Amendment_one_South_Lake_Parking.docx

DOCX document 33 KB Posted

Attached to
South Lake Trailhead Parking
Solicitation number
AG-9JGP-S-15-0045
Issued by

About this file

Amendment 1 South Lake Parking with revised Schedule of Items

View the file

Other files

File Type Posted
Site_visit_notes_and_attendees.docx DOCX document
South_Lake_Parking_Drawing_Admendment_1.pdf PDF
Bid_Bond_SF_24-98.pdf PDF
General_Decision_Number_CA31.pdf PDF
SOUTH_LAKE_Project_Special_Specification.pdf PDF
DRAWINGS.pdf PDF
Best_Management_Practices.pdf PDF
South_Lake_Parking_Solicitation.rtf RTF text file
Fire_Plan_Aug_2012.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
Amendment 1 (one)
May 1, 2015
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA Forest Service Central California Acquisitions 631 Coyote Street Nevada City, CA 95959 Same

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.
|X|
AG-9A63-S-15-0045

9B. DATED (SEE ITEM 11)

4/15/2015

|_|
10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

|X| The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers |_| is extended, |X| is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning __1___ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

|_|
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
|_|
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
|_|
D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor |_| is not, |_| is required to sign this document and return ________ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

South Lake Trailhead Paving

1. Revised quantity for Item 60901, Asphalt Curbing, See Schedule attached.

2. Primary Water source changed to creek across from Parcher’s Resort, approx one mile away.

3. Deleted Item 20101, Clearing and Grubbing, no longer necessary.

4. Included in this amendment, revised drawings, sheets B 1.0, D 1.0, C 1.0, C 3.0

5. Site visit notes and attendees are attached.

6. Submit Amendment One Schedule of Items with offer.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
DONALD TINSLEY, CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
/s/ Donald Tinsley
May 1, 2015

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

PART I - SCHEDULE OF ITEMS

SECTION B - Supplies or Services and Prices/Costs Schedule of Items

SOUTH LAKE TRAIL HEAD PARKING RESURFACING

WHITE MOUNTAIN RANGER DISTRICT

INYO NATIONAL FOREST

INYO COUNTY, CALIFORNIA

B- 1 - SCHEDULE OF ITEMS

ITEM NO.
DESCRIPTION
METHOD OF MEASUREMENT
PAY UNIT
EST. QTY.
UNIT PRICE
TOTAL PRICE
15101
Mobilization
LSQ
LS
-
15701
Erosion Control
LSQ
LS
-
20101
Clearing and Grubbing (Deleted by Amendment 1)
Not Priced
20401
Roadway Excavation, Compaction Method A, Finishing Tolerance C, Parking Lot 3
DQ
CY
140
$ _________
$ _________
20402
Sub-Excavation and Disposal of Excess material, Parking Lot 1 , 2, and 3
DQ
CY
$ _________
$ _________
30101
Aggregate Base, Grade D, Compaction Method F, Finishing Tolerance C
DQ
CY
880
$ _________
$ _________
30301
Road Reconditioning, Pulverize, Scarify 6-inch depth, Parking Lot 3
DQ
SY
2,611
$ _________
$ _________
40401
Minor Hot Asphalt Concrete, 3-inch depth
DQ
TON
887
$ _________
$ _________
41001
Slurry Seal, Type I
AQ
SY
2,288
$ _________
$ _________
41401
Crack and Joint Sealing
LSQ
LS
All
60501
Geotextile Material, Type 1-A
AQ
SY
4,628
$ _________
$ _________
60901
Asphalt Concrete Curbing, 5” depth

Revised Amendment One

DQ
LF
728
$ _________
$ _________
60902
Remove and Reset Wheel stops
AQ
EA
13
$ _________
$ _________
60909
Precast Concrete Wheel stops
AQ
EA
12
$ _________
$ _________
63301
Install Parking Signs (Day Use)
AQ
EA
3
$ _________
$ _________
63302
Install Accessible Signs
AQ
EA
4
$ _________
$ _________
63401
Pavement Marking: Access Aisle for Accessible Parking Stall, White
AQ
EA
2
$ _________
$ _________
63402
Pavement Marking: Symbols for Accessible Parking Stalls, Blue and White
AQ
EA
4
$ _________
$ _________
63403
Pavement Marking: Parking Stall Striping, White
DQ
LF
1,899
$ _________
$ _________

TOTAL BASE BID $___________

OPTION ITEM:

ITEM NO.
DESCRIPTION
METHOD OF MEASUREMENT
PAY UNIT
EST. QTY.
UNIT PRICE
TOTAL PRICE
62501
Seeding
LSQ
LS
All
62502
Re-vegetation: Bucket Plants
AQ
EA
65
$__________
$__________

TOTAL OPTION BID $___________

B.2 Option for Increased Quantity—Separately Priced Line Item (FAR 52.217-7) (Mar 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 day from award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

B.3 Note Regarding Bond Premiums

Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted