CRR_CGS_BMP_Solicitation.doc
DOC document 380 KB Posted
- Attached to
- Camp Richardson CGS retrofit and BMP
- Solicitation number
- AG-9JGP-S-15-0071
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| site_visit_4_29.pdf | ||
| Geotech_Report_Final.pdf | ||
| 2014PitInspections.pdf | ||
| CR_Badger_Roads-Sewer.pdf | ||
| Eagle_Roads2-2-2Way_West1.pdf | ||
| AMEND_003_CRR_CGS_Options.doc | DOC document | |
| AMEND_002_CRR_CGS_Options.doc | DOC document | |
| amend001_camp_rich.pdf | ||
| CRR_Drawings_4-7-2015.pdf | ||
| SectionJ_wages_CA150009.docx | DOCX document | |
| CR_Entrance_Builiding_Specs.pdf | ||
| CR_SWPPP_Feb2015.pdf | ||
| CR_Electric_Specs.pdf | ||
| SectionJ_Fire_Plan.doc | DOC document | |
| FP-03_Supplemental_Specs.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
www.acquisition.gov/far/
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-9JGP-15-S-0071
2. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
4/10/2015
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
7. ISSUED BY
CODE
| 8. ADDRESS OFFER TO |
9. FOR INFORMATION
CALL:
A. NAME
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
CAMP RICHARDSON CAMPGROUNDS (CGS) BMP RETROFIT
Price Range The Government's estimate is:
between $1,000,000 and $5,000,000.
Contractor MUST be registered in both:
*SAM (System For Award Management): http://www.sam.gov *ORCA: http://orca.bpn.gov
**Please provide the following information:**
DUNS#_____________
11. The Contractor shall begin performance within 10 calendar days and complete it within (See Section C) calendar days after receiving FORMCHECKBOX award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See section F.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.
Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 4:30PM (hour) local time May 12, 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B.
An offer guarantee
FORMCHECKBOX
is, FORMCHECKBOX is not required.
C.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.
Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
1442-101
STANDARD FORM 1442 (REV. 4-85)
Computer Generated
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
| 16. REMITTANCE ADDRESS (Include only if different than Item 14) |
CODE
FACILITY CODE
17.
The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
FORMCHECKBOX
10 U.S.C. 2304(c)( )
FORMCHECKBOX
41 U.S.C. 253(c)( )
26. ADMINISTERED BY
CODE
| 27. PAYMENT WILL BE MADE BY |
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
FORMCHECKBOX
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
FORMCHECKBOX
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated
STANDARD FORM 1442 BACK (REV. 4-85)
PART 1, SCHEDULE OF ITEMS
SECTION B SUPPLIES OR SERVICES, AND PRICES/COSTS
| PROJECT |
| Camp Richardson CGS Reconstruction |
| UNIT |
| Lake Tahoe Basin Management Unit |
| SOL. # |
| AG-9JGP-S-15-0071 |
| ITEM NO. |
| DESCRIPTION |
| MEASURE |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL PRICE |
| 15101 |
| Mobilization |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 15201 |
| Construction Survey and Staking, Method II, Tolerance B |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 15701 |
| Erosion Control BMPs |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 20102 |
| Clearing and Grubbing |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 20207 |
| Tree Removal (greater than 6" dbh) |
| AQ |
| EA |
| 612. |
| $ - |
| $ - |
| 20304 |
| Remove Bollards/Misc Obstructions |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 20303 |
| Pavement Removal |
| AQ |
| AC |
| .4 |
| $ - |
| $ - |
| 20305 |
| Stockpile Bear Boxes and Fire rings |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 20402 |
| Roadway Excavation, Earthwork and Fine Grading, Compaction C, Tolerance B |
| AQ |
| AC |
| 8.9 |
| $ - |
| $ - |
| 20407 |
| Campsite Living Area Construction - Single |
| AQ |
| EA |
| 66. |
| $ - |
| $ - |
| 20408 |
| Campsite Living Area Construction - Double |
| AQ |
| EA |
| 29. |
| $ - |
| $ - |
| 20409 |
| Campsite Living Area Construction - Group |
| AQ |
| EA |
| 6. |
| $ - |
| $ - |
| 20404 |
| Campground Channel Construction |
| AQ |
| LF |
| 805. |
| $ - |
| $ - |
| 20405 |
| Infiltration Basin Construction |
| AQ |
| EA |
| 98. |
| $ - |
| $ - |
| 21104 |
| Roadway Obliteration, Method 1 (includes existing campsite decompaction) |
| AQ |
| AC |
| 7. |
| $ - |
| $ - |
| 25101 |
| Install Class 4 Rip-Rap |
| AQ |
| CY |
| 40. |
| $ - |
| $ - |
| 25201 |
| Construct Retaining Wall |
| AQ |
| LF |
| 290. |
| $ - |
| $ - |
| 30101 |
| Aggregate Base, CalTrans 3/4" Class 2 |
| AQ |
| TON |
| 11,600. |
| $ - |
| $ - |
| 40301 |
| Asphalt - CalTrans 1/2" Max Medium 'B' Type |
| AQ |
| TON |
| 5,800. |
| $ - |
| $ - |
| 60201 |
| Culvert 24", Installation, Bedding and Backfill, Compaction Method A |
| AQ |
| LF |
| 414. |
| $ - |
| $ - |
| 61101 |
| Waterline, Trenching, Installation, Bedding, and Backfill |
| AQ |
| LF |
| 350. |
| $ - |
| $ - |
| 61104 |
| Water Spigot |
| AQ |
| EA |
| 7. |
| $ - |
| $ - |
| 61902 |
| Single Gate Fabrication and Installation |
| AQ |
| EA |
| 2. |
| $ - |
| $ - |
| 61903 |
| Double Gate Fabrication and Installation |
| AQ |
| EA |
| 2. |
| $ - |
| $ - |
| 61905 |
| Install Bollards |
| AQ |
| EA |
| 45. |
| $ - |
| $ - |
| 61904 |
| Install Boulders |
| AQ |
| EA |
| 435. |
| $ - |
| $ - |
| 61906 |
| Fence Relocation |
| AQ |
| LF |
| 450. |
| $ - |
| $ - |
| 63301 |
| Sign Placement |
| AQ |
| EA |
| 46. |
| $ - |
| $ - |
| 63302 |
| Campsite Unit Markers |
| AQ |
| EA |
| 101. |
| $ - |
| $ - |
| 63406 |
| Pavement Markings |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 63606 |
| Electrical Trenching, Conduit, and Wires (includes Relocation of Electrical Pedestal and Installation of Pull Boxes) |
| AQ |
| LF |
| 550. |
| $ - |
| $ - |
| 61201 |
| Sewer Trenching and Line |
| AQ |
| LF |
| 150. |
| $ - |
| $ - |
| 61202 |
| Construct RV Dump Station |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 61501 |
| Construct Concrete Pathway |
| AQ |
| LF |
| 470. |
| $ - |
| $ - |
| 60902 |
| Construct Concrete Mountable Curb |
| AQ |
| LF |
| 680. |
| $ - |
| $ - |
CONTINUED ON PAGE 2
SCHEDULE OF ITEMS
Continued from Page 1
| ITEM NO. |
| DESCRIPTION |
| MEASURE |
| UNIT |
| QUANTITY |
| UNIT PRICE |
| TOTAL PRICE |
Option Item 1 - Lodgepole Loop
| 15101-L |
| Mobilization |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 15701-L |
| Erosion Control BMPs |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 20102-L |
| Clearing and Grubbing |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 20207-L |
| Tree Removal (greater than 6" dbh) |
| AQ |
| EA |
| 125. |
| $ - |
| $ - |
| 20304-L |
| Remove Bollards/Misc Obstructions |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 20402-L |
| Roadway Excavation, Earthwork and Fine Grading, Compaction C, Tolerance B |
| AQ |
| AC |
| .9 |
| $ - |
| $ - |
| 20408-L |
| Campsite Living Area Construction - Double |
| AQ |
| EA |
| 14. |
| $ - |
| $ - |
| 20405-L |
| Infiltration Basin Construction |
| AQ |
| EA |
| 6. |
| $ - |
| $ - |
| 21104-L |
| Roadway Obliteration, Method 1 (includes existing campsite decompaction) |
| AQ |
| AC |
| .6 |
| $ - |
| $ - |
| 30101-L |
| Aggregate Base, CalTrans 3/4" Class 2 |
| AQ |
| TON |
| 1,040. |
| $ - |
| $ - |
| 40301-L |
| Asphalt - CalTrans 1/2" Max Medium 'B' Type |
| AQ |
| TON |
| 630. |
| $ - |
| $ - |
| 61905-L |
| Install Bollards |
| AQ |
| EA |
| 5. |
| $ - |
| $ - |
| 61904-L |
| Install Boulders |
| AQ |
| EA |
| 55. |
| $ - |
| $ - |
| 63301-L |
| Sign Placement |
| AQ |
| EA |
| 3. |
| $ - |
| $ - |
| 63302-L |
| Campsite Unit Markers |
| AQ |
| EA |
| 14. |
| $ - |
| $ - |
| 63406-L |
| Pavement Markings |
| LS |
| LS |
| 1. |
| $ - |
| $ - |
| 60001-2 |
| Option Item 2 - Provide & Install Entrance Station |
| LSQ |
| LS |
| 1. |
| $ - |
| $ - |
| 61501-3 |
| Option Item 3 - Construct Concrete Pathway (Entrance Station) |
| AQ |
| LF |
| 35. |
| $ - |
| $ - |
| 61201-4 |
| Option Item 4 - Badger's Den Sewer Trenching and Line |
| AQ |
| LF |
| 315. |
| $ - |
| $ - |
| 40302-5 |
| Option Item 5 - Pave pedestrian path -Asphalt CalTrans 1/2" Max Medium 'B' Type, includes agg base shoulders |
| AQ |
| LF |
| 987. |
| $ - |
| $ - |
| 30102-6 |
| Option Item 6- Construct Overflow Parking Space |
| AQ |
| EA |
| 5. |
| $ - |
| $ - |
TOTAL BASE ITEMS
TOTAL OPTION ITEMS
| TOTAL ALL ITEMS |
| $ - |
| NOTES: |
| 1. Offeror/bidder must price each item to be considered for award. |
2. Offers/bids for quantities less than those listed may be rejected.
3. If award is made in excess of $30,000, bonds will be required. (See Section I.)
4. If offer/bid exceeds $150,000, a bid bond equal to 20% of the offered total price is required.
5. Following are abbreviation definitions from FP-03, Section 109 that may appear in the "Unit" column of the Schedule of Items; AC=Acre, CQ=Contract Quanitity, CY= Cubic Yard, EA=Each, GAL=Gallon, HR=Hour, LF=Linear Foot, LS=Lump Sum, MI=Mile, LB=Pound, SF=Square Foot, SY=Square yard, ST=Station, TON=Ton. CQ and LS will be measured and paid as stated in FP-03, Section 109-02. All other Units will be paid according to FAR clause 52.211-18, PRICE SUBMITTED BY:
Signature
Phone
Vendor Name
FAX
Address
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Scope of Contract
Camp Richardson Campground Reconstruction includes complete reconstruction of two campgrounds at Camp Richardson Resort near South Lake Tahoe, California. This work includes, but is not limited to: tree removal, clearing and grubbing, fill and excavation, aggregate base placement, asphalt placement, minor utility work, campsite furniture relocation, road barrier placement and culvert installation. Additionally, this project involves the relocation of a bike path, construction of a pedestrian path and the construction of access roads. These items will require traffic control and occur within the right-of-way for California Highway 89. Caltrans will be formally involved with this portion of the work. The work in Eagle’s Nest will include construction of a one-lane roundabout and sewage dump station. The project also includes several optional bid items. These include: construction of an additional campsite loop, installation of a pre-constructed entrance building, alternative for paving the pedestrian path, installation of a sewer lateral for a future restroom and additional aggregate base parking spaces. This project will require coordination with local and state regulatory agencies, as well as, the special-use permittee running operations at Camp Richardson Resort. Coordinating agencies include: the Lahontan Regional Water Quality Control Board, Tahoe Regional Planning Agency, Caltrans, and South Tahoe Public Utility District.
Project Location
From the intersection of Hwy 89 and Lake Tahoe Blvd (Hwy 50) in South Lake Tahoe, CA travel North on Hwy 89 approximately 2.5 miles. Badger’s Den Campground is on the north side of Hwy 89 and Eagle’s Nest Campground is on the south side of Hwy 89. Lat: 38.933260, Lon: -120.036745
NOTE: Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. In no event shall failure to inspect the site constitute grounds for a claim after contract award. (See Section L, 52.236-27, SITE VISIT.)
Price Range The Government's estimate is:
[ X ] $1,000,000 and $5,000,000.
Estimated Start Date June 15th, 2015
Contractor must begin work within 10 days of the effective date of the Notice to Proceed. See Section F for additional information.
Restrictions on Work
1. Work in Badger’s Den Campground (north side of Hwy 89) will be allowed from June 8th, 2015 through October 15th, 2015. Work in Eagle’s Nest Campground (south side of Hwy 89) will be allowed from September, 8th 2015 through June 24th, 2016.
2. In accordance with the fire plan, if included in Section J.
3. When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable damage.
4. See the attached Storm Water Pollution Prevention Plan (SWPPP) section III.B.1 for information on ground disturbance restrictions and the winterization plan.
5. All utility work including: water, sewer, electric and entrance station work including concrete walkway, must be completed before October 15, 2015.
6. Construction activities will be restricted on all federal holidays. Work must be secured on July 3-5, 2015. The job site must be in a condition to allow for heavy public use during that time period.
7. Work will be allowed 7:00 a.m.-7:00 p.m. Monday-Friday.
8. Weekend activities and alternate work hours may be approved by the CO on a case by case basis. A request to work on weekends or alternate hours must be submitted 7 days prior to scheduling to provide adequate time for review.
Worker's Compensation Insurance
The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone is not required to carry the insurance.
Camping and Housing (see also Section H, Camping Permit Compliance)
Camping is not permitted in US Forest Service campgrounds. Contractor [X] will [ ] will not be permitted to camp elsewhere on US Forest Service land. Camping on Forest Service land is not a right; permission may be revoked for failure to comply with the terms of the permit.
Maps
INCLUDED WITH DRAWINGS
Drawings and Specifications
Project Drawings: The following drawings are part of this solicitation:
Drawings for Camp Richardson Campground Reconstruction (47 Sheets) CASQA Standard Specifications:
WM-1
Material Delivery and Storage
WM-2
Material Use
WM-3
Stockpile Management
WM-4
Spill Prevention and Control
WM-5
Solid Waste Management
WM-6
Hazardous Waste Management
WM-8 Concrete Waste Management
WM-9
Sanitary/Septic Waste Management
WM-10 Liquid Waste Management
EC-1
Scheduling
EC-2
Preservation of Existing Vegetation
EC-3
Hydraulic Mulch
EC-8
Wood Mulching
EC-9
Earth Dikes and Drainage Swales
EC-10
Velocity Dissipation Devices
EC-15
Soil Preparation-Roughening
EC-16
Non-Vegetated Stabilization
WE-1
Wind Erosion Control
SE-1
Silt Fence
SE-2
Sediment Basin
SE-5
Fiber Rolls
SE-7
Street Sweeping
TC-1
Stabilized Construction Entrance/Exit
TC-3
Entrance Outlet Tire Wash
NS-1
Water Control and Conservation
NS-3
Paving & Grinding Ops
NS-6
Illicit Connection and Illegal Discharge
NS-7
Potable Water/Irrigation
NS-8
Vehicle and Equipment Cleaning
NS-9
Vehicle Equipment Fueling
NS-10
Vehicle and Equipment Maintenance
NS-12
Concrete Curing
NS-13
Concrete Finishing
Specifications:
[ X ] Construction Standard Institute (CSI) specifications
These specifications are physically incorporated in the solicitation.
[ X ] Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 (US Customary Units) This document is incorporated by reference and is available on the web in either MS Word
(http://www.wfl.fha.dot.gov/design/specs/English/FP03_USCust_final_111403.doc) or Acrobat (http://www.wfl.fha.dot.gov/design/specs/English/FP03_USCust_final_111403.pdf)
It is also available as a wire-bound book that can be purchased from the US Government Printing
Office:
Superintendent of Documents U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: (toll free) 866.512.1800 Fax: 202.512.2250 Mail: Stop SSOP, Washington, DC 20402-0001
Stock Number: 050-001-00341-4 (U.S. Customary)
[ ]1996 road and bridge specifications-- Standard Specifications applicable to this project can be found in Forest Service Specifications for Construction of Roads & Bridges, August 1996 (EM-7720-100), which is incorporated by reference. The publication is available for purchase from the Superintendent of Documents, US Government Printing Office (GPO), Washington, DC 20402 (202-512-1800). The GPO stock number is 001-001-00660-2. It may also be accessed electronically at the following website address: http://www.fs.fed.us/.ftproot/pub/acad [ ] 1985 road and bridge specifications-- Standard Specifications applicable to this project can be found in Forest Service Specifications for Construction of Roads & Bridges, April 1985, which is incorporated by reference. The publication is out of print. Contact the issuing office for copies of relevant specifications.
[ ] Trail specifications-- Standard Specifications applicable to this project can be found in Standard Specifications for Construction and Maintenance of Trails, September 1996 (EM-7720-103), which is incorporated by reference. The publication is available for purchase from the Superintendent of Documents, US Government Printing Office (GPO), Washington, DC 20402 (202-512-1800). The GPO stock number is 001-001-00661-1. It may also be accessed electronically at the following website address: http://www.fs.fed.us/.ftproot/pub/acad Special Project Specifications are physically incorporated within this solicitation, beginning on the next page.
The following Standard and Special Project Specifications are applicable to this contract:
| # |
| Description |
| Date |
CSI Specifications
| 16010 |
| Electrical General Provisions |
| 02-27-2015 |
| 16020 |
| Conductors and Cables |
| 02-27-2015 |
| 16030 |
| Raceways and Boxes |
| 02-27-2015 |
| 16040 |
| Wiring Devices |
| 02-27-2015 |
Supplemental Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03 (US Customary Units)
| 101 |
| Terms, Format, and Definitions |
| 07-25-2005 |
| 102 |
| Bid, Award, and Execution of Contract |
| 02-16-2005 |
| 103 |
| Scope of Work |
| 02-16-2005 |
| 104 |
| Control of Work |
| 02-17-2005 |
| 105 |
| Control of Material |
| 01-18-2007 |
| 106 |
| Acceptance of Work |
| 05-11-2004 |
| 107 |
| Legal Relations and Responsibility to the Public |
| 05-04-2007 |
| 108 |
| Prosecution and Progress |
| 02-16-2005 |
| 109 |
| Measurement and Payment |
| 02-17-2005 |
| 151 |
| Mobilization |
| 05-04-2007 |
| 152 |
| Construction Survey and Staking |
| 08-05-2005 |
| 155 |
| Schedules for Construction Contracts |
| 05-11-2004 |
| 201 |
| Clearing and Grubbing |
| 02-18-2005 |
| 203 |
| Removal of Structures and Obstructions |
| 02-25-2005 |
| 204 |
| Excavation and Embankment |
| 03-26-2009 |
| 211 |
| Roadway Obliteration |
| 02-25-2005 |
| 301 |
| Untreated Aggregate Courses |
| 10-14-2011 |
| 403 |
| Hot Asphalt Concrete Pavement |
| 03-02-2005 |
| 602 |
| Culverts and Drains |
| 09-06-2005 |
| 633 |
| Permanent Traffic Control |
| 03-03-2005 |
| 634 |
| Permanent Pavement Markings |
| 03-03-2005 |
| 718 |
| Traffic Signing and Marking Material |
| 08-05-2009 |
The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996) Inspections Government inspections are for the purpose of satisfying the Government that the supplies and/or services are acceptable and do not relieve the Contractor of the responsibility for maintaining quality control. The Contracting Officer's Representative or designated inspector will conduct all inspections. The Contractor (or designated representative) is encouraged to be present to observe inspections
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, ground disturbing activities shall not start before May 1st, 2015, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than September 15th, 2015. The time stated for completion shall include final cleanup of the premises.
Work Timing
Delays due to normal adverse weather, weekends, and holidays have been included in the calculation of contract time.
The Contractor is encouraged to complete the earthwork and foundations prior to October 15 when all ground disturbing activities must cease until May 1. The construction sites must be winterized with temporary erosion control prior to October 15 or prior to onset of winter conditions (whichever is first).
Winter Shutdown
When winter weather sets in and the continuation of work is impractical, the Contracting Officer may authorize a total suspension until such time as work can proceed. During the period of total suspension, the calendar days elapsed will not be charged against the contract time specified.
SECTION G--CONTRACT ADMINISTRATION DATA
GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
NONE
Invoices
Payment will be made from the contractor’s invoice. All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. There is no pre-award registration.
After award of a contract, please make sure that your company registers promptly at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account. PRIOR to starting the IPP enrollment process, please verify that the point of contact’s (POC’s) email address is up to date in your company’s System for Award Management (SAM) account at www.sam.gov and that any recent update(s) have been allowed time to process resulting in an “Active” status on the SAM account. The one-time enrollment in IPP means a series of emails will be sent to the SAM POC. If you have questions on the IPP enrollment process, the help desk phone number is 1-866-973-3131.
Invoices in IPP are now the official record of payment. The payment certification per FAR 52.232-5 and a breakdown of billing, based on the pricing schedule, must be included as attachments to the IPP invoice. (See next page for invoice certification language.) The contractor must also be up-to-date on certified payrolls for the invoiced timeframe, FAR 52.222-8. For assistance with creating invoices and attachments in IPP, the help desk phone number is 1-866-973-3131.
The Contractor shall submit payrolls weekly for each week in which any contract work is performed. The copies shall be sent to the COR. Payrolls submitted shall set out accurately and completely all of the information listed on the form WH-347 (available for download at www.dol.gov), including the certification verbatim from the WH-347. Forms from other State or County governments are not compliant.Invoices that do not meet these requirements will be rejected.
Payment for Materials off Site
In accordance with Clause 52.232-5, progress payments may include payment for materials stored off site. Contractor shall provide a copy of the paid invoice; provide evidence that the material will be included in the finished project; and identify the location where the materials are stored, so that the government may make visual inspection if the Contracting Officer deems it necessary. The Contractor shall be liable for loss, damage, or destruction of the materials until such time as the materials are physically in the possession and control of the government. The Contractor will not be held liable to the extent that the Contracting Officer determines that the loss, damage, or destruction occurred through the fault or negligence of the government or its agents.
PAYMENT CERTIFICATION
I hereby certify, to the best of my knowledge and belief, that—
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor’s performance.
(Name)
(Title)
(Date)
(Invoiced Timeframe) Payment for Materials Off Site
In accordance with Clause 52.232-5, progress payments may include payment for materials stored off site. Contractor shall provide a copy of the paid invoice; provide evidence that the material will be included in the finished project; and identify the location where the materials are stored, so that the government may make visual inspection if the Contracting Officer deems it necessary. The Contractor shall be liable for loss, damage, or destruction of the materials until such time as the materials are physically in the possession and control of the government. The Contractor will not be held liable to the extent that the Contracting Officer determines that the loss, damage, or destruction occurred through the fault or negligence of the government or its agents.
Incidental Items
The intent of the contract is to provide for the completion of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment of items shown.
Preconstruction Conference
This required conference will be scheduled by the COR. (See also Section I, Clause 52.236-26.)
SECTION H--SPECIAL CONTRACT REQUIREMENTS
Emergencies
Fire Plan [X]See Section J, Fire Plan [ ]Not applicable; however, Contractors are required to comply with State law during fire season.
Area of Responsibility for Fire. Unless otherwise noted elsewhere in the contract, the following define the limits of a contractor's area of responsibility for fire under the terms of the Fire Plan (Section J):
[X](a) Trail Construction - 100 meters on either side of the centerline [X](b) Construction of Structures - 100 meters around the perimeter of the project [X](c) Road Construction - 400 meters on either side of the centerline [ ](d) Special for this project:
Utility Services
NONE
Superintendence by Contractor
In addition to Clause 52.236-6, the following applies: The name and the specific authorities of the foreman or superintendent must be designated in writing to the Contracting Officer. The Contractor may use his/her own prepared letterhead stationery or a "Designation of Contractor's Representative" form available from the Contracting Officer. If the Contractor or the designee is not present when work is being performed on the contract, a Suspend Work Order may be issued with contract time continuing to run. The Contractor shall have a person on-site that is fully conversant in the English language.
Loss, Damage or Destruction
Equipment Furnished with Operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
Other. Even though this contract may provide for performing services at the direction of Government personnel, the contract is not for personal services, and neither the Contractor nor his or her personnel are Government employees. The Government assumes no liability for injury occurring to Contractor personnel or to third parties, or for loss, damage, or destruction involving third parties' property as a result of the Contractor's operation. Except that the Government is liable for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) acting within the scope of their employment.
Camping Permit Compliance
Contractor shall comply with all terms and conditions of any camping permit issued to allow use of premises. Any non-compliance will result in suspension of work until compliance is achieved.
Archaeological and Historic Sites
Location of known archaeological, historic, or pre-historic materials--such as Amerind artifacts and/or historic mining, logging, or fur trapping remains protected by the American Antiquities Act (l6 USC 433)--will be identified for the contractor before work commences.
Spill Plan
If the total oil or oil products storage exceeds 1,320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare and implement a Spill Prevention and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer. The Contractor under the direction of the Contracting Officer, or in the absence of said officer, acting independently, shall immediately take action to contain and clean up, without expense to the Government, all petroleum products spills on or in the vicinity of the project which are caused by the Contractor's employees directly or indirectly as a result of contract operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government for the containment and clean up of petroleum products spills caused by Contractor's employees or resulting from contract operations. The Contractor shall immediately report all petroleum products spills to the Contracting Officer.
Equipment Cleaning
All off-road equipment used on this project shall be washed before moving into the project area so that the equipment is free of soil, seeds, vegetative material, or other debris that could contain or hold seeds of noxious weeds. “Off-road equipment” includes all logging and construction equipment and such brushing equipment as brush hogs, masticators, and chippers; it does not include log trucks, chip vans, service vehicles, water trucks, pickup trucks, and similar vehicles not intended for off-road use.
Equipment will be considered clean when visual inspection does not reveal soil, seeds, plant material, or other such debris. Disassembly of equipment components or specialized inspection equipment is not required. Contractor shall notify the Contracting Officer at least five days in advance of moving equipment in so that arrangements can be made for inspection.
If the project area is known to contain noxious weeds, the equipment shall be cleaned before moving to other Forest Service system lands which do not contain noxious weeds.
Work Limit Items
All construction activity shall be performed during the period between May 1st and Oct 15th.
Any ground disturbing work not completed by Oct 15th shall be winterized. Ground disturbing work may resume on May 1st of the following year. Winterization shall consist of placing wood chips on all disturbed areas at the direction of the COR, aggregate material (if asphalt work is not complete), covering of stockpiles, leaving the site in a safe condition and allowing for use of the site by the Forest Service or its assignees. Winterization shall be at the contractors expense if the work is not completed by October 15th.
Work may continue past Oct 15th if the foundation and any other ground disturbing work have been completed. Materials may only be staged from hardened surfaces such as pavement or concrete. Native soil or vegetated areas may not be used as staging areas. Stockpiles shall be covered during any storm events and after October 15th.
The Contracting Officer and/or Contracting Officers Representative may direct the contractor to install additional Best Management Practices (bmps) not identified in the plans or specifications. The contractor will have 24 hours to install these bmps.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (JUL 2004)
52.203-3 Gratuities (APR 1984)
52.203-5 Covenant Against Contingent Fees (APR 1984)
52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006)
52.203-7 Anti-Kickback Procedures (OCT 2010)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)
52.204-4 Printed or Copied Double- Sided on Recycled Paper (MAY 2011)
52.204-7 System For Award Management (FEB 2012) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010) 52.211-18 Variation in Estimated Quantity (APR 1984)
52.215-2 Audit and Records -- Negotiation (OCT 2010)
52.219-8 Utilization of Small Business Concerns (JAN 2011) 52.219-9 Small Business Subcontracting Plan (JAN 2011) Alternate II (JAN 2011) 52.219-16 Liquidated Damages --Subcontracting Plan (JAN 1999) 52.219-27 Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) 52.222-3 Convict Labor (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (JUL 2005)
52.222-6 Davis-Bacon Act (JUL 2005)
52.222-7 Withholding of Funds (FEB 1988)
52.222-8 Payrolls and Basic Records (JUN 2010) 52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (FEB 1988)
52.222-21 Prohibition of Segregated Facilities (FEB 1999)
52.222-26 Equal Opportunity (MAR 2007)
52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)
52.222-35 Equal Opportunity for Veterans (SEP 2010)
52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010)
52.222-37 Employment Reports on Veterans (SEP 2010)
52.222-50 Combating Trafficking In Persons (FEB 2009)
52.223-1 Biobased Product Certification (DEC 2001)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (DEC 2007)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6 Drug-Free Workplace (MAY 2001)
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-1 Authorization and Consent (DEC 2007)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)
52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)
52.228-2 Additional Bond Security (OCT 1997)
52.228-11 Pledges of Assets (JAN 2012)
52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995)
52.228-14 Irrevocable Letter of Credit (DEC 1999)
52.228-15 Performance and Payment Bonds – Construction (OCT 2010)
52.229-3 Federal, State, and Local Taxes (APR 2003)
52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)
52.232-9 Limitation on Withholding of Payments (APR 1984)
52.232-16 Progress Payments
52.232-17 Interest (OCT 2010)
52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims (JAN 1986)
52.232-27 Prompt Payment for Construction Contracts (OCT 2008)
52.232-33 Payment by Electronic Funds Transfer—Central Contractor Registration (OCT 2003)
52.233-1 Disputes (JUL 2002)--Alternate I (DEC 1991)
52.233-3 Protest After Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by The Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984)
Alternate I (APR 1984)
52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997)
52.236-26 Preconstruction Conference (FEB 1995)
52.242-13 Bankruptcy (JUL 1995)
52.243-4 Changes (JUN 2007)
52.244-6 Subcontracts for Commercial Items (DEC 2010)
52.246-21 Warranty of Construction (MAR 1994) Alternate I (APR 1984)
52.248-3 Value Engineering – Construction (OCT 2010)
52.249-2 Termination for Convenience of the Government (MAY 2004)--Alternate I (SEP 1996)
52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)
452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)
452.236-72 Use of Premises (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76 Samples and Certificates (FEB 1988)
452.236-77 Emergency Response (NOV 1996)
52.211-18 Variation in Estimated Quantity (Apr 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
52.219-14 Limitations on Subcontracting (Nov 2011)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Applicability. This clause applies only to—
(1) Contracts that have been set aside or reserved for small business concerns or 8(a) concerns;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) concerns; and
(3) Orders set aside for small business or 8(a) concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for—
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.
(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
52.222-40 – Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)
(a) During the term of this contract, the Contractor shall post an employee notice, of such size and in such form, and containing such content as prescribed by the Secretary of Labor, in conspicuous places in and about its plants and offices where employees covered by the national Labor Relations Act engage in activities relating to the performance of the contract, including all places where notices to employees are customarily posted both physically and electronically, in the languages employees speak, in accordance with 29 CFR 471.2(d) and (f).
(1) Physical posting of the employee notice shall be in conspicuous places in and about the Contractor’s plants and offices so that the notice is prominent and readily seen by employees who are covered by the National Labor Relations Act and engage in activities related to the performance of the contact.
(2) If the Contractor customarily posts notices to employees electronically, then the Contractor shall also post the required notice electronically by displaying prominently, on any Web site that is maintained by the Contractor and is customarily used for notices to employees about terms and conditions of employment, a link to the Department of Labor’s Web site that contains the full text of the poster. The link to the Department’s Web site, as referenced in (b)(3) of this section, must read, “Important Notice about Employee Rights to Organize and Bargain Collectively with Their Employers.”
(b) This required employee notice, printed by the Department of Labor, may be—
(1) Obtained from the Division of Interpretations and Standards, Office of Labor-Management Standards, U.S. Department of Labor, 200 Constitution Avenue, NW., Room N-5609, Washington, DC 20210, (202) 693-0123, or from any field office of the Office of Labor-Management Standards or Office of Federal Contract Compliance Programs;
(2) Provided by the Federal contracting agency if requested;
(3) Downloaded from the Office of Labor-management Standards Web site at http://www.dol.gov/olms/regs/compliance/EO13496.htm ; or
(4) Reproduced and used as exact duplicate copies of the Department of Labor’s official poster.
(c) The required text of the employee notice referred to in this clause is located at Appendix A, Subpart A, 29 CFR Part 471.
(d) The Contractor shall comply with all provisions of the employee notice and related rules, regulations, and orders of the Secretary of Labor.
(e) In the event that the Contractor does not comply with the requirements set forth in paragraphs (a) through (d) of this clause, this contract may be terminated or suspended in whole or in part, and the Contractor may be suspended or debarred in accordance with 29 CFR 471.14 and subpart 9.4 Such other sanctions or remedies may be imposed as are provided by 29 CFR part 471, which implements Executive Order 13496 or as otherwise provided by law.
(f) Subcontracts.
(1) The Contractor shall include the substance of this clause, including this paragraph (f), in every subcontract that exceeds $10,000 and will be performed wholly or partially in the Unites States, unless exempted by the rules, regulations, or orders of the Secretary of Labor issued pursuant to section 3 of Executive Order 13496 of January 30, 2009, so that such provisions will be binding upon each subcontractor.
(2) The Contractor shall not procure supplies or services in a way designed to avoid the applicability of Executive Order 13496 or this clause.
(3) The Contractor shall take such action with respect to any such subcontract as may be directed by the Secretary of Labor as a means of enforcing such provisions, including the imposition of sanctions for noncompliance.
(4) However, if the Contractor becomes involved in litigation with a subcontractor, or is threatened with such involvement, as a result of such direction, the Contractor ma request the United States, through the Secretary of Labor, to enter into such litigation to protect the interests of the United States.
(End of clause) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (September 2013).
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA) designated items unless
(1) The product cannot be acquired
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than
(i) October 31 of each year during contract performance.
FAR 52.225-9 Buy American Act—Construction Materials (SEP 2010)
(a) Definitions. As used in this clause- "Component" means an article, material, or supply incorporated directly into a construction material.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Cost of components" means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
"Domestic construction material" means-
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States, if the cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.
"Foreign construction material" means a construction material other than a domestic construction material.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to the construction material or components listed by the Government as follows:
__NONE______________________________________
[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.