Corrections_to_Drawings.pdf

PDF 50 KB Posted

Attached to
Soda Creek Generator Wiring
Solicitation number
AG-9AC7-S-15-0102
Issued by

About this file

Corrections to Drawings

View the file

Other files

File Type Posted
AG-9AC7-S-15-0102_QA_1.pdf PDF
AG-9AC7-S-15-0102_-_CORRECTED.pdf PDF
AG-9AC7-S-15-0102.pdf PDF
WD_CA150017_1-2-15_CA17.pdf PDF
Drawings.pdf PDF
AG-9AC7-S-15-0102.pdf PDF
Special_Project_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Corrections to Drawings: Soda Creek Generator Wiring AG-9AC7-S-15-0086 Page 1 of 1

Corrections to Drawings

1. On sheet 3/5, upper right corner, Sheet General Notes- Transfer Switch and Distribution Panel will not be Government Furnished.

2. On sheet 3/5, upper right corner, add the following note:

The Fire Barracks will be occupied beginning May 3rd.

3. On sheet 3/5, right middle, Keynotes-

Concrete generator pad is already in place. Gas supply riser will not be brought up through the pad in a sleeve.

3. On sheet 4/5, upper left corner, Detail 1- 6” base course compacted to 95% max. density.

5. On sheet 4/5, upper right corner, Detail 7- Add note to say: Ground rod should provide maximum 25 Ohm resistance.

6. On sheet 4/5, lower right corner, Detail 9- Couplings shown are to be steel couplings.

Note:

Fire personnel will be moving into the Fire Barracks on May 3rd. The generator is the only source of power to the compound. Ensure that all the work to prep for the generator connection is done prior to disconnecting the old generator and connecting the new generator.