South_Lake_Parking_Drawing_Admendment_1.pdf

PDF 1 MB Posted

Attached to
South Lake Trailhead Parking
Solicitation number
AG-9JGP-S-15-0045
Issued by

About this file

Amendment one revised drawings

View the file

Other files

File Type Posted
Site_visit_notes_and_attendees.docx DOCX document
Amendment_one_South_Lake_Parking.docx DOCX document
Bid_Bond_SF_24-98.pdf PDF
General_Decision_Number_CA31.pdf PDF
SOUTH_LAKE_Project_Special_Specification.pdf PDF
DRAWINGS.pdf PDF
Best_Management_Practices.pdf PDF
South_Lake_Parking_Solicitation.rtf RTF text file
Fire_Plan_Aug_2012.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET OF

SCALE:

DRAWING

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT NO:

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

S. REESE

T.SCHOLTEN

S. REESE

12/2014

S U

M M

A R

Y

O

F

Q

U A

N T

I T

I E

S

B 1.0

1" = 75'

2 9

SUMMARY OF QUANTITIES

ITEM NO. ITEM DESCRIPTION UNIT

GRADING &

SURFACING

SUMMARY

TABULATION OF

QUANTITIES LUMP SUM

ESTIMATED

QUANTITIES

BID

REMARKS AND/OR DETERMINATION OF

ESTIMATED QUANTITY

15101 MOBILIZATION LS ALL ALL

15701 EROSION CONTROL LS ALL ALL

20101 CLEARING AND GRUBBING LS ALL ALL

Deleted as part of Amendment 1

20401

ROADWAY EXCAVATION, COMPACTION, METHOD

A, FINISHING TOLERANCE C, PARKING LOT 3

CY 140 140

20402

SUB-EXCAVATION AND DISPOSAL OF EXCESS

MATERIAL, PARKING LOT 1, 2, AND 3

CY 537 537

30101

AGGREGATE BASE, GRADE D, COMPACTION

METHOD F, FINISHING TOLERANCE C

CY 880 880

30301

ROAD RECONDITIONING, PULVERIZE, SCARIFY

6-INCH DEPTH, PARKING LOT 3

SY

2,611 2,611

40401

MINOR HOT ASPHALT CONCRETE, 3-INCH DEPTH

TON 887 887

41001

SLURRY SEAL, TYPE I

SY

2,288 2,288

41401 CRACK AND JOINT SEALING LS ALL

60501

GEOTEXTILE MATERIAL, TYPE 1-A

SY

4,628 4,628

60901

ASPHALT CONCRETE CURBING, 5" DEPTH

LF 728 728

Removed Island curbing in parking lot 3 as part of

Amendment 1

60902 REMOVE AND RESET WHEEL STOPS EA 13 13

60909 PRECAST CONCRETE WHEEL STOPS EA 12 12

63301

INSTALL PARKING SIGNS (DAY USE)

EA 3 3

63302 INSTALL ACCESSIBLE SIGNS EA 4 4

63401

PAVEMENT MARKING: ACCESS AISLE FOR

ACCESSIBLE PARKING SPACES, WHITE

EA 2 2

63402

PAVEMENT MARKINGS: SYMBOLS FOR

ACCESSIBLE PARKING STALL, BLUE AND WHITE

EA 4 4

63403

PAVEMENT MARKING: PARKING STALL STRIPING,

WHITE

LF

1,899 1,899

62501

SEEDING (OPTION ITEM)

LS ALL ALL

62502

RE-VEGETATION: BUCKET PLANTS

(OPTION ITEM)

EA 65 65

DRAWING

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT NO:

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

S. REESE

T.SCHOLTEN

S. REESE

12/2014

LEGEND

"PK" NAIL WITH SHINER FOUND THIS SURVEY, SET IN

GRANITE OUTCROP

WOODEN SIGN

GRANITE ROCK OR BARRIER ROCK

RESURFACING AREA: PULVERIZE EXISTING PAVEMENT

AND AGGREGATE BASE MATERIALS, RETAIN FOR USE

EXISTING PINE TREE AND DIAMETER IN INCHES

EDGE OF TREES

CONCRETE WHEEL STOPS

ROLLED AC CURB

CONCRETE CURB

NOTES

1. RELOCATE DUMPSTER TO PROPOSED

LOCATION SHOWN

2. REMOVE ALL CURBING LOCATED IN PROPOSED

RESURFACING AREAS

3. PROTECT IN PLACE ALL STRUCTURES UNLESS

NOTED, INCLUDING RECYCLING AND BEAR BOXES

4. TREES LOCATED IN GRUB AREA SHALL BE

REMOVED BY OTHERS

5. THERE SHALL BE NO GROUND DISTURBANCE

BEYOND THE EXISTING DISTURBANCE LIMITS

D E

M O

L I T

I O

N

P

L A

N

D 1.0

1" = 75'

3 9

Grubbing removed from contract

DRAWING

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT NO:

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

S. REESE

T.SCHOLTEN

S. REESE

12/2014

GENERAL NOTES

- STAGING AREA MUST BE WITHIN PROJECT AREA. UPON COMPLETION OF THE PROJECT, THE

STAGING AREA FOR CONSTRUCTION MATERIALS SHALL BE SWEPT CLEAN OF ANY AND ALL

AGGREGATE AND ASPHALT.

- THE PRIMARY WATER SOURCE IS LOCATED AT THE INLET OF THE CULVERT LOCATED ACROSS

FROM PARCHER'S RESORT, APPROXIMATELY 1 MILE FROM THE PROJECT AREA. WATER SOURCES

SHALL COMPLY WITH SECTIONS 170, 725 AND BEST MANAGEMENT PRACTICES. WATERING IS

INCIDENTAL TO SECTION 404, NO ADDITIONAL PAYMENT SHALL BE OFFERED.

- THE PROJECT AREA SHALL BE CLOSED TO THE PUBLIC FOR THE DURATION OF THE CONTRACT.

TRAFFIC CONTROL SIGNS SHALL BE POSTED AT ALL APPROACHES TO THE PROJECT WORK AREAS TO INDICATE CLOSURES TO PUBLIC TRAVEL AND ACCESS. THERE SHALL BE NO SEPARATE PAY ITEM

FOR TRAFFIC CONTROL AND SIGNAGE.

- COR TO STAKE REVEGETATION AREA. SEE SECTION 062500

- STOCKPILING IS INCIDENTAL TO ITEM 20400, EXCAVATION AND EMBANKMENT

- RESURFACE AND REGRADE AREA (PARKING LOT 3): CONTRACTOR SHALL PULVERIZE EXISTING

PAVEMENT AND AGGREGATE AND RETAIN FOR REUSE. EXCAVATE SUBGRADE AS REQUIRED TO

MEET NEW GRADING PLAN. REPLACE PULVERIZED MATERIAL WITH NEW AGGREGATE BASE AS

REQUIRED TO OBTAIN 6- INCH DEPTH.

-RESURFACE AREA (PARKING LOTS 1 & 2): CONTRACTOR SHALL REMOVE EXISTING PAVEMENT AND

AGGREGATE. EXCAVATE SUBGRADE AS REQUIRED TO MAINTAIN EXISTING TOP OF ASPHALT

ELEVATIONS WITH NEW 9- INCH SECTION. ADD NEW 6" AGGREGATE BASE. HAULING OF MATERIALS

ARE INCIDENTAL TO LINE ITEM 20401

LEGEND

"PK" NAIL WITH SHINER FOUND THIS SURVEY, SET

IN GRANITE OUTCROP

WOODEN SIGN

GRANITE ROCK OR BARRIER ROCK

RESURFACE AND REGRADE

RESURFACE

CRACK SEAL AND SLURRY SEAL

EXISTING PINE TREE AND DIAMETER IN INCHES

EDGE OF TREES

CONCRETE WHEEL STOPS

NEW AC CURB

EDGE OF PAVEMENT

NOTES

1. RELOCATE DUMPSTER TO PROPOSED

LOCATION SHOWN

2. PROTECT IN PLACE ALL STRUCTURES

UNLESS NOTED, INCLUDING RECYCLING

AND BEAR BOXES.

S I T

E

P

L A

N

C 1.0

1" = 75'

4 9

Island curbing in parking lot 3 removed Revised Water Source

DRAWING

DATE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT NO:

PACIFIC

REGION

SOUTHWEST

R5

NO. DATE REVISIONS

SERVICE

U S D A

FOREST

S. REESE

T.SCHOLTEN

S. REESE

12/2014

LEGEND

"PK" NAIL WITH SHINER FOUND THIS

SURVEY, SET IN GRANITE OUTCROP

WOODEN SIGN

GRANITE ROCK OR BARRIER ROCK

EDGE OF TREES

ROLLED AC CURB

EDGE OF PAVEMENT

NOTES

1. STRIPE PARKING LOT PER CURRENT

MUTCD SEE SHEET C5.0 FOR DETAILS

2. INSTALL 72" REINFORCED CONCRETE

WHEEL STOPS. PIN TO SURFACE.

3. INSTALL SIGNS PER PLAN. SEE SHEET C5.0

FOR DETAILS

S T

R I P

I N

G

S

I G

N A

G E

P

L A

N

6 9

1" = 40'

C 3.0

PARKING

ONLY

VAN

ACCESSIBLE

SIGN SCHEDULE

PARKING

ONLY

A

B

C

DAY USE AREA

PARKING

File details come from the government source that posted it. Updated .