Corrections to Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-9AC7-S-15-0102_QA_1.pdf | ||
| AG-9AC7-S-15-0102_-_CORRECTED.pdf | ||
| AG-9AC7-S-15-0102.pdf | ||
| WD_CA150017_1-2-15_CA17.pdf | ||
| Drawings.pdf | ||
| AG-9AC7-S-15-0102.pdf | ||
| Special_Project_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Corrections to Drawings: Soda Creek Generator Wiring AG-9AC7-S-15-0086 Page 1 of 1
Corrections to Drawings
1. On sheet 3/5, upper right corner, Sheet General Notes- Transfer Switch and Distribution Panel will not be Government Furnished.
2. On sheet 3/5, upper right corner, add the following note:
The Fire Barracks will be occupied beginning May 3rd.
3. On sheet 3/5, right middle, Keynotes-
Concrete generator pad is already in place. Gas supply riser will not be brought up through the pad in a sleeve.
3. On sheet 4/5, upper left corner, Detail 1- 6” base course compacted to 95% max. density.
5. On sheet 4/5, upper right corner, Detail 7- Add note to say: Ground rod should provide maximum 25 Ohm resistance.
6. On sheet 4/5, lower right corner, Detail 9- Couplings shown are to be steel couplings.
Note:
Fire personnel will be moving into the Fire Barracks on May 3rd. The generator is the only source of power to the compound. Ensure that all the work to prep for the generator connection is done prior to disconnecting the old generator and connecting the new generator.