarse
17.8
Fine
13.6
Total
31.4
Sand Coarse
7.5
Medium
25.5
Fine
23.1
Total
56.1
Fines Silt
10.3
Clay
2.2
Total
12.5
D10
0.0554
D15
0.0927
D20
0.1392
D30
0.2913
D50
0.9566
D60
1.8417
D80
16.4405
D85
23.1491
D90
31.3269
D95
40.2316
Fineness Modulus
3.71
Cu
33.27
Cc
0.83 smontalvo
PLATE: B-1c
Project:
Source of Sample: TEST PIT 4 Depth: 1.5'-3.5' Sample Number: 4A
PLATE
LL PL D85 D60 D50 D30 D15 D10 Cc Cu
MATERIAL DESCRIPTION TEST DATE USCS NM
NV NP 29.7706 8.0728 3.0479 0.6736 0.1571 0.0763 0.74 105.84
poorly graded gravel with silt and sand GP-GM
1710 U.S. FOREST SERVICE
B-2a
P E
R C
E N
T F
IN
E
R
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel Fine Coarse Medium
% Sand Fine Silt
% Fines Clay
0.0 27.6 18.2 9.7 20.4 14.1 7.6 2.4 i n i n i n
½ i n i n
¾ i n
½ i n
/8 i n
GRAIN SIZE DISTRIBUTION TEST DATA 2/2/2015
Client: U.S. FOREST SERVICE Project: BADGERS DEN Project Number: 1710 Location: TEST PIT 4 Depth: 1.5'-3.5' Sample Number: 4A Material Description: poorly graded gravel with silt and sand
(GP-GM)
Liquid Limit: NV Plastic Limit: NP USCS Classification: GP-GM AASHTO Classification: A-1-a Testing Remarks: RECEIVED 1/16/2015 Tested by: T. HAM Checked by: S. VINEIS
Sieve Test Data
Dry Sample and Tare (grams)
Tare (grams)
Cumulative Pan
Tare Weight (grams)
Sieve Opening
Size
Cumulative Weight
Retained (grams)
Percent Finer
2445.50 0.00 0.00 2" 0.00 100.0 1 1/2" 133.50 94.5
1" 516.60 78.9 3/4" 674.30 72.4 1/2" 815.00 66.7 3/8" 922.00 62.3
#4 1121.00 54.2
685.40 0.00 0.00 #8 91.60 46.9
#10 122.00 44.5 #16 204.20 38.0 #30 326.30 28.4 #40 380.70 24.1 #50 427.70 20.4
#100 500.40 14.6 #200 559.30 10.0
Hydrometer Test Data Hydrometer test uses material passing #10 Percent passing #10 based upon complete sample = 44.5 Weight of hydrometer sample =116.57 Hygroscopic moisture correction:
Moist weight and tare = 67.89 Dry weight and tare = 67.28 Tare weight = 19.67 Hygroscopic moisture = 1.3% Automatic temperature correction Composite correction (fluid density and meniscus height) at 20 deg. C = -3.0 Meniscus correction only = -1.0 Specific gravity of solids = 2.580 Hydrometer type = 152H Hydrometer effective depth equation: L = 16.294964 - 0.164 x Rm smontalvo
PLATE: B-2b
Elapsed Time (min.)
Temp.
(deg. C.)
Actual Reading
Corrected Reading K Rm
Eff.
Depth
Diameter (mm.)
Percent Finer
0.50 20.2 28.0 25.0 0.0139 27.0 11.9 0.0678 9.8
1.00 20.2 26.0 23.0 0.0139 25.0 12.2 0.0486 9.0
2.00 20.2 23.0 20.0 0.0139 22.0 12.7 0.0350 7.9
3.00 20.2 21.0 18.0 0.0139 20.0 13.0 0.0290 7.1
5.00 20.2 19.0 16.0 0.0139 18.0 13.3 0.0227 6.3
10.00 20.2 17.0 14.0 0.0139 16.0 13.7 0.0163 5.5
15.00 20.2 15.0 12.0 0.0139 14.0 14.0 0.0134 4.7
30.00 20.2 13.0 10.0 0.0139 12.0 14.3 0.0096 3.9
60.00 20.2 11.0 8.0 0.0139 10.0 14.7 0.0069 3.1
120.00 20.2 9.0 6.0 0.0139 8.0 15.0 0.0049 2.4
250.00 20.2 8.0 5.0 0.0139 7.0 15.1 0.0034 2.0
480.00 20.2 7.0 4.0 0.0139 6.0 15.3 0.0025 1.6
1380.00 20.2 6.0 3.0 0.0139 5.0 15.5 0.0015 1.2
Fractional Components
Cobbles
0.0
Gravel Coarse
27.6
Fine
18.2
Total
45.8
Sand Coarse
9.7
Medium
20.4
Fine
14.1
Total
44.2
Fines Silt
7.6
Clay
2.4
Total
10.0
D10
0.0763
D15
0.1571
D20
0.2886
D30
0.6736
D50
3.0479
D60
8.0728
D80
26.2439
D85
29.7706
D90
33.5577
D95
38.7068
Fineness Modulus
4.68
Cu
105.84
Cc
0.74 smontalvo
PLATE: B-2c
Project:
Source of Sample: TEST PIT 7 Depth: 1.0'-3.0' Sample Number: 7A
Plate
LL PL D85 D60 D50 D30 D15 D10 Cc Cu
MATERIAL DESCRIPTION TEST DATE USCS NM
NV NP 22.5141 1.5811 0.9981 0.5804 0.3055 0.1108 1.92 14.28
well-graded sand with silt and gravel SW-SM
1710 U.S. FOREST SERVICE
B-3a
P E
R C
E N
T F
IN
E
R
GRAIN SIZE - mm.
0.0010.010.1110100
% +3" Coarse
% Gravel Fine Coarse Medium
% Sand Fine Silt
% Fines Clay
0.0 15.5 9.1 11.7 44.1 12.4 7.2 0.0 i n i n i n
½ i n i n
¾ i n
½ i n
/8 i n
GRAIN SIZE DISTRIBUTION TEST DATA 3/9/2015
Client: U.S. FOREST SERVICE Project: BADGERS DEN Project Number: 1710 Location: TEST PIT 7 Depth: 1.0'-3.0' Sample Number: 7A Material Description: well-graded sand with silt and gravel
(SW-SM)
Liquid Limit: NV Plastic Limit: NP USCS Classification: SW-SM AASHTO Classification: A-1-b Testing Remarks: RECEIVED 1/16/2015 Tested by: T. HAM Checked by: S. VINEIS
Sieve Test Data
Dry Sample and Tare (grams)
Tare (grams)
Cumulative Pan
Tare Weight (grams)
Sieve Opening
Size
Cumulative Weight
Retained (grams)
Percent Finer
869.00 0.00 0.00 1-1/2" 0.00 100.0
1" 119.00 86.3
3/4" 135.00 84.5
1/2" 157.10 81.9
3/8" 175.10 79.9
#4 213.70 75.